You are on page 1of 44

COMMUNICATION

AND VISIBILITY MANUAL


for European Union
External Actions
2 010

EuropeAid
European Commission

EuropeAid Cooperation Office

Rue de la Loi 41, B-1049 Bruxelles


Fax: 32-2 299 64 07
E-mail: europeaid-info@ec.europa.eu

Internet
http://ec.europa.eu/world
http://ec.europa.eu/europeaid

This brochure is available in French, English and Spanish.

Neither the European Commission nor any person acting on behalf of the

Commission is responsible for use which might be made of the following information.

Design: Tipik Communication Agency

European Union, 2010

Reproduction is authorised provided the source is acknowledged.


TABLE OF CONTENTS

1 INTRODUCTION ............................................................................................................................ 5

2 COMMUNICATION AND VISIBILITY: A STEP BY STEP GUIDE . ................................................ 7


2.1 Appropriate Visibility .............................................................................................................. 7
2.2 Key Audiences and Target Groups ........................................................................................ 7
2.3 Communication and Visibility Plans ...................................................................................... 7
2.3.1 Communication and Visibility Plan Template ..................................................................... 7
2.3.2 Communication Budget ................................................................................................... 9
2.3.3 Drafting and Implementing the Plan . ................................................................................ 9
2.3.4 Reporting ......................................................................................................................... 9

3 INTERNATIONAL ORGANISATIONS .......................................................................................... 11


3.1 Introduction ........................................................................................................................... 11
3.2 United Nations Agencies, Funds and Programmes and
assimilated entities (UN AFPs).............................................................................................. 11
3.2.1 Background and Existing Framework of Cooperation ..................................................... 11
3.2.2 Operational Criteria Applicable to the Visibility and Communication
Actions Undertaken by the United Nations and the European Commission . .................. 11
3.2.3 Communication and Visibility Actions ............................................................................. 12
3.3 The World Bank Group ......................................................................................................... 12
3.3.1 Background and Existing Framework of Cooperation ..................................................... 12
3.3.2 Financing Instruments and Roles ................................................................................... 13
3.3.3 Appropriate Communication and Visibility Activities . ...................................................... 13

4 ADJUSTING THE COMMUNICATION AND VISIBILITY PLAN TO THE ACTION ...................... 17


4.1 Basics .................................................................................................................................... 17
4.2 Other Communication Activities .......................................................................................... 17
4.2.1 Press releases ................................................................................................................ 18
4.2.2 Press Conferences . ....................................................................................................... 18
4.2.3 Press Visits . ................................................................................................................... 18
4.2.4 Leaflets, Brochures and Newsletters .............................................................................. 18
4.2.5 Websites ........................................................................................................................ 19
4.2.6 Display Panels ................................................................................................................ 20
4.2.7 Commemorative Plaques ............................................................................................... 20
4.2.8 Banners ......................................................................................................................... 20
4.2.9 Vehicles, Supplies and Equipment . ................................................................................ 20
4.2.10 Promotional Items ......................................................................................................... 20
4.2.11 Photographs ................................................................................................................. 21
4.2.12 Audiovisual Productions . .............................................................................................. 22
4.2.13 Public Events and Visits ................................................................................................ 22
4.2.14 Information Campaigns ................................................................................................. 22
4.3 Visibility for Specific Types of Action .................................................................................. 23
4.3.1 Provision of Supplies and Equipment . ............................................................................ 23
4.3.2 Infrastructure-related Actions ......................................................................................... 23
4.3.3 Technical Assistance Actions and Studies . .................................................................... 23
4.3.4 Grants ............................................................................................................................ 23
4.3.5 Budget Support ............................................................................................................. 23

5 REPORTING ................................................................................................................................ 25

6 FURTHER INFORMATION .......................................................................................................... 27

ANNEX 1  THE COMMUNICATION MATRIX: HOW AND WHEN TO


COMMUNICATE WHAT TO WHOM? .......................................................................................... 29

ANNEX 2 EU VISUAL IDENTITY ELEMENTS ............................................................................................. 31


1 The EU Flag ............................................................................................................................ 31
2 Geometrical Description . ........................................................................................................ 31
3 Colours ................................................................................................................................... 31
4 Backgrounds .......................................................................................................................... 31
5 Alterations and Additions ........................................................................................................ 32
6 Disclaimer ............................................................................................................................... 32
7 Internet Links .......................................................................................................................... 32
8 EU Visibility after Completion of the Action .............................................................................. 32

ANNEX 3 TEMPLATES FOR COMMUNICATION PRODUCTS .................................................................. 33


1 Press Releases ....................................................................................................................... 33
2 Leaflets ................................................................................................................................... 34
3 Brochures ............................................................................................................................... 35
4 Newsletters ............................................................................................................................. 36
5 Display Panels.......................................................................................................................... 37
6 Banners .................................................................................................................................. 37
7 Commemorative Plaques ........................................................................................................ 38
8 Vehicle Panels ........................................................................................................................ 38
9 Promotional Items ................................................................................................................... 40

ANNEX 4 Definitions & GENERAL STATEMENTS ................................................................................. 41


1 General Statements..................................................................................................................41
2 Definitions of the European Union and its Institutions ...............................................................41
European Union .......................................................................................................................41
European Parliament . ..............................................................................................................41
Council of the European Union . .............................................................................................. 42
European Commission . .......................................................................................................... 42
European Court of Justice ...................................................................................................... 42
European Court of Auditors . ................................................................................................... 42
Other institutions ..................................................................................................................... 42
1 INTRODUCTION page 5
A C T I O N S
E X T E R N A L
U N I O N

T
his manual has been designed to permit, to develop a communication and
ensure that actions that are wholly visibility plan that will highlight in a dynamic
E U R O P E A N

or partially funded by the European way the impact of the EU support. This
Union (EU) incorporate information and may require the engagement of outside
communication activities designed to raise expertise.
the awareness of specific or general audi-
Furthermore, it should be clear that the
ences of the reasons for the action and the
terminology used in this manual does not
F O R

EU support for the action in the country or


refer to Communication for Development
region concerned, as well as the results
(which can be defined as being a social
M A N U A L

and the impact of this support.


process based on dialogue using a broad
The manual mainly covers the written and range of tools and methods. It is also about
visual identity of the EU. It sets out require- seeking change at different levels including
ments and guidelines for briefings, written listening, building trust, sharing knowledge
V I S I B I L I T Y

material, press conferences, presenta- and skills, building policies, debating and
tions, invitations, signs, commemorative learning for sustained and meaningful
plaques and all other tools used to highlight change. It is not public relations or cor-
EU participation. In addition, it offers tools porate communication.2) These elements
designed to enable the development of should certainly be taken into account,
A N D

a dynamic communication strategy that and may be financed from the projects
will highlight the achievements of EU communication and visibility budget, but
C O M M U N I C A T I O N

support. fall outside the scope of this manual.3

This manual contains compulsory require- All communication and visibility activities
ments for all contractors and implementing should be carried out in close cooperation
partners under contracts and financing with the appropriate Delegation of the
agreements which specifically refer to European Union or the relevant department
them, whether signed by the European of the European Commission.
Commission or by any other Contracting
This manual replaces the EU Visibility
Authority. In all other cases the manual is
Guidelines for External Actions (September
only designed to provide guidance, unless
2005).
otherwise stated. In all cases the provisions
of specific contracts, financing agreements
and contribution agreements prevail.

Contractors, implementing partners and


international organisations1 are encouraged,
where the available budget and resources

1Chapter 3 of this Manual on international organisations development and change". The participants - World
applies to the United Nations Organisations and the Congress on Communication for Development
World Bank Group, which have both signed specific Rome - Italy October 27, 2006.
agreements on communication and visibility with the 3For more information, see (inter alia):
EU (see chapter 3). www.devcomm-congress.org/
2Definition taken from "The Rome Consensus.
Communication for development: a major pillar for
2C
 OMMUNICATION page 7
AND VISIBILITY
A C T I O N S
E X T E R N A L

A Step By Step Guide


U N I O N
E U R O P E A N

2.1 Appropriate 2.2 Key Audiences The level of detail should be commensurate
with the nature, extent and cost of the
Visibility and Target Groups
communication activities envisaged.
Communication should focus on develop- In order to communicate effectively, tar-
Contractors, implementing partners
F O R

ment with the EU as partner and on the get audiences should be clearly identi-
or international organisations should
achievements and impact of the action, fied in communication and visibility plans.
produce a communication and visibility
M A N U A L

not on administrative or procedural mile- Audiences will include opinion formers and
plan which will have to be agreed with the
stones. In order to maximise the impact influential figures, as well as those beyond
EU Delegation staff managing the action, in
of communication efforts: government and media who have a stake
close coordination with the EU Delegation
in the action, or are affected by it.
Activities need to be timely staff responsible for communication
V I S I B I L I T Y

Information used must be accurate Contractors, implementing partners and activities.


