You are on page 1of 5
Appendix Table1 Requirements of Laboratory Equipment/Apparatus Configuration | Configuration Quantity Laboratory No | Apparatus / Equipment Name | Unit | Central fal Lan field | laboratory | Tescaper | beratory yard 1_| Sand filling tbe _15em Unit | 8 x 3 2_| 30 Bearing Tester Unit 2 x 1 3 | Deformation modulus z 3 | tester(Bv2) Ue 2 4 Deformation modulus ae ern Unit 2 x 1 Light (heavy) dynamic e By eee Unit | Bach? Bach! 6_| Static penetrometer Unit L x 1 7_| Rebound apparatus Set 2 2 2 8 | Anchorrod pull-out apparatus | Unit 1 x 1 9. | Cover protectometer Set L 1 1 10_| Crack detector Unit 1 1 1 11_| Oven Set 2 2 2 Geotechnique sieve (20am, a 2 Set 2 2 a 13_| Sieve shaker Unit 1 1 1 14 | Unconfined pressure apparatus | Unit 1 x i Electronic analytical balance 1s | tooo Set 1 1 1 16 | Mold-releasing equipment Unit | 1 x 1 17 | Electronic balance 200g Ike | Unit | Each} Each 1 Each | Liquid and plastic Timit = 18 | combined measuring instrument _| S* u i “Heavy type geotechnique 19 | automatic compaction test Set 2 x 2 apparatus 20 | Cutting ring Unit 30 x 10 21_| Relative density meter Unit 1 x 1 Surface vibration compaction ie at | Bes Unit 1 1 23_| Concrete mixer Unit 1 1 1 assed electric charge measuring 24) IE cat Unit 1 1 25_| Rebar comosion tester | Unit 1 1 x 26 | Fumping table Unit i 1 1 27_| Electric stone sawing machine | Unit 1 1 x 28_| Flecttic grinding machine Unit a 1 x DPD | _GM 217 ‘Sieel bar automatic staking 217 aia writ] 1 1 1 30. | Concrete impermeability tester _| Unit 1 i x 31. Standard caring box [iva [1 1 1 32_| Concrete slump meter | Unit 8 3 3 yp Cover content Sa 33 apparatus Set $ 3 3 Sa | Cement onsen ad sting z 34 | time tester oa i aH 35_ [cement negaivepesuresever | Unt | 1 1 1 36_| Cement pase miner Uait | 1 1 x 37_| Cement monar mixer vat | 1 1 x Cement mortar ration ; . 38 | compaction platform Unit 2 au 39 [Cement boiingbox | Ua | 1 1 x 40_| Le Chatters expansion exer | Unit [| 1 x 41_| Bloc bending eter sit | 1 1 x | Compression clamp nie | 1 1 x 43. | Sand, stone bulk density tube Unit 1 1 1 | Comparsior unit | 1 x as | Gmetepressusbleeding [ait | 1 1 Concrete ankage or epanson : st ‘measuring instrument ceil y i 47 | Concrete dling machine | Unit | 1 H 1 Concrete ere el Ty = as | Goes unit [1 1 ‘uiomati Temperate and 49 | humidity contol equipment of | Unit | 1 1 1 Standardize ering room 30_| Wire repeated bening machine | Ua [1 H a oy [Masport Tse |g 7 7 52_| Mortar consitensy texte se] 1 7 1 (758 [sonore vibrating ble wie | __1 1 1 Fs | Fak ond lonaated rail sa | Faby wie | 1 1 35_| Breconi scales 100 tie | 1 1 300KN Bending and 56 | compression eing machin, | Unie | 1 1 * Songant sues can be measured TOOOKN Universal mechanical st | tesing machine san messire | Set | 1 “ steel strand_ SOOKN Univeral mechani ae | cunloaies unit | 1 1 000K Compresion Tina 59, | 000K sa | 1 1 1 @ [Basic medihwmessrae | Cat [1 i i DD _|_e_] al ar | Same ern a [oe | ; a | cmnrmrmae one | : [Were ape tat | 2 2 6 | Caing machine tit | 1 x 65 _| Tensile testing machine SKN Unit 1 x 66 [Low temperate bending ti Unit [1 5 67 | let waterpoofappanias | Unit [1 : | hikes ergs Cat [ 1 5 oe [Borne ee a [ya | ; we [casan aca ET | ae | 2 | Themen wat a ta | 7 7a_ [Glas appari se | 1 73_| Flame photometer Unit 1 x 74 _| Visible light spectrophotometer Unit 1 x 75, [High expe fimace | Unk [1 1 76 [Aci mtr Uait [1 : 77 | Taalsatontoamens” Tg [an ; 7B | Seale misoscope Car [a i 79 [lve gage tat | 2 ci soa 217 Table2 Requirements of Testers and Working Conditions Project Team No. Item Central Laboratory of "| Test station on | laboratory | Dean tack slab site | or sleeper yard notlewsthan | notless than | not less than E Hal ex 350m? 300m 1800 2 | Arenofeuringroom | TUS tian | potiess than 50m? | ets shan notless than 12 | notlessthan S| not less than 5 3 | Quantity of personnel es = jets “The professional Hie and working seniority of of eae rey tad | EasineedS years | Engino8 years | Engineer/s years technical supervisor The professional ttle and working seniority ofthe 5 | voineseiny of | papacy | Bagel yeu | Engine yrs quality The profesional ileand | "SBF | Tecnican or | THnsin or 6 | working seniority of assistant | | assistant engineer | 4. Sas aig eas engineer abovels | Sm eneincn | engineer abovels i ears eats ‘Number of test engineers 8 3 3 Computers more than’ units | more than 2units [1 2 units Fax machines, printers, | atleast one unit 9 aol tleastone unit | cach item I unit | cach item 1 unit 10 vehicle eee 1 1 pPD_|_GM 217 4 Appendix Table 3 Requirements of Concrete Performance Test Items Detection / Ne} | eran ‘Technical requirement Remarks 1 | Shmp orstump | Should mest the requirement of Table 24 of T/T F fow | 3275 Railway Concrete | Should mest the requirement of Table 25 of TA/T Ci EUAS one 3275 Ratiway Concrete ! 3 | Bleeding rate 0 7 Compressive 4 ro Meet the design requirements | | Passed elecsic | Should meet the requirement of Table 28 of TET ‘| charge 3275 Railway Concrete mane ‘<0.1%*B Reinforced concrete 6 ee 0.060% prestressed concrete i (Bis the amount of cementitious material used) : #438 Bis the amount of cementitious material 7 | 803 content $0, eeeaen / any | Should meet the requirement of Table 32 of TST SF Eerste 3275 Railway Concrete i E ‘When required in astic mod 9 | Blastic modulus Meet the design requirements eee “impermeability 5 ‘When required in 10 ae ‘Meet the design requirements panies Corrosion Only for concrete under 11 | resistance os sulfate chemical attack coefficient environment Only the ballastiess 12 Shrinkage <400x10 ‘tock base plete sb, selfcompacting concrete pe> | 6M _| 217

You might also like