You are on page 1of 3
esytuonline.com Printed Pages —6 Roll No, 220514(20) 020713(20) Engg. (Fifth Semester) Examin April-May, 2016 (Old Course) (Civil Engg. Branch) IRRIGATION ENGINEERING tuos‘aurfuoNyAs3 Time Allowed : Three hours Maximum Marks: 100 Minimum Pass Marks : 35 shes aah wer wen ote & aie fo eal ps Ped 1 1 Po ot se Re er Fee Rr 2 a ow We er ie ET uo), Fe: Al questions ere canoes mentioned 2 ctr nese of my dat or dip he 3 English version question should be weated as nt AL (a) fiterd weer aR F fof s ‘Write aboot importance of Ivigntion. ‘ostaaayo2e713a0) cesvtuonline.com e.com esvtuonline.com twos ouljuonAsa esvtuonli esytuonline.com 21 (b) is Fa Ted og fais sia WH fe 5 Write the difference between Furrow method and Basin method of ligation. 2. (@) afta acta ar aa asi aA 5 Deseribe hydrological cycle with sketch, reat or eraeg eng wet are ww ST Explain Unit Hydrograph & Runoff. (©), Sea Gi or wre a afoia wi oh a aia hi eat Ft 5 Define Duty, delta and base period and derive relation ‘between them. 3. (@) Sree a wafies BA A eR aT awa Es Describe the factors affecting run off» &) re hate, ena cece ka aa ‘anil wes ated) s Explain Stop rotation giving examples and describe ins advantages, Rasraaoynzorssc20) e.com e.com esvtuonline.com tuos‘aurfuoNyAs3 ONyAsa esytuonline.com 13r 4. (@) Pre og & argu Por Feit ae Ga w Fae vafeg— ‘ag 4 -@) eT = 100 cm aa at afer = 2% ‘want eri fry = 12% Fa H= 15 gee wet Afra seas ave = 25 mm Determine the frequency of irrigation forthe folowing, data: Depth of root zone = 100 em Field capacity = 22% Permanent wilting point ~ 12% 4 ghee Daily consumptive use of water = 25 mm () Se at orate eel eat esis fog wt efter aay Fx oR werner By ae A eC A et are Define field capacity, permanent wilting point. Represents types of soil water with the help of sketch Density of si 5 ‘mostaaoyo20713@0) Pro. e.com esvtuonline.com e.com esvtuonl: esytuonline.com ta ie (a) fend Web fra fst a A Fac eto a apteg a oe atea at A fafam 5 Enlist the various survey carried out for irrigation Project and write about their purpose. 2) wiies wlan a ort wa a err ee AAA SS © nti the plane prepared in pretininry sone. g © 6 (a) Fran Regal oa A erat ain a er g Sah s 2 @ ara i) oir fat at at 5 a aH = chaste dam coring to folowing points 3 g © Topography 2 5 (3) Material used = = 6) Used g SO ede ar 50 a Rie aed ee 3 Sty gece she ree Fin er aot ae a vat s Eli the various fores ating on gravity dam and et neat sketch of dam showing al of them 220514@20)920713¢20) e.com esvtuonli tuos‘aurfuoNyAs3 uonjaso esvtnol eC rd a cif a ee ah RY 10. tay Sty esytuonline.com ts] amee WM ad a tr ene rails fier aa EE rere & card Raf 10 Draw a neat labelled sketch of diversion head work and ‘waite down funetion of is all the components wert so fara ae A a oad 2 fis ma 3 ort we Frere aril a a say) 10 What do you understand fom cross deage were? — Describe different types of cross drainage works, z sce 5 or eC setre eam ee PR aH fafa Fa aR Sram arieor a ates wife: e.com Write down the advantages and disadvantages of lining of Canal, Enlist different types of lining provided on Canal. 0 esvtuonl: Explain components of Canal works with neat sketches. 1% © fre Ring s20stazoyoae71320) Fro. e:com 16] csvtuonline.com Gi) Fat eet? otk ae Explain : (any two) @ Lif tigation GH Irrigation machinary and equipments z csvTUonline.com z ecm 22051420/020713¢20) esvtuonline.com 3 esvtu

You might also like