Appendix Table1 Requirements of Laboratory Equipment/Apparatus Configuration
| Configuration Quantity
Laboratory
No | Apparatus / Equipment Name | Unit | Central fal Lan field
| laboratory | Tescaper | beratory
yard
1_| Sand filling tbe _15em Unit | 8 x 3
2_| 30 Bearing Tester Unit 2 x 1
3 | Deformation modulus z
3 | tester(Bv2) Ue 2 4
Deformation modulus
ae ern Unit 2 x 1
Light (heavy) dynamic e
By eee Unit | Bach? Bach!
6_| Static penetrometer Unit L x 1
7_| Rebound apparatus Set 2 2 2
8 | Anchorrod pull-out apparatus | Unit 1 x 1
9. | Cover protectometer Set L 1 1
10_| Crack detector Unit 1 1 1
11_| Oven Set 2 2 2
Geotechnique sieve (20am, a
2 Set 2 2 a
13_| Sieve shaker Unit 1 1 1
14 | Unconfined pressure apparatus | Unit 1 x i
Electronic analytical balance
1s | tooo Set 1 1 1
16 | Mold-releasing equipment Unit | 1 x 1
17 | Electronic balance 200g Ike | Unit | Each} Each 1 Each |
Liquid and plastic Timit =
18 | combined measuring instrument _| S* u i
“Heavy type geotechnique
19 | automatic compaction test Set 2 x 2
apparatus
20 | Cutting ring Unit 30 x 10
21_| Relative density meter Unit 1 x 1
Surface vibration compaction ie
at | Bes Unit 1 1
23_| Concrete mixer Unit 1 1 1
assed electric charge measuring
24) IE cat Unit 1 1
25_| Rebar comosion tester | Unit 1 1 x
26 | Fumping table Unit i 1 1
27_| Electric stone sawing machine | Unit 1 1 x
28_| Flecttic grinding machine Unit a 1 x
DPD | _GM
217‘Sieel bar automatic staking
217
aia writ] 1 1 1
30. | Concrete impermeability tester _| Unit 1 i x
31. Standard caring box [iva [1 1 1
32_| Concrete slump meter | Unit 8 3 3
yp Cover content Sa
33 apparatus Set $ 3 3
Sa | Cement onsen ad sting z
34 | time tester oa i aH
35_ [cement negaivepesuresever | Unt | 1 1 1
36_| Cement pase miner Uait | 1 1 x
37_| Cement monar mixer vat | 1 1 x
Cement mortar ration ; .
38 | compaction platform Unit 2 au
39 [Cement boiingbox | Ua | 1 1 x
40_| Le Chatters expansion exer | Unit [| 1 x
41_| Bloc bending eter sit | 1 1 x
| Compression clamp nie | 1 1 x
43. | Sand, stone bulk density tube Unit 1 1 1
| Comparsior unit | 1 x
as | Gmetepressusbleeding [ait | 1 1
Concrete ankage or epanson :
st ‘measuring instrument ceil y i
47 | Concrete dling machine | Unit | 1 H 1
Concrete ere el Ty =
as | Goes unit [1 1
‘uiomati Temperate and
49 | humidity contol equipment of | Unit | 1 1 1
Standardize ering room
30_| Wire repeated bening machine | Ua [1 H a
oy [Masport Tse |g 7 7
52_| Mortar consitensy texte se] 1 7 1
(758 [sonore vibrating ble wie | __1 1 1
Fs | Fak ond lonaated rail
sa | Faby wie | 1 1
35_| Breconi scales 100 tie | 1 1
300KN Bending and
56 | compression eing machin, | Unie | 1 1 *
Songant sues can be measured
TOOOKN Universal mechanical
st | tesing machine san messire | Set | 1 “
steel strand_
SOOKN Univeral mechani
ae | cunloaies unit | 1 1
000K Compresion Tina
59, | 000K sa | 1 1 1
@ [Basic medihwmessrae | Cat [1 i i
DD _|_e_]al
ar | Same ern a [oe | ;
a
| cmnrmrmae one | :
[Were ape tat | 2 2
6 | Caing machine tit | 1 x
65 _| Tensile testing machine SKN Unit 1 x
66 [Low temperate bending ti Unit [1 5
67 | let waterpoofappanias | Unit [1 :
| hikes ergs Cat [ 1 5
oe [Borne ee a [ya | ;
we [casan aca ET | ae | 2
| Themen wat a ta | 7
7a_ [Glas appari se | 1
73_| Flame photometer Unit 1 x
74 _| Visible light spectrophotometer Unit 1 x
75, [High expe fimace | Unk [1 1
76 [Aci mtr Uait [1 :
77 | Taalsatontoamens” Tg [an ;
7B | Seale misoscope Car [a i
79 [lve gage tat | 2 ci
soa
217Table2 Requirements of Testers and Working Conditions
Project Team
No. Item Central Laboratory of "| Test station on
| laboratory | Dean tack slab site
| or sleeper yard
notlewsthan | notless than | not less than
E Hal ex 350m? 300m 1800
2 | Arenofeuringroom | TUS tian | potiess than 50m? | ets shan
notless than 12 | notlessthan S| not less than 5
3 | Quantity of personnel es = jets
“The professional Hie and
working seniority of of
eae rey tad | EasineedS years | Engino8 years | Engineer/s years
technical supervisor
The professional ttle and
working seniority ofthe
5 | voineseiny of | papacy | Bagel yeu | Engine yrs
quality
The profesional ileand | "SBF | Tecnican or | THnsin or
6 | working seniority of assistant | | assistant engineer | 4. Sas
aig eas engineer abovels | Sm eneincn | engineer abovels
i ears eats
‘Number of test engineers 8 3 3
Computers more than’ units | more than 2units [1 2 units
Fax machines, printers, | atleast one unit
9 aol tleastone unit | cach item I unit | cach item 1 unit
10 vehicle eee 1 1
pPD_|_GM
217
4Appendix Table 3 Requirements of Concrete Performance Test Items
Detection /
Ne} | eran ‘Technical requirement Remarks
1 | Shmp orstump | Should mest the requirement of Table 24 of T/T F
fow | 3275 Railway Concrete
| Should mest the requirement of Table 25 of TA/T
Ci EUAS one 3275 Ratiway Concrete !
3 | Bleeding rate 0 7
Compressive
4 ro Meet the design requirements
| | Passed elecsic | Should meet the requirement of Table 28 of TET ‘|
charge 3275 Railway Concrete
mane ‘<0.1%*B Reinforced concrete
6 ee 0.060% prestressed concrete i
(Bis the amount of cementitious material used)
: #438 Bis the amount of cementitious material
7 | 803 content $0, eeeaen /
any | Should meet the requirement of Table 32 of TST
SF Eerste 3275 Railway Concrete i
E ‘When required in
astic mod
9 | Blastic modulus Meet the design requirements eee
“impermeability 5 ‘When required in
10 ae ‘Meet the design requirements panies
Corrosion Only for concrete under
11 | resistance os sulfate chemical attack
coefficient environment
Only the ballastiess
12 Shrinkage <400x10 ‘tock base plete sb,
selfcompacting
concrete
pe> | 6M _|
217