You are on page 1of 42

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Soil Investigation Check by : Setiono H.
Location : Jakarta Date :
Bor location : Kali Penggilingan No. Bor : BH-63
Density (g)

No. Sample UDS 1 UDS 2 UDS 3 DS 4 DS 5


Depth : 3.50-4.00 3.50-4.00 450-500 19.00 - 19.55 25.00 - 25.55
No. 1 2 1 2 1 2 1 2 1
Wt of can (gr) 74.48 74.48 74.48 74.48 74.48 74.48
Wt of soil + can (gr) 218.62 219.21 241.07 241.93 195.63 196.71
Wt of soil (gr) 144.14 144.73 166.59 167.45 121.15 122.23
Vol of can (cm ) 3
85.34 85.34 85.34 85.34 85.34 85.34
Density (gr/cm3) 1.689 1.696 1.952 1.962 1.420 1.432
Ave of density (gr / cm3) 1.692 1.957 1.426 - -
Water content (w)

No. Sample UDS 1 UDS 2 UDS 3 DS 4 DS 5


Depth : 3.50-4.00 3.50-4.00 450-500 19.00 - 19.55 25.00 - 25.55
No. 1 2 1 2 1 2 1 2 1
Wt of can (gr) 15.47 15.55 4.75 4.18 15.38 15.73 5.43 5.18 8.50
Wt of wet soil + can (gr) 42.67 45.25 43.43 37.00 45.70 43.80 28.54 31.77 45.32
Wt of dry soil + can (gr) 34.73 36.36 36.08 30.60 44.99 43.03 21.56 23.66 33.83
Wt of moisture (gr) 7.94 8.89 7.35 6.40 0.71 0.77 6.98 8.11 11.49
Wt of dry soil (gr) 19.26 20.81 31.33 26.42 29.61 27.30 16.13 18.48 25.33
Water content (%) 41.23 42.72 23.46 24.22 2.40 2.82 43.27 43.89 45.36
Average (%) 41.97 23.84 2.61 43.58 44.72

Specific of gravity (Gs)

No. Sample UDS 1 UDS 2 UDS 3 DS 4 DS 5


Depth : 3.50-4.00 3.50-4.00 450-500 19.00 - 19.55 25.00 - 25.55
No. 4 5 26 28 7 8 25 26 29
Wt of picnometer 28.46 31.50 34.42 35.29 29.98 30.91 32.54 34.41 29.65
Wt of picnometer + dry soil 36.81 39.61 42.07 43.06 37.36 38.70 41.89 44.10 37.77
Wt of picnometer + soil + water 82.59 85.64 89.32 90.86 84.06 85.35 87.24 89.74 86.54
Wt of picnometer + water 77.52 80.72 84.60 86.05 79.30 80.40 81.30 83.57 81.41
Wt of dry soil 8.35 8.11 7.65 7.77 7.38 7.79 9.35 9.69 8.12
Specific of gravity 2.546 2.542 2.611 2.625 2.817 2.743 2.742 2.753 2.716
Average 2.544 2.618 2.780 2.747 2.712
Temperature 26 26 26 26 26 26 26 26 26
Correction 0.9983 0.9983 0.9983 0.9983 0.9983 0.9983 0.9983 0.9983 0.9983
Average of Gs 2.54 2.61 2.78 2.74 2.71
ERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
: Setiono H.

: BH-63
Density (g)

DS 5
25.00 - 25.55
2

-
Water content (w)

DS 5
25.00 - 25.55
2
7.66
36.39
27.60
8.79
19.94
44.08
44.72

Specific of gravity (Gs)

DS 5
25.00 - 25.55
30
31.98
40.59
86.83
81.40
8.61
2.708
2.712
26
0.9983
2.71
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Soil Investigation Check by : Setiono H.
Jambi : Jakarta Date :
Bor location : Kali Penggilingan No. Bor : BH-63

Atterberg Limits
No. Sample : UDS 1 UDS 2

Depth : 3.50-4.00 3.50-4.00

Testing Liquid Limit (LL) Plastic Limit (PL) Liquid Limit (LL) Plastic Limit (PL)