Activities should be coordinated international organisations should focus
In case a communication and visibility plan
closely with the Commission their communication and visibility plan
is considered, the following template can
The right audience(s) should be on audiences in the beneficiary country,
be useful.4 In principle, it should be based
targeted who are the ones for whom the impact
A N D

on the implementation section of the visi


Messages should interest the target of the action will be most apparent and
bility matrix (see Annex 1). The visibility
audience(s) most immediately relevant.
matrix is a simple tool that has been de-
C O M M U N I C A T I O N

Activities should be appropriate in


In as much as the financing is available, signed to offer basic guidance on the main
terms of resources spent, timing and
and the urgency, nature, and context of elements of communication activities at
expected impact
the action will allow, international organ various stages of the project cycle.
However, there should also be room in any isations should include in their communi-
plan to seize a good opportunity. A good cation and visibility plan audiences within
communication reflex and the ability to exploit the EU, specifically opinion-formers and
unexpected opportunities to the benefit of elite audiences involved in the field of
the action will often be as important as international cooperation.
more formal efforts and may often be free of
cost. Where such opportunities arise, they
should be exploited. The communication 2.3 Communication
and visibility plan for any action should and Visibility Plans
seek to maximise synergies with the overall
2.3.1 Communication and
visibility strategy of the EU Delegation (or the
Visibility Plan Template
relevant Commission department) and, in
A budgeted communication and visibility
the case of the United Nations, that of the
plan should be included in the work plan
relevant United Nations Organisation.
of any EU-funded or co-funded action,
highlighting the external communication
activities that need to take place at key
stages in the life of the action.

4 For international organisations see chapter 3.3.


2 page 8
A C T I O N S
E X T E R N A L
U N I O N

Communication and Visibility Plan Template


E U R O P E A N

General Communication Strategy


Objectives
1. Overall communication objectives
2. Target groups
F O R

Within the country(ies) where the action is implemented


Within the EU (as applicable)
M A N U A L

3. Specific objectives for each target group, related to the actions objectives and the
phases of the project cycle
Examples of communication objectives:
ensure that the beneficiary population is aware of the roles of the partner and of the EU
V I S I B I L I T Y

in the activity
raise awareness among the host country population or in Europe of the roles of the
partner and of the EU in delivering aid in a particular context
raise awareness of how the EU and the partner work together to support education,
health, environment, etc
A N D

COMMUNICATION ACTIVITIES
4. Main activities that will take place during the period covered by the communication and
C O M M U N I C A T I O N

visibility plan
Include details of:
the nature of the activities
the responsibilities for delivering the activities
5. Communication tools chosen
Include details of advantages of particular tools (media, advertising, events, etc.) in the local
context

INDICATORS OF ACHIEVEMENT5
6. Completion of the communication objectives
Include indicators of achievement for the different tools proposed
7. Provisions for feedback (when applicable)
Give details of assessment forms or other means used to get feedback on the activity
from participants

RESOURCES
8. Human Resources
Person/days required to implement the communication activities
Members of the management team responsible for communication activities
9. Financial resources
Budget required to implement the communication activities (in absolute figures and
as a percentage of the overall budget for the action)

5 Consistent with those set out in the logical framework for the action.
2 page 9
A C T I O N S
E X T E R N A L

In devising communication activities to be


U N I O N

2.3.2 Communication Budget


The funds set aside for communication funded under operational agreements, EU
activities should have been included in any and partner organisation staff should take
account of the following:
E U R O P E A N

financing agreement, contract or contribu-


tion agreement, and should be reflected in Methods of communication selected
the appropriate working document (e.g. an- and messages given should be
nual work plan, devis programme, etc). compatible with prevailing social or
The communication budget should be suf- religious norms in the place where the
F O R

ficient to have a real impact, and reflect the communication activity is carried out.
size, and, consequently, the likely impact Activities should respect the local
M A N U A L

of the action. The precise budget allocated environment.


to communication should be agreed with In all communication activities, the
the Commission on the basis of contextual local language(s) should be used as
and project-related factors. far as possible.
V I S I B I L I T Y

Outside expertise may be called upon, to


There may be situations where a financing
be funded from the budget for the action, to
agreement or contribution agreement does
carry out the communication activities.
not include a specific budgetary provision
for visibility activities. In this event, and Smaller programmes may be carried out
in consultation with the Commission, a directly by the partner with the support of
A N D

minimum of 1,000 should be identified the Commission (provision of brochures,


for basic visibility items (e.g. stickers or assistance with press contacts, etc).
C O M M U N I C A T I O N

other visual identity material). In any event, the resources (human, finan-
cial, etc.) needed for implementation of
2.3.3 Drafting and Implementing specific communication activities should
the Plan be carefully assessed during the design of
While the plan should be agreed with the the communication and visibility plan.
Commission, partner country officials and
Changes to communication and visi
other partners (e.g. other donors) may
bility plans should be agreed with the
need to be brought into the process, to
Commission.
ensure complementarities of effort.

2.3.4 Reporting
The standard reporting requirements fore-
seen in the provisions of specific contracts,
financing agreements and contribution
agreements prevail. These reports should
include details on the progress of visibility
activities.
3 International page 11
Organisations
A C T I O N S
E X T E R N A L
U N I O N

3.1 Introduction in the interest of transparency in the use 3.2.2 Operational Criteria
of public funds, and as a means to foster Applicable to the Visibility
This chapter deals with the specific as- global solidarity. and Communication Actions
E U R O P E A N

pects of communication and visibility in Undertaken by the United Nations


The funding relation between the United
the framework of cooperation with the and the European Commission
Nations and the EU is governed by
United Nations and the World Bank, As agreed in the Joint Action Plan on
the 2003 Financial and Administrative
which have both signed with the European Visibility, the main objective of visibility activi-
Framework Agreement (FAFA). This agree-
Commission specific agreements in these ties is the communication of positive results
F O R

ment is applicable to all EC Directorates-


areas. It reflects not only the more complex of the partnership. In addition to inputs,
General and all the United Nations
environment of multi-donor coordination, visibility activities should focus on outputs
M A N U A L

Organisations that are party to it and sets


but also the special role of major partner and the impact of the actions results.
out the legal obligations in relation to a
international organisations and the EUs
number of aspects, including visibility. Within the inception phase of an action,
commitment to multilateralism.
In particular, Article 11 of the FAFA sets out a communication and visibility plan
V I S I B I L I T Y

the legal obligations of the United Nations highlighting the related communication
3.2 United Nations in relation to visibility. Its content is repeat- activities should be discussed and agreed
Organisations ed and expanded in Article 6 of the General between the United Nations Organisation
Conditions applicable to European Union carrying out the action and the EU focal
3.2.1 Background and Existing contribution agreements with international point [see chapter 2]. Once agreed,
Framework of Cooperation organisations. the United Nations Organisation shall
A N D

The United Nations and the European report on the implementation of the plan
Both Article 11 of the FAFA and Article 6 of
Commission have developed a strong under the regular reporting requirements
C O M M U N I C A T I O N

the General Conditions clearly indicate that


partnership in the pursuit of shared hu- foreseen in the respective Contribution
United Nations Organisations should take all
manitarian and development goals. These Agreement.
appropriate measures to publicise the fact
have been outlined in a number of strategic
that an Action has received funding from the In the preparation of a Contribution
policy and programme frameworks. Both
European Union. These articles also provide Agreement both the United Nations
the United Nations and the Commission
basic guidance in terms of the target audi- Organisation and the EU should agree
are also committed to increasing the ef-
ences and visibility tools, and delineate the on the appropriate financial allocation to
fectiveness of aid in line with the principles
correct procedure regarding the size and be included for the budget line entitled
of the Paris Declaration.
prominence of the acknowledgement, dis- Visibility Actions.
The nature of the relationship, and its
claimers on United Nations publications, and In identifying appropriate communication
bearing on the purpose and manner in
visibility requirements in relation to equip- and visibility activities, certain overarching
which communication and visibility ac-
ment bought with an EU contribution. The criteria will be taken into account:
tivities are carried out, is reflected in
other chapters of this manual contain cross-
the Joint Visibility Action Plan signed by Size and proportion of the
references to the relevant provisions of the
Commissioner Benita Ferrero-Waldner and Commissions financing
FAFA and the contribution agreements.
United Nations Deputy Secretary General The EU recognises that visibility activities
Mark Malloch Brown in September 2006. Eligible costs in relation to communica- need to take into account and reflect the
The Action Plan emphasizes the shared tion and visibility are set out under section multi-party nature of multi-donor agree-
commitment to communicate the results 3 of FAFA and Article 14 of the General ments even as they highlight the partner-
of the United Nations/EC partnership to Conditions.6 ship with the EU.
beneficiaries and external stakeholders

6 United Nations: http://www.undp.org/eu/documents/EC-UN Joint Visibility Guidelines.pdf


World Bank :
http://ec.europa.eu/europeaid/work/procedures/implementation/international_organisations/other_documents_relating_world_bank/documents/joint_visibility_guidelines.pdf
3 page 12
A C T I O N S
E X T E R N A L
U N I O N

In the event that the EC contribution is Nature of the action should be strategic, and build on broader
to a multi-donor action or is channelled The communication and visibility plan sets of activities or programmes, focusing
E U R O P E A N

through a United Nations Organisation should be adapted to the nature of the on activities which better lend themselves
Trust Fund established for global, regional action. The thematic area and geographical to attract the target audiences. For exam-
or broad thematic initiatives, and where it scope of the action should set the para ple, when a number of programmes are
is not reasonably possible or appropriate meters of the visibility activities. For instance, financed by the Commission in a country
to identify the activities financed by the projects relating to coordination, security, or region, or covering a common theme,
F O R

