Professional Documents
Culture Documents
Load Flow Report
Load Flow Report
Bus 1 (#53 Village) 13.800 95.368 -3.9 0 0 2.958 2.219 Vh-Tx1_Bushing3 -2.992 -2.244 164.1 80.0
Bus 1 (Columbia) 13.800 98.459 -5.9 0 0 4.204 2.210 Bus95 0.034 0.027 1.8 79.0
Bus1 (DP1) 13.800 101.086 -1.2 0 0 0 0 Out-Door Overhead Bus 9.983 7.894 526.8 78.4
Bus1 (DP2) 13.800 102.893 0.0 0 0 0 0 Bus69 -5.200 -2.518 234.9 90.0
Bus1 (DP3) 13.800 102.894 0.0 0 0 3.733 2.800 Bus61 -5.559 -4.417 288.7 78.3
Bus1 (DP4) 13.800 102.896 1.4 0 0 0 0 Vh-Tx1_Bushing 10.362 3.458 444.2 94.9
Bus 1 (Edinbugh) 13.800 103.877 -5.6 0 0 2.178 1.212 Bus146 4.413 2.883 212.3 83.7
Bus1 (GOE) 69.000 100.754 -2.4 0 0 0 0 Bus2 (GOE) -3.029 -3.526 38.6 65.2
Bus 1 (Goodhope) 13.800 101.199 -4.5 0 0 9.711 5.342 Bus91 0.035 0.027 1.8 79.3
Bus 1 (New G/town) 13.800 102.567 -4.0 0 0 3.470 1.856 Bus57 0.035 0.027 1.8 79.4
ETAP
Project: System Studies Page: 2
12.6.0H
Location: DBIS Date: 08-29-2016
Contract: System Studies SN:
Engineer: System Planning and Design Revision: Base
Study Case: 2015 Peak
Filename: Onverwagt_PV_System Config.: Normal
Bus 1 (Onverwagt) 13.800 95.171 -6.4 0 0 3.321 0.505 Bus101 0.034 0.026 1.9 79.3
Bus 1 (Vrhoop) 13.800 102.870 1.4 0 0 3.699 1.667 Bus1 (DP4) -3.734 -1.694 166.8 91.1
Bus 1- Skeldon 13.800 97.705 1.3 0 0 1.282 0.962 Bus138 -4.900 -2.000 226.6 92.6
Bus2 69.000 100.754 -2.4 0 0 0 0 Bus3 -9.898 -7.129 101.3 81.1 2.500
Bus2 (DP1) 13.800 102.663 0.3 0 0 0 0 Bus3 9.981 7.918 519.2 78.3
Bus2 (DP2) 13.800 102.894 0.0 0 0 0 0 Bus65 -5.200 -2.518 234.9 90.0
Bus2 (DP3) 13.800 102.894 0.0 0 0 9.694 7.271 Bus79 -6.353 -5.048 329.9 78.3
Bus2 (GOE) 69.000 100.754 -2.4 0 0 0 0 Bus1 (GOE) 3.029 3.526 38.6 65.2
Bus 2 (New G/town) 13.800 101.833 -4.8 0 0 5.877 2.666 Bus56 0.035 0.027 1.8 79.4
Bus 2- Skeldon 13.800 97.705 1.3 0 0 0 0 Bus155 -2.400 -1.000 111.3 92.3
Bus3 13.800 102.333 0.1 0 0 0 0 Bus2 (DP1) -9.968 -7.868 519.2 78.5
Bus4 13.800 102.682 0.3 5.200 4.125 0 0 Bus2 (DP1) 5.200 4.125 270.4 78.3
Bus 4 (Canefield) 13.800 98.079 -5.7 0 0 1.285 0.622 Overhead Bus1 Cfield Cats 0.000 0.000 0.0 0.0
Bus 5 (Canefield) 13.800 98.079 -5.7 0 0 2.931 2.199 Overhead Bus2 Cfield Cats 1.619 1.215 86.4 80.0
ETAP
Project: System Studies Page: 3
12.6.0H
Location: DBIS Date: 08-29-2016
Contract: System Studies SN:
Engineer: System Planning and Design Revision: Base
Study Case: 2015 Peak
Filename: Onverwagt_PV_System Config.: Normal
Bus6 (GOE) 69.000 100.754 -2.4 0 0 0 0 Bus1 (GOE) 3.482 1.819 32.6 88.6