No. 1 2 3 4 1 2 1 2 3 4 1

Wt of can 6.75 6.62 6.68 6.67 6.72 6.48 15.59 15.34 15.55 15.65 8.62
Wt of wet soil + can 19.75 15.88 19.38 16.76 19.07 20.96 25.99 30.42 28.32 30.59 16.53
Wt of dry soil + can 15.36 12.88 15.47 13.76 16.16 17.38 22.14 25.04 24.02 25.81 14.49
Wt of moisting 4.39 3.00 3.91 3.00 2.91 3.58 3.85 5.38 4.30 4.78 2.04
Wt. of dry soil 8.61 6.26 8.79 7.09 9.44 10.90 6.55 9.70 8.47 10.16 5.87
Water content 50.99 47.92 44.48 42.31 30.83 32.84 58.78 55.46 50.77 47.05 34.75

Average 31.84 34.83


Number of blow 10 18 32 42 12 18 28 40
Limit value LL = 45.71 PL = 31.84 LL = 61.90 PL =

UDS 1 3.50-4.00 UDS 2 3.50-4.00


Water content [%]

Water content [%]

Flow Curve Flow Curve


54 60
58
52
56
50 f(x) = -5.9700092655 ln(x) + 64.9281071132
54

48 52
50
46 48
44 46
44
42
42
40 40
1 10 100 1 10 100

Number of Blow Number of Blow

Plastic Limit (PL) = 31.84 % Plastic Limit (PL) = 34.83 %


Liquid Limit (LL) = 45.71 % Liquid Limit (LL) = 61.90 %
Plastic lndex (PI) = 13.88 % Plastic lndex (PI) = 27.07 %
GERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
IL TESTING LABORATORY
ng Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
: Setiono H.

: BH-63

Atterberg Limits
UDS 2

3.50-4.00

Plastic Limit (PL)

8.09

16.90

14.62
2.28

6.53

34.92

34.83

34.83
Water content [%]

Flow Curve
60
58
56
54
52
50
48
46
44
42
40
1 10 100

Number of Blow
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Soil Investigation Check by : Setiono H.
Location : Jakarta Date :
Bor location : Kali Penggilingan No. Bor : BH-63

Grain Size Analysis


No. Sample : UDS 1 3.50-4.00 Sieve W total : 100

Sieve No. Diameter [mm] Wt. retained [gram] % Retained % passing

4 4.750 0.52 0.52 99.48


10 2.000 0.84 0.84 98.64
20 0.840 0.44 0.44 98.20
40 0.425 0.65 0.65 97.55
60 0.250 0.09 0.09 97.46
100 0.150 0.90 0.90 96.56
200 0.075 1.56 1.56 95.00
0.28 5.00

No. Sample : UDS 1 3.50-4.00 Hydrometer Wd =

Date Time Rh T C Rh + C Zr M D N
0 36.0 26 0 36.0 6.339 0.0131 0.0000 99.85
0.25 36.0 26 0 36.0 6.339 0.0131 0.0658 99.85
0.5 35.5 26 0 35.5 6.474 0.0131 0.0470 98.46
1 35.0 26 0 35.0 6.608 0.0131 0.0336 97.08
2 34.0 26 0 34.0 6.877 0.0131 0.0242 94.30
5 31.0 26 0 31.0 7.682 0.0131 0.0162 85.98
10 28.0 26 0 28.0 8.488 0.0131 0.0120 77.66
20 24.0 26 0 24.0 9.563 0.0131 0.0090 66.57
40 20.0 26 0 20.0 10.637 0.0131 0.0067 55.47
60 18.0 26 0 18.0 11.174 0.0131 0.0056 49.93
180 10.0 26 0 10.0 13.323 0.0131 0.0036 27.74
1440 0.0 26 0 0.0 16.009 0.0131 0.0014 0.00
0.00
Sand
Gravel

Clay Silt
F M C
100
90
% Finer

80
70
60
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10
Diameter [mm]
50
40
30
20
10
0
0.0001 0.001 0.01 0.1 1 10
Diameter [mm]
Gravel : 0.52 Sand : 4.48 Silt : 87.98 Clay : 7.02
GERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
IL TESTING LABORATORY
Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
: Setiono H.

Grain Size Analysis


gram

59.47

N'
94.86
94.86
93.54
92.22
89.59
81.68
73.78
63.24
52.70
47.43
26.35
0.00
Gravel

0.01 0.1 1 10
Diameter [mm]
0.01 0.1 1 10
Diameter [mm]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Soil Investigation Check by : Setiono H.
Location : Jakarta Date :
Bor location : Kali Penggilingan No. Bor : BH-63