EU, the European Commission agrees etc. are unlikely to require a major visibility it could be envisaged, subject to previ-
that adequate visibility for its contribution component, if any. ous agreement from the Commission, to
M A N U A L

will be provided within the context of use the individual project communication
Other considerations
broader visibility and communication and visibility budgets to put together a
Factors such as insecurity, or local political
designed for the overall initiative. This more comprehensive communication pro-
issue will be discussed between the United sensitivities may curtail information activ
gramme and to achieve greater impact.
V I S I B I L I T Y

Nations Organisation and the European ities in some crisis zones and, in extreme
Such an arrangement would however
Commission on a case-by-case basis cases, it may be necessary to avoid visibil
still require reporting to take place on a
during the inception phase of the action ity altogether. Some actions require a high
project basis.
and the outcome will be reflected in the level of political neutrality. In these cases,
Contribution Agreement. the target audience and visibility tools will To the extent possible, United Nations
A N D

be chosen in relation to what is appropri- agencies should identify potential areas


Urgency
ate, in consultation and agreement with the where broader and more strategic commu-
Where a speedy intervention is envisaged
C O M M U N I C A T I O N

EU Delegation. When standard procedures nication could be sought using the various
in response to a sudden crisis, the United
for visibility are not possible due to security EC-UN Strategic Partnership Agreements
Nations Organisations are not expected
reasons, the visibility requirements will be as a guiding reference. These proposals
to prepare a full communication and visi
foregone, or possible alternative arranged should be shared with the relevant EC
bility plan immediately. United Nations
where appropriate (e.g. communication and United Nations staff in Brussels for
agencies should nonetheless ensure
actions in EU member states). information.
that in such situations the Commissions
support for their action is displayed from 3.2.3 Communication and
the start in an appropriate manner for the Visibility Actions
action. It is understood that in such cases A non-exhaustive inventory of specific
3.3 The World
the provisions of the FAFA and General activities which may, depending on cir- Bank Group
Conditions should continue to be respected cumstances, be implemented is found in 3.3.1 Background and Existing
unless otherwise agreed by the parties. chapter 4 of this manual. In practice, the Framework of Cooperation
It should be noted that, in the context of choice of the most effective and appropri- In the case of the World Bank (WB), our
their humanitarian partnership, United ate modalities will depend on the size and cooperation is also underpinned by strong
Nations agencies and the Commission may proportion of the EUs financing, and the policy considerations. The Limelette pro
adopt specific visibility and communication urgency, nature and context of the action cess, the annual review of coordination
approaches in order to preserve a distinct as per section 3.3.
and cooperation between European
identity for impartial, needs-based Commission and WB staff, provides a
In addition to action-based communi-
humanitarian aid operations. forum for nurturing this relationship. The
cation activities, whenever possible and
practical, communication and visibility EC-WB Trust Funds and Co-Financing
3 page 13
A C T I O N S
E X T E R N A L
U N I O N

Framework Agreement (Framework The points, to be taken into consideration


Agreement), signed on 20 March 2009, by the two parties in cases of Multi-Donor
E U R O P E A N

sets forth the terms and conditions upon Trust Funds, are dealt with in section 3.3.3.
which the EC and WB cooperate in financ- point (d) below.
ing development projects, programmes
In the case of parallel co-financing, govern-
and other activities through trust funds
ments are the implementing agencies for
and other means. The provisions regard-
F O R

the purposes of the EU Manual and have


ing visibility in the Framework Agreement
a direct obligation to the EC to carry out
are set out in Article 8 and Attachment
M A N U A L

communication and visibility activities in


4 of the latter.
the field. While the WB has no formal role
The European Commission and the WB or responsibility regarding communica-
signed Joint Visibility Guidelines on 27 May tion and visibility-related activities in such
V I S I B I L I T Y

2009, which should be read together with cases, the WB will make a strong effort to
the visibility provisions in the Framework make it easier to recognise EU financing,
Agreement which they are designed to for example, by means of public events, the
complement . The operational provisions publication of press releases, etc.
of these Joint Guidelines have been incor-
3.3.3 Appropriate Communication
A N D

porated into this Manual.


and Visibility Activities
3.3.2 Financing Instruments and
(a) Matching communication and visibility
C O M M U N I C A T I O N

Roles
activities to the size of the trust fund
The Framework Agreement envisages that
the European Commision can provide fund- The European Commission contributes
ing for WB-administered trust funds (see to WB-administered trust funds, which
Article 2). In other cases, the EC provides can vary in size, from two hundred and
parallel financing which goes directly to fifty thousand US dollars at IFC, and one
the governments in developing countries million US dollars at IBRD/IDA, to several
but has close ties with (parallel to) WB- billion US dollars. The communication and
supported activities (parallel co-financing, visibility activities called for in such cases
see Article 6). will necessarily vary because of the dif-
ferences in available resources, the an-
The WB-administered trust funds can be
ticipated impact of foreseen actions and
categorised into three types: Recipient-
other considerations. The Joint Guidelines
Executed Trust Funds (RETFs); Bank
therefore allow for different approaches
Executed Trust Funds (BETFs) and
to communication and visibility activities,
Financial Intermediary Funds (FIFs), defined
depending on the overall size of the trust
in Article 1 of the Framework Agreement.
fund:
These categories of trust fund can be
financed by either a single donor (Single Many small trust funds with an over-
Donor Trust Fund) or multiple ones (Multi- all size below $10 million do not have
Donor Trust Fund). a significant communications budget
3 page 14
A C T I O N S
E X T E R N A L
U N I O N

because they are focused on programme Communication and visibility plans should Size and proportion of EU funding
activities (however, see point c below). focus on audiences in the beneficiary coun- The European Commission recognises
E U R O P E A N

Nevertheless, as a general rule, simple try, who are the ones who will be most af- that visibility activities need to take into
communication plans should be pre- fected and for whom these actions are most account and reflect the multi-party na-
pared, through media such as websites, relevant. Such target audiences should be ture of multi-donor agreements, even as
press releases, etc. clearly identified in communication and vis- they highlight partnership with the EC. If
ibility plans. Audiences will include opinion the EU contribution funds a multi-donor
F O R

Trust funds with an overall size above $10


leaders and influential figures, as well as action or is channelled through a trust
million should normally have a dedicated
those beyond government and the media fund established for global, regional or
M A N U A L

communications budget which also in-


who have a stake in the action, or are af- broad thematic initiatives, and where it is
cludes the preparation of more detailed
fected by it. not reasonably possible or appropriate to
communications and visibility plans.
identify the EU-financed activities, the ECs
These approaches are a guideline and will (c) Budget contribution will be made visible within
V I S I B I L I T Y

need to take into account the available The funds set aside for communication and the context of broader visibility and com-
budget and certain overarching criteria visibility activities should be reflected in the munication actions designed for the over-
(see points c and d below). relevant working document (e.g. the annual all initiative. This issue will be discussed
work plan). The communication budget between the parties on a case-by-case
(b) Types of Activity and Target
should be sufficient relative to the overall basis during the inception phase, and the
Audiences
A N D

size of the trust fund in order to realise the outcome will be reflected in the relevant
Chapter 4 contains a list of specific ac- Agreement.
communication and visibility objectives.
C O M M U N I C A T I O N

tivities which may, depending on specific


The budget may need to be adjusted in Urgency
circumstances, be implemented. These
the light of relevant circumstances by Where speedy intervention is envisaged
elements may be useful when drafting the
agreement between the EC, WB and in response to a sudden crisis, a full
communication and visibility plan, as well
other donors, as applicable. Changes to communication and visibility plan does
as in the absence of a formal plan.
communication and visibility plans should not need to be immediately prepared. It
Whether special logos are created and also be mutually agreed by the parties. should nonetheless be ensured that in
used will depend on decisions taken by the There may be situations where no dedicated such situations the EUs support for trust-
EC, the WB and other donors or partners, budget for communication and visibility funded actions is displayed from the start
as applicable. For instance, consistent activities is agreed upon. In that case, the in an appropriate manner.
with the principles of the Paris Declaration, EC will provide a minimum of 1,000 for Nature of the action
donors often agree to highlight country agreed visibility actions. In these situations, The communication and visibility plan
ownership rather than donor contribu- the EU Delegation may be best-placed to should be adapted to the nature of the ac-
tions, and have foregone the use of their organise and implement such modest tion. The thematic area and geographical
own logos. The extent of community out- visibility actions, although this will need to scope of the action should set the param-
reach is also at the discretion of EC and be determined on a case-by-case basis. eters for activities geared towards visibility.
WB staff and other donors or partners, For instance, projects relating to coord
(d) Overarching Criteria
as applicable, depending on all relevant ination, security, etc. are unlikely to require
circumstances, including the project or In identifying appropriate communication a major visibility component, if any.
programmes own social communications and visibility activities, certain overarching
goals and activities.7 criteria will be taken into account:

7See for example, the World Banks website on Development Communications.


