You are on page 1of 67

STATI^KI PRORA^UN

KROVNA KONSTRUKCIJA

ROG - RG 1(~etinar II klase)


S = 22
= 0.384 rad
SIN = 0.375
COS = 0.927
; COS2 = 0.86
g
OSNI RAZMAK ROGOVA: E = 0.80 m

Analiza optere}enja
W
1) TEGOLA 0.10 KN/m2
DASKA 0.15 KN/m2
ROGOVI 0.15 KN/m2
g= 0.40 KN/m2

2) SNEG: S= 0.70 KN/m2

3) VETAR: W= 0.16 KN/m2


B
L'= 2.30
gn= g*E*COS = 0.30 KN/m'
A
Sn= S*E* COS2 = 0.48 KN/m'
L 2.13
Wn= W*E 0.13 KN/m'

An= 1.04 KN (Wn/(gn+Sn))*100= 16.45 >15%


AII= 0.36 KN
Bn= 1.04 KN MERODAVNO JE OSNOVNO+DOP.OPTERE]ENJE
BII= 0.36 KN (uz pove}anje osnovnih napona za 15%)
Qn= g*E*COS+S*E* COS2 +W*E
Av= 1.10 KN
Bv= 1.10 KN Qn= 0.91 KN/m'
ugib u sredini raspona:
5*Qn*L4 QII= g*E*SIN +S*E*SIN *COS
f=
384EI QII= 0.31 KN/m'
E= 1000 KN/cm2
I= 1440 cm4 Mmax= 0.60 KNm
W= 52.10 cm3
f= 0.23 cm USVOJENI ROGOVI: b= 10 cm
(~etinar II klase) h= 12 cm
fdop= L / 200 = 1.15 cm Wstv= 240.00 cm3
ROG -RG2 (~etinar II klase)
S = 22
= 0.384 rad.
SIN = 0.374
COS = 0.927 ; COS2 =0.86
g
RAZMAK ROGOVA: 0.82 m

ANALIZA OPTERE]ENJA:
W
1) TEGOLA 0.10 KN/m2
2) DASKA 0.15 KN/m2
3) ROGOVI 0.15 KN/m2
g= 0.40 KN/m2

2) SNEG: S= 0.70 KN/m2


C
B 3) VETAR: W= 0.16 KN/m2

A 3.15 (ao)
3.00 (au) gn= g*E*COS = 0.30 KN/m'

Sn= S*E* COS2 = 0.49 KN/m'


L= 5.70
Wn= W*E 0.13 KN/m'

An= 1.03 KN ((Wn/(gn+Sn))*100 16.45 >15%


AII= 0.48 KN
Bn= 3.57 KN MERODAVNO JE OSNOVNO+DOP.OPTERE]ENJE
BII= 0.99 KN (uz pove}anje osnovnih napona za 15%)
Cn= 1.11 KN Qn= g*E*COS+S*E* COS2 +W*E
CII= 0.51 KN
Av= 1.13 KN
Bv= 3.68 KN Qn= 0.93 KN/m'
Cv= 1.22 KN
ugib u sredini raspona AB: QII= g*E*SIN +S*E*SIN *COS
Qn*au4*(0.1302-10/16x)
f= QII= 0.32 KN/m'
10 J
f= 1.11 cm M B= -1.10 KNm
MAB= 0.57 KNm
fdop= au /200 = 1.5 cm potr.Wx= 95.64 cm3

USVOJENI ROGOVI: b= 10 cm
(~etinar II klase) h= 12 cm
Wx= 240.00 cm3
GREBENJA^A - GB(~etinar II klase)
= 22 = 0.384 rad.
SIN = 0.374
COS = 0.927 ; COS2 =0.86
q
Analiza optere}enja:
1) OD KROVA q= 3.00 KN/m'
2) SOP.TE@INA = 0.12 KN/m'
B q= 3.12 KN/m'

qn= q*COS = 2.89 KN/m'


A 4.38 qII= q*SIN = 1.17 KN/m'

MAB= 3.55 KNm


L= 4.06 potr.Wx= 355.21 cm3

Av= 2.11 KN USV. GREBENJA^A: b= 14 cm


Bv= 4.23 KN (~etinar II klase) h= 16 cm
Wx= 597.33 cm3
ugib : Ix= 4778.67 cm4
fstv= 1.46 cm
fdop= ao /200 = 2.19 cm

DIMENZIONISANJE PODROZNJA^A

ANALIZA OPTERE]ENJA:
Q 1)OD ROGOVA Q 3.68 KN/m'

Lra~= 2.05 m'

Mmax=0.125*Q*L2= 1.93 KNm


1.35
0.70 0.70 W= 168.10 cm3
2.75
USVOJENA PODROZNJA^A : b= 14.00 cm
Av=Bv= 5.06 KN (~etinar II klase) h= 14.00 cm
Wstv= 457.33 cm3
J=b*h3/12=3201.33 cm4

fdop=L 0.68 cm
fstv=5QL /384EJ=0.26
4
cm
fstv<fdop
PAJANTE:

USV. PAJANTE: b/h=12/10cm


(~etinar II klase)

KLJE[TA:

USV. KLJE[TA: 2x5/14 cm


(~etinar II klase)

VEZNE GREDE :

USVAJAM: b/h=14/16cm
(~etinar II klase)

STUBOVI:

USVAJAM: b/h=14/14cm
(~etinar II klase)

KOSNICI:

USVAJAM: b/h=12/12cm
(~etinar II klase)

VEN^ANICE:

USV. VEN^ANICE: b/h=12/10cm


(~etinar II klase)
POS 100 + / KONSTRUKCIJA IZNAD I SPRATA /

TAVANICA
USVAJA SE POLUMONTA@NA TAVANICA "LMT". TAVANICA SE SASTOJI OD GREDICA /NOSA^A/
NA RAZMAKU OD B=40cm / izme|u kojih se postavljaju blokovi ispune dimenzija 28x25x16cm /
I ARMIRANO BETONSKE PLO^E /dpl = 4cm, MB 20 / LIVENE NA LICU MESTA /Huk = 20cm/.
OSNOVNA ARMATURA GREDICA JE VARENA ^ELI^NA RE[ETKA (7/7/4) Aa1 =2F7 (GA 500/560)
DODATNA ARMATURA Aa2 JE REBRASTA RA 400/500/prema prora~unu/.
A.B. PLO^A ARMIRA SE U POLOVINI VISINE MRE@OM Aam =Q 131 (MAG 500/560).
TAVANICE RASPONA Lo > 4m, OJA^AVAJU SE PO SREDINI REBROM ZA UKRU]ENJE b/d=15/20cm,
ARMIRANIM SA 2RF10 .(Za raspone preko 5m zadati nadvi{enje L/300).
ISPOD PREGRADNIH ZIDOVA PARALELNIH SA PRAVCEM NO[ENJA TAVANICE, IZVODI SE
SKRIVENA A.B. GREDA /armirana prema prora~unu/ ILI SE UDVOJE GREDICE.