Bus8 69.000 100.754 -2.4 0 0 0 0 Bus11 -3.029 -3.526 38.6 65.2 2.500
Bus9 0.480 99.343 -2.2 0 0 0.482 0.362 Bus7 -0.482 -0.362 730.1 80.0
Bus11 13.800 100.910 -1.3 0 0 0 0 GOE Bus5 -3.037 -3.681 197.8 63.6
Bus12 13.800 102.682 0.3 5.200 4.125 0 0 Bus2 (DP1) 5.200 4.125 270.4 78.3
Bus13 0.480 99.920 -1.2 0 0 0.415 0.311 Bus2 (DP1) -0.415 -0.311 623.8 80.0
Bus17 0.480 98.318 -2.7 0 0 0.412 0.309 Bus1 (DP1) -0.412 -0.309 629.3 80.0
Bus18 13.800 101.110 -1.2 5.200 4.100 0 0 Bus1 (DP1) 5.200 4.100 274.0 78.5
Bus19 13.800 101.110 -1.2 5.200 4.125 0 0 Bus1 (DP1) 5.200 4.125 274.6 78.3
Bus28 69.000 100.039 -2.6 0 0 0 0 Golden Grove Bus2 3.919 2.290 38.0 86.3 -3.750
Bus31 69.000 100.031 -2.6 0 0 0 0 Golden Grove Bus1 3.995 2.332 38.7 86.4 -3.750
Bus32 0.480 99.766 -5.0 0 0 0.035 0.026 Golden Grove Bus1 -0.035 -0.026 52.0 80.0
Bus34 0.480 99.766 -5.0 0 0 0.035 0.026 Golden Grove Bus2 -0.035 -0.026 52.0 80.0
Bus37 69.000 99.199 -2.6 0 0 0 0 Sophia Bus4 7.755 2.670 69.2 94.6 -2.500
Bus41 69.000 99.199 -2.6 0 0 0 0 Sophia Bus5 5.388 1.855 48.1 94.6 -2.500
Bus45 69.000 98.838 -2.8 0 0 0 0 Bus54 5.937 2.964 56.2 89.5 -4.990
Bus47 69.000 98.838 -2.8 0 0 0 0 Bus51 3.515 1.983 34.2 87.1 -4.990
Bus56 0.480 100.017 -5.4 0 0 0.035 0.026 Bus 2 (New G/town) -0.035 -0.026 52.0 80.0
Bus57 0.480 100.758 -4.6 0 0 0.035 0.026 Bus 1 (New G/town) -0.035 -0.026 51.8 80.0
* Bus61 13.800 102.899 0.0 5.559 4.417 0 0 Bus1 (DP3) 5.559 4.417 288.7 78.3
Bus64 0.480 101.137 -1.0 0 0 0.556 0.417 Bus1 (DP3) -0.556 -0.417 826.4 80.0
Bus65 13.800 102.897 0.0 5.200 2.518 0 0 Bus2 (DP2) 5.200 2.518 234.9 90.0
Bus66 13.800 102.897 0.0 5.200 2.518 0 0 Bus2 (DP2) 5.200 2.518 234.9 90.0
Bus67 0.480 100.239 -1.4 0 0 0.554 0.415 Bus2 (DP2) -0.554 -0.415 830.3 80.0
Bus69 13.800 102.895 0.0 5.200 2.518 0 0 Bus1 (DP2) 5.200 2.518 234.9 90.0
Bus70 0.480 100.315 -1.4 0 0 0.554 0.415 Bus1 (DP2) -0.554 -0.415 830.0 80.0
* Bus73 13.800 102.899 0.0 5.559 4.417 0 0 Bus1 (DP3) 5.559 4.417 288.7 78.3
* Bus75 13.800 102.899 0.0 5.559 4.417 0 0 Bus1 (DP3) 5.559 4.417 288.7 78.3
Bus76 0.480 101.064 0.8 0 0 0.035 0.026 Bus 1 (Vrhoop) -0.035 -0.026 51.7 80.0
Bus77 0.480 101.137 -1.0 0 0 0.556 0.417 Bus2 (DP3) -0.556 -0.417 826.4 80.0
* Bus79 13.800 102.899 0.0 6.353 5.048 0 0 Bus2 (DP3) 6.353 5.048 329.9 78.3
* Bus81 13.800 102.899 1.4 8.293 2.978 0 0 Bus1 (DP4) 8.293 2.978 358.3 94.1
* Bus82 13.800 102.899 1.4 8.293 2.978 0 0 Bus1 (DP4) 8.293 2.978 358.3 94.1
* Bus83 13.800 102.899 1.4 8.293 2.978 0 0 Bus1 (DP4) 8.293 2.978 358.3 94.1