3 page 15
A C T I O N S
E X T E R N A L
U N I O N

Other considerations Messages should interest the target


Factors such as insecurity, or local political audience(s)
E U R O P E A N

sensitivities may hinder information activities Activities should be appropriate


in certain crisis zones and, in extreme cases, in terms of resources spent and
it may be necessary to avoid visibility alto- expected impact
gether. Some actions require a high level of
However, there should also be room in
political neutrality. In these cases, the target
F O R

any plan to seize a good opportunity. A


audience and visibility tools will be chosen in good reflex for communication and the
relation to what is appropriate, in consulta-
M A N U A L

ability to make use of unexpected oppor-


tion and agreement with the EU Delegation. tunities to benefit the action will often be
Where standard procedures for visibility are as important as more formal efforts. The
not possible for security reasons, the visibil- communication and visibility plan for any
ity requirements will be foregone, or possi-
V I S I B I L I T Y

action should seek to maximize syner-


ble alternatives arranged where appropriate gies with the ECs overall visibility strategy
(e.g. communication actions in EU Member and that of the WB and other donors or
States). Where standard procedures on vis- partners, as applicable.
ibility are not possible due to insecurity and
Annex 2 on EU Visual Identity Elements
political sensitivities, the steps agreed to be
A N D

and Annex 4 on General Statements about


taken at country level will be communicated
the European Union provide guidance on
to EC and Bank headquarters.
C O M M U N I C A T I O N

the correct use of the EUs visual iden-


(e) Developing a Communication and tity and general statements by interna-
Visibility Plan tional organisations and implementing
partners.
Where a communication and visibility plan
is called for and mutually agreed upon,
the types of communication and visibility
activities selected should focus principally
on the achievements and impact of the
financed action, rather than on administra-
tive or procedural milestones. In order to
maximize the impact of communication
efforts:

Activities need to be timely


Information used must be accurate
Activities should be coordinated
closely with the EC and WB
The right audience(s) should be
targeted
4A
 djusting the page 17
Communication
A C T I O N S

and Visibility Plan


E X T E R N A L

to the Action
U N I O N

C
E U R O P E A N

ontractors, implementing part- rights issues (copyrights, etc). The Project Display panels (see section 4.2.6)
ners and international organisa- Manager should always be included in Commemorative plaques
tions are responsible for giving contacts with the Press and Information (see section 4.2.7)
adequate publicity to the action they are Officer. Banners (see section 4.2.8)
implementing as well as to the support Vehicles, supplies and equipment
F O R

Contractors or implementing partners or


from the EU. (see section 4.2.9)
international organisations should use
Promotional items
M A N U A L

Different activities may be appropriate at their normal stationery in letterheads or


different stages of the project cycle. In any (see section 4.2.10)
fax headers sheets, but should add the
event, communication activities should Photographs (see section 4.2.11)
phrase This project/programme is funded
focus on achievements and the impact Audiovisual productions
by the European Union as well as the
(see section 4.2.12)
V I S I B I L I T Y

of the action, not on administrative and EU flag when communicating on matters


procedural milestones. The signature of Public events and visits
related to the action (see Annex 2). The
a document, even if it relates to a large (see section 4.2.13)
graphic identity of the EU (see Annex 2)
amount of money, will not necessarily at- Information campaigns
must enjoy an equally prominent place
tract much media attention, particularly (see section 4.2.14)
and size as that of the contractor or im-
in the EU.
A N D

plementing partner. Specific rules apply for


The following sections contain an overview international organisations (see Standard Basic guidance on these elements is
C O M M U N I C A T I O N

of possible communication activities. These Contribution Agreement, article 6.2 of the provided below. Templates for various
elements may be useful when drafting the General Conditions). communication products are provided in
communication and visibility plan, as well Annex 3.
The disclaimer (see annex 2.6) must be
as in the absence of a formal plan. included in all publications.

4.1 Basics 4.2 Other


Before initiating any information, commu- Communication
nication or visibility activity, contractors, Activities
implementing partners and international
Other elements of the communication and
organisations should contact the Press and
visibility plan might include:
Information Officer at the EU Delegation
accredited to their country. The Press Press releases (see section 4.2.1)
and Information Officer is responsible for Press conferences
co-ordinating the overall EU communica- (see section 4.2.2)
tion strategy in the country or countries to Press visits (see section 4.2.3)
which his/her EU Delegation is accredited. Leaflets, brochures and newsletters
The Press and Information Officer can also (see section 4.2.4)
provide information on intellectual property Web sites (see section 4.2.5)
4 page 18
A C T I O N S
E X T E R N A L
U N I O N

4.2.1 Press releases release should be written at the top of 4.2.3 Press Visits
Press releases can be a very useful con- the document. However, it is sometimes Group visits by journalists to project sites
E U R O P E A N

tribution to the communication activities appropriate to embargo the release until, may offer additional visibility opportunities.
around an action. As a general rule, a press for example, the publication of financial fig- Such visits should be well-timed and focus
release should be issued at the start of ures. In this case, a simple expression such on tangible achievements. Where appro-
all actions. as Not to be used before 10:00 hours, 15 priate, groups of visiting journalists should
October should be included at the top of be accompanied by representatives of the
F O R

Where the implementing partner or inter-


the document. EU Delegation.
national organisation launches the press
M A N U A L

release in the context of the action, it A newsworthy press release should con-
should liaise with the Press and Information tain: a heading, a strong leading paragraph 4.2.4 Leaflets, Brochures and
Officer at the EU Delegation or the relevant summarising the essential facts, the main Newsletters
Commission department before sending it body of the story, quotes, some back- Publications such as leaflets, brochures
V I S I B I L I T Y

out. Where the Commission launches the ground information, and contact details and newsletters can be useful in commu-
press release, the contractor must provide for further information. nicating the results of an action to specific
all necessary technical information that audiences.
The release should be kept to one side
would allow the Delegation or Commission Leaflets can provide basic factual in-
of an A4 page whenever possible; if it is
department to do so. The general policy formation and the address (such as
longer, more follows should be written
is that contractors should not issue press
A N D

at the bottom of every subsequent page. a mailing address or web site) where
releases and make public statements further information can be found;
unless cleared with the Commission. In At the end of the document, make sure
C O M M U N I C A T I O N

the context of actions implemented with to write End. Brochures can go into greater detail,
international organisations, where the EU highlighting the context, including inter-
After End, the press release should pro-
plans to issue a press release focusing on views with stakeholders, beneficiaries,
vide the name of at least one person whom
the action, it should liaise with the rele and so on;
the journalist can contact for further in-
vant international organisation for a similar formation. Where possible, both a work Newsletters are characterised by their
clearance. and a home telephone number should regularity, and can be issued to inform
The release should incorporate the EU be provided. on the progress of an action. This is
flag, mention that funding was provided useful, for example for infrastructure
by the EU and mention the amount of EU 4.2.2 Press Conferences projects, training programmes, and so
funding in euro and in the local currency. Press conferences organised in the con- on, where the impact of an action can
If a press conference is planned, the press text of the communication and visibil be appreciated over time.
release should include the name of an EU ity plan should always be organised in
Publications should always be tailored to
personality who will be present at the press cooperation with the Commission. The
the audience in question, and focus on the
conference, if appropriate. invitations should bear an EU flag in ac-
intended results of the action, not the finan-
cordance with the applicable general rules
The release should be dated at the top cial and administrative details. Texts should
(see section 3.1).
and should also indicate when the informa- be short and simple, and photographs
tion may be released. Generally, journal- At the press conference itself, an EU used where possible to illustrate the action
ists prefer to be able to use the release flag should be displayed if other flags or and its context. If possible, photographs
immediately; in this case For immediate symbols are being displayed. should be of the people involved in the
4 page 19
A C T I O N S
E X T E R N A L
U N I O N

action, rather than the officials responsible that could be communicated on a web-
for its management. site (photographs of the evolution of the
E U R O P E A N

action, short interviews, material for the


In general, all material produced in paper
press, etc.), it may be agreed in the com-
form should also be made available in
munication and visibility plan to establish
electronic form, so that it can be sent
an independent website related to the
by e-mail and posted on a web site. For
action.
F O R

material in paper form, distribution capacity


(mailing lists) should be considered. The site should be established in close
M A N U A L

cooperation with the EU Delegation or


All leaflets and brochures should incor
the responsible officials in the EuropeAid
porate the basic elements of the EU visual
Cooperation Office who can ensure co-
identity, i.e. the EU flag (Annex 2) and the
herence, and provide links to the relevant
disclaimer (Annex 2) and project details,
V I S I B I L I T Y

Commission sites.
contact name, address, telephone, fax
and e-mail. As a minimum, links should be made to the
websites of the local EU Delegation and the
Leaflets and brochures produced by a
EuropeAid Cooperation Office as follows:
contractor and/or implementing partner
must also incorporate a definition of the http://ec.europa.eu/europeaid/
A N D

EU (see Annex 4). Furthermore, in these index_en.htm


cases, the cover page must clearly identify
C O M M U N I C A T I O N

the action as being part of an EU-funded At the end of the action, the website should
action. The front page lower banner must be copied onto CD-rom and transmitted
carry the disclaimer in Annex 2. The upper to the Delegation for possible further use
banner of the newsletter must be designed in its general communication activities and
as shown in Annex 3 (section 4). for archival purposes.
Copies, including electronic copies of the
publications should be made available to
the Commission.

4.2.5 Websites
Websites are increasingly a basic require-
ment for communication, but separate
websites are not always required for all
actions since information could simply
be made available via the website of the
EU Delegation or the partners website,
for example.