POS 101 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 4.02 m


qu 1) Krov 1.00 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 4.22 g= 4.40 KN/m2
4) Korisno p= 1.00 KN/m2
qu = 8.84 KN/m' q= 5.40 KN/m2
Au=Bu= 18.66 kN/m' maxMu= 19.688 KNm
za jednu gredicu: Aa = 1.148 cm2
Ag = 9.29 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 9.29 kN/m' Aa2 = 1RF10 (RA 400/500)
Ap=Bp= 2.11 kN/m' Aam= Q 131 (MA 500/560)

POS 102 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 3.38 m


qu 1) Krov 1.00 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 3.55 g= 4.40 KN/m2
4) Korisno p= 1.00 KN/m2
qu = 8.84 KN/m' q= 5.40 KN/m2
Au=Bu= 15.69 kN/m' maxMu= 13.918 KNm
za jednu gredicu: Aa = 0.794 cm2
Ag = 7.81 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 7.81 kN/m' Aa2 = 1RF8 (RA 400/500)
Ap=Bp= 1.77 kN/m' Aam= Q 131 (MA 500/560)

POS 103 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 0.60 m


qu 1) Krov 1.00 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 0.63 g= 4.40 KN/m2
4) Korisno p= 1.00 KN/m2
qu = 8.84 KN/m' q= 5.40 KN/m2
Au=Bu= 2.78 kN/m' maxMu= 0.439 KNm
za jednu gredicu: Aa = 0.504 cm2
Ag = 1.39 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 1.39 kN/m' Aa2 =
Ap=Bp= 0.32 kN/m' Aam= Q 131 (MA 500/560)

POS 104 - LMT 40 , d =16+4= 20cm , MB 20 , lo =1.99 m


qu 1) Krov 1.00 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 2.09 g= 4.40 KN/m2
4) Korisno p= 1.00 KN/m2
qu = 8.84 KN/m' q= 5.40 KN/m2
Au=Bu= 9.24 kN/m' maxMu= 4.824 KNm
za jednu gredicu: Aa = 0.504 cm2
Ag = 4.60 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 4.60 kN/m' Aa2 =
Ap=Bp= 1.04 kN/m' Aam= Q 131 (MA 500/560)

POS 105 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 2.65 m


qu 1) Krov 1.00 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 2.78 g= 4.40 KN/m2
4) Korisno p= 1.00 KN/m2
qu = 8.84 KN/m' q= 5.40 KN/m2
Au=Bu= 12.30 kN/m' maxMu= 8.555 KNm
za jednu gredicu: Aa = 0.504 cm2
Ag = 6.12 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 6.12 kN/m' Aa2 =
Ap=Bp= 1.39 kN/m' Aam= Q 131 (MA 500/560)
POS 106 -AB Konzolna plo~a, MB 20, GA 240/360 dpl= 20 cm
lo = 0.38 m Analiza optere}enja:
qu Gu 1) Krov 1.00 KN/m2
2) Sopstvena te`ina 5.00 KN/m2
A 3) Malter 0.40 KN/m2
L = 0.40 g= 6.40 KN/m'
4) Zid 1.20 KN/m'
Ag = 3.75 KN/m' Gu=1.6G 1.92 KN
Ap = 0.40 KN/m' 5) Korisno p= 1.00 KN/m2
qu=1.6g+1.8p= 12.04 KN/m'
Au = 6.72 KN/m'
Mumax= 1.72 KNm

USVOJENO: Aa F 8 /15cm - gore glavna


A F 6 / 20 cm - gore podeona
F 8 /15cm - dole
F 6 / 30 cm - dole podeona

20

38 25

POS 107 -AB Konzolna plo~a, MB 20, GA 240/360 dpl= 10cm

10
POS 107A

30 USVOJENO: Aa = F 8 /20cm
LMT Ap = F 6 / 20 cm

50 25

POS 107A - AB greda venca , MB 20, RA 400/500, b= 25 cm


d= 30 cm

2R F 12 USVOJENO: Aa = 2RF 12
uz = F8 /20
uz F8
30 2 F 10
Oblik uzengija
(torzija)
2R F 12
25

POS 1 + / KONSTRUKCIJA IZNAD PRIZEMLJA /

TAVANICA
USVAJA SE POLUMONTA@NA TAVANICA "LMT". TAVANICA SE SASTOJI OD GREDICA /NOSA^A/
NA RAZMAKU OD B=40cm / izme|u kojih se postavljaju blokovi ispune dimenzija 28x25x16cm /
I ARMIRANO BETONSKE PLO^E /dpl = 4cm, MB 20 / LIVENE NA LICU MESTA /Huk = 20cm/.
OSNOVNA ARMATURA GREDICA JE VARENA ^ELI^NA RE[ETKA (7/7/4) Aa1 =2F7 (GA 500/560)
DODATNA ARMATURA Aa2 JE REBRASTA RA 400/500/prema prora~unu/.
A.B. PLO^A ARMIRA SE U POLOVINI VISINE MRE@OM Aam =Q 131 (MAG 500/560).
TAVANICE RASPONA Lo > 4m, OJA^AVAJU SE PO SREDINI REBROM ZA UKRU]ENJE b/d=15/20cm,
ARMIRANIM SA 2RF10 .(Za raspone preko 5m zadati nadvi{enje L/300).
ISPOD PREGRADNIH ZIDOVA PARALELNIH SA PRAVCEM NO[ENJA TAVANICE, IZVODI SE
SKRIVENA A.B. GREDA /armirana prema prora~unu/ ILI SE UDVOJE GREDICE.

POS 1 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 4.02 m


qu 1) Podna konstrukcija 1.20 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 4.22 g= 4.60 KN/m2
4) Korisno p= 1.50 KN/m2
qu = 10.06 KN/m' q= 6.10 KN/m2
Au=Bu= 21.23 kN/m' maxMu= 22.405 KNm
za jednu gredicu: Aa = 1.292 cm2
Ag = 9.71 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 9.71 kN/m' Aa2 = 1RF10 (RA 400/500)
Ap=Bp= 3.17 kN/m' Aam= Q 131 (MA 500/560)

POS 2 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 1.87 m


qu 1) Podna konstrukcija 1.20 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 1.96 g= 4.60 KN/m2
4) Korisno p= 2.00 KN/m2
qu = 10.96 KN/m' q= 6.60 KN/m2
Au=Bu= 10.76 kN/m' maxMu= 5.282 KNm
za jednu gredicu: Aa = 0.504 cm2
Ag = 4.52 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 4.52 kN/m' Aa2 =
Ap=Bp= 1.96 kN/m' Aam= Q 131 (MA 500/560)

