Project No. 19 Project Name Project detail/ Location
Check list for Ready Mix Concrete (Slab)
Location : Drawing Ref : Sheet No . 1/1
S. No. Points to be verified Yes No N/A Remarks
1 Is the approval for ready mix supplier received 2 Whether time of transport after batching at plant & type of retarder added are noted 3 Whether temperature of concrete and atmospheric temperature at site checked to be within specified limits 4 Are the slump cone, cube moulds & curing tank available 5 Are the concrete vibrators available and have been checked in advance whether they are in working condition 6 Whether approval for concrete pour inspection request from R.E received 7 Is the sequence of concreting agreed with R.E. 8 Reinforcement, form work are checked as per the checklist 9 Whether cover blocks checked and found as per requirement 10 Whether slump test carried out and is within the permissible limit 11 Whether the cubes are casted from different truck mixers
12 Whether compaction of concrete carried out while doing
the concreting 13 Whether surface cracks checked after 1-2 hours and wet hessien cloth laid 14 Whether post concrete inspection done and repair works to honeycombing, if found done in a proper way 15 Whether curing is done for the number of days as specified
16 Has the co-ordination with M&E services done as per the
checklist Other special requirements/Remarks:
NAME SIGNATURE DATE
Site Engineer MEP Engineer NA Project Engineer Project Manager HSEQ QA/QC Incharge