If the action is designed to have a long


life, and will give rise to significant material
4 page 20
A C T I O N S
E X T E R N A L
U N I O N

4.2.6 Display Panels As part of the opening ceremony of perma- Unless otherwise agreed with the
Infrastructure-related actions funded by nent structures erected with EU funding or Commission, any supplies or equipment
E U R O P E A N

the EU may be identified as such by means co-funding, contractors, implementing part- delivered under an EU-funded action
of display panels describing the action. The ners or international organisations should should be clearly identified and should
display panels should be clearly visible so place a permanent plaque in the most vis- feature prominently the EU flag and the
that those passing are able to read and ible part of the building, such as the main mention Provided with the support of the
understand the nature of the action. The entrance or in front of the building. When EU in the operational language of the EU
F O R

display panels should be erected beside appropriate, the plaque could contain the programme and in the local language. Any
access routes to the site where the action following sentence: This [name of the struc- vehicles used in actions supported by the
M A N U A L

is taking place and should remain in place ture] was funded by the European Union EU should carry vehicle panels (Annex 3).
from the start of the action until six months with the EU flag placed underneath it.
Specific rules apply to international
after its completion. When contractors or implementing part- organisations (see Standard Contribution
V I S I B I L I T Y

Contractors, implementing partners or ners consider it appropriate to add the logo Agreement, Art. 6.1 of the General
international organisations should also of a partner organisation on the plaque, Conditions).
produce a display panel with which to it should be positioned in the lower-right
promote their EU-funded action at an hand corner, and the EU flag should be in
4.2.10 Promotional Items
exhibition or event, or at the entrance of the lower-left hand corner.
Promotional items should be distributed when
A N D

a training centre or office reception. The specified in the communication strategy of an


shape, size and dimensions of panels vary 4.2.8 Banners action. All kinds of promotional items (such as
depending on the amount of information Plastic or textile banners similar to the
C O M M U N I C A T I O N

T-shirts, caps and pens) can be produced by


that needs to be conveyed, and whether example given in Annex 3.6 should implementing partners, contractors or inter-
the panel is intended to be portable or be produced when specified in the national organisations as supporting material
permanent. Low-cost panels can be made communication strategy of an action. They for their information and communication ac-
using self-adhesive lettering and a well- are intended to serve as a backdrop for tivities in the framework of their action. Before
positioned EU flag in the upper left-hand special events such as inaugurations and taking any decision on the production of such
corner. When contractors or implementing conferences. items, the Press and Information Officer at the
partners consider it appropriate to add EU Delegation should be consulted.
the logo of a partner organisation on the 4.2.9 Vehicles, Supplies and
Equipment The promotional items produced should
display panel, it should be positioned in the
Any vehicles used in an EU-funded action be clearly identified with the EU flag, and if
upper-right hand corner. Specific arrange-
should be clearly identified, and visibly possible carry the words European Union
ments should be agreed with international
and key messages or key phrases. The
organisations. carry the EU flag and the phrase Provided
Press and Information Officer can provide
with the support of the EU in the oper
samples of such items.
4.2.7 Commemorative Plaques ational language of the EU programme and
Permanent commemorative plaques are in the local language. The company logos On certain promotional items (e.g. pens
an effective way of acknowledging the in- of the contractor, the implementing partner and banners), where it is not possible to
volvement of the EU in the construction and other donors may appear on vehicles, include key messages in their entirety, at
or planning of permanent structures such although the EU flag should be displayed least the EU flag should appear, followed
as houses, clinics, factories, institutions, at least as prominently as the logos of all by a key phrase to be agreed with the
training centres, roads, bridges, etc. parties involved in the action. EC Delegation (see also Annex 3).
4 page 21
A C T I O N S
E X T E R N A L
U N I O N

4.2.11 Photographs Duplicates of the photos should be sent to:


Photographs showing the progress of all
The Press and Information Officer at
E U R O P E A N

actions should be taken where appropriate


the EU Delegation;
to document the progress of actions and
The EuropeAid Information
events related to these (their launch, visits
Communication and Front Office
by EU officials, and so on) so that they can
Unit (see section 6 for address).
be used in communication material.
F O R

The following sections should help con-


The duplicate photos should state on the
M A N U A L

tractors, implementing partners and inter-


back:
national organisations in their search for
pictures to illustrate their communication The name and contact details of the
materials. person sending the pictures.
V I S I B I L I T Y

The name of the organisation


4.2.11.1 Picture Selection or person that owns the picture
Where possible, the communication and visi copyright.
bility plan should make provisions for the use The name of the action to which
of a professional photographer on a regular the picture relates, its duration (e.g.
basis to illustrate the evolution of an action. 2004-2008) and the country in which
A N D

The photos chosen should be those which it was taken.


will best illustrate the results and impact of The European Commission will be entitled
C O M M U N I C A T I O N

the action, and should match any written to use or reproduce photos submitted to
information on the action. As with writ- the above archives without payment of
ten material, people involved in the action royalties.
are the focus, not the officials involved in
managing the action, in holding meetings
about the issue, and so on.

4.2.11.2 Picture Archives


As a general rule, digital photography should
be used in order to facilitate reproduction
on web sites and other information material
(for producing printed materials, 300 dpi is
the minimum quality standard).
4 page 22
A C T I O N S
E X T E R N A L
U N I O N

4.2.12 Audiovisual Productions Those attending EU-funded training


Audio-visual material may be appropriate, courses, conferences, seminars, fairs,
E U R O P E A N

but can be expensive to produce, so exhibitions and workshops should be


should only be prepared when there is a made aware that the EU is financing the
realistic chance of it being distributed by event. The EU flag should appear on all
the media. However, small video clips can material.
be produced very simply for displaying on
F O R

Depending on the circumstances, the op-


web sites, or publicity material.
portunity should be taken to display the
M A N U A L

As with all material the productions should European flag and/or banners (see annex 3)
acknowledge the EU support, by featuring in meeting rooms.
the EU flag at the beginning and / or end. As
High level visits by Commission officials
with photos, the contractor, implementing
or political leaders are a potential com-
V I S I B I L I T Y

partner or international organisation should


munication opportunity through press
make sure that duplicates in the final
releases, press conferences, events, and
distribution format and in the professional
through public diplomacy such as photo
format are sent to:
opportunities when visiting a project site.
The Press and Information Officer at
The EU Delegation accredited to the benefi-
A N D

the EU Delegation;
ciary country should be closely involved in
The EuropeAid Information,
the preparation and implementation of such
C O M M U N I C A T I O N

Communication and Front Office


events, including contacts with the media.
Unit (see section 6 for address).

Unless otherwise specified in the relevant 4.2.14 Information Campaigns


contract/agreement, the broadcast line- Large actions can support the organising
up for the rush material broadcast should of an information campaign during the
be sent to the EuropeAid Information, lifetime of the action. Such campaigns can
Communication and Front Office Unit. raise the visibility of the action and the
EU by promoting discussion of the issues
4.2.13 Public Events and Visits around an action, such as public health,
Organising a public event (or participat- road safety, the environment, and so on.
ing in an event organised independ-
Such a campaign requires adequate
ently from the action, for example by the
resources in terms of management, and
EU Delegation) may offer excellent
should always be coordinated with the
opportunities for generating interest in an
Commission.
actions particular achievements. Such
events can include conferences, work-
shops, seminars, fairs, and exhibitions.
4 page 23
A C T I O N S
E X T E R N A L
U N I O N

4.3 Visibility for Aside from static visibility activities such


as signs and other visible indications,
Specific Types
E U R O P E A N

communication activities can be aimed


of Action at explaining the impact of the action on
Specific activities may be more appropriate improving peoples daily lives safer trans-
to some types of action than others. port, warmer housing, better schooling,
cleaner water, etc.
F O R

4.3.1 Provision of Supplies and


Equipment 4.3.3 Technical Assistance
M A N U A L

This type of action can particularly lend Actions and Studies


itself to communication activities, given Since this type of action can be very tech-
the clear link between the substance of nical in nature, involving policy advice, or
the action and a visible improvement in may require a certain degree of confiden-
V I S I B I L I T Y

the functioning of, for example, a building tiality, particular care will be needed in
or a piece of infrastructure. selecting communication activities.

