Diaphragm Walls and Stractures 25
Diaphragm Walls and Stractures 25
3. Methods
3.1. Trenches
3.1.1. GEOMIX
The soil is premixed during the downward excavation and the spoil is moved towards the top of the cutting head. As the machine moves
upwards again, it moves the mix from above the cutting head to below it. During this phase a binding agent is injected and mixed with the soil.