POS 3 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 0.60 m


qu 1) Podna konstrukcija 1.20 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 0.63 g= 4.60 KN/m2
4) Korisno p= 1.50 KN/m2
qu = 10.06 KN/m' q= 6.10 KN/m2
Au=Bu= 3.17 kN/m' maxMu= 0.499 KNm
za jednu gredicu: Aa = 0.504 cm2
Ag = 1.45 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 1.45 kN/m' Aa2 =
Ap=Bp= 0.47 kN/m' Aam= Q 131 (MA 500/560)

POS 4 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 1.99 m


qu 1) Podna konstrukcija 1.20 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 2.09 g= 4.60 KN/m2
4) Korisno p= 1.50 KN/m2
qu = 10.06 KN/m' q= 6.10 KN/m2
Au=Bu= 10.51 kN/m' maxMu= 5.490 KNm
za jednu gredicu: Aa = 0.504 cm2
Ag = 4.81 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 4.81 kN/m' Aa2 =
Ap=Bp= 1.57 kN/m' Aam= Q 131 (MA 500/560)

POS 5 - LMT 40 , d =16+4= 20cm , MB 20 , lo = 2.65 m


qu 1) Podna konstrukcija 1.20 KN/m2
2) LMT konstrukcija 3.00 KN/m2
A B 3) Plafon 0.40 KN/m2
L = 2.78 g= 4.60 KN/m2
4) Korisno p= 2.00 KN/m2
qu = 10.96 KN/m' q= 6.60 KN/m2
Au=Bu= 15.25 kN/m' maxMu= 10.607 KNm
za jednu gredicu: Aa = 0.617 cm2
Ag = 6.40 kN/m' Aa1 = 2F7 (GA 500/560)
Bg = 6.40 kN/m' Aa2 =
Ap=Bp= 2.78 kN/m' Aam= Q 131 (MA 500/560)
POS 6 - AB MASIVNA PLO^A , MB 20 , GA 240/360 dpl = 15 cm
lo = 1.00 m b= 100 cm
Analiza optere}enja :
1) Podna konstrukcija 1.20 kN/m2
qu 2) Sop.te`ina 3.75 kN/m2
3) Malter 0.40 kN/m2
A B g= 5.35 kN/m2
1.05 4) Korisno 2.00 kN/m2
p= 2.00 kN/m2
Ag=Bg= 2.81 kN/m'
Ap=Bp= 1.05 kN/m' qu=1.6g+ 12.16 kN/m'

Au=Bu= 6.38 kN/m' Mu = 1.68 kNm


max 0.06 MPa < 0.80MPa Aa= 1.87 cm2
Ap= 0.37 cm2
ea= 26.67 cm
ep= 74.68 cm
USVOJENO: A F 8 /15cm dole glavna
Ap= F 6 /20cm dole podeona
Q 131 (MA 500/560)gore seizmi~ka

POS 7 - AB MASIVNA PLO^A , MB 20 , GA 240/360 dpl = 15 cm


lo = 0.60 m b= 100 cm
Analiza optere}enja :
1) Podna konstrukcija 1.20 kN/m2
qu 2) Sop.te`ina 3.75 kN/m2
3) Malter 0.40 kN/m2
A B g= 5.35 kN/m2
0.63 4) Korisno 2.00 kN/m2
p= 2.00 kN/m2
Ag=Bg= 1.69 kN/m'
Ap=Bp= 0.63 kN/m' qu=1.6g+ 12.16 kN/m'

Au=Bu= 3.83 kN/m' Mu = 0.60 kNm


max 0.03 MPa < 0.80MPa Aa= 1.87 cm2
Ap= 0.37 cm2
ea= 26.67 cm
ep= 74.68 cm
USVOJENO: A F 8 /20cm dole glavna
Ap= F 6 /20cm dole podeona
Q 131 (MA 500/560)gore seizmi~ka
POS 8 -AB Konzolna plo~a, MB 30, GA 240/360 dpl= 15 cm
lo = 0.90 m Analiza optere}enja:
qu Gu 1) Pod 1.20 KN/m2
2) Sopstvena te`ina 3.75 KN/m2
A 3) Malter 0.40 KN/m2
L = 0.95 g= 5.35 KN/m'
4) Ograda 1.80 KN/m'
Ag = 6.86 KN/m' Gu=1.6G 2.88 KN
Ap = 1.89 KN/m' 5) Korisno p= 2.00 KN/m2
qu=1.6g+1.8p= 12.16 KN/m'
Au = 14.37 KN/m'
Mumax= 8.15 KNm

USVOJENO: Aa F 8 /15cm - gore glavna


A F 6 / 20 cm - gore podeona
5 12 F 8 /30cm - dole
F 6 /30 cm - dole podeona
AB ograda:
Aa = F 6 /15cm
40 Ap = F 6 / 20 cm

15

35

90 25

1) F 8 /30cm

2) F 8 /30cm
F 6 /15cm

POS 9 - AB PODESTNA PLO^A , MB 20 , GA 240/360 dpl = 12 cm


lo = 1.03 m b= 100 cm
Analiza optere}enja :
1) Podna konstrukcija 1.20 kN/m2
qu 2) Sop.te`ina 3.00 kN/m2
3) Malter 0.40 kN/m2
A B g= 4.60 kN/m2
1.08 4) Korisno 2.50 kN/m2
p= 2.50 kN/m2
Ag=Bg= 2.49 kN/m'
Ap=Bp= 1.35 kN/m' qu=1.6g+ 11.86 kN/m'

Au=Bu= 6.41 kN/m' Mu = 1.73 kNm


max 0.08 MPa < 0.80MPa Aa= 1.42 cm2
Ap= 0.28 cm2
ea= 35.09 cm
ep= 98.26 cm
USVOJENO: A F 8 /20cm dole glavna
Ap= F 6 /20cm dole podeona

POS 10 -AB Konzolna plo~a, MB 30, GA 240/360 dpl = 15 cm


lo = 0.73 m Analiza optere}enja:
qu Gu 1) Pod 1.20 KN/m2
2) Sopstvena te`ina 3.75 KN/m2
A 3) Malter 0.40 KN/m2
L = 0.77 g= 5.35 KN/m'
4) Ograda 0.70 KN/m'
Ag = 4.80 KN/m' Gu=1.6G 1.12 KN
Ap = 1.53 KN/m' 5) Korisno p= 2.00 KN/m2
qu=1.6g+ 12.16 KN/m'
Au = 10.44 KN/m'
Mumax= 4.43 KNm
USVOJENO: Aa F 8 /15cm - gore glavna
A F 6 / 20 cm - gore podeona
F 8 /30cm - dole
F 6 /30 cm - dole podeona

AB GREDE: POS G+ / KONSTRUKCIJE IZNAD SPRATA I PRIZEMLJA /

G 1 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 3.56 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2) POS 107;POS 107A 3.65 kN/m'
L = 3.74 3) Zid 0.80 kN/m'
4) Krov 2.00 kN/m'
Au= 24.90 kN
Bu= 24.90 kN qu=1.6g+ 13.32 kN/m'
max 0.43 MPa < 0.80 MPa Mu = 23.26 kNm
Aa = 2.39 cm2
2R F 12 LMT
USVOJENO: Aa = 3RF 12
30 uz =F6 /20
uz F6

