You are on page 1of 12

BANDAR LAMPUNG

TAHUN 2015
42.90
ENGINEERING CONSULTANT
JL. BLORA, GG. JAYA NO. 16 TELP (0721) 771997 - BANDAR LAMPUNG
D A FT A R ISI G A M B A R
NOM OR NAM A GAM BAR JM L . L B R
JL . H E N D R O SU R A T M IN K E JL . P. SE B E SI K E C . SU K A R A M E
01 PE T A L O K A SI PE K E R JA A N 1
02 LA Y O U T D R A IN A SE IA IN 1
03 PO T O N G A N M E M A N JA N G 1
04 PO T O N G A N M E L IN T A N G 3
05 D E T A IL T Y PIC A L PA SA N G A N B A T U 1
06 L A Y O U T R E N C A N A G O R O N G -G O R O N G 1
07 D E N A H G O R O N G -G O R O N G 1
08 D E T A IL G O R O N G -G O R O N G 1
JU M L A H 10
Gorong-gorong
Trase Rencana
Drainase Eksisting
Pagar Komplek
K A B U PA T E N L A M PU N G SE L A T A N
K E C . T A N JU N G SE N A N G
K EC . K ED A TO N
K E C . R A JA B A SA K E C . SU K A R A M E
K EC . SU K A R A M E
K EC . K E M IL IN G
K EC . SU K A B U M I
K E C . T A N JU N G K A R A N G B A R A T
K EC . TA N JU N G K A R A N G TIM U R
K E C . T A N JU N G K A R A N G PU SA T
K EC . TELU K B ETU N G U TA R A
K EC . PA N JA N G
K E C . T E LU K B ET U N G SELA TA N
K EC . TELU K B ETU N G B A R A T
01 16
LF
GO
P.
LA
KE
Gorong-gorong
Trase Rencana
Drainase Eksisting
Pagar Komplek
IN
TM
RA
SU
O
DR
EN
.H
JL
SURATMIN
RO
JL. HEND
Embung
TA
OE
.S
JL
KE KOMPLEK IAIN
RADEN INTAN
LAY OUT DRAINASE KOMPLEK IAIN
Jl. Pulau Sebesi
Kantor Dinas PU Kota Bandar Lampung
02 16
Akhir Siring Pasangan
Awal Siring Pasangan
Hm. 2+73

Hm. 4+34
POTONGAN MEMANJANG
(P.0 - P.7)
Tanggul kiri existing
Tanggul kanan existing Jembatan Gorong-gorong Batas Talud Existing Dasar saluran rencana
STA 0+000 (Existing)
Dasar saluran existing
12
10
EMBUNG
5
0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
bidang persamaan / reference level
+0.00 meter
PATOK HEKTOMETER Hm 0 Hm 1 Hm 2 Hm 3 Hm 4
P1 P2 P3 P4 P5 P6 P7

P0
NOMOR PROFIL

123.0

223.0

273.0

323.0

373.0

423.0
23.0
0.0
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE 23.0 100.0 100.0 50.0 50.0 50.0 50.0 50.0

8.90 11.02 11.18

9.02 10.52 10.52

9.01 10.51 10.51

9.00 10.50 10.50

8.84 10.48 10.54

8.79 10.44 10.44

8.79 10.44 10.44

9.10
ELEVASI TANGGUL KIRI
YANG ADA

9.43
ELEVASI TANGGUL KANAN

9.26
ELEVASI DASAR SALURAN PADA AS
ELEVASI TANAH ASLI PADA AS SALURAN

8.843

8.825

8.807

8.790
ELEVASI TANGGUL
ELEVASI MUKA AIR RENCANA

9.320

9.020

9.007

9.004

8.843

8.825

8.807

8.790
ELEVASI DASAR SALURAN
RENCANA
R X Y L
TRASE SALURAN
TL
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN
TIPE BANGUNAN
Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
m I A
03 16
CL Pagar IAIN
3.97 11
1.51
0.30 0.30
2.15 10 1.50
+ 10.307
5.37
1.50
+8.807
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
6.00
10.482

10.436
10.333

10.435

10.614

ELEVASI TANAH ASLI


9.917
8.924

8.793

9.181

ORIGINAL GROUND LEVEL


JARAK (m)
0.40

0.80
0.10
0.60

0.70
0.10

6.00 1.60
DISTANCE (m)
P6
CL Pagar IAIN
2.27
0.13 POTONGAN MELINTANG
0.30 0.30
1.50 5.00 (P.6 - P.8)
2.15
+ 10.290
5.37
10
1.50
+8.790
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
7.00
ELEVASI TANAH ASLI 9.102

9.264
9.535

9.426
8.544

8.481
ORIGINAL GROUND LEVEL
JARAK (m)

0.20

0.40
5.00 1.00 5.15
DISTANCE (m)
P7
CL Pagar IAIN
2.70
0.28
0.30 0.30
1.50 5.00
2.15
+ 10.290
5.37
10
1.50
+8.790
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
7.00
ELEVASI TANAH ASLI

9.102

9.264
9.535

9.426
8.544

8.481
ORIGINAL GROUND LEVEL
JARAK (m)

0.20

0.40
5.00 1.00 5.15
DISTANCE (m)
P 7 + 11 1 : 50 09 16
Pagar IAIN
0.00
0.00
0.00 11
0.00
10
bidang persamaan
reference level
8.00
10.492

