You are on page 1of 1

--------------------------------------------

Questions to discuss with Hicham


--------------------------------------------
- Customer Templates: SSV, Site integration Report (Mallem)
- MTU size of backhaul relevant for MTU size of eNB
- what was your backhaul at Orange Marseille?

- Cluster RF optim Drive test criteria for interference and coverage holes: RSRQ <-
thresold value depending
on load
- your Cluster RF optim DT performed with OCNS load?
- For Cluster optim what did you change mainly: tilts? azimuths?
- what is ACP?
- We have to do Cluster RF optim with UE, did you compare planning with Cluster DT
results?
- Did you have to consider 4G - 3G Handover or CS fallback?

- How did you execute FTP UL/DL tests -- attach -- ftp -- wait -- ftp -- wait --
ftp ..... stop? or rather attach -- continuous ftp -- stop?

- How did you execute HO tests? with ongoing ping? 32 byte? 1000 byte? or more?

You might also like