362010416.

xls Proyecto

Num Cdigo Txt Corto Txt Largo Dur. Acel Dur. Pre Dur.Nor Coste Acel Coste Norm Med Rend
1 A.1 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
2 A.2 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
3 A.3 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
4 A.4 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
9 B.1 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
10 B.2 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
11 C.1 0.00 7.00 7.00 0.00 0.00 0.00 0.00000
12 D.2 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
13 D.1 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
14 E.1 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
15 E.2 0.00 7.00 7.00 0.00 0.00 0.00 0.00000
16 E.3 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
17 E.4 0.00 2.00 2.00 0.00 0.00 0.00 0.00000
18 D.3 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
19 D.4 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
20 D.5 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
21 F.1 0.00 8.00 8.00 0.00 0.00 0.00 0.00000
23 E.5 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
24 E.6 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
25 E.7 0.00 2.00 2.00 0.00 0.00 0.00 0.00000
26 E.8 0.00 6.00 6.00 0.00 0.00 0.00 0.00000
27 E.9 0.00 7.00 7.00 0.00 0.00 0.00 0.00000
28 E.10 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
29 E.11 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
30 E.12 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
31 E.13 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
32 E.16 0.00 3.00 3.00 0.00 0.00 0.00 0.00000
33 E.17 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
34 E.18 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
35 TT3 0.00 7.00 7.00 0.00 0.00 0.00 0.00000
36 TT1 0.00 14.00 14.00 0.00 0.00 0.00 0.00000
37 TT2 0.00 21.00 21.00 0.00 0.00 0.00 0.00000
38 E.19 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
39 E.14 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
40 E.15 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
41 J 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
42 G 0.00 10.00 10.00 0.00 0.00 0.00 0.00000
44 H.1 0.00 6.00 6.00 0.00 0.00 0.00 0.00000

01/08/2016 16:05:09 / Previsto Pagina 1 de 9 Paginas


362010416.xls Proyecto

45 H.3 0.00 3.00 3.00 0.00 0.00 0.00 0.00000


46 H.4 0.00 2.00 2.00 0.00 0.00 0.00 0.00000
47 I 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
48 H.2 0.00 2.00 2.00 0.00 0.00 0.00 0.00000
51 TT6 0.00 7.00 7.00 0.00 0.00 0.00 0.00000
52 TT9 0.00 3.00 3.00 0.00 0.00 0.00 0.00000
53 K.1 0.00 2.00 2.00 0.00 0.00 0.00 0.00000
54 K.2 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
55 K.3 0.00 4.00 4.00 0.00 0.00 0.00 0.00000
56 K.4 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
59 L.1 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
60 L.2 0.00 3.00 3.00 0.00 0.00 0.00 0.00000
61 L.3 0.00 3.00 3.00 0.00 0.00 0.00 0.00000
62 M.1 0.00 1.00 1.00 0.00 0.00 0.00 0.00000
63 M.2 0.00 1.00 1.00 0.00 0.00 0.00 0.00000

01/08/2016 16:05:09 / Previsto Pagina 2 de 9 Paginas


362010416.xls Proyecto

Precio
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

01/08/2016 16:05:09 / Previsto Pagina 3 de 9 Paginas


362010416.xls Proyecto

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

01/08/2016 16:05:09 / Previsto Pagina 4 de 9 Paginas


362010416.xls Tiempos

CUADRO DE HOLGURAS RED-GRAFOS

Num Cdigo DURACION Ei Li Ef Lf Ei + D Li + D Holgura T. Holgura L. Holgura I.


