You are on page 1of 6

Job No.

SUBSURFACE EXPLORATION LOG 16-14529-2


Project : JUBAIL RAILWAY PROJECT
Location : MAIN LINE, P5 (KP=9600m to 12900m) Client : YAPI MERKEZI SAUDI COMPANY
BORING NO. Type of Boring : Rotary Wash Diameter of Boring 90mm
: 6/9/2016
Date Started :
JRN-BH-57 (KP=10980) Sampling Hammer Wt & Drop :140lbs & 30" Date Completed :6/9/2016
Ground Elevation (m) : 4.237 North : 42931.926 East : 60444.969 Depth at Gr. Water Table (m): 1.73
Sample Type

Blows Per
& Number

Classific-
(Meters)

Symbol
30 Cms

DESCRIPTION Standard Penetration REMARKS


Depth

ation

Test, Blows/30 Cms.


0 10 20 30 40 50 60
Brownish, silty clayey SAND.
HE

1 1
1
SPT-1 1 Ditto, very loose.
1 SC-SM
TR
2 2
1
SPT-2 2 Ditto, loose.
3
TR
3 1.24 3
2
SPT-3 5 Grayish, loose, poorly graded, fine to medium
5 grained SAND with silt.
TR
4 4
4
SPT-4 6 Ditto, medium dense.
6
TR
5 5
3
SPT-5 5 Ditto, loose.
5
TR
6 6
4
SPT-6 7 Ditto, medium dense.
9
TR
7 7
6
SPT-7 10 Ditto,
15 SP-SM
TR
8 8
12
SPT-8 14 Ditto, dense.
33

9 TR 9

10
SPT-9 10 Ditto, medium dense.
10 12 10

TR

11 11
11
SPT-10 10 Ditto,
11

12 12
Legend : SPT1: Standard Penetration Test and No. Pz : Piezometer
TR : Tricone Drilling NE: Not Encountered SHEET 1 OF 2
C1 : Rock Core Run and Number HE: Hand Exavation
GULF CONSULT- Geotech Division. P.O. BOX 684, Al-Khobar. Tel.8944468 / 8954242 - Jubail Tel. 3410017 / 3410018
163
Job No.
SUBSURFACE EXPLORATION LOG 16-14529-2
Project : JUBAIL RAILWAY PROJECT
Location : MAIN LINE, P5 (KP=9600m to 12900m) Client : YAPI MERKEZI SAUDI COMPANY
BORING NO. Type of Boring : Rotary Wash Diameter of Boring 90mm
: 6/9/2016
Date Started :
JRN-BH-57 (KP=10980) Sampling Hammer Wt & Drop :140lbs & 30" Date Completed :6/9/2016
Ground Elevation (m) : 4.237 North : 42931.926 East : 60444.969 Depth at Gr. Water Table (m): 1.73
Sample Type

Blows Per
& Number

Classific-
(Meters)

Symbol
30 Cms

DESCRIPTION Standard Penetration REMARKS


Depth

ation

Test, Blows/30 Cms.


0 10 20 30 40 50 60
TR Grayish, medium dense, poorly graded, fine to
SP-SM medium grained SAND with silt.
13 -8.76 13
29
SPT-11 40 Yellowish, very dense, silty GRAVEL. >>
50/10cm

