Depth

Item RC Rate/per meter (GHC)

1 0-50

2 50-100

3 100-150

4 150-200

5 200-250

6 250-300

Item DD HQ NQ

Rate/per meter (GHC)

1 0-100

2 100-200

3 200-300

4 300-400

5 400-500

6 500-600
Delay Time
Item Description/CORING Rate/hr (GHC)

1 move to new site

2 set up/set down

3 Packing tools

4 Pull/Run rods

5 Mixing mud

6 Standby

7 Fishing

8 Reaming time

9 Change over

10 Cleaning hole

11 DD drilling time

12 RC drilling time

13 Survey time

14 Changing drill bit

15 Core orientation

16 Service time

17 Hammer servicing

18 Laying water line

19 Controlled drilling

20 Mobilization/Demobilization

Consumables

Item Description Rate/m (GHC)

1 Aus plug(kg)

2 Bentonite(kg)

3 Polymer(L)

4 Rod grease

5 PVC pipe(m)

6 Drill foam(L)
7 A+B foam

8 Bit lube(L)

9 Sl foam(L)

10 C pack(L)

11 Diesel(L)

12 Hammer oil(L)

13 Liquid rod grease(L)

14 Material lost in hole(LOT)

15 CR650 Bucket
Item Descrition - Others Unit cost/h (GHC)

1 Diesel carting

2 Dozer hire

3 Water carting

4 Water pump

5 Genset

6 Submersible pump(hr)

7 Low loader hire

8 Aux booster

9 Aux comp

You might also like