1 A.1 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
2 A.2 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
3 A.3 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
4 A.4 1.00 0.00 0.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00
9 B.1 1.00 1.00 1.00 2.00 2.00 2.00 2.00 0.00 0.00 0.00
10 B.2 1.00 2.00 2.00 3.00 3.00 3.00 3.00 0.00 0.00 0.00
11 C.1 7.00 3.00 3.00 10.00 10.00 10.00 10.00 0.00 0.00 0.00
12 D.2 1.00 10.00 12.00 11.00 13.00 11.00 13.00 2.00 0.00 -2.00
13 D.1 1.00 10.00 10.00 11.00 11.00 11.00 11.00 0.00 0.00 0.00
14 E.1 1.00 11.00 13.00 12.00 14.00 12.00 14.00 2.00 0.00 -2.00
15 E.2 7.00 12.00 14.00 19.00 21.00 19.00 21.00 2.00 0.00 -2.00
16 E.3 1.00 19.00 21.00 20.00 22.00 20.00 22.00 2.00 0.00 -2.00
17 E.4 2.00 22.00 22.00 24.00 24.00 24.00 24.00 0.00 0.00 0.00
18 D.3 1.00 11.00 11.00 12.00 12.00 12.00 12.00 0.00 0.00 0.00
19 D.4 1.00 12.00 12.00 13.00 13.00 13.00 13.00 0.00 0.00 0.00
20 D.5 1.00 13.00 13.00 14.00 14.00 14.00 14.00 0.00 0.00 0.00
21 F.1 8.00 14.00 14.00 22.00 22.00 22.00 22.00 0.00 0.00 0.00
23 E.5 1.00 24.00 24.00 25.00 25.00 25.00 25.00 0.00 0.00 0.00
24 E.6 1.00 25.00 25.00 26.00 26.00 26.00 26.00 0.00 0.00 0.00
25 E.7 2.00 26.00 40.00 28.00 42.00 28.00 42.00 14.00 0.00 -14.00
26 E.8 6.00 26.00 26.00 32.00 32.00 32.00 32.00 0.00 0.00 0.00
27 E.9 6.00 28.00 42.00 35.00 49.00 34.00 48.00 15.00 1.00 -13.00
28 E.10 1.00 35.00 49.00 36.00 50.00 36.00 50.00 14.00 0.00 -14.00
29 E.11 1.00 32.00 32.00 33.00 33.00 33.00 33.00 0.00 0.00 0.00
30 E.12 1.00 33.00 33.00 34.00 34.00 34.00 34.00 0.00 0.00 0.00
31 E.13 1.00 34.00 34.00 35.00 35.00 35.00 35.00 0.00 0.00 0.00
32 E.16 3.00 26.00 36.00 29.00 39.00 29.00 39.00 10.00 0.00 -10.00
33 E.17 1.00 29.00 39.00 30.00 40.00 30.00 40.00 10.00 0.00 -10.00
34 E.18 1.00 30.00 40.00 31.00 41.00 31.00 41.00 10.00 0.00 -10.00
35 TT3 7.00 31.00 41.00 38.00 48.00 38.00 48.00 10.00 0.00 -10.00
36 TT1 14.00 35.00 35.00 49.00 49.00 49.00 49.00 0.00 0.00 0.00
37 TT2 21.00 36.00 50.00 57.00 71.00 57.00 71.00 14.00 0.00 -14.00
38 E.19 1.00 38.00 48.00 39.00 49.00 39.00 49.00 10.00 0.00 -10.00
39 E.14 1.00 49.00 49.00 50.00 50.00 50.00 50.00 0.00 0.00 0.00
40 E.15 1.00 57.00 71.00 58.00 72.00 58.00 72.00 14.00 0.00 -14.00
41 J 1.00 39.00 49.00 40.00 50.00 40.00 50.00 10.00 0.00 -10.00
42 G 10.00 50.00 50.00 60.00 60.00 60.00 60.00 0.00 0.00 0.00
44 H.1 6.00 60.00 60.00 66.00 66.00 66.00 66.00 0.00 0.00 0.00
45 H.3 3.00 60.00 63.00 63.00 66.00 63.00 66.00 3.00 0.00 -3.00
46 H.4 2.00 58.00 72.00 60.00 74.00 60.00 74.00 14.00 0.00 -14.00
47 I 1.00 60.00 65.00 61.00 66.00 61.00 66.00 5.00 0.00 -5.00
48 H.2 2.00 66.00 66.00 68.00 68.00 68.00 68.00 0.00 0.00 0.00
51 TT6 7.00 66.00 72.00 73.00 79.00 73.00 79.00 6.00 0.00 -6.00
52 TT9 3.00 60.00 74.00 63.00 77.00 63.00 77.00 14.00 0.00 -14.00
53 K.1 2.00 68.00 68.00 70.00 70.00 70.00 70.00 0.00 0.00 0.00
54 K.2 1.00 70.00 73.00 71.00 74.00 71.00 74.00 3.00 0.00 -3.00
55 K.3 4.00 70.00 70.00 74.00 74.00 74.00 74.00 0.00 0.00 0.00
56 K.4 1.00 70.00 73.00 71.00 74.00 71.00 74.00 3.00 0.00 -3.00
59 L.1 1.00 74.00 76.00 75.00 77.00 75.00 77.00 2.00 0.00 -2.00
60 L.2 3.00 74.00 74.00 77.00 77.00 77.00 77.00 0.00 0.00 0.00
61 L.3 3.00 74.00 74.00 77.00 77.00 77.00 77.00 0.00 0.00 0.00
62 M.1 1.00 74.00 76.00 75.00 77.00 75.00 77.00 2.00 0.00 -2.00
63 M.2 1.00 74.00 76.00 75.00 77.00 75.00 77.00 2.00 0.00 -2.00

