You are on page 1of 46

DEWA_OFFICIAL DEWAOFFICIAL

DEWAOFFICIAL DEWAVIDEOGALLERY




2016




3
2

 4.5 ( ) 69............................... 6...........................................................................................................................................................


4.6 (/ )71.............................................................................................
-
.4.7 (
)73................................................................................................................................... 8................................................................................................................................................................................... .1
1
10.................................................................................................................................................... 1.2
-
11................................................................................................................................................................................. 1.3
78............................................................................................................................................................................... 5.1 19........................................................................................................................................................................................ 1.4
78........................................................................................................................................................ .2
5
-
78....................................................................................................................................................... 5.3
79............................................................................................................................................................... 5.4 24................................................................................................................................................................................. .1
2
81...................................................................................................................................................................... 5.5 25......................................................................................................................................................................... 2.2
82................................................................................................................................................................. 5.6 26............................................................................................................................................................ 2.3

- - " " ( )NOC

6.1 84....................................................................................................................................................................... 28.................................................................................................................................................................................... .1


3
6.2 84.................................................................................................................................................................... 28........................................................................................................................................................ 3.2
33................................................................................................................................ 3.3
-
40.................................................................................................. 3.4
7.1 / 88......................................................................................................... : 42............................................................................................................................................................................. 3.5
7.2 88.................................................................................................................................................. :
-

90..................................................................................................................................................................................... 4.1 44.......................................................................................................................................................................


91..................................................................................................................................................................................................... 4.2 / 57................................................................................................................
 4.3 (
) 63.....................................................................................................................................
4.4 66.....................................................................................................

5
4


.

.

7
6

: : . XLPE 132 1.1


.1 ( () 
. .2 (( )pilot cables ()  :
400 132
. 
.
: ( XLPE () ()
( ()

Pair - 14/20 Nos. :



.

. 132 . XLPE 400

24/48
18mm

9
8

1.3 1.2
400 132 : 400 : 132 .
 . 132 . 400 :
50 . 132
 . 132  . 132 50  .2 400 - 132 400 - ( () .1
()PVC ducts ( )
 . / 132
. 400 400 .
400 .


. 132 ( ) . ( Gantry 132/ 400)

( )

11
10

. 132 50 . 132

132 50
132 50

13
12

. / 132 ()PVC ducts . 132 50

/ 132 132 50
( 10) ( )

15
14

. / 132

( / 132) ( / 132)

17
16

1.4
 . / .

. 1.4.1
 . ()
.

: .
.
 . 50 .
.
2.4

( . 1.4.1)
1.4.1 132
1.4.2

.
.
. ( )

1.4.3 (
)
 .
.
:
( / 132)
.1 / ( )1.4.6
132 .2 ( )1.4.7
.

19
18

. 1.4.5 1.4.4
1.4.8 ( )Gantry

1.4.7 .  1.4.6 / 50
1.4.9 ( )Gantry

21
20

1.4.10


1.4.11

23
22

2.2 :


2.1


. .  .
 . ( )NOC

 . . .
( )NOC

25
24

2.3


( )NOC

" " ()NOC



27
26
" " ( )NOC

3.1.1 3.2.2 " " 3.1



3.1.1
. " " ( )NOC

.
TP/TMD/TLM/LP&N/QP-01.A04b

. 132/400 .
3 .2 .1 .1
3.1.2
- .2

tp@tlm.dewa.gov.ae 04-3229095 2 :
" " . " "

- -
04-3227929/3221547 :


.
:

:
 . .
(
)

) . 3.1.3
(
.
 . ( 132 / 400
)
(

(
:
( 2) (
)3.1.1
3.2
:
:

 .
:
:

()3.1.2 : 3.2.1 " "


"

. 132/400
 .
(
)3.1.3
. ) ( ......................................................
......................................................

 . .
......................................................
.
......................................................
.

( : )3.1.
......................................................
: ......................................................

29
28
" " ( )NOC

.3.1.1 -

31
30
" " ( )NOC

 .

3.1.3 3.1.2 132 .
3.2.3

.
. .
3.2.4

 6
15 .

3.3


 . ( ) .  .3 .
 . 132. ( )

( 1/1000 DLMT : ( )TLP-Supervisor
).  1 400 . 3.1.4
 . 132 .
2
3

. 4 .
 . 132  5 /
6 :

. 7  .1 132 ( )HDD
 .
 8

.
.  .2
. . . .