Unconfined Compression Test


Sample No. / Depth UDS 1 3.50-4.00 0.182 UDS 2 3.50-4.00
Time Strain Area Undisturbed Remoulded Undisturbed Remoulded
t (mnt) e (%) A 1 (cm 2) Ring P (kg) s (kg/cm 2) Ring P (kg) s (kg/cm 2) Ring P (kg) s (kg/cm 2) Ring P (kg) s (kg/cm 2)
0.00 0.00 11.341 0.0 0.000 0.000 0.0 0.000 0.000 0.0 0.000 0.000 0.0 0.000 0.000
0.50 0.50 11.398 7.5 1.365 0.120 5.0 0.910 0.080 4.0 0.728 0.064 3.0 0.546 0.048
1.00 1.00 11.456 18.0 3.276 0.286 10.0 1.820 0.159 8.0 1.456 0.127 6.0 1.092 0.095
1.50 1.50 11.514 26.0 4.732 0.411 15.5 2.821 0.245 10.8 1.957 0.170 8.5 1.547 0.134
2.00 2.00 11.573 34.0 6.188 0.535 21.0 3.822 0.330 13.5 2.457 0.212 11.0 2.002 0.173
2.50 2.50 11.632 38.0 6.916 0.595 25.5 4.641 0.399 16.8 3.049 0.262 13.0 2.366 0.203
3.00 3.00 11.692 41.0 7.462 0.638 30.0 5.460 0.467 20.0 3.640 0.311 15.0 2.730 0.233
4.00 4.00 11.814 46.0 8.372 0.709 35.0 6.370 0.539 28.0 5.096 0.431 20.0 3.640 0.308
5.00 5.00 11.938 48.5 8.827 0.739 38.0 6.916 0.579 35.0 6.370 0.534 24.0 4.368 0.366
6.00 6.00 12.065 50.0 9.100 0.754 40.0 7.280 0.603 40.0 7.280 0.603 27.0 4.914 0.407
7.00 7.00 12.195 51.5 9.373 0.769 42.0 7.644 0.627 43.0 7.826 0.642 30.0 5.460 0.448
8.00 8.00 12.327 52.0 9.464 0.768 42.0 7.644 0.620 45.0 8.190 0.664 32.0 5.824 0.472
9.00 9.00 12.463 47.0 8.554 0.686 36.0 6.552 0.526 46.0 8.372 0.672 34.0 6.188 0.497
10.00 10.00 12.601 40.0 7.280 0.578 35.0 6.370 0.506
11.00 11.00 12.743 30.0 5.460 0.428
12.00 12.00 12.888
13.00 13.00 13.036
14.00 14.00 13.187
15.00 15.00 13.343

q u max = 0.769 kg/cm 2 q' u max = 0.627 kg/cm 2 q u max = 0.672 kg/cm 2 q' u max = 0.506 kg/cm 2

Stress (s) - Strain (e) Curve


UDS 1 3.50-4.00 UDS 2 3.50-4.00

0.90 0.80
s [kg/cm2]
s [kg/cm2]

0.80 0.70

0.70
0.60

0.60
0.50
0.50
0.40
0.40
0.30
0.30
0.20
0.20
Undisturbed Undisturbed
0.10 0.10
Remoulded Logarithmic
(Undisturbed)
0.00 0.00
-1 1 3 5 7 9 11 13 15 0 2 4 6 8 10 12 14

e [%] e [%]
0.20
0.20
Undisturbed Undisturbed
0.10 0.10
Remoulded Logarithmic
(Undisturbed)
0.00 0.00
-1 1 3 5 7 9 11 13 15 0 2 4 6 8 10 12 14

e [%] e [%]
cu = 0.384 kg/cm 2 S= s/s' = 1.226 cu = 0.336 kg/cm 2 S = s/s' = 1.329
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Triaxial - UU Test
Project : Soil Investigation Load ring 0.182
Location : Jakarta Strain Rate : 0.760
Bor location : Kali Penggilingan Sample : d: 38.00
Check by : Setiono H. h: 76.00
Date : A: 11.341
Sample No. UDS 1 Depth : 3.50-4.00
Time Strain Area s 3 = 0.50 kg/cm 2 s 3 = 1.00 kg/cm 2
t e A1 Ring P Ds u Ds' Ring P Ds u Ds'
mnt % cm 2 div kg (kg/cm2 div kg (kg/cm2
0.00 0.00 11.341 0.0 0.000 0.000 0.0 0.000 0.000
0.50 0.50 11.398 10.0 1.820 0.160 15.0 2.730 0.240
1.00 1.00 11.456 21.0 3.822 0.334 29.0 5.278 0.461
1.50 1.50 11.514 35.0 6.370 0.553 42.0 7.644 0.664
2.00 2.00 11.573 45.0 8.190 0.708 55.0 10.010 0.865
2.50 2.50 11.632 50.0 9.100 0.782 62.0 11.284 0.970
3.00 3.00 11.692 53.0 9.646 0.825 66.0 12.012 1.027
4.00 4.00 11.814 57.0 10.374 0.878 73.0 13.286 1.125
5.00 5.00 11.938 59.0 10.738 0.899 75.5 13.741 1.151
6.00 6.00 12.065 59.0 10.738 0.890 76.0 13.832 1.146
7.00 7.00 12.195 52.0 9.464 0.776 71.0 12.922 1.060
8.00 8.00 12.327
9.00 9.00 12.463
10.00 10.00 12.601
11.00 11.00 12.743
12.00 12.00 12.888
13.00 13.00 13.036
14.00 14.00 13.187
15.00 15.00 13.343
16.00 16.00 13.501
17.00 17.00 13.664
18.00 18.00 13.831
19.00 19.00 14.001
20.00 20.00 14.176
21.00 21.00 14.356
22.00 22.00 14.540
23.00 23.00 14.729
Max value = 0.899 Max value = 1.151

