Long Dan Cross Drainase Komplek IAIN
Long Dan Cross Drainase Komplek IAIN
TAHUN 2015
42.90
ENGINEERING CONSULTANT
JL. BLORA, GG. JAYA NO. 16 TELP (0721) 771997 - BANDAR LAMPUNG
D A FT A R ISI G A M B A R
NOM OR NAM A GAM BAR JM L . L B R
JL . H E N D R O SU R A T M IN K E JL . P. SE B E SI K E C . SU K A R A M E
01 PE T A L O K A SI PE K E R JA A N 1
02 LA Y O U T D R A IN A SE IA IN 1
03 PO T O N G A N M E M A N JA N G 1
04 PO T O N G A N M E L IN T A N G 3
05 D E T A IL T Y PIC A L PA SA N G A N B A T U 1
06 L A Y O U T R E N C A N A G O R O N G -G O R O N G 1
07 D E N A H G O R O N G -G O R O N G 1
08 D E T A IL G O R O N G -G O R O N G 1
JU M L A H 10
Gorong-gorong
Trase Rencana
Drainase Eksisting
Pagar Komplek
K A B U PA T E N L A M PU N G SE L A T A N
K E C . T A N JU N G SE N A N G
K EC . K ED A TO N
K E C . R A JA B A SA K E C . SU K A R A M E
K EC . SU K A R A M E
K EC . K E M IL IN G
K EC . SU K A B U M I
K E C . T A N JU N G K A R A N G B A R A T
K EC . TA N JU N G K A R A N G TIM U R
K E C . T A N JU N G K A R A N G PU SA T
K EC . TELU K B ETU N G U TA R A
K EC . PA N JA N G
K E C . T E LU K B ET U N G SELA TA N
K EC . TELU K B ETU N G B A R A T
01 16
LF
GO
P.
LA
KE
Gorong-gorong
Trase Rencana
Drainase Eksisting
Pagar Komplek
IN
TM
RA
SU
O
DR
EN
.H
JL
SURATMIN
RO
JL. HEND
Embung
TA
OE
.S
JL
KE KOMPLEK IAIN
RADEN INTAN
LAY OUT DRAINASE KOMPLEK IAIN
Jl. Pulau Sebesi
Kantor Dinas PU Kota Bandar Lampung
02 16
Akhir Siring Pasangan
Awal Siring Pasangan
Hm. 2+73
Hm. 4+34
POTONGAN MEMANJANG
(P.0 - P.7)
Tanggul kiri existing
Tanggul kanan existing Jembatan Gorong-gorong Batas Talud Existing Dasar saluran rencana
STA 0+000 (Existing)
Dasar saluran existing
12
10
EMBUNG
5
0 1 2 3 4 5 6 7 8 9 10
SV = 1 : 100
0 10 20 30 40 50 60 70 80 90 100
SH = 1 : 1000
bidang persamaan / reference level
+0.00 meter
PATOK HEKTOMETER Hm 0 Hm 1 Hm 2 Hm 3 Hm 4
P1 P2 P3 P4 P5 P6 P7
P0
NOMOR PROFIL
123.0
223.0
273.0
323.0
373.0
423.0
23.0
0.0
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE 23.0 100.0 100.0 50.0 50.0 50.0 50.0 50.0
9.10
ELEVASI TANGGUL KIRI
YANG ADA
9.43
ELEVASI TANGGUL KANAN
9.26
ELEVASI DASAR SALURAN PADA AS
ELEVASI TANAH ASLI PADA AS SALURAN
8.843
8.825
8.807
8.790
ELEVASI TANGGUL
ELEVASI MUKA AIR RENCANA
9.320
9.020
9.007
9.004
8.843
8.825
8.807
8.790
ELEVASI DASAR SALURAN
RENCANA
R X Y L
TRASE SALURAN
TL
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN
TIPE BANGUNAN
Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
m I A
03 16
CL Pagar IAIN
3.97 11
1.51
0.30 0.30
2.15 10 1.50
+ 10.307
5.37
1.50
+8.807
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
6.00
10.482
10.436
10.333
10.435
10.614
8.793
9.181
0.80
0.10
0.60
0.70
0.10
6.00 1.60
DISTANCE (m)
P6
CL Pagar IAIN
2.27
0.13 POTONGAN MELINTANG
0.30 0.30
1.50 5.00 (P.6 - P.8)
2.15
+ 10.290
5.37
10
1.50
+8.790
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
7.00
ELEVASI TANAH ASLI 9.102
9.264
9.535
9.426
8.544
8.481
ORIGINAL GROUND LEVEL
JARAK (m)
0.20
0.40
5.00 1.00 5.15
DISTANCE (m)
