You are on page 1of 58

COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA

Bernardino Barrera Perforista A A A N N N N N D D D D D D D D D D A A A A A N N N N N D D D 314.40 157.20


HE 6 375.60 188 102,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Leo Lopez Ayudante A A A N N N N N D D D D D D D D D D A A A A A N N N N N D D D 314.40 104.80
3 375.60 125 102,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Nelson Santibaez Ayudante A A A N N N N N D D D D D D D D D D A A A A A N N N N N D D D 314.40 104.80
12 375.60 125 102,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Juan Saavedra Chofer A A A N N N N N D D D D D D D D D D D D D D D N N N N N D D D 215.70 71.90
303.60 101 72,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Hector Cartes Perforista B N N D D D D D D D D D D A A A A A N N N N N 230.00 115.00
111.00 56 72,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Pablo Donaire Perforista B N N - 0.00
36.00 12 12,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Patricio Gonzalez Ayudante B A A A A A N N N N N 230.00 76.67
75.00 25 60,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Roberto Lopez Chofer A N N N N N 98.70 32.90
72.00 24 30,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Fernando Ardiles Perforista B A A A A A N N N N N A A A A A N N N 273.75 136.88
399.10 200 108,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Johnson Rojas Ayudante C A A A A A N N N N N A A A A A N N N 273.75 91.25
399.10 133 108,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Gabriel Araya Ayudante C A A A A A N N N N N 186.50 62.17
186.00 62 60,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Salvador Arcos Ayudante C A A A A N N N 87.25 29.08
140.50 47 42,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Javier Ramirez Chofer A A A A A A N N N N N A A A A A N N N 273.75 91.25
6 4 1 399.10 133 108,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Alejandro Flores Perforista B A A A A A N N N N N A A A 189.35 94.68
134.50 67 78,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Pablo Donaire Perforista C A A 14.05 4.68
35.50 12 12,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Javier Espinoza Ayudante C A A A A A N N N N N A A A 189.35 63.12
134.50 45 78,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Paulino Alvarado Ayudante C A A A A A N N N N N A A A 189.35 63.12
134.50 45 78,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Mauricio Romero Chofer A A A A A A A A A A A 175.30 58.43
99.00 33 60,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Carlos Soza Supervisor A A A A A A A A A A A A A A A A A A A A A A 359.45 359.45
399.10 399 126,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Javier Ayestaran E.Faena A A A A A A A A 135.00 135.00
39.00 39 42,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Leopoldo Muoz Supervisor A A A - 0.00
36.00 36 12,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Luis Cortes Preven. A D D D D D D D A A A A A A A A A A A D D D D D D D D D D A A 193.05 193.05
12 12 12 12 12 12 134.50 135 78,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Cesar Robles Preven. A A A A A A A A A A A A A 171.90 171.90
285.10 285 72,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Waldo Celis Preven. A A A A A A A A 142.50 142.50
126.00 126 42,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Alexis Gonzalez S.Tecnico A A A A A A A A A A A A A 209.50 209.50
10 12 12 189.00 189 72,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Oscar Diaz S.Tecnico A A A - 0.00
36.00 36 12,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Mario Tello Electrom. A A A A 39.00 39.00
36.00 36 18,000
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Luis Saldao Mecanico A - 0.00
- 0 0
COLLAHUASI

BONO METRO SUPERVISOR


Fecha 24-4 25-4 26-4 27-4 28-4 29-4 30-4 1-5 2-5 3-5 4-5 5-5 6-5 7-5 8-5 9-5 10-5 11-5 12-5 13-5 14-5 15-5 16-5 17-5 18-5 19-5 20-5 21-5 22-5 23-5 Total METROS
Da 11.95 19.60 21.00 12.00 9.45 3.35 13.40 3.00 15.00 3.70 18.00 33.00 12.90 27.00 14.05 217.40
Perforacion DD
Noche 27.05 23.90 20.00 19.00 3.55 5.35 13.65 1.40 18.25 22.60 30.00 24.30 9.30 24.10 10.60 9.20 20.50 3.60 286.35
Da 18.00 6.00 0.60 9.00 6.00 17.00 56.60
Perforacion RC
Noche 18.00 90.00 60.00 36.00 3.00 66.00 72.00 90.00 18.50 453.50
Total DD 0.00 0.00 39.00 43.50 0.00 20.00 40.00 0.00 3.55 17.35 23.10 0.00 1.40 21.60 36.00 33.00 39.30 3.70 0.00 9.30 42.10 43.60 0.00 9.20 33.40 30.60 0.00 0.00 0.00 14.05 503.75
Total RC 0.00 36.00 0.00 0.00 90.00 0.00 0.00 60.00 0.00 0.00 0.00 36.00 3.00 0.00 0.00 0.00 0.00 0.00 72.00 0.00 0.00 0.00 72.60 9.00 0.00 0.00 96.00 0.00 35.50 0.00 510.10

T.METROS DD
Nombre Trabajador Categoria Turno T.METROS RC B.ALTURA
Eliseo Moltalvan Mecanico A A A A A A 128.30 128.30
81.60 82 30,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE

161,535 27,200
6 10,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
53,845 27,200
3 10,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
53,845 27,200
12 10,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
39,403 19,200
0 10,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
91,833 19,200
0 7,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
3,860 3,200
0 2,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
28,681 16,000
0 5,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
14,442 8,000
0 5,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
152,239 28,800
0 8,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
50,746 28,800
0 8,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
29,967 16,000
0 5,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
16,887 11,200
0 3,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
50,746 28,800
11 8,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
82,536 20,800
0 5,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
6,819 3,200
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
27,512 20,800
0 5,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
27,512 20,800
0 5,000
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
24,102 16,000
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
166,968 33,600
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
49,695 11,200
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
4,632 3,200
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
20,800
72 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
19,200
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
11,200
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
19,556 19,200
34 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
1,158 3,200
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
4,800
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
0
0 0
SUPERVISOR T/C
SUPERVISOR 643.31

METROS $ B.TERRENO
H.EXTRAS B.NOCHE
8,000
0 0

You might also like