Bus84 0.480 102.080 -6.2 0 0 0.035 0.026 Bus 1 (Edinbugh) -0.035 -0.026 51.4 80.0
Bus85 13.800 102.891 1.4 0 0 0 0 Bus1 (DP4) -10.362 -3.457 444.2 94.9
Bus86 0.480 101.584 0.7 0 0 0.418 0.313 Bus1 (DP4) -0.418 -0.313 618.4 80.0
Bus89 69.000 97.470 -3.4 0 0 0 0 Bus92 9.771 5.637 96.8 86.6 -5.000
Bus91 0.480 99.377 -5.1 0 0 0.034 0.026 Bus 1 (Goodhope) -0.034 -0.026 52.1 80.0
Bus95 0.480 97.001 -6.8 0 0 0.034 0.026 Bus 1 (Columbia) -0.034 -0.026 52.8 80.0
Bus96 69.000 95.257 -4.3 0 0 0 0 Bus100 4.253 2.393 42.9 87.1 -5.000
Bus101 0.480 93.282 -7.1 0 0 0.034 0.025 Bus 1 (Onverwagt) -0.034 -0.025 54.0 80.0
Bus105 69.000 93.480 -5.0 0 0 0 0 Bus 1 (Onverwagt) 3.363 0.619 30.6 98.3
Bus111 69.000 92.006 -4.7 0 0 0 0 Virtual Bus No 53 Village -5.215 -1.073 48.4 97.9
Bus113 69.000 92.006 -4.7 0 0 0 0 Bus114 6.193 4.461 69.4 81.1 -7.500
Bus117 0.480 98.537 -5.6 0 0 0.481 0.360 Bus38 -0.481 -0.360 733.3 80.0
Bus119 0.480 98.537 -5.6 0 0 0.481 0.360 Bus40 -0.481 -0.360 733.3 80.0
Bus120 0.480 96.883 -6.4 0 0 0.341 0.256 Bus60 -0.341 -0.256 528.7 80.0
Bus122 0.480 95.247 -3.9 0 0 0.034 0.025 Bus104 -0.034 -0.025 53.4 80.0
ETAP
Project: System Studies Page: 7
12.6.0H
Location: DBIS Date: 08-29-2016
Contract: System Studies SN:
Engineer: System Planning and Design Revision: Base
Study Case: 2015 Peak
Filename: Onverwagt_PV_System Config.: Normal
Bus137 69.000 97.470 -3.4 0 0 0 0 Main Bus 1( Goodhope) 0.000 0.000 0.0 0.0
Bus138 13.800 97.706 1.3 4.900 2.000 0 0 Bus 1- Skeldon 4.900 2.000 226.6 92.6
Bus142 69.000 97.470 -3.4 0 0 0 0 Main Bus 1( Goodhope) 0.000 0.000 0.0 0.0
Bus143 13.800 97.705 1.3 2.400 1.000 0 0 Bus 1- Skeldon 2.400 1.000 111.3 92.3
Bus145 69.000 95.257 -4.3 0 0 0 0 Main Bus 1( Columbia) 0.000 0.000 0.0 0.0
Bus146 13.800 91.423 -11.9 0 0 4.140 2.105 Bus 1 (Edinbugh) -4.140 -2.105 212.5 89.1
Bus155 13.800 97.705 1.3 2.400 1.000 0 0 Bus 2- Skeldon 2.400 1.000 111.3 92.3
GOE Bus4 13.800 100.998 -1.2 0 0 3.314 1.467 Bus7 0.484 0.376 25.4 79.0
GOE Bus5 13.800 100.998 -1.2 0 0 3.140 2.355 Overhead Bus GOE Cats 0.000 0.000 0.0 0.0
Golden Grove Bus1 13.800 101.584 -4.4 0 0 3.625 2.195 Bus31 -3.974 -2.156 186.2 87.9
Golden Grove Bus2 13.800 101.584 -4.4 0 0 4.179 2.024 Bus28 -3.899 -2.117 182.7 87.9
MAIN BUS1 (G/Grove) 69.000 100.031 -2.6 0 0 0 0 Bus33 2.485 3.125 33.4 62.2
Main Bus1 (NEW SOPHIA) 69.000 99.192 -2.6 0 0 0 0 Bus52 -2.468 -3.462 35.9 58.0
Main Bus1 (SOPHIA) 69.000 99.199 -2.6 0 0 0 0 Main Bus2 (SOPHIA) -19.268 -4.995 167.9 96.8
