You are on page 1of 10

TABLE OF CONTENTS

TABLE OF CONTENTS i

LIST OF TABLES v

LIST OF FIGURES vii

LIST OF ACRONYMS ix

CHAPTER I

PROJECT SUMMARY

INTRODUCTION 1

PROJECT LOCATION 3

DESCRIPTIVE DEFINITION OF THE PROJECT 7

GOALS AND OBJECTIVES 8

CHAPTER II

TECHNICAL STUDY

NATURE OF SERVICES 10

POTENTIAL USERS 10

DESCRIPTION OF THE ENVIRONMENTAL SETTING

Present Condition of the Site 12

Present Condition of the Target Location 13

i
Future Condition without the Project 21

ENVIRONMENTAL IMPACT ASSESSMENT 22

HEALTH AND SAFETY REQUIREMENTS MANAGEMENT ON SITE

Administrative Control 32

Design and Engineering Control 33

Personal Protective Equipment (PPE) 33

Management on Site 33

Key Hazards and Risks 34

Project Constraints 35

CHAPTER III

PROJECT DESIGN

DESIGN TRADE-OFFS 37

DESIGN CONSIDERATIONS

CHED Memorandum Order 39

National Building Code of the Philippines (NBCP) 41

National Structural Code of the Philippines (NSCP) 49

National Plumbing Code of the Philippines 54

ii
BUILDING DESIGN CONCEPT

Electrical System 54

Water Supply 55

Sewage Disposal and Drainage 55

Fire Protection System 56

Solid Waste Management System 56

Road and Drainage Design 57

DESIGN PROCEDURES FOR STRUCTURAL ANALYSIS

Design Procedures for Slab 57

Design Procedures for Beams 61

Design Procedures for Columns 62

Design Procedures for Column Footing 63

Design Procedures for Flexural Members 65

Design Procedures for Compression Members 66

Design procedure for Water Tank 67

DESCRIPTION OF FACILITIES

Administration Building 67

iii
College of Accountancy, Business Economics and International

Hospitality Management (CABEIHM) Building 69

Rough Estimate 70

BIBLIOGRAPHY

APPENDIX A: Architectural Drawings

APPENDIX D: Communication Letters and Pertinent Documents

iv
List of Tables

Table 1: Assessment of Presence of ECAs within Site Location 26

Table 2: Design Constraint Assessment of the Host Municipality and Site Location and

Corresponding Resolution 28

Table 3: Key Impacts and Mitigation Plan 30

Table 4: Tabulation of the Project Constraints 36

Table 5: Sensitivity Analysis 38

Table 6: Minimum Required Off-Street (Off-RROW) cum On-Site Parking Slot,

Area and Loading/Unloading Space Requirements

by Allowed Use or Occupancy 45

Table 7: Suggested Median and Lane Widths within Alleys or Roadways by Minimum

RROW Width and by Suggested Vehicle Speeds 46

Table 8: Rage of Required Sidewalk and Planting Strip Widths (total at both sides of

RROW) by RROW Width 47

Table 9: Minimum planting Strip Widths by RROW Width 47

Table 10: Minimum Design Dead Loads 51

Table 11: Minimum Uniform and Concentrated Load 52

Table 12: Important factors for wind load 53

Table 13: Important factors for seismic load 54

v
Table 14: Minimum thickness of one way slab 59

Table 15: Description of Facilities in Each Floor of Admin Building 68

Table 16: Description of Facilities in Each Floor of CABEIHM Building 70

Table 17: Rough Estimate of Batangas State University-Mabini Phase II 70

vi
List of Figures

Figure 1: Mabini and its surrounding bodies of water 4

Figure 2: Vicinity Map of Batangas State University-Mabini 6

Figure 3: Vicinity map of the project location via satellite imagery 7

Figure 4: Proposed Entrance Road for the Campus 12

Figure 5: On-going Backfill of the Main Entrance of the Campus 13

Figure 6: An excerpt of parts subjected to clearing 13

Figure 7: Topographic Profile of the Site Location 14

Figure 8: Soil Profile at (50 m, 0) 15

Figure 9: Soil Profile at (100 m, 0) 16

Figure 10: Soil Profile at (150 m, 0) 17

Figure 11: Soil Profile at (0, 50 m) 18

Figure 12: Soil Profile at (0, 100 m) 19

Figure 13: Soil Profile at (0, 150 m) 20

Figure 14: Future Condition of the Project Site 21

Figure 15: Zoning Map Classification of Project Location 24

Figure 16: An excerpt of Strategic Agriculture and Fisheries Development Zones Map

Configuration of Project Location 25

Figure 17: Sample Sidewalk 48

vii
Figure 18: Front Elevation of Driveway 49

Figure 19: Side Elevation of Driveway 49

viii
List of Acronyms
Acronym Definition
CABEIHM College of Accountancy, Business
Economics and International
Hospitality Management
CHED Commission on Higher Education
CMO CHED Memorandum Order
DENR Department of Environment and
Natural Resources
DL Dead Load
ECA Environmentally Critical Areas
EIA Environmental Impact Assessment
EIS Environmental Impact System
IRR Implementing Rules and Regulations
LL Live Load
MCB Mabini College of Batangas
MGB Mines and Geosciences Bureau
NBCP National Building Code of the
Philippines
NPAAD Network of Protected Areas for
Agricultural and Agro-
Industrial Development
NPCP National Plumbing Code of the
Philippines
NSCP National Structural Code of the
Philippines
PAGASA Philippine Atmospheric
Geophysical Astronomical Service
Administration
PD Presidential Decree

ix
PHIVOLCS Philippine Institute of Volcanology
and Seismology
PSA Philippine Statistics Authority
RROW Road Right Of Way
SAFDZ Strategic Agriculture and Fisheries
Development Zones
TCT Transfer Certificate of Title

You might also like