3R F 12
25

G 2 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 0.90 m d= 20 cm

LMT

2R F 12 USVOJENO: Aa = 2RF 12
20 uz =F6 /20
uz F6
2R F 12
25

G 3 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 0.90 m d= 20 cm

LMT

4R F 12 USVOJENO: Aa = 4RF 12
20 uz =F6 /20
uz F6
4R F 12
50

G 4 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.05 m d= 40 cm
qu Analiza optere}enja:
1) Sopst. te`ina 2.50 kN/m'
A B 2) POS 101 18.66 kN/m'
L = 4.25 3) Krov 1.00 kN/m'

Au= 51.58 kN
Bu= 51.58 kN qu=1.6g+ 24.26 kN/m'
max 0.64 MPa < 0.80 MPa Mu = 54.84 kNm
Aa = 4.14 cm2

USVOJENO: Aa = 4RF 12
uz =F8 /20
LMT

2R F 12

40
uz F8

4R F 12
25

G 5 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 1.37 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) POS 101 18.66 kN/m'
L = 1.44 3) Krov 1.00 kN/m'

Au= 16.01 kN
Bu= 16.01 kN qu=1.6g+ 22.26 kN/m'
max 0.44 MPa < 0.80 MPa Mu = 5.76 kNm
Aa = 0.94 cm2

USVOJENO: Aa = 2RF 12
uz =F8 /20
LMT

2R F 12
20 uz F8

2R F 12
25

G 6 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 3.68 m d= 40 cm
qu Analiza optere}enja:
1) Sopst. te`ina 2.50 kN/m'
A B 2) POS 101 18.66 kN/m'
L = 3.86 3) Krov 1.00 kN/m'

Au= 46.87 kN
Bu= 46.87 kN qu=1.6g+ 24.26 kN/m'
max 0.58 MPa < 0.80 MPa Mu = 45.28 kNm
LMT Aa = 3.36 cm2

2R F 12 USVOJENO: Aa = 3RF 12
uz =F8 /20

40
uz F8

3R F 12
25

G 7 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.02 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) Krov 2.00 kN/m'
L = 4.22

Au= 10.97 kN
Bu= 10.97 kN qu=1.6g+ 5.20 kN/m'
max 0.30 MPa < 0.80 MPa Mu = 11.58 kNm
LMT Aa = 1.96 cm2

2R F 12 USVOJENO: Aa = 2RF 12
20 uz F6 uz =F6 /20

2R F 12
25

G 8 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.02 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) Krov 2.00 kN/m'
L = 4.22

Au= 10.97 kN
Bu= 10.97 kN qu=1.6g+ 5.20 kN/m'
max 0.30 MPa < 0.80 MPa Mu = 11.58 kNm
Aa = 1.96 cm2
USVOJENO: Aa = 2RF 12
uz =F6 /20
(KAO POS G 7)

G 9 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.02 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) Krov 2.00 kN/m'
L = 4.22

Au= 10.97 kN
Bu= 10.97 kN qu=1.6g+ 5.20 kN/m'
max 0.30 MPa < 0.80 MPa Mu = 11.58 kNm
LMT Aa = 1.96 cm2
USVOJENO: Aa = 2RF 12
2R F 12 uz =F6 /20
20 uz F6 (KAO POS G 7)

2R F 12
25

G 10 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.02 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2) POS 107;POS 107A 3.65 kN/m'
L = 4.22 3) Zid 0.80 kN/m'
4) Krov 2.00 kN/m'
Au= 28.11 kN
Bu= 28.11 kN qu=1.6g+ 13.32 kN/m'
max 0.48 MPa < 0.80 MPa Mu = 29.67 kNm
Aa = 3.08 cm2
2R F 12 LMT
USVOJENO: Aa = 3RF 12
30 uz =F6 /20
uz F6
3R F 12
25

G 11 - AB Plo~asta greda , MB 20, RA 400/500, b= 75 cm


lo = 2.35 m d= 20 cm

LMT

4R F 12
20
uz F6
4R F 12
75

USVOJENO: Aa = 4RF 12
uz =F6 /20

G 12 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.30 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) Krov 2.00 kN/m'
L = 4.52 3) POS 103 2.78 kN/m'

Au= 18.01 kN
Bu= 18.01 kN qu=1.6g+ 7.98 kN/m'
max 0.50 MPa < 0.80 MPa Mu = 20.33 kNm
LMT Aa = 3.67 cm2
USVOJENO: Aa = 4RF 12
2R F 12 uz =F6 /20
20 uz F6

4R F 12
25

G 13 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 1.99 m d= 20 cm

LMT
USVOJENO: Aa = 2RF 12
2R F 12 uz =F6 /20
20 uz F6

2R F 12
25
G 14 - AB Greda(nadvratnik) , MB 20, RA 400/500, b= 25 cm
lo = 4.30 m d= 50 cm
qu Analiza optere}enja:
1) Sopst. te`ina 3.13 kN/m'
A B 2) POS 103; POS 105 15.10 kN/m'
L = 4.52 3) Krov 2.00 kN/m'

Au= 52.60 kN
Bu= 52.60 kN qu=1.6g+ 23.30 kN/m'
max 0.51 MPa < 0.80 MPa Mu = 59.37 kNm
LMT Aa = 3.44 cm2

2R F 12 USVOJENO: Aa = 4RF 12
uz =F8 /20
uz F8
50
2 F 10

4R F 12
25

G 15 - AB Greda(nadprozornik) , MB 20, RA 400/500, b= 25 cm


lo = 1.99 m d= 50 cm
qu Analiza optere}enja:
1) Sopst. te`ina 3.13 kN/m'
A B 2) POS 105 12.30 kN/m'
L = 2.09 3) Krov 2.00 kN/m'

Au= 21.42 kN
Bu= 21.42 kN qu=1.6g+ 20.50 kN/m'
max 0.21 MPa < 0.80 MPa Mu = 11.19 kNm
LMT Aa = 2.30 cm2

2R F 12 USVOJENO: Aa = 2RF 12
uz =F8 /20
uz F8
50
2 F 10

2R F 12
25

G 16 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 2.65 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) POS 107;POS 107A 3.65 kN/m'
L = 2.78 3) Zid 0.80 kN/m'
4) Krov 2.00 kN/m'
Au= 17.14 kN
Bu= 17.14 kN qu=1.6g+ 12.32 kN/m'
max 0.48 MPa < 0.80 MPa Mu = 11.92 kNm
LMT Aa = 2.03 cm2