01/08/2016 16:05:09 / Previsto Pagina 5 de 9 Paginas


362010416.xls Costes

Num Cdigo Txt Corto Txt Largo Dur. Acel Dur. Pre Dur. Nor Coste Acel Coste Norm Dur. Calc. Coste Calc.
1 A.1 0.00 1.00 1.00 0.00 0.00 1.00 0.00
2 A.2 0.00 1.00 1.00 0.00 0.00 1.00 0.00
3 A.3 0.00 1.00 1.00 0.00 0.00 1.00 0.00
4 A.4 0.00 1.00 1.00 0.00 0.00 1.00 0.00
9 B.1 0.00 1.00 1.00 0.00 0.00 1.00 0.00
10 B.2 0.00 1.00 1.00 0.00 0.00 1.00 0.00
11 C.1 0.00 7.00 7.00 0.00 0.00 7.00 0.00
12 D.2 0.00 1.00 1.00 0.00 0.00 1.00 0.00
13 D.1 0.00 1.00 1.00 0.00 0.00 1.00 0.00
14 E.1 0.00 1.00 1.00 0.00 0.00 1.00 0.00
15 E.2 0.00 7.00 7.00 0.00 0.00 7.00 0.00
16 E.3 0.00 1.00 1.00 0.00 0.00 1.00 0.00
17 E.4 0.00 2.00 2.00 0.00 0.00 2.00 0.00
18 D.3 0.00 1.00 1.00 0.00 0.00 1.00 0.00
19 D.4 0.00 1.00 1.00 0.00 0.00 1.00 0.00
20 D.5 0.00 1.00 1.00 0.00 0.00 1.00 0.00
21 F.1 0.00 8.00 8.00 0.00 0.00 8.00 0.00
23 E.5 0.00 1.00 1.00 0.00 0.00 1.00 0.00
24 E.6 0.00 1.00 1.00 0.00 0.00 1.00 0.00
25 E.7 0.00 2.00 2.00 0.00 0.00 2.00 0.00
26 E.8 0.00 6.00 6.00 0.00 0.00 6.00 0.00
27 E.9 0.00 7.00 7.00 0.00 0.00 7.00 0.00
28 E.10 0.00 1.00 1.00 0.00 0.00 1.00 0.00
29 E.11 0.00 1.00 1.00 0.00 0.00 1.00 0.00
30 E.12 0.00 1.00 1.00 0.00 0.00 1.00 0.00
31 E.13 0.00 1.00 1.00 0.00 0.00 1.00 0.00
32 E.16 0.00 3.00 3.00 0.00 0.00 3.00 0.00
33 E.17 0.00 1.00 1.00 0.00 0.00 1.00 0.00
34 E.18 0.00 1.00 1.00 0.00 0.00 1.00 0.00
35 TT3 0.00 7.00 7.00 0.00 0.00 7.00 0.00
36 TT1 0.00 14.00 14.00 0.00 0.00 14.00 0.00
37 TT2 0.00 21.00 21.00 0.00 0.00 21.00 0.00
38 E.19 0.00 1.00 1.00 0.00 0.00 1.00 0.00
39 E.14 0.00 1.00 1.00 0.00 0.00 1.00 0.00
40 E.15 0.00 1.00 1.00 0.00 0.00 1.00 0.00
41 J 0.00 1.00 1.00 0.00 0.00 1.00 0.00
42 G 0.00 10.00 10.00 0.00 0.00 10.00 0.00
44 H.1 0.00 6.00 6.00 0.00 0.00 6.00 0.00

