PYRAMID STEEL STRUCTURE (Pvt) Ltd.

CONSTRUCTION OF PYRAMID STEEL STRUCTURES

10th Running Bill

Sub-Contractor:- Sarwar Hussain Shah.


BOQ Amount Verified Executed Amount (Rs.)
Sr. # Description
(Rs.) Previous Paid (Rs.) This Bill (Rs.) Up To Date (Rs.)

1 Construction of Civil Work at PSS 3,500,000 3,861,169 323,240 4,184,409


Contractor Risk & Cost
2 (180,000) (180,000)
(Concrete Mixer Machine With Diesel)
Total Work Done (A) 3,500,000 3,681,169 323,240 4,004,409
Deductions

1 Retention Money 5% 184,058 16,162 200,220


Mobilization Advance
2 (in 3 x Equal Installments) 80,000 - 80,000
Rs.80,000/-
3 Income Tax @ 7% - -

Total Deductions (B) 264,058 16,162 280,220

Total Verified Bill C = (A - B) 3,417,111 307,078 3,724,189

Payment Made (Advance) = D - -

Net Payment to be Made E = (C - D) - -

Verified By :- Approved By :-

Manager Production Chief Operating Officer


(HOD) (HOD)
L STRUCTURE (Pvt) Ltd.

YRAMID STEEL STRUCTURES

h Running Bill

Verified Executed Amount (Rs.)


% Comp.

120.00%

Feb, Mar, Apr,


May-2017
PYRAMID STEE

COSNTRUCTION OF PYRAMID STEEL S


ABSTRACT OF
Sub-Contractor:- Sarwar Hussain Shah.

As per Work Order


Sr. # Description Unit
Quantity Rate Amount
Structural Excavation in
1 Cft - 10.00 -
Common Material.

Bed Dressing With Leveling &


1i Sft 12,212.00 5.00 61,060
Compaction.
Back Fill With Stone Aggrigate.
2 Under Footing With Leveling & Cft - 10.00 -
Compaction.
Main Shed Gentry Crane
3 Sft - 10.00 -
Centre Area Back Fillig.

Main Shed Gentry Crane Edge


4 Sft - 30.00 -
Concrete.
Main Store & Electrical
5 Workshop Flooring Marble Petty Sft - 35.00 -
Comp. in all respect
PYRAMID STEE

COSNTRUCTION OF PYRAMID STEEL S


ABSTRACT OF
Sub-Contractor:- Sarwar Hussain Shah.

As per Work Order


Sr. # Description Unit
Quantity Rate Amount
Main Shed Boundary Wall
6 Sft - 35.00 -
(Brick Work).

Main Shed Boundary Wall


7 Sft - 20.00 -
(Plaster Work).

Main Shed Boundary Wall (Fair


8 Sft - 20.00 -
Face Painting Work).

Main Shed Boundary Wall


9 Sft - 1,800.00 -
(Window Petty Work).

10 Column & Beam Concrete. Rft - 15.00 -

11 Sewer Man Hole Work. L.S 24.00 1,800.00 43,200

Main Pedestal Fair Face


12 L.S - 400.00 -
Concrete, Plaster etc.
PYRAMID STEE

COSNTRUCTION OF PYRAMID STEEL S


ABSTRACT OF
Sub-Contractor:- Sarwar Hussain Shah.

As per Work Order


Sr. # Description Unit
Quantity Rate Amount
Sand Blasting Shed Soling
13 Sft - 10.00 -
Removing.

14 Lean Concrete. Sft 12,212.00 15.00 183,180

15 Roof Water Proofing. Sft 200.00 30.00 6,000

Bitument Coat & Polythene


16 Sft - 15.00 -
Sheet Complete.
Steel Plate Shttring Work for
17 Column & Beams, Wood Sft - 40.00 -
Suporting etc.
Reinforcement Steel Grade-60
18 Kgs - 6.00 -
(Cutting, Bending, Fixing)
PYRAMID STEE

COSNTRUCTION OF PYRAMID STEEL S


ABSTRACT OF
Sub-Contractor:- Sarwar Hussain Shah.

As per Work Order


Sr. # Description Unit
Quantity Rate Amount
Extra Work
19 L.S - - -
(Detail Attached)

Project Engineer Qua


(Civil Works)
PYRAMID STEE

COSNTRUCTION OF PYRAMID STEEL S


ABSTRACT OF
Sub-Contractor:- Sarwar Hussain Shah.

As per Work Order


Sr. # Description Unit
Quantity Rate Amount

Main Road Brick Soling & Kerb


19 Sft - 50.00 -
Stone With Lean Concrete.

Main Shed Right Passage Tuff


20 Sft - 50.00 -
Paver With Sand Cussion.

Wall & Floor With Skirting Tile


21 Sft - 40.00 -
Work.

22 Main Cable Trench Back Filling Cft - 10.00 -

23 Soling Removing & Repairing Sft - 30.00 -


PYRAMID STEE

COSNTRUCTION OF PYRAMID STEEL S


ABSTRACT OF
Sub-Contractor:- Sarwar Hussain Shah.