Where the impact of the action is signifi-


cant in an area likely to arouse public inter
4.3.4 Grants
Given the small size of many grant-aided
est, the media should be alerted to the
A N D

actions (as compared to, for example,


possibility of a photo opportunity when
infrastructure actions) communication
the supplies arrive in the country. Many
C O M M U N I C A T I O N

activities may be smaller in scale and/or


opportunities will arise to alert the media
more focussed on a restricted group of
at installation, first operation, etc.
people. Nevertheless, due to their proxim-
ity to the beneficiary population, they can
4.3.2 Infrastructure-related
be extremely helpful in demonstrating the
Actions
added value of EU support.
Physical infrastructure actions (roads,
bridges, buildings, etc.) or other actions
which are tangible in nature (agricultural,
4.3.5 Budget Support
This manual is not designed for budget
forestry, water management, etc.) offer
support operations. Nonetheless, informa-
the greatest possibility for significant
tion and communication measures should
communication activities, given the direct
be foreseen as part of the accompanying
impact that the action is likely to have on
measures. It is recommended that the con-
improving peoples lives. This is valid
tractor or implementing partner involved
regardless of whether the EU is providing
with these accompanying measures liaise
funding for the construction, rehabilitation
closely with the Commission to define an
or running of the action.
appropriate communication strategy.
5 REPORTING8 page 25
A C T I O N S
E X T E R N A L

C
U N I O N

ontractors and/or implementing The inception report which defines


partners are required to produce an actions plan of operations
administrative reports to update or work plan.
E U R O P E A N

and inform the European Commission on The periodical progress reports


the progress and findings of EU actions. which cover the activities of an
These should have an EU style front cover action.
sporting the name of the action and the The completion report.
date of the reports submission. The
F O R

Reporting requirements vary from action


reports back cover should contain the
to action. Details concerning the context,
following disclaimer:
M A N U A L

frequency and submission procedure


The contents of this publication are the are given in the general conditions of all
sole responsibility of <name of the author/ contracts.
contractor/implementing partner> and can
Contractors and implementing partners
V I S I B I L I T Y

in no way be taken to reflect the views of


should make sure that at least one section
the European Union.
of their reports (interim and final) contains a
The European Commission requires these detailed description and evaluation of their
reports to facilitate the monitoring and communication activities (giving concrete
evaluation of actions. It also uses these examples) and their impact (illustrating this
A N D

to inform governments in partner countries with a file of press cuttings and audio-
of the progress of EU actions. visual transcripts whenever possible).
C O M M U N I C A T I O N

There are three types of administrative If the report is to be made available to


reports covering the different stages of the public, the cover must use the report
the project cycle: presentation template:

The European Unions XXXXXXX programme


For Partner Country

The industrial

development programme

for Partner Country

Activity report

This project is funded by A project implemented by


The European Union (CONTRACTOR)

8 This section does not apply to international organisations.


6F
 URTHER page 27
INFORMATION
A C T I O N S
E X T E R N A L
U N I O N
E U R O P E A N

T
his manual was drawn up by the European Commission
Information, Communication and
EuropeAid Cooperation Office
Front Office Unit of the EuropeAid
Cooperation Office. It incorporates the Information, Communication
F O R

Joint Guidelines agreed with the United and Front Office Unit 04
Nations. L-41, Office 06/84
M A N U A L

Further details and/or clarifications can B - 1049 Brussels


be obtained from the EU Delegation
accredited to the country in which the Tel: + 32-2 296 94 97
contractor, implementing partner or
V I S I B I L I T Y

Fax: + 32-2 299 64 07


international organisation is operating or
E-mail: europeaid-info@ec.europa.eu
from the EuropeAid Cooperation Office
Information, Communication and Front Web site: http://ec.europa.eu/europeaid/
Office Unit at the following address:
A N D
C O M M U N I C A T I O N
ANNEX 1 THE COMMUNICATION MATRIX: HOW AND WHEN TO
COMMUNICATE WHAT TO WHOM? ............................................................................. 29

ANNEX 2 EU VISUAL IDENTITY ELEMENTS ................................................................................ 31


1 The EU Flag . ............................................................................................................ 31
2 Geometrical Description ........................................................................................... 31
3 Colours .................................................................................................................... 31
4 Backgrounds ............................................................................................................ 31
5 Alterations and Additions .......................................................................................... 32
6 Disclaimer ................................................................................................................ 32
7 Internet Links ............................................................................................................ 32
8 EU Visibility after Completion of the Action . .............................................................. 32

ANNEX 3 TEMPLATES FOR COMMUNICATION PRODUCTS . .................................................... 33


1 Press Releases . ....................................................................................................... 33
2 Leaflets . ................................................................................................................... 34
3 Brochures ................................................................................................................ 35
4 Newsletters .............................................................................................................. 36
5 Display Panels........................................................................................................... 37
6 Banners ................................................................................................................... 37
7 Commemorative Plaques ......................................................................................... 38
8 Vehicle Panels .......................................................................................................... 38
9 Promotional Items . ................................................................................................... 40

ANNEX 4 DEFINITIONS & GENERAL STATEMENTS .................................................................... 41


1 General Statements................................................................................................... 41
2 Definitions of the European Union and its Institutions ................................................ 41
European Union ....................................................................................................... 41
European Parliament ................................................................................................ 41
Council of the European Union ................................................................................. 42
European Commission ............................................................................................. 42
European Court of Justice ........................................................................................ 42
European Court of Auditors ...................................................................................... 42
Other institutions ...................................................................................................... 42
ANNEX 1 page 29
A C T I O N S
E X T E R N A L

The Communication Matrix:


How and When to Communicate
What to Whom?
U N I O N
E U R O P E A N

C
ommunication should occur The scope of the visibility matrix goes
throughout the life cycle of the beyond the scope of individual contracts,
action and should be timely. contribution agreements or financing
Communication and visibility efforts should agreements (it also covers programming,
F O R

be used to announce and accompany key identification, appraisal, financing,


milestones. evaluation and audit). Although it is useful
M A N U A L

in the context of drafting communication


In order to tailor visibility activities both
and visibility plans (see section 2.3 above),
to the specific stages of the action (or
it should therefore be clear that not all
of the project cycle) and to the target
activities proposed under the visibility
population, the matrix below can be used.
V I S I B I L I T Y

matrix can be funded in the context of


This matrix outlines the types of visibility
specific contracts, contribution agreements
activity appropriate to the various stages
or financing agreements.
of the life cycle of an action.

It should be noted that the stages of the


A N D

project cycle set out in the matrix are


proposed for the purpose of planning only.
They are not intended to be the focus of the
C O M M U N I C A T I O N

communication activities (the focus should


be achievements and impact). The matrix
is intended as a flexible tool and may be
updated and adapted at any stage of the
action, if necessary.
page 30
A C T I O N S

Project
E X T E R N A L

cycle stage/
Evaluation
communication Programming Identification Appraisal Financing Implementation
& Audit
activity
& target groups
U N I O N

Communication Announce EU Information on Information on Highlight amount Awareness raising Demonstration


objective support action status action status of EC support, and of impact
context
E U R O P E A N

Responsibility Commission Commission Commission Commission/ Partner Commission/


Partner Partner

Type of key The worlds "More, better, "The EU and The worlds Cooperation that "The EU delivers"
message biggest donor at faster Europe <partner>- biggest donor at Counts
F O R

the service of the cares" delivering more the service of the


Millennium Goals and better aid Millennium Goals
together"
M A N U A L

Most appropriate Press conferences, Information Information Press conference Events, site visits, Videos, reports
tools events, interviews campaign campaign TV and radio spots,
high level visits
V I S I B I L I T Y

Beneficiary Press conference Information Inform via the Inform via the Information Make key results
population following pledge campaign to media on selection media when campaign publicly available
accompany visit of partner financing is Photo Work with the
of identification confirmed opportunities, media to show
mission Public signing (joint) high level the impact on the
ceremony visits to mark ground
A N D

milestones
Formation of
multi-donor
C O M M U N I C A T I O N

action steering
committees

EU institutions Press conference - - - Information Make key results


and international following pledge campaign publicly available &
donor community Photo broaden to include
opportunities, key strategic
(joint) high level messages
visits to mark
milestones
Joint presentations
to Parliament
Thematic events

European citizens Press conference - - Inform via Photo Inform via


following pledge the media, if opportunities, the media, if
appropriate (joint) high level appropriate
Work with visits to mark Make key results
specialist press milestones publicly available
Thematic events Broad awareness and broaden
raising campaigns, to include key
using a specific strategic messages
programme as an
anchor
Thematic events
ANNEX 2 page 31
A C T I O N S
E X T E R N A L

EU Visual Identity Elements


U N I O N
E U R O P E A N

1 The EU Flag 2 Geometrical 4 Backgrounds


The common element branding all EU- Description The flag should preferably be printed
funded actions is the EU flag: The EU flag is in the form of a blue on a white background. Multicolour
F O R

rectangular flag of which the fly is one and backgrounds should be avoided, especially
a half times the length of the hoist. The 12 those involving a colour that clashes with
M A N U A L

gold stars situated at equal intervals form an the blue. Where a coloured background
undefined circle, of which the centre is the is unavoidable, a white border with a
point of intersection of the diagonals of the thickness equal to 1/25th of the height of
rectangle. The radius of the circle is equal the rectangle must be used.
V I S I B I L I T Y

Whatever the size, scope or objectives of to one-third the height of the hoist. Each of
an action, the EU flag must be prominently the stars has five points that are situated on
displayed as specified in this manual on the circumference of an undefined circle of
all materials produced by the contractor, which the radius is equal to oneeighteenth
implementing partner or international the height of the hoist. All stars are upright
organisation.
A N D

- that is to say, with one point vertical i.e.


Electronic templates have been developed pointing upwards, and two points in a
straight line at right angles to the mast.
C O M M U N I C A T I O N

for each type of communication tool and


can be downloaded from the following The circle is arranged so that the stars
site: appear in the position of the hours on
http://ec.europa.eu/europeaid/work/visibility/ the face of a clock. Their number is
index_en.htm invariable.

