Code No: 55010 Set No. 1


JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
III B.Tech. I Sem., I Mid-Term Examinations, September 2011
MANAGEMENT SCIENCE
Objective Exam
Name: ______________________________ Hall Ticket No. A
Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 10.

I Choose the correct alternative:

1. Father of scientific management [ ]


(a) F.W.S Taylor (b) H.Fayol (c) Flippo (d) Jeck Gilberth

2. The main advantage of line organization is it is [ ]


(a) Effective command and control (b) defined responsibilities at all levels

om
(c) rigid discipline in the organization (d) ability of quick decision at all levels

3. Which of the following organization is preferred in automobile industry [ ]


(a) Line organization (b) line and staff organization

e.c
(c) functional organization (d) effective organization.

4. In time study the rating factor is applied to determine [ ]


(a) Standard time of a job
(c) fixation of incentive rate
m
(b) merit rating of the work
(d) normal time of a aimed at
ho
5. In inventory control theory, the economic order quantity is [ ]
(a) Average level of inventory (b) optimum lot size
tu

(c) lot size corresponding to break even analysis (d) capacity of warehouse

6. The salient feature of functional organization is [ ]


.jn

(a) Strict adherence to specification (b) separation of planning and design part
(c) each individual maintains functional efficiency (d) work is properly planned and distributed
w

7. The most popular type of organization used for civil engg construction is [ ]
(a) Line organization (b) line and staff organization
w

(c) functional organization (d) effective organization


w

8. Under the emerson efficiency plan, the worker gets a normal wage at the efficiency of [ ]
(a) 50% (b) 66% (c) 75% (d)85%

9. Father of industrial engineering [ ]


(a) Jeck Gilberth (b) Gnatt (c) Taylor (d) Newton

10. Which of the following organization is best suited for steel plants is [ ]
(a) Line organization (b) line and staff organization
(c) functional organization (d) effective organization

Cont2

www.jntuhome.com
To get updates to mobile sms ON JNTUHOME to 09870807070 or http://labs.google.co.in/smschannels/subscribe/JNTUHOME

Code No: 55010 :2: Set No. 1

II Fill in the blanks

11. Management is the art of ___________ through formally organized groups.

12. Management is both _____________ and ______________

13. ___________ was the foundation for work study and other productivity related techniques

14. Plant location is a _______________ decision.

15. Deciding in advance what is to be done in future is called ______________

16. The process of estimating the future based on the present and past data is called _____________

om
17. The process of guiding the subordinates to enable them to achieve goals is called ____________

e.c
18. The basic unit of work activity in micromotion studies is called _______________

19. Plant layout is a determinant of ____________ and profitability.

20. One of the examples for stock-out costs is ________________m


ho
-oOo-
tu
.jn
w
w
w

www.jntuhome.com
To get updates to mobile sms ON JNTUHOME to 09870807070 or http://labs.google.co.in/smschannels/subscribe/JNTUHOME

Code No: 55010 Set No. 2


JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
III B.Tech. I Sem., I Mid-Term Examinations, September 2011
MANAGEMENT SCIENCE
Objective Exam
Name: ______________________________ Hall Ticket No. A
Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 10.

I Choose the correct alternative:

1. In time study the rating factor is applied to determine [ ]


(a) Standard time of a job (b) merit rating of the work
(c) fixation of incentive rate (d) normal time of a aimed at

2. In inventory control theory, the economic order quantity is [ ]

om
(a) Average level of inventory (b) optimum lot size
(c) lot size corresponding to break even analysis (d) capacity of warehouse

3. The salient feature of functional organization is [ ]

e.c
(a) Strict adherence to specification (b) separation of planning and design part
(c) each individual maintains functional efficiency (d) work is properly planned and distributed

4.
(a) Line organization
m
The most popular type of organization used for civil engg construction is
(b) line and staff organization
[ ]
ho
(c) functional organization (d) effective organization

5. Under the emerson efficiency plan, the worker gets a normal wage at the efficiency of [ ]
tu

(a) 50% (b) 66% (c) 75% (d)85%

6. Father of industrial engineering [ ]


.jn

(a) Jeck Gilberth (b) Gnatt (c) Taylor (d) Newton

7. Which of the following organization is best suited for steel plants is [ ]


w

(a) Line organization (b) line and staff organization


(c) functional organization (d) effective organization
w

8. Father of scientific management [ ]


w

(a) F.W.S Taylor (b) H.Fayol (c) Flippo (d) Jeck Gilberth

9. The main advantage of line organization is it is [ ]


(a) Effective command and control (b) defined responsibilities at all levels
(c) rigid discipline in the organization (d) ability of quick decision at all levels

10. Which of the following organization is preferred in automobile industry [ ]


(a) Line organization (b) line and staff organization
(c) functional organization (d) effective organization.

Cont2

www.jntuhome.com
To get updates to mobile sms ON JNTUHOME to 09870807070 or http://labs.google.co.in/smschannels/subscribe/JNTUHOME

Code No: 55010 :2: Set No. 2

II Fill in the blanks

11. Plant location is a _______________ decision.

12. Deciding in advance what is to be done in future is called ______________

13. The process of estimating the future based on the present and past data is called _____________

14. The process of guiding the subordinates to enable them to achieve goals is called ____________

15. The basic unit of work activity in micro motion studies is called _______________

16. Plant layout is a determinant of ____________ and profitability.

om
17. One of the examples for stock-out costs is ________________

e.c
18. Management is the art of ___________ through formally organized groups.

