Professional Documents
Culture Documents
Diaphragm Walls and Stractures 26
Diaphragm Walls and Stractures 26
The latest technologies are used for monitoring work quality Geomix rig
3.1.2. TRENCHMIX
The trenches of mixed soil and binding agent are constructed using a specially designed trencher, which has the
following features:
- the soil is broken up and mixed, rather than excavated,
- the soil and binding agent are mixed in situ.
The binder may be introduced as a powder (dry method) or as a pre-mixed grout (wet method).
33