33
32
" " ( )NOC

 ()
. .  .
( .  . / .
). . ()ROW 132 400 /  .
 .  .
. / .
.
 .  . . ( )ROW .
.  .  .
 . ( ) / (
 . / /  .
/ . . ) .
 .  . (  .
 . . ) 400 132.
1/1000 DLMT  . .  .
400 . .  . 400
132 .
 .  . 132
.LILO /  . 132
( )  . .

 . . .  . (
400/132 . . .
 . ).
. .  .  .
 .

.

. . .
 .
 . .
 .
.  . / / / PVC RTU

 . ( ) 400 132 1000 . .
 . ( DLTM  .
. ) . 1/1000 DLMT
. ( )  .  . / 400 132
 . . 132 400 /

35
34
" " ( )NOC

132 / 400 .  .  . .
 . 1/1000  .
 .
132 / 400 1/1000 DLMT
/  . "" "".
.
/ . 400 132
 .  .
. . ( ) 1/1000 DLMT
 .  . . 400
/  . / / 132
400 / 132 . 132 400/
.  . .
 . ( )  . /
. 132 400 /
(  . . ()ROW
/ ).  . .
 . . / . ( .)ROW
( )  .  .
 . 132 / 400 . . / .
/  . ( )  .
.
. . / .  . ( )
 . /   .
: . .
.  . /
 . . .
. / / .  .
 . .
/ 4 ( )
 .
/ / .
.

37
36
" " ( )NOC

 . ( )  .  . /
132/ 400
. (
 . . /
(  . ) .
) ( /) .  .
/ ( ).  . 400 132.
 .  .
132 . 400
 . 132.
.  . 132
 . .
.  . / (
 . ).
/ .  . /  .
 . ( ) .
( ) . . 132 / 400
 .  .
. . ( )
. . . ( ).  .
 . .
132
( ). :
 . ( )single line drawing
/ .
() / .
 .

.

39
38
) NOC( " "

3.4
132 /400 .
132 /400 .

This DEWA 400/132kV cables NOC is fully or partially issued subject to the following conditions:

