1
1/19/2016
5.1
5.1.1
) ( )
) ( )
) ( )
( )
2
1/19/2016
5.2
5.2.1
) (
)
)
)
5.2.2, 5.2.3
5.2.2
( )
-
-
-
3
1/19/2016
A B A
B
A A
A B
B A
B
A E C
A
D B
Figure 1. Distribution of observed lightning damages Table 1: Location and revised percentage of occurrence
On flat-roofed buildings with rectangular corners. of lightning damages. (Refer to Figures 1 and 2
A LightningDamageLocation %ofoccurrence
(A)ProtrudingCorners >90
B
(B)Horizontal/SlantingEdges <5
B B (C)VerticalEdges <2
A
(D)FlatSurfaces(nearA) <1
B B
A (E)Intrudingcorners,otherlocations 0
A
4
1/19/2016
WIWATKULWONGWIT
5
1/19/2016
6
1/19/2016
7
1/19/2016
5.1
8
1/19/2016
5.1
9
1/19/2016
.1
20
10
1/19/2016
22
11
1/19/2016
r
1
2
h1
h2
H
r = h2 tan 2
23
r = h2 tan
24
12
1/19/2016
r
r
r
h > 60 .
h < 60 .
r 0.8 h
r 1. r ( 5.1)
2. H = h
25
.6
.5.2
.5.2.1
5.1
26
13
1/19/2016
-
-
-
27
14
1/19/2016
h1 h1
2
h2
H
30
15
1/19/2016
31
32
16
1/19/2016
33
34
17
1/19/2016
1 1
3
2
2
1.
2.
3.
5.1
1 1
3
2
1
2
3
5.1 36
18
1/19/2016
37
19
1/19/2016
d1
39
d1
40
20
1/19/2016
4
B
B
ht
r
r 1
h
1 h
C
C
O
2
41
h
1
D
1 90
Key
1 protected volume
2 reference plane
3 air-termination rod D
h relevant heights of air-
termination according to
Table 2
Protection angle
D, D limit of the protected area
21
1/19/2016
.5.2.2.2
5.1
r
/
r ( 5.1)
.18 .19 r
44
22
1/19/2016
23
1/19/2016
I II
IV
III
24
1/19/2016
-
-
-
49
R
KA ()
1 2.9 20
2 5.4 30
3 10.1 45
4 15.7 60
50
25
1/19/2016
1 1
r
r
2 r
r
r
r r
51
1
2 1
26
1/19/2016
r
1 1
ht = h
2
3
27
1/19/2016
21
100
30
21
100
30
28
1/19/2016
60
21
100
60
.5.2.2.3
)
-
-
- 1/10
-
60 80 %
) 5.1
)
2
( 5.3)
)
58
29
1/19/2016
flat-topped roof M
C.
Wa
ge
ne
r
gable roof
M
C.
Wa
ge
ne
r
30
1/19/2016
31
1/19/2016
63
5.1
32
1/19/2016
.5.2.4.2
.1
33
1/19/2016
34
1/19/2016
35
1/19/2016
1
2
3
4 3
5 4
6
7
8
9
10
11
5.3
60
36
1/19/2016
1
2
3
4 3
5 4
6
( .4.3.3 4.3.6)
7
8
9
10 3
4.3
37
1/19/2016
76
38
1/19/2016
.5.2.4.2.5
39
1/19/2016
40
1/19/2016
.5.2.4.2.6
( .32)
Key
s 1.metallicmast
1 2.isolator
2
3
3.airterminationrod
4.airterminationconductor
4
5.bondingconductor
8 6.antennacable
6 6 5 7.testjoint
8.equipotential bondingbar
9.foundationearthelectrode
radiusoftherollingsphere,seeTable2
sseparationdistance
L llengthtobeconsideredforseparation
7 7 distance
calculation
SPD
Type1
MDB PCB
9
SPD
Type2
MDBmaindistributionbox
8
PCBpowerconnectionbox
41
1/19/2016
Key
1 1.metallicmast
2.horizontalairterminationconductorontheridgeofthe
roof
1
3.jointbetweentheroofdownconductorandthe
metallic
antennamast
4.antennacable
2 5.themainbondingbar,metallicshieldontheantenna
3 cableisconnectedtothe
bondingbar
6.testjoint
7.TV
8.parallelroutingoftheantennacableandtheelectric
1 4 powercable
9.electricpowercable
10.earthterminationsystem
11.themainelectricpowerdistributionboxwithSPD
12.foundationearthelectrode
7 13.LPSconductor
1 protectionangle
5 8 3 llengthtoconsideredforseparationdistance
calculation
8
NOTEForsmallstructuresonlytwodownconductorsmaybe
6 1 sufficient,accordingto5.3.3
1
9 1 1
0 2 E.32.bTVantennausingthemastasanairterminationrod
.5.2.4.2.7
5.2.5 5.2
( .33)
42
1/19/2016
Key
1 1.rollingsphere
r 2.airterminationrod
3.electricequipment
4.downconductor
5.metallicvessel
rradiusoftherollingsphere,
seeTable2
2 2 sseparationdistance
3 3
s 5 s accordingto6.3
4 4
5.2.5
5.1.3
)
- (
(Brazing)
)
-
t 5.2
43
1/19/2016
44
1/19/2016
.5.2.6
6.3
89
6.3
90
45
1/19/2016
5.2.3
60
2-3
(
20
( )
)
120 120
46
1/19/2016
.5.2.3
120 20
(
)
47
1/19/2016
Myth TheFact
Lightningonlystrikesthe Weakerlightningmaydischarge
highestpoint atlowerstructures
48
1/19/2016
97
49