3A PACKAGE
DELIVERY NOTE
RAYMOND INTERNATIONAL CO.LTD.(KSA BRANCH)
PROJECT No.: RI/ FMSCO/MA'ADEN_RI-16125 & 16068
DATE: 31-OCT-16
SL.
SPO
SP 02
SP- 06
SP-OL
sP-03
SP-05
SP-o1
sp-02
SPs
SP-09
SP-oL
sP-03
SP OF
SP-06
sP-10
sP-12
Sr
spud
SP-15
SP- 05
sP-07
SP-a1
SP-03
SP-05
SP-07
‘SP-os
SP-O1
'sP-05
‘P-07
AL TALLY,
ty
SPOOL No.
DESCRIPTION
1aXI0"G ECC REDUCER ROTH W.N. FLG
10X3" RED TEE W ALL END W.NFLG
10'0 45°ELBOW W/ BOTH END W.NTLG
270 90°FLBOW W/ BOTH ENDW.N.FLG
2°0 90"ELBOW W/ BOTH ENDWANFLG
20 90" ELBOW W/ BOTH END W.N.FLG
HIXU'@ ECC REDUCER BOTH WN. FLG
UXPOKED TEE W ALL END WNJLG
10X2"G RED TEF W ALL ENDWNTLG
10°0 FIVE SPOOL W/ BOTH END W.NILG
10'0 90° ELBOW W/ BOTH END W.N-FLG
WO PIPE SPOOL W/ BOTH END WN.FLG
WO IPE SPOOL W/BOTH END W.NELG
10%0 FIPE SPOOL W/ BOTH END W.N.FLG
10°0 90° ELBOW W/ BOTH END W.NILG
10°9 PIPE SPOOL W/ BOTH END W.NFLG
'G PIPE SPOOL W/ ROTH END W.NFLG
FO PIPE SPOOL W/ BOTH END W.NILG
PIPE SPOOL W/ BOTH FNDWA.FLG
PIPE SPOOL W/ BOTH END W.NFLG
PIPE SPOOL W/ BOTH END W.NFLG
PO PIPE SPOOL W/ BOTH END WNTLG
10'@ 45° ELBOW Wy ROTH END W.NELG
10 469° ELBOW W/ BOIL END WNJLG
10° PIPE SPOOL W/ BOTH END W.N.FLG-
10°0 PIPE SPOOL W/ BOTH END W.NFLG
W'OPIPE SPOOL W/ ROTH END WNFLG
MW" PIPE SPOOL W/ BOTH END W.NLG
AO PIPE SPOOL W/BOTHE
10°O PIPE SPOOL W/ BOTHT END WNFLG
10°9 PIPE SFOOL W/ BOTH END WNELG
10"6 90°FLBOW W/ BOTH END W.N.FLG_
WO PIFE SPOOL W/ BOTH ENDWNFLG
"0 90"ELBOW W/ BOTH END W.NFLG
40° PIPE SPOT W/ BOTH END W.NFLG
270 90° ELBOW W/ BOTH END W.NFLG
1OW W/BOTH END W.
OWW/ ROTH END W.
LENGTH
EMARKS
a REMARK:
1195
2858
3500
3500
628
3500
3500
5500
B76
3700
3300
2483Raymond Saudi Arabia Ltd.
Ed Raymond Eastem Province Complex (REPC) - Tally Department
Lele, EP1SC2 Material Delivery Inspection Report
RYN :7606L8 client AMLEW. Ctent PO vate: Z/OF4A6
P.O.QUANTITY Quantity orpeuiveny + ASAT
scoreor work : 27D Linen REPORT NO. :_ Of}
t
Material supplied by
Trucker Name Ins
Released and Inspected By, ‘Truck Plate No, 36 BF?
gd Signatur
le FROOTTRTOTRRaymond Saudi Arabia Ltd.
Raymond Easter Province Complex (REPC) - Tally Department
Gl2s EPIC CO Material Delivery Inspection Report
RvYNG: (6062 cite: AVGA PEA cientPoe vate: Bl-OQ-l 6
(eo.quanmmy QuantiryorEtverY :_ Pee Pel
REPORT NO. :_ al
SCOPE OF WORK
Material Asleased w
‘Trucker Name
Released and inspected By Truck Plato No.
I. Be ‘Signature
FOCI Rar OTA,
ois>>>HONTS>da301NA>>HONIS>doOuyS
1>>>>>>>>>>>1IN 7810104 LW9BL9028
9ysz90.s286 beeetekye1y/oauvit
: “ii ian
Rugeiaran
So
° Bethea ae
i
|
| Spee
Se ae
oResuasisocie: Sere *
| Fees
}OSE 3VTR04 S
ATO Fo}
LNDIA
23371101
PKINDE