The EU flag constitutes the main element


of the European visual identity. For this
3 Colours
reason, specific guidelines have been
The flag has the following official The EU flag can be downloaded from the
drawn up to ensure its accurate use and
colours: following web page:
reproduction.
Pantone Reflex Blue for the surface http://ec.europa.eu/europeaid/work/visibility/
While most points on the standard colours
of the rectangle. index_en.htm
that should be used in the EU flag and on
how to create this EU flag are included Pantone Process Yellow for the
in the present document, more detailed stars.
instructions can be found in Annex A1 of Contractors, implementing partners and
the Interinstitutional style guide available international organisations must, until
from the following site: further notice, use the Pantone Process
Yellow and the Pantone Reflex Blue.
http://publications.europa.eu/code/en/
en-000100.htm The international Pantone range is widely
available and easily accessible, also for
non-professionals.
page 32
A C T I O N S
E X T E R N A L
U N I O N

5 Alterations and home page. In addition, reference can


be made to the European Union in the
Additions
E U R O P E A N

World web portal, which can be found


Contractors, implementing partners and at http://ec.europa.eu/world/. This portal
international organisations should be contains links to more specialised sites
aware that when reproducing the EU with information on the EUs external
flag in newsletters and other graphic relations.
F O R

presentations it must be used in its entirety,


without any alterations or additions made
M A N U A L

to it. Thus the EU flag must not be shown to 8 EU Visibility after


incorporate any flag or symbol of another Completion of the
country, donor or institution. Each should
be presented separately from the other.
Action
V I S I B I L I T Y

An action may continue to be managed


by the beneficiary or partner after the
6 Disclaimer EU-funded phase of the action has been
completed. In this case, six months after
The EU is not responsible for the contents
the phase funded by the EU has finished,
of communication material prepared by
A N D

no EU symbol may be included in any


contractors, implementing partners or
communication tools of the action, with
international organisations. These must
C O M M U N I C A T I O N

the exception of any commemorative


therefore include the following disclaimer
plaques.
in their publications:
However, the following sentence must
This publication has been produced
be included on material, with the same
with the assistance of the European
prominence as was given to the EU flag:
Union. The contents of this publication
The initial phase <dates> of this project/
are the sole responsibility of <name of the
programme was supported by the
author/contractor/implementing partner/
European Union.
international organisation> and can in no
way be taken to reflect the views of the Specific arrangements should be agreed
European Union. with international organisations.

7 Internet Links
All publications produced by contractors
or implementing partners should refer to
official EU sources for more information
and, in particular, to the Europa home
page (see Annex 3) and/or EC Delegation
ANNEX 3 page 33
A C T I O N S
E X T E R N A L

Templates for Communication


Products
U N I O N
E U R O P E A N

1 Press release

U
se of the templates below is
recommended for contractors
F O R

and implementing partners.


M A N U A L

Electronic versions of these templates are


available at the following address:

http://ec.europa.eu/europeaid/work/visibility/
PRESS RELEASE
index_en.htm
V I S I B I L I T Y

Sarajevo, 31.04.2000
A N D

All media are invited to the inauguration of the Laboratory for Quality Control of drugs on May 15
2000 at 11.00 in Sarajevo. The reconstruction and equipment of the laboratory have been financed
by the European Commission to the tune of 2 million Euro. The works have been performed by the
NGO Lab Help.
C O M M U N I C A T I O N

Quality control of drugs is vital for the development of BiH!s domestic production and will
ensure that it conforms to European standards.

For more information, please contact:


Mr Frane Maroevic, EC press and information adviser
Mr Ivan Ivanic, project manager NGO Lab Help

A project implemented This project is funded The European Commission is the EUs executive body.
by the contractor by the European Union
The European Union is made up of 27 Member States who have decided to gradually link
Marsala Tita 14 Delegation of together their know-how, resources and destinies. Together, during a period of enlargement
71 000 Sarajevo the European Union of 50 years, they have built a zone of stability, democracy and sustainable development
Bosnia and Herzegovina in Bosnia and Herzegovina whilst maintaining cultural diversity, tolerance and individual freedoms. The European
Tel: Dubrovacka 6 Union is committed to sharing its achievements and its values with countries and peoples
Fax: 71000 Sarajevo beyond its borders.
Bosnia and Herzegovina
Tel: +387 71 666 044
Fax: +387 71 666 037
page 34
A C T I O N S
E X T E R N A L

2 Leaflets
U N I O N

For more information


E U R O P E A N

The European Unions XXXXXXX programme


Mr. John Heck The European Union is made up of 27 Member for Partner Country
Vrbanjusa 152 States who have decided to gradually link together
71000 Sarajevo their know-how, resources and destinies. Together,
Bosnia and Herzegovina during a period of enlargement of 50 years, they
Tel:
Fax:
have built a zone of stability, democracy and
sustainable development whilst maintaining cultural
Industrial
E-mail:
diversity, tolerance and individual freedoms.
Web site:

The European Union is committed to sharing its


Development
The European Commission Representation
F O R

achievements and its values with countries and


Office to BiH
Mr. Hansjrg Kretschmer peoples beyond its borders. programme
Dubrovacka, 6
71000 Sarajevo The European Commission
M A N U A L

Bosnia and Herzegovina is the EUs executive body.


Tel:
Fax:
E-mail:
Web site:
V I S I B I L I T Y

This programme is implemented by (contractor).


The views expressed in this publication do not
necessarily reflect the views of the European
Commission
This project is funded by
The European Union
A project implemented by
(CONTRACTOR)
A N D

The industrial
Development Programme
for Partner Country
C O M M U N I C A T I O N

The concept The objectives Programme Components

Enim vulputpat. Ut prat. Dui tet augiamet ver sisi blan Enim vulputpat. Ut prat. Dui tet augiamet ver sisi blan Enim vulputpat. Ut prat. Dui tet augiamet ver sisi blan
ut in hent vel et in hendiatum dolor ipsusto consequat ut in hent vel et in hendiatum dolor ipsusto consequat ut in hent vel et in hendiatum dolor ipsusto consequat
acillan ut lor sum dolessi. acillan dipsum ercidunt dolessi. acillan dipsum er dolessi.

Ut dolorero exerit pratin henibh esse esto core Ut dolorero exerit pratin henibh esse esto core Ut dolorero exerit pratin henibh esse esto core
commy nullut auguera estrud min eumsandreet atin commy nullut auguera estrud min eumsandreet atin commy nullut auguera estrud min eumsandreet atin
ulput amcon henis amconsequam ex ex et ad dunt ulput amcon henis amconsequam ex ex et ad dunt ulput amcon henis amconsequam ex ex et ad dunt
lan ex esed te facillum ing et, sed mod dolor acilisim lan ex esed te facillum ing et, sed mod dolor acilisim lan ex esed te facillum ing et, sed mod dolor acilisim
zzriliq uamcommy nulla at, veliquatue delit atinis zzriliq uamcommy nulla at, veliquatue delit atinis zzriliq uamcommy nulla at, veliquatue delit atinis
eugue core atam simala. eugue core amcon henis amis. eugue core core etam amis.

Im digna feummod molorpercin volobore core Target groups


duiscidunt alit dolute dignibh euis eum augiamet am
zzrit la autpat, quat loborperos am velenis molorpercin volobore, alm, core duiscidunt alit dolute
nullandreet nulluptat, consed tet vercill umsandre dignibh euis eum augiamet am zzrit la autpat, quat
diatin etuer si blaor susto dipit vendipit lorperc loborperos am velenis nullandreet nulluptat, consed
iduipsu msaiat, euisisisi. tet vercill umsandre diatin etuer.

Enim vulputpat. Ut prat. Dui tet augiamet ver sisi blan Enim vulputpat. Ut prat. Dui tet augiamet ver sisi blan
ut in hent vel et in hendiatum dolor ipsusto consequat ut in hent vel et in hendiatum dolor ipsusto consequat
acillan dipsum e dolessi. acillan dipsum ercidunt dolessi.
ANNEX 3 page 35
A C T I O N S
E X T E R N A L

3 Brochures
U N I O N
E U R O P E A N

The European Unions XXXXXXX programme


For Partner Country
F O R
M A N U A L

The industrial

development programme
V I S I B I L I T Y

for Partner Country


A N D

Activity report
C O M M U N I C A T I O N

This project is funded by A project implemented by


The European Union (CONTRACTOR)
page 36
A C T I O N S
E X T E R N A L

4 Newsletters
U N I O N
E U R O P E A N

NEWSLETTER TITLE
A quarterly newsletter published by xxxx a project funded by European Union's XXXXX programme for "Partner Country"
N1

IN FOCUS
F O R

Title

> Iquam itemno nonsequamet, quat.


M A N U A L

Duisl dolobor percidunt, itam velisim


ip etue cor iriuscil enislim, quat. Duis
nit emmiriuscil enisl it, wisisl utpat,
adiamconsent ing eui bla at ut am,
con atinam utpat.