01/08/2016 16:05:09 / Previsto Pagina 6 de 9 Paginas


362010416.xls Costes

45 H.3 0.00 3.00 3.00 0.00 0.00 3.00 0.00


46 H.4 0.00 2.00 2.00 0.00 0.00 2.00 0.00
47 I 0.00 1.00 1.00 0.00 0.00 1.00 0.00
48 H.2 0.00 2.00 2.00 0.00 0.00 2.00 0.00
51 TT6 0.00 7.00 7.00 0.00 0.00 7.00 0.00
52 TT9 0.00 3.00 3.00 0.00 0.00 3.00 0.00
53 K.1 0.00 2.00 2.00 0.00 0.00 2.00 0.00
54 K.2 0.00 1.00 1.00 0.00 0.00 1.00 0.00
55 K.3 0.00 4.00 4.00 0.00 0.00 4.00 0.00
56 K.4 0.00 1.00 1.00 0.00 0.00 1.00 0.00
59 L.1 0.00 1.00 1.00 0.00 0.00 1.00 0.00
60 L.2 0.00 3.00 3.00 0.00 0.00 3.00 0.00
61 L.3 0.00 3.00 3.00 0.00 0.00 3.00 0.00
62 M.1 0.00 1.00 1.00 0.00 0.00 1.00 0.00
63 M.2 0.00 1.00 1.00 0.00 0.00 1.00 0.00

01/08/2016 16:05:09 / Previsto Pagina 7 de 9 Paginas


362010416.xls Simulacion

Num Cdigo Txt Corto Txt Largo Dur. Opt Dur. Pre Dur.Pes Distribucion Dur. Est. Dur. Sim. Criticidad
1 A.1 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
2 A.2 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
3 A.3 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
4 A.4 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
9 B.1 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
10 B.2 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
11 C.1 0.00 7.00 7.00 Determinista 7.00 0.00 0.00
12 D.2 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
13 D.1 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
14 E.1 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
15 E.2 0.00 7.00 7.00 Determinista 7.00 0.00 0.00
16 E.3 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
17 E.4 0.00 2.00 2.00 Determinista 2.00 0.00 0.00
18 D.3 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
19 D.4 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
20 D.5 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
21 F.1 0.00 8.00 8.00 Determinista 8.00 0.00 0.00
23 E.5 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
24 E.6 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
25 E.7 0.00 2.00 2.00 Determinista 2.00 0.00 0.00
26 E.8 0.00 6.00 6.00 Determinista 6.00 0.00 0.00
27 E.9 0.00 7.00 7.00 Determinista 7.00 0.00 0.00
28 E.10 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
29 E.11 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
30 E.12 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
31 E.13 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
32 E.16 0.00 3.00 3.00 Determinista 3.00 0.00 0.00
33 E.17 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
34 E.18 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
35 TT3 0.00 7.00 7.00 Determinista 7.00 0.00 0.00
36 TT1 0.00 14.00 14.00 Determinista 14.00 0.00 0.00
37 TT2 0.00 21.00 21.00 Determinista 21.00 0.00 0.00
38 E.19 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
39 E.14 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
40 E.15 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
41 J 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
42 G 0.00 10.00 10.00 Determinista 10.00 0.00 0.00
44 H.1 0.00 6.00 6.00 Determinista 6.00 0.00 0.00

01/08/2016 16:05:09 / Previsto Pagina 8 de 9 Paginas


362010416.xls Simulacion

45 H.3 0.00 3.00 3.00 Determinista 3.00 0.00 0.00


46 H.4 0.00 2.00 2.00 Determinista 2.00 0.00 0.00
47 I 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
48 H.2 0.00 2.00 2.00 Determinista 2.00 0.00 0.00
51 TT6 0.00 7.00 7.00 Determinista 7.00 0.00 0.00
52 TT9 0.00 3.00 3.00 Determinista 3.00 0.00 0.00
53 K.1 0.00 2.00 2.00 Determinista 2.00 0.00 0.00
54 K.2 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
55 K.3 0.00 4.00 4.00 Determinista 4.00 0.00 0.00
56 K.4 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
59 L.1 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
60 L.2 0.00 3.00 3.00 Determinista 3.00 0.00 0.00
61 L.3 0.00 3.00 3.00 Determinista 3.00 0.00 0.00
62 M.1 0.00 1.00 1.00 Determinista 1.00 0.00 0.00
63 M.2 0.00 1.00 1.00 Determinista 1.00 0.00 0.00

01/08/2016 16:05:09 / Previsto Pagina 9 de 9 Paginas