2R F 12 USVOJENO: Aa = 2RF 12
20 uz F6 uz =F6 /20

2R F 12
25

G 17 - AB vezna greda , MB 20, RA 400/500, b= 25 cm


lo = 2.65 m d= 20 cm

LMT

2R F 12 USVOJENO: Aa = 2RF 12
20 uz F6 uz =F6 /20

2R F 12
25

G 18 - AB greda sa prepustom, MB 20, RA 400/500, b= 25 cm


d= 20 cm
qu2 qu1 qu Pu Analiza optere}enja:
'1) Sopst. te`ina 1.25 kN/m'
A B 2) pos 106 6.72 kN/m'
1.3 1.60 0.85 3) pos 104 9.24 kN
3.75 4) G 13 1.25 kN/m'

Au= 7.70 kN
Bu= 18.37 kN qu = 11.24 kN/m'
max 0.41 MPa < 0.80 MPa qu1 = 2.00 kN/m'
qu2 = 8.72 kN/m'
Pu= 2.00 kN
LMT

2R F 12 PRESEK U POLJU A-B :


20 uz F6 USVOJENO: 2RF 12 Gore
3RF 12 Dole
3R F 12 U F6/20
25

LMT

3R F 12 PRESEK NAD OSLONCEM B :


20 uz F6 USVOJENO: 3RF 12 Gore
2RF 12 Dole
2R F 12 U F6/10
25

G 19 - AB Greda , MB 20, RA 400/500, befek = 25 cm


lo = 2.53 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) POS 102 15.69 kN/m'
L = 2.66

Au= 23.58 kN
Bu= 23.58 kN qu=1.6g+ 17.75 kN/m'
max 0.65 MPa < 0.80 MPa Mu = 15.66 kNm
LMT Aa = 2.74 cm2

2R F 12 USVOJENO: Aa = 3RF 12
20 uz F6 uz =F6 /20

3R F 12
25

G 20 - AB Kontinualna greda , MB 20, RA 400/500, b= 25 cm


d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B C 2) POS 107;POS 107A 3.65 kN/m'
3.51 3.33 3) Zid 0.80 kN/m'
4) Krov 2.00 kN/m'
Au= 34.27 kN 5) POS 105 12.30 kN/m'
Bu= 109.59 kN qu=1.6g+ 25.62 kN/m'
Cu= 31.39 kN
MAB = 22.68 kNm
max 0.96 MPa > 0.80 MPa MB = -37.54 kNm
MBC = 19.20 kNm

2R F 12 LMT PRESEK U POLJU A-B :


USVOJENO: 2RF 12 Gore
30 3RF 12 Dole
uz F6 U F8/20

3R F 12
25

4R F 12 LMT PRESEK NAD OSLONCEM B :


USVOJENO: 4RF 12 Gore
30 2RF 12 Dole
uz F6 U F8/10

2R F 12
25

2R F 12 LMT PRESEK U POLJU B-C :


USVOJENO: 2RF 12 Gore
30 3RF 12 Dole
uz F6 U F8/20

3R F 12
25

G 21 - AB Greda(nadprozornik) , MB 20, RA 400/500, b= 25 cm


lo = 2.80 m d= 50 cm
qu Analiza optere}enja:
1) Sopst. te`ina 3.13 kN/m'
A B 2) POS 6 6.38 kN/m'
L = 2.94 3) Ograda 2.00 kN/m'

Au= 21.43 kN
Bu= 21.43 kN qu=1.6g+ 14.58 kN/m'
max 0.21 MPa < 0.80 MPa Mu = 15.75 kNm
Aa = 2.30 cm2

USVOJENO: Aa = 2RF 12
uz =F8 /20

2F8
POS 6
2R F 12 5
20
2 F 10 15
50
uz F8
30 30

2R F 12
25

G 22 - AB Greda , MB 20, RA 400/500, b= 45 cm


lo = 4.02 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 2.25 kN/m'
A B 2) POS 6 6.38 kN/m'
L = 4.22 3) Zid 5.80 kN/m'

Au= 40.65 kN
Bu= 40.65 kN qu=1.6g+ 19.26 kN/m'
max 0.63 MPa < 0.80 MPa Mu = 42.89 kNm
Aa = 7.93 cm2

USVOJENO: Aa = 5RF 14
uz =F8 /20
LMT

2R F 12
20 uz F8

5R F 14
45

G 23 - AB Greda(nadprozornik) , MB 20, RA 400/500, b= 25 cm


lo = 0.80 m d= 50 cm

3R F 12
3R F 12
POS 6
5
USVOJENO: Aa = 2RF 12
uz = F8 /20 15
50

2R F 12 30
uz F8

25 25

G 24 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.05 m d= 40 cm
qu Analiza optere}enja:
1) Sopst. te`ina 2.50 kN/m'
A B 2) POS 1 21.23 kN/m'
L = 4.25 3) Korisno 1.00 kN/m'

Au= 57.05 kN
Bu= 57.05 kN qu=1.6g+ 26.83 kN/m'
max 0.70 MPa < 0.80 MPa Mu = 60.65 kNm
Aa = 4.58 cm2

USVOJENO: Aa = 4RF 12
uz =F8 /20
LMT

2R F 12

40
uz F8

4R F 12
25

G 25 - AB Greda- stepenik , MB 20, RA 400/500, b= 25 cm


lo = 1.37 m d= 27 cm

2R F 12
USVOJENO: Aa = 2RF 12
27 uz F6 uz =F6 /20

2R F 12
25

G 25A - AB Greda-stepenik , MB 20, RA 400/500, b= 25 cm


lo = 1.87 m d= 30 cm

2R F 12
USVOJENO: Aa = 2RF 12
30 uz F6 uz =F6 /20

2R F 12
25

G 26 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 3.68 m d= 40 cm
qu Analiza optere}enja:
1) Sopst. te`ina 2.50 kN/m'
A B 2) POS 1 21.23 kN/m'
L = 3.86 3) Korisno 1.00 kN/m'

Au= 51.84 kN
Bu= 51.84 kN qu=1.6g+ 26.83 kN/m'
max 0.64 MPa < 0.80 MPa Mu = 50.07 kNm
LMT Aa = 3.78 cm2

2R F 12 USVOJENO: Aa = 4RF 12
uz =F8 /20

40
uz F8

4R F 12
25

G 27 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.02 m d= 40 cm
qu Analiza optere}enja:
1) Sopst. te`ina 2.50 kN/m'
A B 2) POS 2 10.76 kN/m'
L = 4.22 3) Zid(d=20cm) 7.80 kN/m'

Au= 57.49 kN
Bu= 57.49 kN qu=1.6g+ 27.24 kN/m'
max 0.71 MPa < 0.80 MPa Mu = 60.67 kNm
Aa = 4.58 cm2

USVOJENO: Aa = 4RF 12
uz =F8 /20
LMT

2R F 12
40
uz F8

4R F 12
25

G 28 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.02 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2) POS 7 3.83 kN/m'
L = 4.22 3) Zid(d=20cm) 7.80 kN/m'

Au= 40.75 kN
Bu= 40.75 kN qu=1.6g+ 19.31 kN/m'
max 0.70 MPa < 0.80 MPa Mu = 43.01 kNm
Aa = 4.61 cm2