Graphic stress strain Mohr's circle


D s [k g /c m 2 ]

t [kg/cm2]

0.7
1.40 0.6
0.5
1.20
0.4
1.00 0.3
0.2
0.80
0.1
0.60 0
0 0.5 1 1.5 2 2.5
0.40
s 3 = 0.50 kg/cm2
0.20 s 3 = 1.00 kg/cm2
s [kg/cm2]

0.00
1.40 0.6

D s [k

t
0.5
1.20
0.4
1.00 0.3
0.2
0.80
0.1
0.60 0
0 0.5 1 1.5 2 2.5
0.40
s 3 = 0.50 kg/cm2
0.20 s 3 = 1.00 kg/cm2
s [kg/cm2]

0.00
0 1 2 3 4 5 6 7 8 9 10 f= 11.59 o

e [%] c= 0.264 kg/cm2


G DEPARTMENT
Y
01 45 83

kg/div
mm/menit
mm
mm
cm2

1.5 2 2.5

cm2]
1.5 2 2.5

cm2]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Triaxial - UU Test
Project : Soil Investigation Load ring 0.182
Location : Jakarta Strain Rate : 0.760
Bor location : Kali Penggilingan Sample : d: 38.00
Check by : Setiono H. h: 76.00
Date : A: 11.341
Sample No. UDS 2 Depth : 3.50-4.00
Time Strain Area s 3 = 0.50 kg/cm 2 s 3 = 1.00 kg/cm 2
t e A1 Ring P Ds u Ds' Ring P Ds u Ds'
mnt % cm 2 div kg (kg/cm2 div kg (kg/cm2
0.00 0.00 11.341 4.0 0.728 0.064 9.0 1.301 0.115
0.50 0.50 11.398 5.5 1.001 0.088 12.0 2.184 0.192
1.00 1.00 11.456 6.0 1.092 0.095 13.0 2.366 0.207
1.50 1.50 11.514 6.5 1.183 0.103 14.0 2.548 0.221
2.00 2.00 11.573 7.0 1.274 0.110 15.0 2.730 0.236
2.50 2.50 11.632 7.5 1.365 0.117 16.0 2.912 0.250
3.00 3.00 11.692 8.0 1.456 0.125 17.0 3.094 0.265
4.00 4.00 11.814 9.0 1.638 0.139 18.0 3.276 0.277
5.00 5.00 11.938 10.0 1.820 0.152 19.0 3.458 0.290
6.00 6.00 12.065 11.0 2.002 0.166 20.0 3.640 0.302
7.00 7.00 12.195 12.0 2.184 0.179 20.5 3.731 0.306
8.00 8.00 12.327 12.5 2.275 0.185 21.0 3.822 0.310
9.00 9.00 12.463 13.0 2.366 0.190 21.5 3.913 0.314
10.00 10.00 12.601 13.5 2.457 0.195 22.0 4.004 0.318
11.00 11.00 12.743 14.0 2.548 0.200 22.0 4.004 0.314
12.00 12.00 12.888 14.0 2.548 0.198 22.0 4.004 0.311
13.00 13.00 13.036 14.0 2.548 0.195
14.00 14.00 13.187
15.00 15.00 13.343
16.00 16.00 13.501
17.00 17.00 13.664
18.00 18.00 13.831
19.00 19.00 14.001
20.00 20.00 14.176
21.00 21.00 14.356
22.00 22.00 14.540
23.00 23.00 14.729
Max value = 0.200 Max value = 0.318

