You are on page 1of 17

Renewable Energy Policy

and Implementation Results

1
10
(.. 2555-2564)


Alternative Energy Development Plan
(AEDP : 2012-2021)

25%
2564



2,000 MW

1,200 MW
100 ktoe 3,630 MW 600 MW 160 MW
9 ./ 5.97 ./ 25 ./
8,200 ktoe 1,000 ktoe 35 ktoe
3,200 MW , 100 ktoe 44%
4,390 MW , 9,235 ktoe




2 MW 1 MW 2555
324 MW 1,284 MW 9.67%
1,608 MW 3 MW
2
2
Strategies for AEDP
Promote RE on Encouraging
the Private
Community Investment
scale

Improve Promote R&D


Relevant as a tool for RE
Infrastructure industry

Promote Modifying
better outdated
understanding
rules and
regulations

3
Renewable Energy Development

Technical Function

Information on Energy Potential


- Wind Map with Electronic Database
- Solar Map
- Biomass Database

Research and Support


- Biomass Gasification Technology to produce heat,
electricity and mixed energy
- Low speed wind turbine (1 kW)
- Compressed Biogas at Ubon Rachathani and Chiangmai
- Research on the use of E85 in Motorcycles

Prototype Demonstration
- Large Wind Turbine at Hua-Sai District,
Nakhon Si thammarat and Muang District, Pattani
Province (under construction)
- Small Wind Turbine at the Seashores and Mountain
Pass
- Standard Pattern of Biogas System DEDE 1, DEDE 2
- Standard Pattern of Solar Dryer System
4
Renewable Energy Development

Promotional and Supporting Measures

Financial Measures
- Adder (Feed in Tariff)
- Investment Capital Support for 20-30%
(Biogas, Solar Heat, Solar Dryer, MSW)
- Low Interest Loan/ Joint-investment
(Revolving Fund, ESCO Fund)
- Tax Incentives (through BOI)
- Promoting CDM Projects

5
Renewable Energy Development

Driven Measures and Assistance


Hydro
- Develop Hydro Power Project at
Irrigation Dam with EGAT
- Develop Mini Hydro Power/Village through trilateral
cooperation

MSW/Biogas
- Cooperate with BMA, Fresh Markets, Schools,
Municipality
- Biogas System in Demonstration Farm Site

Biofuels
- Pricing Measure (Tax/Oil Fund)
- Promoting FFV (E85)
- Vehicles Tax Policy Improvement
- Increase service stations 6 Service 21 Service 50 Service
Stations of E85 Stations of E85 Stations of E85
VOLVO Mitsubishi Chevrolet
S80 2.5 Lancer

6
64 : 1,200 MW 1.

: 7.28 MW




Micro Siting



( : 60 MW,
3 : 90 MW)





61 1,153.41 MW
VSPP 46 112.41 MW
SPP 15 1,041.00 MW


/ 17 308.28 MW
VSPP 14 68.28 MW


SPP 3 240.00 MW
7
2.
64 : 2,000 MW, 100 ktoe
38

: 316 MW, 3.75 ktoe


. (.. 2535)
PV-Roof Top
Solar Collector
Adder Feed-In-Tariff

50,000 .. 2565


SPP / VSPP

762 3,668 MW
VSPP (PV) 481 1,811 MW
VSPP (solar thermal) 274 1,409 MW
SPP 7 447 MW
523 2,177 MW
VSPP (PV) 261 744 MW
/ VSPP (solar thermal) 260 1,343 MW
SPP 2 90 8MW
64 : 1,608 MW 3.

: 95.70 MW

2 (
500 MW 784 MW)

(Pico Hydro)

Micro Hydro Turbine

/
9
4.
64 : 3,630 MW, 8,200 ktoe

: 1,828 MW, 4,502 ktoe

High Pressure Boiler



Promotional Zone

Distrubuted Green
Generation : DDG)

/


/
391
2,947.48 MW
VSPP 358 2,291.78 MW
SPP 33 655.70 MW

220

1,564.15 MW
VSPP 219 1,560.15 MW
(Adder)
SPP 1 4.00 MW
/ 10
5.
64 : 600 MW, 1,000 ktoe

: 172.85 MW, 447 ktoe


( VSPP )
(MW)


ON OFF
Grid Grid

/ (CBG) * 31.10 29.50 60.60
48.10 12.90 61.00

7.10 1.40 8.50
/
2.20 21.50 23.70

0.20 4.80 5.00
88.70 70.10 158.80

* 300 /

(ktoe)

275.50

** 106.50
CBG
26.40
9.00

3.60
421.00
** 11


150,000 /
6.
64 : 160 MW, 35 ktoe

: 27.48 MW, 1.71 ktoe



(RDF)





., .


35 226.74 MW
VSPP 34 166.74 MW
SPP 1 60.00 MW

/ 21 130.59 MW
VSPP

16
27.48 MW 12
7.
64 : 9.00 /

: 1.28 /

91
E20 E85
E20 E10 (91) 2 /
Flex Fuel Vehicle (FFV)
FFV conversion kits
(Ethanal Hub)

(/)




E20
FFV 3%
1,780-3,000 CC 13
8.

1. 64 : 5.97 /

: 2.81 /

2. 64 : 25.00 /

Bio Hydrogenated Diesel (BHD) Biojet


ED95

14
9.
64 : 1 MW
1.
112
: 350 kw

2.
64 : 2 MW




. -


15
Renewable Energy Development as of Sept 2012
Existing Capacity/Used amount (June
Types Unit 2012)
Target in 2021

Natural Energy
1. Wind MW 7.28 1,200
2. Solar
2.1 Electricity MW 316.12 2,000
2.2 Heat ktoe 3.5 100
3. Hydro MW 95.70 1,608
Bio Energy
4. Bio-mass
4.1 Electricity MW 1828.50 3,630
4.2 Heat ktoe 4502.0 8,200
5. Bio-gas
5.1 Electricity MW 172.85 600
5.2 Heat ktoe 447.23 1000
6. MSW
6.1 Electricity MW 27.48 160
6.2 Heat ktoe 48.55 35
Biofuel
7. Ethanol Ml/d 1.28 9
8. Bio-Diesel Ml/d 2.81 5.97
9. New Energy (Substitute Biodiesel) Ml/d - 25
Total RE Consumption ktoe 7084.12 -
Total Final Energy Consumption ktoe 74,976 -
The percentage of Renewable Energy Consumption = 9.67%
16
www.dede.go.th

DEDE: Knowledge Base organisation


and sustainable development Centre of RE and EE
17