1. This NOC is not a blanket permission to start the work. should be removed. A steel protection barrier should to be provided for
2. Send prior notification to DEWA at least 2 working days in advance by fax link boxes in the vicinity of the road.
to 04 322 9095 or email tp.tlm@dewa.gov.ae and confirmed with the 23. Any existing spare ducts should be extended to the proposed road
engineers telephone number given in the issued NOC (No-Objection widening or crossing area. If this is not possible, then new end to end
Certificate). spare ducts should be provided and maintained at least 1.5 metres either
3. Originals and copies of the NOC drawings approved by DEWAs TLM side of the proposed road edge. This is from the road shoulder edge or the
(Transmission Line Maintenance) department must be available at the road shoulder protection edge)
worksite (within the vicinity of the cable area), including trial-pit verified 24. Route markers should not be displaced or destroyed as they will be
drawings and method of statement. Sub-contractors are not allowed to replaced or reinstated in the same place or position after completion of the
work in the vicinity of DEWAs 132kV power, FO (Fibre-Optic), or pilot works with the pole or flush type and tiled area to be provided with the
cable routes without prior approval from DEWA TLM. flush type marker. Project owners are financially liable for their loss or
4. Responsible engineers, supervisors and approved safety officers should irreparable damage. Suitable route markers to be provided over the cable
be available at the site while working close to DEWAs ED services. route when asphalt road works involved subject to RTA approval.
5. Contractors should take all safety regulations and precautions are at their 25. Every drawing must be marked with GPS coordinates showing cable
own cost while working in the vicinity of DEWAs services and will be liable positions at every 50-metre interval and turning areas with protection,
for any damage as per local Act 06/2015. Action will be taken against profile details and cross-sections in relation to the permanent structures
violators and contractor as per the violations, black points or fines or landmarks to be provided after finishing the project. Drawings should
incurred. also include the status of live FO or pilot cable portions clearly marked with
6. Trial holes to be taken by hand excavation in presence of DEWA personnel GPS coordinates in the As-Built drawing, in case the power cable is
prior to start of construction work to identify and confirm clearance of abandoned.
services marked in the approved NOC and the presence of any more 26. All work must be carried out in presence of DEWA personnel during normal
existing cables not marked that need to be identified and verified by TLM DEWA working hours (0730-1430 hours). Any deviation must be agreed in
staff. The Party has to make additional trial pits as per the site conditions writing in advance. No work is allowed at night. However, in urgent cases
or any request from DEWA staff. After backfilling any trial pit, temporary night work is permitted within the approved revised method statement as
signboards should be installed above the cable route showing numbers, applicable as per site conditions.
types and depth of cables. Also the coordinates must be specified in the 27. No high-pressure pipe joints must not be located under or close to any
drawing for TP Locations. cables. The surrounding steel sleeve must be extended to both sides of the
7. Existing 132kv cables within the vicinity of proposed working area to be cable depending upon the diameter of the pipeline, this is to be approved
located and identified by digging trial pits, barricading, and fixing danger by DEWA.
signboards as per DEWA requirements and site conditions in the presence 28. The party who obtained the NOC from DEWA is only allowed to work at the
of TLM-LP (Transmission Line Maintenance Line Patrolling) staff. DEWA site. However, sub-contractors works can be allowed if previously
TLM Clearance will be provided to the contractor only after fulfilling the approved by the appropriate DEWA department.
condition. 29. Clearance from retaining walls, pilings or pillars must be at least 2.0m
8. Any machinery, construction equipment, excavators and other vehicles not away from any cable or trough. The works to be carried out after identify
allowed to work, move or park over the cable route at unmade area and the the cable/trough with coordinates by TLMs cable staff.
use of heavily vibrating compactors are prohibited. If any particular 30. Any deep excavation in close proximity to any cable or trough should be
locations require a cross over for the cables, then that area is to be provided with steel sheet piling and protection with de-watering
protected and a separate NOC must be obtained. arrangements along the cable route, after providing method of statement.
9. Cable corridors should not be enclosed by fencing. If the corridor is inside 31. Any proposed 400/132 kV cable installation, diversion, or in or out loop
the boundary of project area, then it should not be used as a storage area, must be a minimum of 100 metres. Clearance to be required from the
site offices, or for any other purpose existing nearest cable joint location to the proposed cable joint location, if
10. No road construction, -landscaping or other work should be carried out not the proposed cables to be connected to the nearest existing cable
where joints and link boxes exit and joint bays must able accessible at all joint. Contractors must take health & safety and precautionary measures
times. If any activity takes places within this area that is not mentioned in to safeguard power, pilot and FO cables during shutdown works for any
the approved NOC and drawings, then a separate NOC must be obtained LILO and Diversion works.
for it. 32. If any cable circuits are energised and could affect the proposed working
11. Any construction or structures in the DEWA corridor, such as for other area before completion of the work and during the validity of the NOC, then
utility services, manholes, or gullies, are prohibited. separate NOCs must be obtained to complete the remaining work.
12. Any streetlight poles, crash barriers, road signboards, or excessive filling 33. After obtaining general NOC for the project, separate NOCs to be obtained
on cable corridor are prohibited. Only grass or shrubs are allowed in the for the following: utility services installations, diversions, plantations,
cable corridor. Trees should be at least 5.0 meters away. tiling, piling, drilling, street lighting & signal foundations, chambers,
13. The minimum clearance for services such as cables, pipes and ducts must Manholes, gullies, RTU (Remote Terminal Unit) Cabinets /SCADA cable
be 1 (one) Meter away and 500mm above or below and no services lay on works, Hoarding boards, Meter Cabinets etc., if these details are not
top of the troughs. mentioned in the Project NOC drawing along with cross sections and
14. DEWA reserves the right to excavate the garden, grass, tiled area or road clearance of Transmission lines.
without any notification in case of emergency. Anyone undertaking tiling, 34. Entrance to DEWA substation and access to DEWA corridor should not be
gardening, and landscaping work should give an undertaking before blocked for the proposed project/work by any means temporary or
commencement of the work and obtain an NOC. permanently. Access way to DEWA substation, Cable/OHL corridor to be
15. Protection and backfilling must be specified on NOC drawings, Methods of arranged by the Developer, and the relevant authorities for routine
statement, and site instruction must be carried out under DEWA TLM patrolling and maintenance work.
supervision. 35. Proposed protection for the cable/trough, Pipelines, sleeve extensions,
16. All crossings of 132 kV cables and passing parallels require a separate new spare ducts, Duct extensions to be confirmed and verified by TLMD
cross section. Sections, protection and methods of statement for this must cable staff during or completing the particular works (before backfilling
be approved by DEWA in advance. No crossing is allowed over or under the area) and the verified details to be submitted along with the As-Built
cable joints or link boxes. drawings and completion certificates.
17. Micro tunnelling, thrust boring, and directional drilling should have a 36. Fibre hand shovels should be used for removal of sand inside the trough
minimum vertical clearance of 2.0metres from the bottom of cables or with live cables.
troughs and a horizontal clearance of 2.0metres from the edge of the cable 37. Contractor site engineers, supervisor staff, and machine operators should
or trough to the entry or exit pit. The drilling profile must be approved by attend TBT given by TLP Engineer as and when required.
DEWA TLM. 38. Working personnel and site agents are liable to receive any site
18. Micro tunnelling, thrust boring, directional drilling, piling and soil instructions by issuing stop work notices issued by DEWA representatives.
investigation will be approved only after all the services and clearances Working personnel and site agents must not ignore or behave improper
have been identified and verified with coordinates. If existing cables are in manner on receipt of these notices and must stop the work immediately.
HDD (Horizontal Directional Drilling) and not possible to locate through Failure to do so will be considered as serious violation.
trial pit, then atrial pit should be dug at a minimum of 1.0m below the 39. Contractors must notify DEWA after completion of all required works and
proposed excavation depth and confirm that the cable is deeper than the obtain a clearance certificate within 45 days. Clearance certificates will
proposed excavation or drilling depth. The method statement and shop not to be issued if the relevant conditions are not met.
drawing must be approved by DEWA before work is carried out. The 40. This NOC is valid for 6 months only, and should be revalidated 15 days
drilling location must be ensured as per the approved profile and before it is due to expire.
coordinates before starting the work by the TLM-TP supervisor. 41. DEWA reserves the right to stop the work, and review, suspend, or cancel
19. Shifting, slewing or exposing cables will not be permitted without an NOC the NOC in case of any violations of the above conditions or any observed
demonstrating explicit written permission. high risks to the network during work at the site or any emergency arises.
20. Separate NOC has to be taken from DEWA through RTA for the works
outside the building plot limit within the vicinity of the Transmission lines
such as shoring, piling, and anchoring, fencing access way to the building,
interlock tiling landscaping, or any other similar work.
21. Existing cables coming under the proposed roads crossing area shall be
provided with suitable protection along with spare ducts and temporary
road constructed on top of cables have to be removed once use is over.
22. Existing cables or troughs coming under or along the proposed road Transmission Lines Maintenance department
should be diverted and the abandoned portion of the cables or troughs Patrolling & NOC Section