Henim duipis nim ilit wis fillmim at ero


odolore tio odolore te vendre euguer
V I S I B I L I T Y

sectet, volore lemma feuis alit nos nim


ipsuscilla faccum deliquatum numsandit
adit ad magnit, consed molobor ercidunt
delent deliqui euisi. Tat il utat, vero
conse faccum autpatum volortio et aut
iure esequis non henibh et lorpero od Verostrud te dignim alit venit ip ercilla Rud et iure magna cor incidui pissim
tinit, velesequate do odignis esto erci conse tat la feum exerci tie modigna illum zzriureros niam zzriurer autem
eugiam et ullan eriusto consenibh mer facip et autpat illum nullam ipiscipit, velis dolor iuscidui elit ulla feu faci bla
pratik immlom sum. velessi blaorenullaore dolore minci et acipit nim dipit, conullaor sit num nostio
wisit et it nullaore tat, susto dit iustrud consendignim quis aci eugait acil ure vel
Rud et iure magna cor incidui pissim tatimm, lore facidui psuscipsum dignim del utet, volor sum do.
A N D

illum zzriureros niam zzriurer autem dolelenisi illummin.


velis dolor iuscidui elit ulla feu faci bla
acipit nim dipit, conullaor sit num nostio Henim duipis nim ilit wis fillmim at ero
consendignim quis aci eugait acil ure vel odolore tio odolore te vendre euguer
del utet, volor sum do. It nulla feugue In this issue:
sectet, volore lemma feuis alit nos nim
C O M M U N I C A T I O N

esteuguero del eraessed magna conse ipsuscilla faccum deliquatum numsandit Supporting the Property Law
el etamm advis doloreet alisi bla feuis adit ad magnit, consed molobor ercidunt
digna facipit in er. Implementation Plan p.2
delent deliqui euisi, etom,mullan eriusto
consenibh mer pratik immlom.
To coreet irilissenim dolor iril exerat vel
elisit nummy num adip ero consecte faci Tat il utat, vero conse faccum autpatum
bla feuguerat, velissed mincinit iriure volortio et aut iure esequis non henibh
dolortisi. Wis in, jummi, etam, otumon, Enforcing the customs law p.3
et lorpero odimm, tinit, lemma feuis lum
autatuero odolum vullummod modions exer sequat loreet, conummod ilim alit.
equate venibh eum erostrud dolor iure Tat il utat, vero conse faccum autpatum
feugiam dio estrumom, er aut vel ing volortio et aut iure esequis non henibh
etum lam sam, allim. et lorpero odimm, tinit, lemma feuis alit
velesequate do odignis esto erci eugiam
Odionsendre conullamet la feugait nos et ullbh immer adiat prat nums and it Interview with
nulputpatet lumin, etis, imm, exer sequat rerostrud magna doloreet alisi duipis Mr Hansjrg Kretschmer p.4
loreet, conummod ilim, do itim, elam, nim ilit wis fillmim at ero odolore tio
dignisitos nums and it rerostrud magna odolore bla feuis, vullummod modions
augait at, quisci nonsequisit. equate venibh eum.

This project is funded by the European Union This project is implemented by (contractor).

The views expressed in this publication do not necessarily reflect the views of the European Commission.
ANNEX 3 page 37
A C T I O N S
E X T E R N A L

5 Display Panels
U N I O N

This project
is financed
by the
E U R O P E A N

EUROPEAN
UNION

Implementing partner:
CONTRACTOR
F O R

Start of the works: 25.09.1999


End of the works: 30.04.2000
M A N U A L
V I S I B I L I T Y
A N D

6 Banners
C O M M U N I C A T I O N

Project funded by the European Union


page 38
A C T I O N S
E X T E R N A L

7 Commemorative Plaques
U N I O N
E U R O P E A N
F O R

This school was rebuilt with the support


M A N U A L

of the European Union


V I S I B I L I T Y

European Union Contractor


A N D

8 Vehicle Panels
C O M M U N I C A T I O N

Provided by the European Union

European Union Contractor


C O M M U N I C A T I O N A N D V I S I B I L I T Y M A N U A L F O R E U R O P E A N U N I O N E X T E R N A L A C T I O N S

ANNEX 3

European Union

Provided by the European Union


Contractor
Provided by the European Union
page

Contractor
39
page 40
A C T I O N S
E X T E R N A L

9 Promotional Items
Important note: On certain promotional items
(e.g. pens and banners), where it is not
U N I O N

possible to include key messages in their


entirety, at least the EU flag must appear,
followed by one of the following key phrases
E U R O P E A N

European
Union

(or similar), underlining the beneficiary


country and the sector concerned: European Union

Cooperation that Counts.


The European Union and the
F O R

countries of [insert the names of the


countries or region]: A Cooperation
M A N U A L

that counts.
The European Unions [insert the
nature of the programme, e.g.
Health] cooperation programme with
V I S I B I L I T Y

[insert the countrys name].


European Union [insert the European

countrys name], partner rather


Union

than donor.
European Union
European Union
A N D

[insert the countrys name].


C O M M U N I C A T I O N
ANNEX 4 page 41
A C T I O N S
E X T E R N A L

Definitions & General


Statements
U N I O N
E U R O P E A N

1 General Statements 2 Definitions of the Commission, the Court of Justice and the
Court of Auditors.
If the contractor, implementing partner or European Union and
international organisation wishes to put a its Institutions
The European Union is a major player in
F O R

general statement on the EU for its region


If the contractor, implementing partner international cooperation and develop-
in written communications such as press
or international organisation decides that ment aid. It is also the worlds largest hu-
M A N U A L

releases, fact sheets, publications, project


more detailed information about the EU is manitarian aid donor. The primary aim of
web sites or electronic information mate-
needed, the following approved definitions the EUs own development policy, agreed
rials, it should use the relevant standard
should be used in any communication in November 2000, is the eradication of
general statement. A general statement on
materials, unless otherwise instructed by
V I S I B I L I T Y

the EU and standard definitions for the EU poverty.


the Press and Information Officer.
and its institutions are provided below.
http://europa.eu/
Other general statements may be appro- European Union
priate, e.g. for the instrument under which The European Union is a unique econom-
European Parliament
the action is being implemented, for more ic and political partnership between 27
A N D

The European Parliament is the directly


general EU development or cooperation European countries. In 1957, the signature
objectives, or to emphasise a particular elected expression of political will of
of the Treaties of Rome marked the will of
C O M M U N I C A T I O N

partnership. For defining such statements, the European Union and the largest
the six founding countries to create a com-
the contractor, implementing partner or multinational Parliament in the world. The
mon economic space. Since then, first the
international organisation should contact European Parliament upholds citizens
Community and then the European Union
the Press and Information Officer or project has continued to enlarge and welcome new rights, adopts legislation and monitors
manager concerned. countries as members. The Union has de- the use of executive power.
veloped into a huge single market with the http://www.europarl.europa.eu
General Statement on the EU euro as its common currency.
The European Union is made up of 27
Council of the European Union
Member States who have decided to What began as a purely economic union Usually known as the Council of Ministers,
gradually link together their know-how, has evolved into an organisation spanning specialised government ministers meet
resources and destinies. Together, dur- all areas, from development aid to environ- from each Member State to take deci-
ing a period of enlargement of 50 years, mental policy. Thanks to the abolition of bor-
sions and resolve national differences in
they have built a zone of stability, democ der controls between EU countries, it is now
racy and sustainable development whilst the various policy areas. The European
possible for people to travel freely within
maintaining cultural diversity, tolerance Council, made up of 27 Heads of State or
most of the EU. It has also become much
and individual freedoms. government, meets at least twice a year
easier to live and work in another EU country.
to set objectives and fix priorities. Each
The European Union is committed to
Member State takes the Presidency in turn
sharing its achievements and its values The five main institutions of the European
for a term of six months.
with countries and peoples beyond its Union are the European Parliament,
borders. the Council of Ministers, the European http://www.consilium.europa.eu
page 42
A C T I O N S
E X T E R N A L
U N I O N

European Commission Other institutions European Central Bank (ECB)


The European Commission is the The European Central Bank is the central
E U R O P E A N

European Communitys executive body. European Investment Bank (EIB) bank for the European Unions single
Led by 27 Commissioners, the European The European Investment Bank is the currency, the euro, that was introduced
Commission initiates proposals of in 1999. The ECBs main task is to
European Unions financing institution.
legislation and acts as guardian of the maintain the euros purchasing power
It provides loans for capital investment
and the price stability in the euro area.
F O R

Treaties. The Commission is also a promoting the Unions balanced economic


The euro area comprises 16 European
manager and executor of common policies development and integration. It is the
Union countries.
M A N U A L

and of international trade relationships. leading institution for basic infrastructure


It is responsible for the management of investments in South Eastern Europe. http://www.ecb.eu
European Union external assistance. http://www.eib.europa.eu
http://ec.europa.eu
V I S I B I L I T Y

European Economic and Social


Court of Justice of European Committee (EESC)
Union The European Economic and Social
The European Court of Justice provides Committee represents the views and
the judicial safeguard necessary to ensure interests of organised civil society vis--
A N D

vis the Commission, the Council and the


that the law is observed in the interpretation
European Parliament. The Committee
and application of the Treaties and all
C O M M U N I C A T I O N

has to be consulted on matters relating


legislation based upon them.
to economic and social policy; it may
http://www.curia.europa.eu also issue opinions on its own initiative
on other matters which it considers to be
European Court of Auditors important.
The European Court of Auditors is
http://www.eesc.europa.eu
responsible for checking that the European
Union spends its money according to
Committee of the Regions (COR)
budgetary rules and regulations. The Committee of the Regions is the
http://www.eca.europa.eu political assembly which provides local
and regional authorities with a voice at the
heart of the European Union. It has to be
consulted on matters concerning regional
policy, the environment and education. It
is composed of representatives of regional
and local authorities.

http://www.cor.europa.eu/
KQ-30-08-601-EN-C

You might also like