Graphic stress strain Mohr's circle


D s [k g /c m 2 ]

t [kg/cm2]

0.2
0.35
0.15
0.30
0.1
0.25
0.05
0.20

0.15 0
0 0.5 1 1.5
0.10
s 3 = 0.50 kg/cm2
0.05 s 3 = 1.00 kg/cm2
s [kg/cm2]

0.00
0.35

D s [k

t
0.15
0.30
0.1
0.25
0.05
0.20

0.15 0
0 0.5 1 1.5
0.10
s 3 = 0.50 kg/cm2
0.05 s 3 = 1.00 kg/cm2
s [kg/cm2]

0.00
0 3 6 9 12 15 f= 6.05 o

e [%] c= 0.037 kg/cm2


G DEPARTMENT
Y
01 45 83

kg/div
mm/menit
mm
mm
cm2

1 1.5

cm2]
1 1.5

cm2]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Triaxial - UU Test
Project : Soil Investigation Load ring 0.182
Location : Jakarta Strain Rate : 0.760
Bor location : Kali Penggilingan Sample : d: 38.00
Check by : Setiono H. h: 76.00
Date : A: 11.341
Sample No. UDS 3 Depth : 450-500
Time Strain Area s 3 = 0.75 kg/cm 2 s 3 = 1.50 kg/cm 2
t e A1 Ring P Ds u Ds' Ring P Ds u Ds'
mnt % cm 2 div kg (kg/cm2 div kg (kg/cm2
0.00 0.00 11.341 10.0 1.820 0.160 20.0 2.892 0.255
0.50 0.50 11.398 15.0 2.730 0.240 26.0 4.732 0.415
1.00 1.00 11.456 20.0 3.640 0.318 35.0 6.370 0.556
1.50 1.50 11.514 24.0 4.368 0.379 39.5 7.189 0.624
2.00 2.00 11.573 28.0 5.096 0.440 44.0 8.008 0.692
2.50 2.50 11.632 31.5 5.733 0.493 46.5 8.463 0.728
3.00 3.00 11.692 35.0 6.370 0.545 49.0 8.918 0.763
4.00 4.00 11.814 40.0 7.280 0.616 52.0 9.464 0.801
5.00 5.00 11.938 43.0 7.826 0.656 56.0 10.192 0.854
6.00 6.00 12.065 45.0 8.190 0.679 59.0 10.738 0.890
7.00 7.00 12.195 47.0 8.554 0.701 61.0 11.102 0.910
8.00 8.00 12.327 49.0 8.918 0.723 61.0 11.102 0.901
9.00 9.00 12.463 49.0 8.918 0.716 61.0 11.102 0.891
10.00 10.00 12.601 49.0 8.918 0.708
11.00 11.00 12.743
12.00 12.00 12.888
13.00 13.00 13.036
14.00 14.00 13.187
15.00 15.00 13.343
16.00 16.00 13.501
17.00 17.00 13.664
18.00 18.00 13.831
19.00 19.00 14.001
20.00 20.00 14.176
21.00 21.00 14.356
22.00 22.00 14.540
23.00 23.00 14.729
Max value = 0.723 Max value = 0.910

Graphic stress strain Mohr's circle


D s [k g /c m 2 ]

t [kg/cm2]

0.7
1.00 0.6
0.90 0.5
0.80 0.4
0.70 0.3
0.2
0.60
0.1
0.50
0
0.40
0 0.5 1 1.5 2 2.5 3
0.30
s 3 = 0.75 kg/cm2
0.20
s 3 = 1.50 kg/cm2
s [kg/cm2]
0.10
0.00
1.00 0.6

D s [k

t
0.90 0.5
0.80 0.4
0.70 0.3
0.2
0.60
0.1
0.50
0
0.40
0 0.5 1 1.5 2 2.5 3
0.30
s 3 = 0.75 kg/cm2
0.20
s 3 = 1.50 kg/cm2
s [kg/cm2]
0.10
0.00
0 3 6 9 12 15 f= 6.36 o

e [%] c= 0.240 kg/cm2


G DEPARTMENT
Y
01 45 83

kg/div
mm/menit
mm
mm
cm2

5 2 2.5 3

cm2]
5 2 2.5 3

cm2]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Direct Shear Test
Project : Soil Investigation Check by : Setiono H.
Location : Kali Penggilingan Date :
No. Sample : BH-63
Depth : 3.50-4.00
Size Of Sample
Diametre (D) = 6.00 cm K= 0.23 kg/div
High= 2.00 cm DD = 0.10 cm/mnt
Area (A)= 28.274 cm
4 8 12
P (kg)
sn ( kg/cm ) = 0.14
2
sn ( kg/cm ) = 0.28 2
sn ( kg/cm ) =
2