USVOJENO: Aa = 4RF 12
uz =F8 /20
LMT

2R F 12

30

uz F8
4R F 12
25

G 29 - AB Greda(nadvratnik) , MB 20, RA 400/500, b= 25 cm


lo = 3.00 m d= 50 cm
qu Analiza optere}enja:
1) Sopst. te`ina 3.13 kN/m'
A B 2) POS 7 3.83 kN/m'
L = 3.15 3) POS 8 14.37 kN/m'

Au= 36.54 kN
Bu= 36.54 kN qu=1.6g+ 23.20 kN/m'
max 0.35 MPa < 0.80 MPa Mu = 28.78 kNm
Aa = 2.30 cm2

2R F 12 USVOJENO: Aa = 3RF 12
uz =F8 /20
uz F8
50
2 F 10

3R F 12
25

POS ST- AB stepeni{na plo~a , MB 20 , GA 240/360 dpl= 12.00 cm


16.88
tg = 0.563
qu 30

B cos = 0.872
Analiza optere}enja:
1) S. te`. plo~e 3.44 kN/m2
2) Od stepenika 1.50 kN/m2
A 3) Obloga step. 0.84 kN/m2
2.35 m g= 5.78 kN/m'
4) Korisno p= 2.50 kN/m2

Ag=Bg= 6.79 kN/m' qu =1.6g+1 13.75 kN/m'


Ap=Bp= 2.94 kN/m' Mumax = 9.49 kNm
Aa= 4.40 cm2
Au =Bu= 16.16 kN/m' Ap= 0.88 cm2
ea= 17.95 cm
ep= 31.82 cm
USVOJENO: A F 10 /15cm
Ap= F 6 /15cm

G 30 - AB Podestna greda , MB 20, RA 400/500, b= 25 cm


lo = 2.40 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2) POS 9 6.41 kN/m'
L = 2.52 3) St 16.16 kN/m'

Au= 32.22 kN
Bu= 32.22 kN qu=1.6g+ 25.57 kN/m'
max 0.55 MPa < 0.80 MPa Mu = 20.30 kNm
Aa = 2.08 cm2
2R F 12
USVOJENO: Aa = 3RF 12
30 uz F8 uz =F8 /20
3R F 12
25

G 31 - AB Podestna greda , MB 20, RA 400/500, b= 25 cm


lo = 2.40 m d= 35 cm

2R F 12

30 uz F8 USVOJENO: Aa = 3RF 12
uz =F8 /20

3R F 12
25

G 32 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 4.30 m d= 20 cm

LMT
USVOJENO: Aa = 4RF 12
2R F 12 uz =F6 /20
20 uz F6

4R F 12
25

G 33 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 1.99 m d= 20 cm

LMT
USVOJENO: Aa = 2RF 12
2R F 12 uz =F6 /20
20 uz F6

2R F 12
25

G 34 - AB Greda(nadvratnik) , MB 20, RA 400/500, b= 25 cm


lo = 4.30 m d= 50 cm
qu Analiza optere}enja:
1) Sopst. te`ina 3.13 kN/m'
A B 2) POS 3 3.17 kN/m'
L = 4.52 3) POS 5 15.25 kN/m'

Au= 52.87 kN
Bu= 52.87 kN qu=1.6g+ 23.42 kN/m'
max 0.51 MPa < 0.80 MPa Mu = 59.68 kNm
LMT Aa = 3.44 cm2
2R F 12 USVOJENO: Aa = 4RF 12
uz =F8 /20
uz F8
50
2 F 10

4R F 12
25

G 35 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 1.99 m d= 20 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.25 kN/m'
A B 2) POS 5 15.25 kN/m'
L = 2.09 3) Zid 8.00 kN/m'

Au= 31.39 kN
Bu= 31.39 kN qu=1.6g+ 30.05 kN/m'
max 0.87 MPa > 0.80 MPa Mu = 16.40 kNm
Aa = 2.87 cm2
LMT
USVOJENO: Aa = 3RF 12
2R F 12 uz =F8 /20
20 uz F6

3R F 12
25

G 36 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 2.65 m d= 30 cm

2R F 12

USVOJENO: Aa = 2RF 12 F8
uz = F8 /20 20
30 3F8
uz F8
10
2R F 12
25 20

G 37 - AB vezna greda , MB 20, RA 400/500, b= 25 cm


lo = 2.65 m d= 20 cm

LMT

2R F 12 USVOJENO: Aa = 2RF 12
20 uz F6 uz =F6 /20

2R F 12
25
G 38 - AB greda sa prepustom, MB 20, RA 400/500, b= 25 cm
d= 20 cm
qu2 qu1 qu Pu

A B
1.3 1.60 0.85 KAO POS G 18
3.75

LMT

2R F 12 PRESEK U POLJU A-B :


20 uz F6 USVOJENO: 2RF 12 Gore
3RF 12 Dole
3R F 12 U F6/20
25

LMT

3R F 12 PRESEK NAD OSLONCEM B :


20 uz F6 USVOJENO: 3RF 12 Gore
2RF 12 Dole
2R F 12 U F6/10
25

G 39 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 2.59 m d= 30 cm
qu Analiza optere}enja:
1) Sopst. te`ina 1.88 kN/m'
A B 2) POS 5 15.25 kN/m'
L = 2.72 3) Zid 4.00 kN/m'

Au= 33.52 kN
Bu= 33.52 kN qu=1.6g+ 24.65 kN/m'
max 0.57 MPa < 0.80 MPa Mu = 22.79 kNm
LMT Aa = 2.36 cm2

2R F 12 USVOJENO: Aa = 3RF 12
uz =F8 /20
30 uz F8

3R F 12
25

G 40 - AB Greda , MB 20, RA 400/500, b= 25 cm


lo = 2.59 m d= 30 cm

LMT KAO POS G 39

2R F 12 USVOJENO: Aa = 3RF 12
uz =F8 /20
30 uz F8

3R F 12
25

G 41 - AB Greda , MB 20, RA 400/500, b= 25 cm


d= 30 cm

LMT KAO POS G 39

2R F 12 USVOJENO: Aa = 2RF 12
uz =F8 /20
30 uz F8

2R F 12
25

TEMELJI

Uslovi fundiranja nisu poznati.Temelji su ra~unati za nosivost tla od 0,15MPa.


U slu~aju manje nosivosti temelje treba prera~unati.Razmak izme|u faza:
iskop,betoniranje traka ili samaca,treba da je {to kra}i.Po zavr{enom betoniranju
temelja, izvr{iti dobro nabijanje zemlje oko temelja i onemogu}iti prodor
povr{inske ili to~e}e vode u temelje.
pret. pdozv = 150 KN/m2
DUBINA FUNDIRANJA:
minD fun = 1,0 m od najni`e kote terena.