41
40
" " ( )NOC

3.5
:
.


564 564 564 ..

04 - 322 1492/493

04 - 322 9095
04 - 506 6417

04 - 506 6793
04 - 322 1262

04 - 307 2239

43
42

.4.1.5

.2 : 4.1

. . . 400 / 132
 .1 : .
" " . . 4.1.1 4.1.2
. 4.1.4 4.1.3

:4.1.4 / :4.1.2 :4.1.1


. 132/400


.5 :
20cm 20cm

DANGER
132kV LIVE CABLE 15cm
DANGER
132kV LIVE CABLE 15cm

.
BELOW BELOW

. Rear view
( 4.2.2 )59 . ( 4.2.3)60 . 20cm 20cm

DANGER DANGER
.6 :
132kV LIVE CABLE 15cm 132kV LIVE CABLE 15cm
75cm
BELOW BELOW

132
.3 :
Rear view
:4.1.3 .
/
. 75cm

. . Front view
" " .
. ( 4.1.7)47 .
( 4.1.9 .)48 .4 :
.
.7 : .
Front view

: 4.1.5

45
44

. () 4.1.7 132 7.1 132


.  . 20 /40 (3 x1 x 0.3)
. ,4.1.6.4.1.7
:4.1.8 /
:4.1.6 132

Protection Slab Details


For Road Construction On
Top Of The 132kV Trough
/ Cable

(3 x1 x 0.3) 132

 .

.
 .8 :  . x 150 4

: .

 .  7.2 132

. .4.1.8
 .
 . .
150

. . 4.1.8

47
46

4.1.10 132 4.1.9 132

132
132

 .  .9 : (
 .13 :  .11 : 50 . 1.4.7 ) 132

. / .10 :
/ . .
 .12 : (
. . )  . /
1.4.6 ( .1.4.7 )20 . 4.1.10 4.1.8 .4.1.9
.  .
.14 : .
/ / 4.1.11 4.1.12 .4.1.13)50 . (.)flush type link box
.

49
48

. 132/400 4.1.12 :4.1.11



.1 : 6 5.5
( . 4.1.14 )4.1.15

4.1.14

4.1.13

PERMITTED PERMITTED
HEIGHT - __ M HEIGHT - __ M

CBCH-INDS

CBCH-INDS

51
50

.2 : 4.1.15

4.1.16

53
52

.4 : 16.5 400 .3 : 40
15 132. 400 30 132.