t DD e = DD/D A Ph t Ph t Ph
Ring Ring Ring
menit mm (%) cm 2 kg kg/cm 2 kg kg/cm 2 kg
0.00 0.00 0.00 28.27 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.00
0.25 0.02 0.25 28.20 2.00 0.46 0.016 3.00 0.69 0.024 5.00 1.15
0.50 0.03 0.50 28.13 4.00 0.92 0.033 6.00 1.38 0.049 8.00 1.84
1.00 0.06 1.00 27.99 6.00 1.38 0.049 9.00 2.07 0.074 12.00 2.76
1.50 0.09 1.50 27.85 7.50 1.73 0.062 11.00 2.53 0.091 15.00 3.45
2.00 0.12 2.00 27.71 9.00 2.07 0.075 13.00 2.99 0.108 18.00 4.14
2.50 0.15 2.50 27.57 10.00 2.3 0.083 15.00 3.45 0.125 21.00 4.83
3.00 0.18 3.00 27.43 11.00 2.53 0.092 17.00 3.91 0.143 23.00 5.29
3.50 0.21 3.50 27.28 11.50 2.65 0.097 18.00 4.14 0.152 24.00 5.52
4.00 0.24 4.00 27.14 12.00 2.76 0.102 18.50 4.26 0.157 25.00 5.75
4.50 0.27 4.50 27.00 12.00 2.76 0.102 18.00 4.14 0.153 25.00 5.75
5.00 0.30 5.00 26.86 9.00 2.07 0.077 13.00 2.99 0.111 21.00 4.83
5.50 0.33 5.50 26.72
6.00 0.36 6.00 26.58
6.50 0.39 6.50 26.44
7.00 0.42 7.00 26.30
t max= 0.102 t max= 0.157 t max=

Direct Shear Curve


t (kg/ cm2 )

Grafik e vs t Grafik s vs t
0.25
0.25
t (kg/cm2)

0.2
0.2
Column
0.15 G
0.15
Column J
0.1 Column
M 0.1

0.05
0.05
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 0
0.00 0.10 0.20 0.30 0.40 0.50
e (%) s (Kg/cm2)
c = 0.011 kg/cm2 f= 21.37 O
ANDUNG - CIVIL ENGINEERING DEPARTMENT
ESTING LABORATORY
eger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Direct Shear Test
: Setiono H.

0.42
t
kg/cm 2
0.000
0.041
0.065
0.099
0.124
0.149
0.175
0.193
0.202
0.212
0.213
0.180

0.213

Grafik s vs t
0.25
t (kg/cm2)

0.2

0.15

0.1

0.05

0
0.00 0.10 0.20 0.30 0.40 0.50
s (Kg/cm2)
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Direct Shear Test
Project : Soil Investigation Check by : Setiono H.
Location : Jakarta Date :
No. Sample : UDS 2
Depth : : 9.50 - 10.00 -
Size Of Sample
Diametre (D) = 6.00 cm K= 0.23 kg/div
High= 2.00 cm DD = 0.10 cm/mnt
Area (A)= 28.274 cm
4 8 12
P (kg)
sn ( kg/cm ) = 0.14
2
sn ( kg/cm ) = 0.28 2
sn ( kg/cm ) = 2

t DD e = DD/D A Ph t Ph t Ph
Ring Ring Ring
menit mm (%) cm 2
kg kg/cm 2
kg kg/cm 2
kg
0.00 0.00 0.00 28.27 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.00
0.25 0.02 0.25 28.20 1.00 0.23 0.008 2.00 0.46 0.016 2.50 0.58
0.50 0.03 0.50 28.13 2.00 0.46 0.016 3.00 0.69 0.025 4.50 1.04
1.00 0.06 1.00 27.99 2.50 0.58 0.021 4.00 0.92 0.033 6.00 1.38
1.50 0.09 1.50 27.85 3.00 0.69 0.025 5.00 1.15 0.041 7.00 1.61
2.00 0.12 2.00 27.71 3.50 0.81 0.029 5.50 1.27 0.046 7.50 1.73
2.50 0.15 2.50 27.57 4.00 0.92 0.033 6.00 1.38 0.050 8.00 1.84
3.00 0.18 3.00 27.43 4.00 0.92 0.034 6.00 1.38 0.050 8.00 1.84
3.50 0.21 3.50 27.28 4.00 0.92 0.034 6.00 1.38 0.051 8.00 1.84
4.00 0.24 4.00 27.14
4.50 0.27 4.50 27.00
5.00 0.30 5.00 26.86
5.50 0.33 5.50 26.72
6.00 0.36 6.00 26.58
6.50 0.39 6.50 26.44
7.00 0.42 7.00 26.30
t max= 0.034 t max= 0.051 t max=

