Basis of Estimate
1. The estimate prepared based on the quantities, provided by you, though there is certain
variations in some of the items.
2. Two Establishment considered at equal distance.
3. Royalty rate as per the Maharashtra Govt. considered.
4. Natural Sand considered.
5. Cement rate Rs. 265 per Bag considered for the estimate, though, the cement rate at the locality
is Rs. 310/- per bag.
6. Diversion Quantity, Safety, considered as per the quantity indicated in BoQ.
7. Design charges not considered in Estimate.
8. The Project Period is 24 Months, though we planned to complete the project in 18 Months from
the day of handing over clear & encumbrance free project site.