Circular Memo.No.§8404/ EE@/DEE3/AEE/2009 Dt. 6-9-2012
‘Sub: R&B Dept. —Certain instructions for Patch work — Issued ~ Reg.
Ref:- Arising.
@e@@
It is brought to the notice of the undersigned that field staff are not informing the quality
control staff immediately on completion of patch work and well before laying of
subsequent layers for verification of the patch work executed, even though instructions
are very clear.
After laying of subsequent layers only, quality control staff are being informed
about the execution of patch work. This is not in order. Further such activity can be
construed as a deliberate attempt to cover up the misdeeds.
Hence all the Superintending engineers dealing with state roads are directed to
ensure that as and when patch work is completed, the same has to be brought to the
notice of the quality control staff immediately and well before laying of subsequent
layers facilitating the quality control staff to inspect the patch work for which circular
instruction in this regard was also issued by the C.E /Q. C . Any violation will be viewed
seriously
2 bay
+ 2 gfhfe
for Engineer-in-Chief (R&B)
Roads
eh
To
All the Superintending Engineer (R&B) dealing with State Roads
Copy to EE(T) & EE® of Roads wing, O/o the Engineer-in-Chief(R&B)Hyderabad