Direct Shear Curve


t (kg/ cm2 )

Grafik e vs t Grafik s vs t
0.08
0.1
0.07
t (kg/cm2)

0.09
0.06 0.08
Column
0.05 G 0.07

0.04 0.06
Column J
0.05
0.03 Column
M 0.04
0.02
0.03
0.01 0.02
0 0.01

0.00 1.00 2.00 3.00 4.00 0


0.00 0.10 0.20 0.30 0.40 0.50 0.60
e (%) s (Kg/cm2)
0.04 0.06
Column J
0.05
0.03 Column
M 0.04
0.02 0.03
0.01 0.02
0 0.01

0.00 1.00 2.00 3.00 4.00 0


0.00 0.10 0.20 0.30 0.40 0.50 0.60
e (%) s (Kg/cm2)

c = 0.017 kg/cm2 f= 6.80 O


PARTMENT

022 - 201 45 83

: Setiono H.

0.42
t
kg/cm 2
0.000
0.020
0.037
0.049
0.058
0.062
0.067
0.067
0.067

0.067

fik s vs t

30 0.40 0.50 0.60


Kg/cm2)
30 0.40 0.50 0.60
Kg/cm2)
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Direct Shear Test
Project : Soil Investigation Check by : Setiono H.
Location : Jakarta Date :
No. Sample : UDS 3
Depth : : 14.50 - 15.00 -
Size Of Sample
Diametre (D) = 6.00 cm K= 0.23 kg/div
High= 2.00 cm DD = 0.10 cm/mnt
Area (A)= 28.274 cm
4 8 12
P (kg)
sn ( kg/cm ) = 0.14
2
sn ( kg/cm ) = 0.28 2
sn ( kg/cm ) = 2

t DD e = DD/D A Ph t Ph t Ph
Ring Ring Ring
menit mm (%) cm 2
kg kg/cm 2
kg kg/cm 2
kg
0.00 0.00 0.00 28.27 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.00
0.25 0.02 0.25 28.20 3.00 0.69 0.024 5.00 1.15 0.041 7.00 1.61
0.50 0.03 0.50 28.13 3.50 0.81 0.029 7.00 1.61 0.057 9.00 2.07
1.00 0.06 1.00 27.99 4.00 0.92 0.033 10.00 2.30 0.082 12.00 2.76
1.50 0.09 1.50 27.85 4.50 1.04 0.037 12.00 2.76 0.099 14.00 3.22
2.00 0.12 2.00 27.71 4.80 1.10 0.040 13.00 2.99 0.108 16.00 3.68
2.50 0.15 2.50 27.57 5.00 1.15 0.042 14.00 3.22 0.117 17.50 4.03
3.00 0.18 3.00 27.43 5.30 1.22 0.044 14.00 3.22 0.117 18.00 4.14
3.50 0.21 3.50 27.28 5.50 1.27 0.046 14.00 3.22 0.118 18.00 4.14
4.00 0.24 4.00 27.14 5.80 1.33 0.049 18.00 4.14
4.50 0.27 4.50 27.00 6.00 1.38 0.051
5.00 0.30 5.00 26.86 6.00 1.38 0.051
5.50 0.33 5.50 26.72 6.00 1.38 0.052
6.00 0.36 6.00 26.58
6.50 0.39 6.50 26.44
7.00 0.42 7.00 26.30
t max= 0.052 t max= 0.118 t max=

Direct Shear Curve


t (kg/ cm2 )

Grafik e vs t Grafik s vs t
0.18
0.25
0.16
t (kg/cm2)

0.14
0.2
0.12 Column
G
0.1 0.15
Column J
0.08
0.06 Column
M 0.1
0.04
0.02 0.05
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 0
0.00 0.10 0.20 0.30 0.40 0.50 0.60
e (%) s (Kg/cm2)
0.15
Column J
0.08
0.06 Column
M 0.1
0.04
0.02 0.05
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 0
0.00 0.10 0.20 0.30 0.40 0.50 0.60
e (%) s (Kg/cm2)

c = 0.007 kg/cm2 f= 19.62 O


PARTMENT

022 - 201 45 83

: Setiono H.