10.504
10.504

10.504
10.504

10.632
ELEVASI TANAH ASLI
9.004

9.004

ORIGINAL GROUND LEVEL


JARAK (m)
0.40

0.40

5.60 1.45 5.10


DISTANCE (m)
P 3 (Existing Pasangan)
CL
Pagar IAIN
3.21
1.55
0.30 0.30
11 1.50 POTONGAN MELINTANG
2.15 (P.3 - P.5)
+ 10.334
5.37
10
1.50
+8.834
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
7.00
10.560

10.544
10.482

10.482

10.701
ELEVASI TANAH ASLI

8.970

8.843

9.077
ORIGINAL GROUND LEVEL
JARAK (m)

0.40
0.20
0.90

0.20
6.20 1.00 2.60
DISTANCE (m)
P4
Pagar IAIN
CL
4.27
1.53
0.30 0.30
2.15 11 1.50
+ 10.325
5.37
10
1.50
+8.825
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
7.00

10.482

10.436

10.026

10.436

10.655
ELEVASI TANAH ASLI

8.924

8.793
9.181
ORIGINAL GROUND LEVEL
JARAK (m)

0.10
0.60

0.50
0.10
5.40 1.00 2.20
DISTANCE (m)
P5 1 : 50 08 16
0.00
0.00
0.00 12
0.00
10
bidang persamaan
reference level
8.00
11.095

11.175

10.000

10.000

11.024

11.025
ELEVASI TANAH ASLI
8.900

8.900

ORIGINAL GROUND LEVEL


JARAK (m)
0.75

0.70

0.75

3.00 1.50 1.50 3.00


DISTANCE (m)
P 0 (Existing Pasangan)
0.00
Pagar IAIN
0.00
POTONGAN MELINTANG
0.00 (P.0 - P.2)
0.00
11
10
bidang persamaan
reference level
8.00
10.508

10.520
10.520

10.520
10.520

10.648
ELEVASI TANAH ASLI

9.020

9.020
ORIGINAL GROUND LEVEL
JARAK (m)

0.40

0.40
5.60 1.45 5.00
DISTANCE (m)
P 1 (Existing Pasangan)
0.00
Pagar IAIN
0.00
0.00 12
0.00
10
bidang persamaan
reference level
8.00

11.327

11.277
10.707
11.107
11.107
10.609

10.507
10.507

10.507
10.507

10.635
ELEVASI TANAH ASLI

9.007

9.007
ORIGINAL GROUND LEVEL
JARAK (m)

0.75
0.25
0.20

0.40

0.40
2.30 1.45 5.20
DISTANCE (m)
P 2 (Existing Pasangan) 1 : 50 07 16
Plesteran + Aci t = 1,5 cm
Pipa Drain PVC 2 " setiap jarak 1,5 m'
CL Pas Batu Belah 1 : 4
Pasir Urug t = 5 cm
0.30 1.50 0.30
POTONGAN MELINTANG
(P.9 - P.11)
1.50

0.30
0.50

0.20
0.05
0.50 1.50 0.50
Detail Typical Pas. Batu
Skala 1 : 25
1 : 50 10 16
Eksisting
Drainase

9.051 9.795
10.520
Suratmin
Jl. Hendro

Embung
Rencana Gorong-gorong
Pagar IAIN

1.50 x 1.80 x 19 .00 m'


f
Pagar Gol

Jembatan Eksisting
Way Prasanti
Kampus IAIN Lapangan Golf Lapangan Golf
Pagar IAIN 11.034
9.844 9.894
10.669
10.706
Jl. Pulau Sebesi
9.244
8.996
10.496
Kios
8.496
Sawah

Way Prasanti
Gorong-gorong Eksisting
1.50 x 1.50 x 15 .00 m'
LAY OUT JL. SEBESI
g
or
on Skala 1 : 1000
-g g
in
o ng n s ist g ti
IN N or la tin an
IA AI Ja Ek
g rI c.
G a l. sis as
r in ga uk Sa Ek Pr
Si en ar l. ay
Pa R v.
M
Sa
El as W
D ri ar
v. i as n
El K
si D na
Si v.
Ka
El si
Si
10.70
9.051
9.051
9.244
9.051 8.90
8.496
+5.00
11.034
tmin

A A
Jl. Hendro Sura

2.30
1.50
+8.90 +10.70 +8.90
9.844
9.894
18.20
10.669
0.40 0.40
19.00
Jl. Pulau Sebesi
10.706
9.244
DENAH GORONG-GORONG
SKALA, 1 : 100
10 - 200
1.90 10 - 200 1.90 2.30
12 - 200

12 - 200

2.30
12 - 200
Anker 2 12 - 300 12 - 200
12 - 200 0.60
+10.70 +10.70
0.20 0.20
12 - 200 12 - 200 10 - 200
1.90
1.60 1.60
2.40
+8.90 +8.90
0.30
0.60
0.30
19/2 =9.50 0.80 1.50 0.80
3.10
DETAIL PENULANGAN PLAT
SKALA, 1 : 50
3.50 6.00 2.00 6.00 1.50 4.80

0.60

0.60
2.30

0.20

0.20
-4 % -2 % +11.00 -2 % -4 %
+10.70 +10.70

1.60

1.60
2.40

0.30
0.60

0.60
+8.90 +8.90
17.40 0.80 1.50
3.20
19.00
POTONGAN A - A POTONGAN B - B
SKALA, 1 : 100 SKALA, 1 : 100