14 14
TR

GM
15 15
25
SPT-12 40 Ditto, >>
50/8cm
TR
16 16
28
SPT-13 47 Ditto, >>
50/5cm -12.21
Boring terminated at 16.45meters depth
17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24
Legend : SPT1: Standard Penetration Test and No. Pz : Piezometer
TR : Tricone Drilling NE: Not Encountered SHEET 2 OF 2
C1 : Rock Core Run and Number HE: Hand Exavation
GULF CONSULT- Geotech Division. P.O. BOX 684, Al-Khobar. Tel.8944468 / 8954242 - Jubail Tel. 3410017 / 3410018
164
Job No.
SUBSURFACE EXPLORATION LOG 16-14529-2
Project : JUBAIL RAILWAY PROJECT
Location : MAIN LINE, P5 (KP=9600m to 12900m) Client : YAPI MERKEZI SAUDI COMPANY
BORING NO. Type of Boring : Rotary Wash Diameter of Boring 90mm
: 6/27/2016
Date Started :
JRN-BH-62s (KP=10993) Sampling Hammer Wt & Drop :140lbs & 30" Date Completed :6/29/2016
Ground Elevation (m) : 4.467 North : 42936.678 East : 60457.108 Depth at Gr. Water Table (m): 1.00
Sample Type

Blows Per
& Number

Classific-
(Meters)

Symbol
30 Cms

DESCRIPTION Standard Penetration REMARKS


Depth

ation

Test, Blows/30 Cms.


0 10 20 30 40 50 60
Yellowish to brownish, silty SAND.

HE
1 1

SM
TR
2 2
1
SPT-1 3 Ditto, brownish, loose.
4
TR
3 1.47 3
2
SPT-2 2 Brownish, loose, poorly graded, fine to
3 medium grained SAND with silt.
TR
4 4
4
SPT-3 3 Ditto, medium dense.
8
TR
5 5
2
SPT-4 2 Ditto, grayish, very loose.
1
TR
6 6
1
SPT-5 2 Ditto, loose.
3
TR
7 7
3 SP-SM
SPT-6 4 Ditto, medium dense.
9
TR
8 8
10
SPT-7 10 Ditto,
9

9 TR 9

12
SPT-8 15 Ditto, dense.
10 18 10

TR

11 -6.53 11
20
SPT-9 35 Brownish, very dense, silty GRAVEL. >>
39 GM

12 12
Legend : SPT1: Standard Penetration Test and No. Pz : Piezometer
TR : Tricone Drilling NE: Not Encountered SHEET 1 OF 4
C1 : Rock Core Run and Number HE: Hand Exavation
GULF CONSULT- Geotech Division. P.O. BOX 684, Al-Khobar. Tel.8944468 / 8954242 - Jubail Tel. 3410017 / 3410018
165
Job No.
SUBSURFACE EXPLORATION LOG 16-14529-2
Project : JUBAIL RAILWAY PROJECT
Location : MAIN LINE, P5 (KP=9600m to 12900m) Client : YAPI MERKEZI SAUDI COMPANY
BORING NO. Type of Boring : Rotary Wash Diameter of Boring 90mm
: 6/27/2016
Date Started :
JRN-BH-62s (KP=10993) Sampling Hammer Wt & Drop :140lbs & 30" Date Completed :6/29/2016
Ground Elevation (m) : 4.467 North : 42936.678 East : 60457.108 Depth at Gr. Water Table (m): 1.00
Sample Type

Blows Per
& Number

Classific-
(Meters)

Symbol
30 Cms

DESCRIPTION Standard Penetration REMARKS


Depth

ation

Test, Blows/30 Cms.


0 10 20 30 40 50 60
TR Brownish, very dense, silty GRAVEL.

