You are on page 1of 11

: . 138 . . . . : .

(1998) :
: 8/11/2545 : 8/12/2545 : .


() (.) (.x.x.) (.2) (.3) (.) (./.3) 28 (./.2) () (./.2) ( )
1 8/3/2545 9 10 15 x 15 x 15 225.00 3,375.00 8.00 2,370.37 240 52.00 0.00 0.00
2 8/3/2545 9 10 15 x 15 x 15 225.00 3,375.00 8.05 2,385.19 240 52.50 0.00 0.00
3 8/3/2545 9 10 15 x 15 x 15 225.00 3,375.00 8.00 2,370.37 240 55.00 0.00 0.00
4 8/4/2545 8 10 15 x 15 x 15 225.00 3,375.00 8.00 2,370.37 240 50.00 0.00 0.00
5 8/4/2545 8 10 15 x 15 x 15 225.00 3,375.00 8.10 2,400.00 240 51.50 0.00 0.00
6 8/4/2545 8 10 15 x 15 x 15 225.00 3,375.00 8.15 2,414.81 240 49.00 0.00 0.00

: : Y = *X + ,

.. .
(. ) (. )
.18860
(Plate Load Test)
. 138 . . . .
BH-1 1.50

0.305 2.00
.
0 0.036
0.058 0.085
0.1 0.136 () ( )
0.2 0.205
0.25 0.015
0.3 0.300
0.50 0.036
Settlement(inch)

0.4
0.450
0.5 0.75 0.058
0.6 1.00 0.085
0.7 1.25 0.136
0.8
1.50 0.205
0.9
1 1.75 0.300
2.00 0.450
Load(Tons)


= 2.00
= 0.45
= 27.37 /..
= 3.00
= 9.12 /..
:
Project 8 + 270 . Boring No. ***
Location . .4 - . .5 . . Sample No. ***
Test By . Type Of Soil ()
Date 25 2541 Methode STD. Proctor
Compaction Test
Blows/Layer 25.00 No. Of Layer 3.00
Wt. Of Hammer 2.50 kg. Diameter Of Mold 10.20 cm.
Higth of Mold 11.62 cm. Volumn Of Mold 949.50 cm.3
Water Content Determination
Sample No. 1 2 3 4 5 Average
Wt. Of Can(gm.) 19.85 20.10 20.00 19.95 20.05 19.99
Wt. Of Can+Wet Soil(gm.) 155.00 157.25 156.42 154.23 156.00 155.78
Wt. Of Can+Dry Soil(gm.) 149.00 148.75 145.64 141.87 141.26 145.30
Wt. Of Water(gm.) 6.00 8.50 10.78 12.36 14.74 10.48
Wt. Of Dry Soil(gm.) 129.15 128.65 125.64 121.92 121.21 125.31
Water Content : w% 4.65 6.61 8.58 10.14 12.16 8.43
Density Determination
Weigth Of Mold(gm.) 4,405.00 4,405.00 4,405.00 4,405.00 4,405.00 4,405.00
Wt. Of Mold + Soil(gm.) 6,515.00 6,630.00 6,700.00 6,675.00 6,680.00 6,640.00
Wt. Of Soil In Mold(gm.) 2,110.00 2,225.00 2,295.00 2,270.00 2,275.00 2,235.00
Wet Density :gw(gm./cm.3) 2.22 2.34 2.42 2.39 2.40 2.35
Dry Density :gd(gm./cm.3) 2.12 2.20 2.23 2.17 2.14 2.17

O.M.C. & Maximum Dry Density Result


2.24
Max. Dry Density(gm./cm.3) 2.21
2.22
2.20
Dry Unit Weight(gm./cc.)

2.18
2.16
OPT. M.C.(%) 9.17
2.14
2.12
2.10
2.08 Engineer : ..
2.06
4.65 6.61 8.58 10.14 12.16 (. )
Water Content(%) .18860
O.M.C. & Maximum Dry Density
2.24
2.22
2.20
Dry Unit Weight(gm./cc.)