As per Work Order


Sr. # Description Unit
Quantity Rate Amount

Laying of RCC Pipe 15" Dia


24 Rft - 25.00 -
Complete in All Respect.

Man Hole Bed With PCC Floor


25 No's - 300.00 -
Complete in All Respect.

Man Hole Batching/Camber


26 No's - 250.00 -
Complete in All Respect.

Man Hole Brick & Plaster Work


27 (Inner & Outer) Complete in All No's - 3,000.00 -
Respect.

Wash Room & Mosque Store


28 Sft 50.00 200.00 10,000
Complete in All Respect.

Construction of CNC Machine


29 No's 50.00 300.00 15,000
Complete in All Respect.
PYRAMID STEE

COSNTRUCTION OF PYRAMID STEEL S


ABSTRACT OF
Sub-Contractor:- Sarwar Hussain Shah.

As per Work Order


Sr. # Description Unit
Quantity Rate Amount

29 Plaster Work of Mosque Dome L.S 320.00 15.00 4,800

Total Work Done Amount in Rs. = 232,380

Checked By :-

Project Engineer
(Civil Works)
MID STEEL STRUCTURE (Pvt) Ltd.

STEEL STRUCTURES NEHLA VILLAGE SUNDER LAHORE.


RACT OF COST AND QUANTITIES
10t

Quantities Amount

Previous This Bill Up to date Previous This Bill

37,606.71 37,607 376,067 -

34,264.00 12,212 46,476 171,320 61,060

8,303.70 8,304 83,037 -

1,512.00 1,512 15,120 -

7,803.43 7,803 234,103 -

3,160.00 3,160 110,600 -


MID STEEL STRUCTURE (Pvt) Ltd.

STEEL STRUCTURES NEHLA VILLAGE SUNDER LAHORE.


RACT OF COST AND QUANTITIES
10t

Quantities Amount

Previous This Bill Up to date Previous This Bill

8,947.93 8,948 313,177 -

10,576.21 10,576 211,524 -

6,909.91 6,910 138,198 -

59.00 59 106,200 -

2,049.25 2,049 30,739 -

34.00 24 58 61,200 43,200

88.00 88 35,200 -
MID STEEL STRUCTURE (Pvt) Ltd.

STEEL STRUCTURES NEHLA VILLAGE SUNDER LAHORE.


RACT OF COST AND QUANTITIES
10t

Quantities Amount

Previous This Bill Up to date Previous This Bill

2,875.00 2,875 28,750 -

50,757.27 12,212 62,969 761,359 183,180

2,034.40 200 2,234 61,032 6,000

770.00 770 11,550 -

7,395.14 7,395 295,806 -

20,819.06 20,819 124,914 -


MID STEEL STRUCTURE (Pvt) Ltd.

STEEL STRUCTURES NEHLA VILLAGE SUNDER LAHORE.


RACT OF COST AND QUANTITIES
10t

Quantities Amount

Previous This Bill Up to date Previous This Bill

- - 49,000 -

Quantity Surveyor Chief Operating Officer


(Civil Works) (HOD)
MID STEEL STRUCTURE (Pvt) Ltd.

STEEL STRUCTURES NEHLA VILLAGE SUNDER LAHORE.


RACT OF COST AND QUANTITIES
10t

Quantities Amount

Previous This Bill Up to date Previous This Bill

5,976.25 5,976 298,813 -

3,375.00 3,375 168,750 -

1,987.11 1,987 79,484 -

2,020.00 2,020 20,200 -

800.00 800 24,000 -


MID STEEL STRUCTURE (Pvt) Ltd.

STEEL STRUCTURES NEHLA VILLAGE SUNDER LAHORE.


RACT OF COST AND QUANTITIES
10t

Quantities Amount

Previous This Bill Up to date Previous This Bill

131 131 3,275 -

5 5 1,500 -

5 5 1,250 -

5 5 15,000 -

150 50 200 30,000 10,000

50 50 - 15,000
MID STEEL STRUCTURE (Pvt) Ltd.

STEEL STRUCTURES NEHLA VILLAGE SUNDER LAHORE.


RACT OF COST AND QUANTITIES
10t

Quantities Amount

Previous This Bill Up to date Previous This Bill

320 320 - 4,800

3,861,169 323,240

Approved By:-

Manager Production
(HOD)
.

10th Running Bill

Amount

Up to date

376,067

232,380

83,037

15,120

234,103

110,600
.

10th Running Bill

Amount

Up to date

313,177

211,524

138,198

106,200

30,739

104,400

35,200
.

10th Running Bill

Amount

Up to date

28,750

944,539

67,032

11,550

295,806

124,914
.

10th Running Bill

Amount

Up to date

49,000

Chief Operating Officer


(HOD)
.

10th Running Bill

Amount

Up to date

298,813

168,750

79,484

20,200

24,000
.

10th Running Bill

Amount

Up to date

3,275

1,500

1,250

15,000

40,000

15,000
.

10th Running Bill

Amount

Up to date

4,800

4,184,409

Approved By:-

Manager Production
(HOD)