ISPOD TEMELJA URADITI SLOJ NABIJENOG BETONA(d= 510cm)

TT 1 - TRAKASTI TEMELJ

OPTERE]ENJE q USVOJEN JE TRAKASTI TEMELJ :


KROV 3.00 [irina temelja B(cm 55
TAVANICE 24.30 Visina temelja H(c 50
ZIDOVI 20.80 MB 20 ; RA 400/500
SERKLA@I +VENAC 7.75 Aa = 2RF 12
TEM.ZID 6.88 uz F 8/20 cm
ZEMLJA NA TEM. 4.00
SOPST. TE@INA 6.25 25
Q 72.98
B=Q / 0.15*10 48.65
USVOJENO:B(cm) = 55
90 2RF12
uz F8/20

2RF12
50 uz F8/20

55

TT 1A - TRAKASTI TEMELJ
25
USVOJEN JE TRAKASTI TEMELJ :
[irina temelja B(cm) 55
Visina temelja H(cm) 50
MB 20 ; RA 400/500 2RF12
Aa = 2RF 12 135 uz F8/20
uz F 8/20 cm

2RF12
50 uz F8/20

55

TT 2 - TRAKASTI TEMELJ
25

USVOJEN JE TRAKASTI TEMELJ :


[irina temelja B(cm) 45
Visina temelja H(cm) 50 90 2RF12
MB 20 ; RA 400/500 uz F8/20
Aa = 2RF 12
uz F 8/20 cm
2RF12
50 uz F8/20

45

TT 3 - TRAKASTI TEMELJ

25
USVOJEN JE TRAKASTI TEMELJ :
[irina temelja B(cm) 45
Visina temelja H(cm) 50
MB 20 ; RA 400/500 90 2RF12
Aa = 2RF 12 uz F8/20
uz F 8/20 cm

2RF12
50 uz F8/20

45

TT 4 - TRAKASTI TEMELJ
25
USVOJEN JE TRAKASTI TEMELJ :
[irina temelja B(cm) 50
Visina temelja H(cm) 50
MB 20 ; RA 400/500 2RF12
Aa = 2RF 12 135 uz F8/20
uz F 8/20 cm

2RF12
50 uz F8/20

50

TT 5-EKSC.TRAKASTI TEMELJ, MB20, RA 400/500, B= 50 cm


25 H= 50 cm
Analiza optere}enja:
1) Krov 3.00 KN/m'
V 2) Serkla`i 4.10 KN/m'
e = 12.5 3) Tavanice 24.30 KN/m'
4) Zidovi 8.00 KN/m'
5) Zemlja na temelj 4.10 KN/m'
q= 43.50 KN/m'
50 6) Sopst.te`ina 6.25 KN/m'
F= 0.50 m2
W= 0.042 m3
50 cm kontrola napona:
1= 0.100 Mpa
dm= 42 cm qu=1.65 71.78 KN/m'
o= dm /8= 5.25 cm du`ina temelja - L = 5.55 m
Mtu=qu * e *L/2= 24.90 kNm
Abo= 1560.25 cm2 Mtbu= 7.21 kNm
O= 179.00 cm Mtu
Aa = *O*ctg
Mtu 2*Abo* v
n= Aa = 5.95 cm2
2*Abo* o ea max= 34.0 cm (za F12)

n = 0.152 KN/cm2 prora~un uzengija:


n = 1.520 Mpa > r Mtru=Mtu-Mtbu= 17.69 kNm
r = 0.80 Mpa(MB20)
3 r = 2.40 Mpa pretp.uzengije F8 (Aa1=0.50cm2)
euz= 21.17 cm
r< n <3 r

2RF12 USVOJENO:
Aa= 8R F 12
90 uz uz=F 8 /20
R 221

TT 5C uraditi u sklopu TT 5
3RF12
uz F8/20 25 25 "TT 5C"
2RF12 50 2F8
2RF12
3RF12 uz F8/20
50 20
90
R 221
70

3RF12
50
50 2RF12
2F8
3RF12
37.5 50
87.5

TT 5A-EKSC.TRAKASTI TEMELJ, MB20, RA 400/500, B= 50 cm


H= 50 cm
2RF12

65 USVOJENO:
R 188 Aa= 6R F 12
uz=F 8 /20

3RF12
uz

uz F8/20 50

3RF12
50

TT 5B-EKSC.TRAKASTI TEMELJ, MB20, RA 400/500, B= 50 cm


H= 50 cm

2RF12

USVOJENO:
R 188 Aa= 6R F 12
135 uz=F 8 /20

uz
44
3RF12 44

uz F8/20 50

3RF12
50

TT 6-EKSC.TRAKASTI TEMELJ, MB20, RA 400/500, B= 45 cm


H= 50 cm
2RF12

65 USVOJENO:
R 188 Aa= 6R F 12
uz=F 8 /20

3RF12
uz

uz F8/20 50

3RF12
45

TT 7 - TRAKASTI TEMELJ
25

USVOJEN JE TRAKASTI TEMELJ :


[irina temelja B(cm) 45
Visina temelja H(cm) 50 90 2RF12
MB 20 ; RA 400/500 uz F8/20
Aa = 2RF 12 R 188
uz F 8/20 cm
2RF12
50 uz F8/20

45

Tst - Temelj stepeni{ta B= 30 cm


H= 40 cm
0.00

2R F 12 USVOJENO: Aa = 2RF 12
uz =F8 /20
uz F8
40

2R F 12
30
TT 8 - TRAKASTI TEMELJ
25

USVOJEN JE TRAKASTI TEMELJ :


[irina temelja B(cm) 50
Visina temelja H(cm) 50 65 2RF12
MB 20 ; RA 400/500 uz F8/20
Aa = 2RF 12 R 188
uz F 8/20 cm
2RF12
50 uz F8/20

50

TT 9 - TRAKASTI TEMELJ
25

USVOJEN JE TRAKASTI TEMELJ :


[irina temelja B(cm) 50
Visina temelja H(cm) 50 65 2RF12
MB 20 ; RA 400/500 uz F8/20
Aa = 2RF 12 R 188
uz F 8/20 cm
2RF12
50 uz F8/20

50

TT 10 - TRAKASTI TEMELJ
25

USVOJEN JE TRAKASTI TEMELJ :


[irina temelja B(cm) 40
Visina temelja H(cm) 50 65 2RF12
MB 20 ; RA 400/500 uz F8/20
Aa = 2RF 12 R 188
uz F 8/20 cm
2RF12
50 uz F8/20

40

TT 11 - TRAKASTI TEMELJ

USVOJEN JE TRAKASTI TEMELJ :


[irina temelja B(cm) 40
Visina temelja H(cm) 50
MB 20 ; RA 400/500
Aa = 2RF 12
uz F 8/20 cm
TG 1 - Vezna kontragreda; MB 20; RA 400/500 B= 25 cm
H= 40 cm