0.42
t
kg/cm 2
0.000
0.057
0.074
0.099
0.116
0.133
0.146
0.151
0.152
0.153

0.153

fik s vs t

30 0.40 0.50 0.60


Kg/cm2)
30 0.40 0.50 0.60
Kg/cm2)
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Consolidation Test

Project : Soil Investigation initial Ht (H0) : 2.50 cm Initial Water content (wn) :
Location : Jakarta Diameter : 6.25 cm Water content (wa) :
Bor location : Kali Penggilingan Area (A) : 30.63 cm2 Dry weight (Ws) = W / (1+wa) :
No. Sample : UDS 1 Weight (W) : 216.63 gr Ht of solids (Hs)=Ws/(A*Gs*gw) :
Depth : 3.50-4.00 Gs : 2.54 Initial void ratio (eo)=(Ho-Hs)/Hs :

dial read at Change in


Loads (s) DH total ave H De e t 90 Cv Note
end samp (DH)
kg/cm 2 cm cm cm cm detik cm 2/detik

0 0.000 0.000 2.500 1.488


0.25 0.010 0.010 0.010 2.490 0.0100 1.478 109 0.0120
0.5 0.028 0.018 0.028 2.472 0.0279 1.460 118 0.0110
1 0.057 0.029 0.057 2.443 0.0567 1.432 131 0.0096
2 0.130 0.073 0.130 2.370 0.1294 1.359 154 0.0078
4 0.213 0.083 0.213 2.287 0.2120 1.276 173 0.0064
8 0.300 0.087 0.300 2.200 0.2986 1.190 190 0.0054
2 0.263 -0.037 0.263 2.237 0.2618 1.226
0.5 0.200 -0.063 0.200 2.300 0.1991 1.289
8.701E-03

1.60
Void Ratio (e)

1.35

1.10
1 10

Log P [kg/cm2]
C c = (e 1 - e 2) / (log p 2 - log p 1) = 0.2810
GERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
OIL TESTING LABORATORY
Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Consolidation Test

41.97
45.18
78.16
1.005
1.488

Note

10

Log P [kg/cm2]
POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
SOIL TESTING LABORATORY
Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project : Soil Investigation Check by
Location : Jakarta Date
Bor location : Kali Penggilingan No. Bor

Laboratory Test Resume


No. Sample UDS 1 UDS 2 UDS 3 DS 4

Depth 3.50-4.00 3.50-4.00 450-500 19.00 - 19.55

Index Properties symbol unit

1. Density g t/m3 1.692 1.957 1.426 -


2. Water content w % 41.97 23.84 2.61 43.58
3. Specific of gravity Gs - 2.54 2.61 2.78 2.74
Void ratio e - 1.13 0.65 1.00 -
Porosity n - 0.53 0.40 0.50 -
Degree of saturation Sr % 94.29 95.30 7.26 --
4. Plastic limit PL % 31.84 34.83 48.54 27.13
Liquid limit LL % 45.71 61.90 69.04 42.72
Plasticity index PI % 13.88 27.07 20.50 15.59
5. Grainsize Gravel G % 0.52 1.15 20.43 0.00
Sand S % 4.48 7.78 14.04 16.51
Silt M % 87.98 86.33 65.53 83.49
Clay C % 7.02 4.74 0.00 0.00

Engineering properties
6 Unconfined qu kg\cm2 0.769 0.672 0.377 -
Compression Test q u' kg\cm2 0.627 0.506 0.272 -
St - 1.226 1.329 1.389 -
cu kg\cm2 0.384 0.336 0.189 -
7 Triaxial - UU Test j o 11.59 4.44 7.02 -
c kg\cm2 0.264 0.372 0.205 -
8 Direct Shear Test j o 21.373 17.482 - -
c kg\cm2 0.011 0.0815 - -
9 Consolidation Test Cc - 0.281 0.172 0.487 -
Cv cm2/detik 8.701.E-03 5.973.E-03 8.404.E-03 -
GERI BANDUNG - CIVIL ENGINEERING DEPARTMENT
IL TESTING LABORATORY
along Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
: Setiono H.
:
: BH-63

Laboratory Test Resume


DS 5

25.00 - 25.55

-
44.72
2.71
-
-
-
NP
NP
NP
0.00
39.84
60.16
0.00

-
-
-
-
-
-
-
-
-
-