Create Sale order for Quantity 1, because of statergy 40 maintained in Material Master sale order

consume the PIR , so the result will be shown below:

Sale order consume the Oldest PIR

Now edit the sale order Quantity to 10 and check the MD04, Sale order consume Oldest PIR (15 EA)
and the result shown below:
Now, edit the sale order Quantity to 20 and check the MD04, sale order consume the entire PIR
quantity and replaced it.

If we run MRP then system will not create any Procurement Proposal because demand was fulfilled
by the available stock.

Now, Edit the Sale Order Quantity to 160 and Run MRP the system will create two planned Order for
10 & 30 Quantity Each.

Scenario-2: Consumption Indicator Removed


Now Check MD04, the sale order never consume PIR because consumption indicator was not
maintained in material master

Now Run MRP, the Planned Orders created for only 5 EA Quantity