4.1.18 4.1.17

400 132
/ ( 80 )
4.1.17 .

55
54

4.2 / .8 : / .5 :
/
. 400/132 . / 40 25
.
 .1 : 4.1.21
/ . 4.1.1 4.1.2 . 4.1.19
( 4.1.3)44 .
 .2 :
. .
" " . . ( 4.1.4 )45
 .3 :
/ 500 .

4.2.1

11 33 / / / 132

.9 : .6 :
. 5.5 6
(
11 33 / .10 : ) . ( 1.4.9)21 .
/ / . 4.1.21
132 .7 :
.

57
56

4.2.2 .4 :
132
. ( 4.1.8 .)47 .
.

/ ( . 4.2.2 )4.2.3 .5 : .

( )4.2.5
132 11/

4.2.5

132(

59
58

 .6 : 4.2.3
. . 1.4.6 (.)GIS
( .1.4.7 )20 4.2.4 132
 .7 : //
.  . 400/132

 .8 :
.  .1 :
5.5 6 -
4.2.6 (/) .
. ( 4.1.14 4.1.15 51 .)52

 .2 : /

( . )4.1.1653.
 .6 : /
 .3 : 132
5 ( .  .10 : ( 1.5)
)4.2.6 / 6( . )4.2.4
.
 .4 :  .11 :  .7 ( :)GPS 132
. .
.
 .5 : . /
. . ( )GPS
NOITAVACXE EHT FO EGDE
4.1.11 4.1.12 .4.1.13)50 .
L.G GNITSIXE
 .12 :
.rtm0.5
NOITAVACXE HCNERT .PORP
.  .8 / :LILO
400/132 . LILO 100

61
60

4.3 ( 4.2.7 .

)
. 400/132

/ .  .1 :
 .7 / :
.
.
. 4.1.1 : 4.1.2 ( 4.1.3.)44 .
( . 4.2.2  .2 :
4.2.3 59 ..)60
4.3.1 132 .
.
" "
.
. ( 4.1.4.)45 .
 .3 :
3
/ 500
. ( 4.2.1)57 .
 .4 :
.
 .5 :


( . )4.3.1
132 132  .6 :

63
62

400/132 .  .11 :  .8 :
132 132

 .8 :  .1 : ( )4.3.2
( / 6 - 5.5 .
). (/) . 4.3.2
 .9 : ( 4.1.14 4.1.15)5152( .  .12 : 132
( /).
 .2 : .
.10 : . 4.1.16)53( .
 .13 :
 10.1 25  .3 : 5 .
150 . 4.2.6
. .)61( . .
.
 10.2 50  .4 : 4.1.11 4.1.12 - 4.1.1312)50( .
180 450 . 4.2.7
. .)62( .  .14 :

 10.3 100  .5 : .
450 .
.  .9 :
 .6 : . 1.4.6
. ( 1.4.7 )20 132 .
 .7 : //
.  .10 :
. 4.2.2
4.2.3)60 59( .

65
64

4.4.2 4.4
. 400/132

( . ).4.4.1  .1 :
 .5 :
. .

 .6/ : . 4.1.1 4.1.2 ( 4.1.3.)44 .

. 4.4.2 .2 :

4.4.1 ( 400 .
132) .
" "
.
. ( 4.1.4)45 .

 .3 :

.

5
.
( 4.1.5.)45.

 .4 :

67
66

4.5 . 400/132
( ) 4.4.3
. 400/132

 .1 :

. .
. :
. 4.1.1 4.1.2 ( 4.1.3.)44 .
.
 .2 / : 20 .
 .6 : 400
.
15 .
 .3 : ( 2) 132
.
. ( . )29 .

 .7 :  .4 :  .1 :
.
132 . ( 4.2.4)60. .  .3 : .
. . .
 .8 : " "  .4 : ( )4.4.3
132 . .
( . )4.5.1 . ( 4.1.4)45 .  .5 :  .2 :
 .5 :
. .

69
68

4.6 (/ ) 4.5.1

400/132

 .5 : /  .1 :

. /
. 4.1.1
 .6 : 4.1.2 ( 4.1.3)44 .