2.18
2.16
2.14
2.12
2.10
2.08
2.06
4.65 6.61 8.58 10.14 12.16
Water Content(%)
** **
FIELD DENSITY TEST
( SAND REPLACEMENT METHOD )
: . 138 . . . .
: 95 % Modified Test
: .
: 27 2542 .
Max. Dry Density 0f Sample 2.200 gm./cc. Sand in Funnel 1,790 gm. Dens. Of Sand 1.430 gm./cc.
Station 0+550 0+600 0+650 0+700 0+750 0+800 0+850 0+900 0+950 1+000
Offset CL. LT. RT. CL. LT. RT. CL. LT. RT. CL.
Volume Of Hole
Initial Wt. of Jar + Sand(gm.) 8,455 8,460 8,450 8,450 8,458 8,448 8,442 8,453 8,450 8,455
Final Wt. of Jar + Sand(gm.) 5,460 5,465 5,451 5,458 5,450 5,450 5,448 5,454 5,460 5,456
Total Wt. of Sand(gm.) 2,995 2,995 2,999 2,992 3,008 2,998 2,994 2,999 2,990 2,999
Wt. of Sand in Funnel(gm.) 1,790 1,790 1,790 1,790 1,790 1,790 1,790 1,790 1,790 1,790
Wt. of Sand in Hole(gm.) 1,205 1,205 1,209 1,202 1,218 1,208 1,204 1,209 1,200 1,209
Volume of Hole(cm.3) 843 843 845 841 852 845 842 845 839 845
Sample In Hole
Wet Soil + Container(gm.) 2,145 2,150 2,147 2,140 2,150 2,145 2,135 2,130 2,135 2,140
Wt. of Container(gm.) 150 150 150 150 150 150 150 150 150 150
Wt. of Wet Soil(gm.) 1,995 2,000 1,997 1,990 2,000 1,995 1,985 1,980 1,985 1,990
Moisture Content
Can No 1 2 3 4 5 7 8 9 10 11
Wet Soil + Can(gm.) 148.5 149.0 149.5 150.0 150.0 149.0 148.5 148.0 149.0 150.0
Dry Soil + Can(gm.) 138.0 138.0 138.3 138.6 138.5 137.3 137.3 136.8 137.5 138.6
Wt. of Can(gm.) 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0
Wt. of Water(gm.) 10.5 11.0 11.2 11.4 11.5 11.7 11.2 11.2 11.5 11.4
Wt. of Dry Soil(gm.) 113.0 113.0 113.3 113.6 113.5 112.3 112.3 111.8 112.5 113.6
Water Content(%) 9.3 9.7 9.9 10.0 10.1 10.4 10.0 10.0 10.2 10.0
Density Of Soil
Wet Density(gm./cm.3) 2.37 2.37 2.36 2.37 2.35 2.36 2.36 2.34 2.37 2.35
Dry Density(gm./cm.3) 2.17 2.16 2.15 2.15 2.13 2.14 2.14 2.13 2.15 2.14
Max. Dry Density(gm./cm. ) 3
2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20 2.20
Percent of Compaction(%) 98.46 98.31 97.71 97.80 96.91 97.22 97.45 96.76 97.55 97.23
Result Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass

**** SERMP-TEST. V.1. **** 2.
Swelling Data : Swell Dial ( 0.01mm.)
Samples No. 1 2 3 4
Date(0-96 hr.) Swell Gage % Swell Swell Gage % Swell Swell Gage % Swell Swell Gage % Swell
12/27/1942 16 0.13
12/28/1942 21 0.17
12/29/1942 27 0.21
12/30/1942 28 0.22
CBR. Load Test Data
Penetration(in.) Load(lb.) psi lb. psi lb. psi lb. psi
0.025 300 100.00 500 166.67
0.050 700 233.33 800 266.67
0.075 1,500 500.00 1,200 400.00
0.100 2,600 866.67 2,560 853.33
0.150 3,000 1,000.00 3,100 1,033.33
0.200 3,800 1,266.67 4,000 1,333.33
0.250 4,200 1,400.00 4,500 1,500.00
0.300 5,000 1,666.67 5,000 1,666.67
0.400 5,500 1,833.33 5,500 1,833.33
0.500 6,000 2,000.00 6,300 2,100.00

C.B.R. = 86.67 %

...........................................................
( )

.18860



3 2543
........................................................................................
.............................................( ) ...............................................( )
......................................
Wire mesh -



As(1) = .. (cm.2/m.)
As(2) = .. (cm.2/m.)
Fs(1) = (kg./cm.2)
Fs(2) = (kg./cm.2)
RB 9 mm. @ 0.15 m.#
As(2) = 4.24 cm.2/m.
Fy(1) = 5,500.00 ksc.
Fs(1) = 2,750.00 ksc.
Fy(2) = 2,400.00 ksc.
Fs(2) = 1,200.00 ksc.
As(1) = As(2) x [Fs(2)/Fs(1)]
As(1) = 1.85 cm.2/m.
()
Dia. 6 mm. @ 0.15 m.#
:
Dia. 6 mm. @ 0.10 m.#

.....................................................
( )
....18860



. . .

. 33 -
64 - -
01-6017639
042-340710418
.18860

.
(. )
.18860

30 2543

. (1998)

1. C.B.R. 2
2. 14
3. 1
4. 1
5. 1
. (1998) -

(Cape Seal) . -
. . .

( )

You might also like