A B
Lo= 4.02

3R F 12
USVOJENO: Aa = 3RF 12
uz F8 uz =F8 /20
40

3R F 12
25

TG 2 - Vezna kontragreda; MB 20; RA 400/500 B= 25 cm


H= 135 cm

A B
Lo= 4.02

POLJE AB
2RF12 Mumax= -81.15 KNm
h= 1.35 m
b= 0.25 m
R 188 fb= 14.0 Mpa
k = 8.866 1.346
135 Aa= 1.59 cm2
USVOJENO:
Gornja zona: Aa = 4RF 12
Donja zona: Aa = 4RF 12
uz =F8 /20
2RF12 Bo~ne strane : R 131

25

TG 3 - Oja~anje podne plo~e B= 30 cm


H= 40 cm
0.00

2R F 12 USVOJENO: Aa = 2RF 12
uz =F8 /20
40 uz F8

2R F 12
30
TG 4 - Oja~anje podne plo~e B= 25 cm
H= 40 cm
0.00

2R F 12 USVOJENO: Aa = 2RF 12
uz =F8 /20
uz F8
40

2R F 12
25

TG 5 - Vezna temeljna greda B= 25 cm


H= 20 cm

0.00

3R F 12 USVOJENO: Aa = 3RF 12
20 uz =F8 /20
uz F8
3R F 12
25

TG 6 - Vezna temeljna greda B= 25 cm


H= 20 cm

0.00

3R F 12 USVOJENO: Aa = 3RF 12
20 uz =F8 /20
uz F8
3R F 12
25

PODNE PLO^E: d =10cm MB 20


MA 500/560

Armirati ih minimalnom potrebnom armaturom

USVAJAM: Q 131
STUBOVI I SERKLA@I

PREMA " PRAVILNIKU O TEHNI^KIM NORMATIVIMA ZA IZGRADNJU OBJEKATA


VISOKOGRADNJE U SEIZMI^KIM PODRU^JIMA " - sl.list SFRJ br 31 od
05.06.1981.g. :
VERTIKALNI SERKLA@I ARMIRAJU SE SA NAJMANJE 4F14mm,
A HORIZONTALNI SERKLA@I SA NAJMANJE 4F12mm.

VERTIKALNI SERKLA@I I STUBOVI:

USVOJENO: RA 400/500 ; MB 20

2R F 14

25 uz F6 /15/7.5

2R F 14
25

2R F 14

2R F 14
stub - S1 75 uz F8
2R F 14

2R F 14

25

2R F 14

stub - S2 i S3 50(55) 2R F 14
uz F8

2R F 14
25

uz F6
Stub kru`nog preseka R=20cm
6R F 10
GREDICA /NOSA^A/
zija 28x25x16cm /

=2F7 (GA 500/560)

U]ENJE b/d=15/20cm,

Aa1 =2F7 (0.77cm2) fb = 14.00

k = 4.267 5.858

fb = 14.00
k = 5.075 4.049

fb = 14.00

k = 28.587 2.571

fb = 14.00

k = 8.619 2.571

fb = 14.00

k = 6.472 2.571
h = 0.175 m
b= 1.00 m
fb= 14 Mpa
k = 15.768 4.587
Aa= 4.68 cm2
Ap= 0.94 cm2
ea= 17 cm
ep= 30 cm
GREDICA /NOSA^A/
zija 28x25x16cm /

=2F7 (GA 500/560)

U]ENJE b/d=15/20cm,

Aa1 =2F7 (0.77cm2) fb = 14.00

k = 4.000 6.591

Aa1 =2F7 (0.77cm2) fb = 14.00


k = 8.237 2.571

Aa1 =2F7 (0.77cm2) fb = 14.00

k = 26.797 2.571

Aa1 =2F7 (0.77cm2) fb = 14.00

k = 8.080 2.571

Aa1 =2F7 (0.77cm2) fb = 14.00

k = 5.813 3.150
h= 0.125 m
b= 1.00 m
fb= 14.0 MPa
k = 11.425 2.571

h= 0.125 m
b= 1.00 m
fb= 14.0 MPa
k = 19.042 2.571
h= 0.125 m
b= 1.00 m
fb= 14 Mpa

k = 5.180 3.918
Aa= 2.86 cm2
Ap= 0.57 cm2
ea= 28 cm
ep= 49 cm
h= 0.095 m
b= 1.00 m
fb= 14.0 MPa
k = 8.536 2.571

h= 0.125 m
b= 1.00 m
fb= 14.0 Mpa

k = 7.027 2.571
Aa= 1.87 cm2
Ap= 0.37 cm2
ea= 27 cm
ep= 75 cm

h = 0.26 m
b = 0.25 m
fb = 14.0 MPa
k = 3.189 = 10.515
h = 0.36 m
b = 0.25 m
fb = 14.0 MPa
k = 2.876 = 13.138

h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 3.945 = 6.739
h = 0.36 m
b = 0.25 m
fb = 14.0 MPa
k = 3.165 = 10.665

h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 2.782 = 13.978
h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 2.782 = 13.978

h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 2.782 = 13.978

h = 0.26 m
b = 0.25 m
fb = 14.0 MPa
k = 2.824 = 13.56
h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 2.099 = 26.23
h = 0.46 m
b = 0.25 m
fb = 14.0 MPa
k = 3.532 = 8.547

h = 0.46 m
b = 0.25 m
fb = 14.0 MPa
k = 8.136 = 5.714
h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 2.741 = 14.53
h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 2.392 = 19.558

h = 0.26 m
b = 0.25 m
fb = 14.0 MPa
k = #DIV/0! = 18.56
h = 0.46 m
b = 0.25 m
fb = 14.0 MPa
k = 6.857 = 5.714
h = 0.16 m
b = 0.45 m
fb = 14.0 MPa
k = 1.939 = 31.48
h = 0.36 m
b = 0.25 m
fb = 14.0 MPa
k = 2.735 = 14.53
h = 0.36 m
b = 0.25 m
fb = 14.0 MPa
k = 3.010 = 11.991

h = 0.36 m
b = 0.25 m
fb = 14.0 MPa
k = 2.734 = 14.53
h = 0.26 m
b = 0.25 m
fb = 14.0 MPa
k = 2.346 = 20.279

h = 0.46 m
b = 0.25 m
fb = 14.0 MPa
k = 5.073 = 5.714
h = 0.095 m
fb = 14.00 Mpa
b = 1.00 m
k = 3.648 7.940

h = 0.26 m
b = 0.25 m
fb = 14.0 MPa
k = 3.414 = 9.155
h = 0.46 m
b = 0.25 m
fb = 14.0 MPa
k = 3.523 = 8.547
h = 0.16 m
b = 0.25 m
fb = 14.0 MPa
k = 2.337 = 20.517
h= 0.26 m
b= 0.25 m
fb = 14.0 MPa
k= 3.222 = 10.365
POLJE AB
Mumax= -31.00 KNm
h= 0.40 m
b= 0.25 m
fb= 14.0 Mpa
k = 4.250 5.858
Aa= 2.05 cm2

USVOJENO:
Gornja zona: Aa1 = 3RF 12
Donja zona: Aa2 = 3RF 12
uz =F8 /20