P7
CL Pagar IAIN
2.70
0.28
0.30 0.30
1.50 5.00
2.15
+ 10.290
5.37
10
1.50
+8.790
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
7.00
ELEVASI TANAH ASLI
9.102
9.264
9.535
9.426
8.544
8.481
ORIGINAL GROUND LEVEL
JARAK (m)
0.20
0.40
5.00 1.00 5.15
DISTANCE (m)
P 7 + 11 1 : 50 09 16
Pagar IAIN
0.00
0.00
0.00 11
0.00
10
bidang persamaan
reference level
8.00
10.492
10.504
10.504
10.504
10.504
10.632
ELEVASI TANAH ASLI
9.004
9.004
0.40
10.544
10.482
10.482
10.701
ELEVASI TANAH ASLI
8.970
8.843
9.077
ORIGINAL GROUND LEVEL
JARAK (m)
0.40
0.20
0.90
0.20
6.20 1.00 2.60
DISTANCE (m)
P4
Pagar IAIN
CL
4.27
1.53
0.30 0.30
2.15 11 1.50
+ 10.325
5.37
10
1.50
+8.825
0.30
0.50
bidang persamaan 1.50
reference level 0.50 0.50
7.00
10.482
10.436
10.026
10.436
10.655
ELEVASI TANAH ASLI
8.924
8.793
9.181
ORIGINAL GROUND LEVEL
JARAK (m)
0.10
0.60
0.50
0.10
5.40 1.00 2.20
DISTANCE (m)
P5 1 : 50 08 16
0.00
0.00
0.00 12
0.00
10
bidang persamaan
reference level
8.00
11.095
11.175
10.000
10.000
11.024
11.025
ELEVASI TANAH ASLI
8.900
8.900
0.70
0.75
10.520
10.520
10.520
10.520
10.648
ELEVASI TANAH ASLI
9.020
9.020
ORIGINAL GROUND LEVEL
JARAK (m)
0.40
0.40
5.60 1.45 5.00
DISTANCE (m)
P 1 (Existing Pasangan)
0.00
Pagar IAIN
0.00
0.00 12
0.00
10
bidang persamaan
reference level
8.00
11.327
11.277
10.707
11.107
11.107
10.609
10.507
10.507
10.507
10.507
10.635
ELEVASI TANAH ASLI
9.007
9.007
ORIGINAL GROUND LEVEL
JARAK (m)
0.75
0.25
0.20
0.40
0.40
2.30 1.45 5.20
DISTANCE (m)
P 2 (Existing Pasangan) 1 : 50 07 16
Plesteran + Aci t = 1,5 cm
Pipa Drain PVC 2 " setiap jarak 1,5 m'
CL Pas Batu Belah 1 : 4
Pasir Urug t = 5 cm
0.30 1.50 0.30
POTONGAN MELINTANG
(P.9 - P.11)
1.50
0.30
0.50
0.20
0.05
0.50 1.50 0.50
Detail Typical Pas. Batu
Skala 1 : 25
1 : 50 10 16
Eksisting
Drainase
9.051 9.795
10.520
Suratmin
Jl. Hendro
Embung
Rencana Gorong-gorong
Pagar IAIN
Jembatan Eksisting
Way Prasanti
Kampus IAIN Lapangan Golf Lapangan Golf
Pagar IAIN 11.034
9.844 9.894
10.669
10.706
Jl. Pulau Sebesi
9.244
8.996
10.496
Kios
8.496
Sawah
Way Prasanti
Gorong-gorong Eksisting
1.50 x 1.50 x 15 .00 m'
LAY OUT JL. SEBESI
g
or
on Skala 1 : 1000
-g g
in
o ng n s ist g ti
IN N or la tin an
IA AI Ja Ek
g rI c.
G a l. sis as
r in ga uk Sa Ek Pr
Si en ar l. ay
Pa R v.
M
Sa
El as W
D ri ar
v. i as n
El K
si D na
Si v.
Ka
El si
Si
10.70
9.051
9.051
9.244
9.051 8.90
8.496
+5.00
11.034
tmin
A A
Jl. Hendro Sura
2.30
1.50
+8.90 +10.70 +8.90
9.844
9.894
18.20
10.669
0.40 0.40
19.00
Jl. Pulau Sebesi
10.706
9.244
DENAH GORONG-GORONG
SKALA, 1 : 100
10 - 200
1.90 10 - 200 1.90 2.30
12 - 200
12 - 200
2.30
12 - 200
Anker 2 12 - 300 12 - 200
12 - 200 0.60
+10.70 +10.70
0.20 0.20
12 - 200 12 - 200 10 - 200
1.90
1.60 1.60
2.40
+8.90 +8.90
0.30
0.60
0.30
19/2 =9.50 0.80 1.50 0.80
3.10
DETAIL PENULANGAN PLAT
SKALA, 1 : 50
3.50 6.00 2.00 6.00 1.50 4.80
0.60
0.60
2.30
0.20
0.20
-4 % -2 % +11.00 -2 % -4 %
+10.70 +10.70
1.60
1.60
2.40
0.30
0.60
0.60
+8.90 +8.90
17.40 0.80 1.50
3.20
19.00
POTONGAN A - A POTONGAN B - B
SKALA, 1 : 100 SKALA, 1 : 100