19. Management is both _____________ and ______________

20. m
___________ was the foundation for work study and other productivity related techniques
ho
-oOo-
tu
.jn
w
w
w

www.jntuhome.com
To get updates to mobile sms ON JNTUHOME to 09870807070 or http://labs.google.co.in/smschannels/subscribe/JNTUHOME

Code No: 55010 Set No. 3


JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
III B.Tech. I Sem., I Mid-Term Examinations, September 2011
MANAGEMENT SCIENCE
Objective Exam
Name: ______________________________ Hall Ticket No. A
Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 10.

I Choose the correct alternative:

1. The salient feature of functional organization is [ ]


(a) Strict adherence to specification (b) separation of planning and design part
(c) each individual maintains functional efficiency (d) work is properly planned and distributed

2. The most popular type of organization used for civil engg construction is [ ]

om
(a) Line organization (b) line and staff organization
(c) functional organization (d) effective organization

3. Under the emerson efficiency plan, the worker gets a normal wage at the efficiency of [ ]

e.c
(a) 50% (b) 66% (c) 75% (d)85%

4. Father of industrial engineering [ ]


(a) Jeck Gilberth (b) Gnatt m
(c) Taylor (d) Newton
ho
5. Which of the following organization is best suited for steel plants is [ ]
(a) Line organization (b) line and staff organization
(c) functional organization (d) effective organization
tu

6. Father of scientific management [ ]


.jn

(a) F.W.S Taylor (b) H.Fayol (c) Flippo (d) Jeck Gilberth

7. The main advantage of line organization is it is [ ]


(a) Effective command and control (b) defined responsibilities at all levels
w

(c) rigid discipline in the organization (d) ability of quick decision at all levels
w

8. Which of the following organization is preferred in automobile industry [ ]


(a) Line organization (b) line and staff organization
w

(c) functional organization (d) effective organization.

9. In time study the rating factor is applied to determine [ ]


(a) Standard time of a job (b) merit rating of the work
(c) fixation of incentive rate (d) normal time of a aimed at

10. In inventory control theory, the economic order quantity is [ ]


(a) Average level of inventory (b) optimum lot size
(c) lot size corresponding to break even analysis (d) capacity of warehouse

Cont2

www.jntuhome.com
To get updates to mobile sms ON JNTUHOME to 09870807070 or http://labs.google.co.in/smschannels/subscribe/JNTUHOME

Code No: 55010 :2: Set No. 3

II Fill in the blanks

11. The process of estimating the future based on the present and past data is called _____________

12. The process of guiding the subordinates to enable them to achieve goals is called ____________

13. The basic unit of work activity in micro motion studies is called _______________

14. Plant layout is a determinant of ____________ and profitability.

15. One of the examples for stock-out costs is ________________

om
16. Management is the art of ___________ through formally organized groups.

17. Management is both _____________ and ______________

e.c
18. ___________ was the foundation for work study and other productivity related techniques

19.

20.
Plant location is a _______________ decision.
m
Deciding in advance what is to be done in future is called ______________
ho
tu

-oOo-
.jn
w
w
w

www.jntuhome.com
To get updates to mobile sms ON JNTUHOME to 09870807070 or http://labs.google.co.in/smschannels/subscribe/JNTUHOME

Code No: 55010 Set No. 4


JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
III B.Tech. I Sem., I Mid-Term Examinations, September 2011
MANAGEMENT SCIENCE
Objective Exam
Name: ______________________________ Hall Ticket No. A
Answer All Questions. All Questions Carry Equal Marks.Time: 20 Min. Marks: 10.

I Choose the correct alternative:

1. Under the emerson efficiency plan, the worker gets a normal wage at the efficiency of [ ]
(a) 50% (b) 66% (c) 75% (d)85%

2. Father of industrial engineering [ ]


(a) Jeck Gilberth (b) Gnatt (c) Taylor (d) Newton

om
3. Which of the following organization is best suited for steel plants is [ ]
(a) Line organization (b) line and staff organization
(c) functional organization (d) effective organization

e.c
4. Father of scientific management [ ]
(a) F.W.S Taylor (b) H.Fayol (c) Flippo (d) Jeck Gilberth

5. The main advantage of line organization is it is


m [ ]
ho
(a) Effective command and control (b) defined responsibilities at all levels
(c) rigid discipline in the organization (d) ability of quick decision at all levels
tu

6. Which of the following organization is preferred in automobile industry [ ]


(a) Line organization (b) line and staff organization
.jn

(c) functional organization (d) effective organization.

7. In time study the rating factor is applied to determine [ ]


(a) Standard time of a job (b) merit rating of the work
w

(c) fixation of incentive rate (d) normal time of a aimed at


w

8. In inventory control theory, the economic order quantity is [ ]


(a) Average level of inventory (b) optimum lot size
w

(c) lot size corresponding to break even analysis (d) capacity of warehouse

9. The salient feature of functional organization is [ ]


(a) Strict adherence to specification (b) separation of planning and design part
(c) each individual maintains functional efficiency (d) work is properly planned and distributed

10. The most popular type of organization used for civil engg construction is [ ]
(a) Line organization (b) line and staff organization
(c) functional organization (d) effective organization

Cont2

www.jntuhome.com
To get updates to mobile sms ON JNTUHOME to 09870807070 or http://labs.google.co.in/smschannels/subscribe/JNTUHOME

Code No: 55010 :2: Set No. 4

II Fill in the blanks

11. The basic unit of work activity in micro motion studies is called _______________

12. Plant layout is a determinant of ____________ and profitability.

13. One of the examples for stock-out costs is ________________

14. Management is the art of ___________ through formally organized groups.

15. Management is both _____________ and ______________

om
16. ___________ was the foundation for work study and other productivity related techniques

17. Plant location is a _______________ decision.

e.c
18. Deciding in advance what is to be done in future is called ______________

19.

20.
m
The process of estimating the future based on the present and past data is called _____________

The process of guiding the subordinates to enable them to achieve goals is called ____________