 .2 :
( . 4.1.8)47 .
.
 .7 : 132
.
" " 400/132
( . 4.2.2 ( )4.2.3)60 - 59 . .
. ( 4.1.4 )45 .  .1 :
 .8 : 4.2.7.)62( . 6 5.5
/ 132  .3 :  .5 : (/) .
. ( 4.1.14 4.1.15 51 .)52
( 1.5) / 500
6 . ( 4.2.4)60 . .  .6 :  .2 :
. ( . )4.1.1653.
 .9 :  .4 : /
 .7 : //  .3 :
( .)HDD 132 . 5 ( .
/ )4.2.661 .
. .  .8 :
( / ).  .4 :

71
70

4.7 ( (/) . /
) 4.1.14 ( 4.1.15 51 )52 .
 .10 :
. 400/132  .3 :
( . 4.1.16)53. /
 .1 :  .4 : .
.  .11 :
( )4.2.7.62 . .
/ .  .5 :
( 4.1.1 4.1.2 4.1.3)44 . . .
 .6 :
 .2 : . . 4.1.11 4.1.12
 .7 : // .4.1.13)50 .
. .  .12 :
.  .8 :
" " ( / ). .
.
( . 4.1.4 )45
( .
 .3 : ( 1.4.7 1.4.6 )20

.  . 400/132

 .4 :
 .1 :
. 5 .
. ( 4.2.6)61 .
 .2 :
. 6-5.5

73
72

.2 : 400/132

. : 6 - 5.5 .1 : ( . )4.7.1
(/) ( . 4.1.14 4.1.15 51 .)52
4.7.1
4.7.2

: .
.

75
74

:  . : .3
 . ( . 4.1.16)53.
.
 . :
. 5 .


( 4.2.6)61 .
 .
.  . :

6 400 5 . //
. 132( . )4.7.2

 .  . :


( / ) .


 . : //
.

 . :
( /
)

77
76

. 5.3.1

5.4 "
" .
:

.  .1
5.1
/
( . )5.4 5.1.4
.







. ( .
http/www.dewa.gov.ae/eBusiness/View/Print ) :
form/No Objection certificate/work intimation/  5.1.1
Supervision Request 
.
.2 .
 . ( 2)


5.2
5.1.2
(3229095 )04 
 .
.
.
.
5.3
5.1.3

5.3.2 
 (
) :
. 
( : 3.1.1)29 .

79
78

5.5
5.5 5.4



.



.

.

81
80

5.6

.
( )5.6

83
82

6.1
( )6 2015
6.2.1.1 (): .


18 ( )
6.2

: .

( .)-1
( .)-2

.
( .)-3 ( )

.
( .)-4 /


400/132
/
.
( .)-5

85
84

6.2.1.2 ():
48 (
) : 35
 .1 . 400/132
.2 ( )


. .
.3 3
.  .1 .
.4  .2
. () .-5
.5 ( )  .3
.
.  .4 ( )


.6
.
 .5
/
. /
.7 / .
 .6 /
400/132
400/132
/ .
/
. /.

. 6.2.1.3 ():

 400/132

87
86

7.2.3 : 7.1 / :
"
" . .
.
. .
(

.

:
7.2 : )
" ".
04-3221499 : 04-3221500  / 400
. 04-3221547 : 043227929 7.1.1 132
: :

7.2.1 ( 2) :
132 / 400  /
. 
. ( ( 2) :
 7:30 02:30)
04-3229095
132 / 400 (  tp.tlm@dewa.gov.ae
: 7:30 02:30 ) 29
04-3229095
 tp.tlm@dewa.gov.ae 7.1.2 :
29
" "
. 043221547 7.2.2 :
043227929

043221547 7.1.3 :
043227929

89
88

:
MTR meter Approx Approximate
NDRC Non Disruptive Road Crossing CS Connection Services
NOC No Objection Certificate DM Dubai Municipality
0 4 322 1519 / 04 322 1507 : OHL Over Head Line DUSUP Dubai Supply Authority
04 322 9095 : OPGW Optical Ground Wire EHV Extra High Voltage
tp.tlm@dewa.gov.ae :
RCC Reinforced Cement Concrete EXTG Existing
www.dewa.gov.ae :
ROW Right Of Way FO Fibre Optic
RTA Road Transport Authority FIG Figure
TBT Tool Box Talk FRL Finished Road Level
TLM - LP Transmission Lines Maintenance - GIS Geographical Information System
Lines Patrolling
GPS Global Positioning System
TMD Transmission Maintenance Dept
HDD Horizontal Directional Drilling
TP Trial Pit
II&P Infrastructure Information & Permits
UG Under Ground
kV Kilo Volt
XLPE Cross Link Poly Ethylene
M meter
MM Milli Meter

91
90

You might also like