13 13
13
SPT-10 25 Ditto, yellowish. >>
50/14cm

14 14
TR
GM

15 15
30 Ditto, >>
SPT-11
50/8cm

16 16
TR

17 -12.53 17
26
SPT-12 37 Yellowish, very dense, clayey SAND. >>
41

18 18
TR

19 19
19
SPT-13 25 Ditto,
30

20 20
SC
TR

21 21
30
SPT-14 37 Ditto, >>
45

22 22
TR

23 -18.53 23
15
SPT-15 26 Gray, hard, fat CLAY. >>
39 CH

24 24
Legend : SPT1: Standard Penetration Test and No. Pz : Piezometer
TR : Tricone Drilling NE: Not Encountered SHEET 2 OF 4
C1 : Rock Core Run and Number HE: Hand Exavation
GULF CONSULT- Geotech Division. P.O. BOX 684, Al-Khobar. Tel.8944468 / 8954242 - Jubail Tel. 3410017 / 3410018
166
Job No.
SUBSURFACE EXPLORATION LOG 16-14529-2
Project : JUBAIL RAILWAY PROJECT
Location : MAIN LINE, P5 (KP=9600m to 12900m) Client : YAPI MERKEZI SAUDI COMPANY
BORING NO. Type of Boring : Rotary Wash Diameter of Boring 90mm
: 6/27/2016
Date Started :
JRN-BH-62s (KP=10993) Sampling Hammer Wt & Drop :140lbs & 30" Date Completed :6/29/2016
Ground Elevation (m) : 4.467 North : 42936.678 East : 60457.108 Depth at Gr. Water Table (m): 1.00
Sample Type

Blows Per
& Number

Classific-
(Meters)

Symbol
30 Cms

DESCRIPTION Standard Penetration REMARKS


Depth

ation

Test, Blows/30 Cms.


0 10 20 30 40 50 60
TR Gray, hard, fat CLAY.

25 25
20
SPT-16 27 Ditto, >>
34

26 26
TR

27 27
30 Ditto, >>
SPT-17
50/8cm
CH

28 28
TR

29 29
39
SPT-18 40 Ditto, >>
50/8cm

30 30
TR

31 -26.53 31
20
SPT-19 39 Yellowish, hard, sandy lean CLAY. >>
45

32 32
TR

33 33
30 Ditto, >>
SPT-20
50/3cm
CL

34 34
TR

35 35
SPT-2150/14cm Ditto, >>

36 36
Legend : SPT1: Standard Penetration Test and No. Pz : Piezometer
TR : Tricone Drilling NE: Not Encountered SHEET 3 OF 4
C1 : Rock Core Run and Number HE: Hand Exavation
GULF CONSULT- Geotech Division. P.O. BOX 684, Al-Khobar. Tel.8944468 / 8954242 - Jubail Tel. 3410017 / 3410018
167
Job No.
SUBSURFACE EXPLORATION LOG 16-14529-2
Project : JUBAIL RAILWAY PROJECT
Location : MAIN LINE, P5 (KP=9600m to 12900m) Client : YAPI MERKEZI SAUDI COMPANY
BORING NO. Type of Boring : Rotary Wash Diameter of Boring 90mm
: 6/27/2016
Date Started :
JRN-BH-62s (KP=10993) Sampling Hammer Wt & Drop :140lbs & 30" Date Completed :6/29/2016
Ground Elevation (m) : 4.467 North : 42936.678 East : 60457.108 Depth at Gr. Water Table (m): 1.00
Sample Type

Blows Per
& Number

Classific-
(Meters)

Symbol
30 Cms

DESCRIPTION Standard Penetration REMARKS


Depth

ation

Test, Blows/30 Cms.


0 10 20 30 40 50 60
TR Yellowish, hard, sandy lean CLAY.
CL

37 -32.53 37
30
SPT-22 35 Gray, hard, sandy fat CLAY. >>
40

38 38
TR

39 39
SPT-23 50/8cm Ditto, >>

40 40
TR

41 41
20 Ditto, >>
SPT-24 CH
50/14cm

42 42
TR

43 43
17
SPT-25 28 Ditto, >>
40

44 44
TR

45 45
20
SPT-26 29 Ditto, >>
47 -40.98
Boring terminated at 45.45meters depth
46 46

47 47

48 48
Legend : SPT1: Standard Penetration Test and No. Pz : Piezometer
TR : Tricone Drilling NE: Not Encountered SHEET 4 OF 4
C1 : Rock Core Run and Number HE: Hand Exavation
GULF CONSULT- Geotech Division. P.O. BOX 684, Al-Khobar. Tel.8944468 / 8954242 - Jubail Tel. 3410017 / 3410018
168

You might also like