Main Bus 1( # 53 Village) 69.000 94.092 -3.1 0 0 0 0 Vh-Tx1_Bushing3 2.998 2.310 33.7 79.2 -2.500
Main Bus 1( Canefield) 69.000 92.006 -4.7 0 0 0 0 Bus112 -0.978 -3.388 32.1 27.7
Main Bus 1( Columbia) 69.000 95.257 -4.3 0 0 0 0 Bus145 0.000 0.000 0.0 0.0
Main Bus 1( Goodhope) 69.000 97.470 -3.4 0 0 0 0 Bus137 0.000 0.000 0.0 0.0
Main Bus 1( New G/town) 69.000 98.838 -2.8 0 0 0 0 Main Bus 2( New G/town) 5.937 2.964 56.2 89.5
Main Bus 1( Onverwagt) 69.000 93.480 -5.0 0 0 0 0 Bus103 -4.368 -3.393 49.5 79.0
Main Bus 1( Vrhoop) 69.000 100.618 -1.7 0 0 0 0 Bus71 6.724 4.574 67.6 82.7
Main Bus 1(Edinburgh) 69.000 99.656 -2.1 0 0 0 0 Vh-Tx1_Bushing2 6.685 4.755 68.9 81.5 -8.750
Main Bus1(KINGSTON) 69.000 100.528 -1.8 0 0 0 0 Main Bus2(KINGSTON) -25.180 -7.466 218.6 95.9
MAIN BUS2 (G/Grove) 69.000 100.039 -2.6 0 0 0 0 Bus27 -6.385 -5.422 70.1 76.2
Main Bus2 (NEW SOPHIA) 69.000 99.192 -2.6 0 0 0 0 Bus50 -9.371 -5.472 91.5 86.4
Main Bus2 (SOPHIA) 69.000 99.199 -2.6 0 0 0 0 Main Bus1 (SOPHIA) 19.268 4.995 167.9 96.8
Main Bus 2( New G/town) 69.000 98.838 -2.8 0 0 0 0 Main Bus 1( New G/town) -5.937 -2.964 56.2 89.5
Main Bus2(KINGSTON) 69.000 100.528 -1.8 0 0 0 0 Main Bus1(KINGSTON) 25.180 7.466 218.6 95.9
Out-Door Overhead Bus 13.800 100.998 -1.2 0 0 0 0 Bus1 (DP1) -9.978 -7.883 526.8 78.5
Overhead Bus GOE Cats 13.800 100.998 -1.2 0 0 0 0 GOE Bus5 0.000 0.000 0.0 0.0
ETAP
Project: System Studies Page: 9
12.6.0H
Location: DBIS Date: 08-29-2016
Contract: System Studies SN:
Engineer: System Planning and Design Revision: Base
Study Case: 2015 Peak
Filename: Onverwagt_PV_System Config.: Normal
Overhead Bus1 Cfield Cats 13.800 98.079 -5.7 0 0 0 0 Bus 4 (Canefield) 0.000 0.000 0.0 0.0
Overhead Bus2 Cfield Cats 13.800 98.072 -5.7 0 0 1.619 1.215 Bus 5 (Canefield) -1.619 -1.215 86.4 80.0
Sophia Bus4 13.800 100.200 -4.6 0 0 9.519 1.355 Bus37 -7.726 -2.359 337.3 95.6
Sophia Bus5 13.800 100.200 -4.6 0 0 2.609 1.893 Bus41 -5.367 -1.639 234.3 95.6
Tx1_Bushing 13.800 102.891 0.0 0 0 0 0 Bus1 (DP2) -4.643 -2.078 206.8 91.3
Tx2_Bushing 13.800 102.890 0.0 0 0 0 0 Bus2 (DP2) -9.842 -4.596 441.7 90.6
Vh-Tx1_Bushing 13.800 102.891 1.4 0 0 0 0 Bus1 (DP4) -10.362 -3.457 444.2 94.9
Vh-Tx1_Bushing2 13.800 103.877 -5.6 0 0 0 0 Main Bus 1(Edinburgh) -6.626 -4.122 314.3 84.9
Vh-Tx1_Bushing3 13.800 95.368 -3.9 0 0 0 0 Main Bus 1( # 53 Village) -2.992 -2.244 164.1 80.0
Virtual Bus No 53 Village 69.000 94.092 -3.1 0 0 0 0 Bus111 5.313 0.338 47.3 99.8
Virtual Bus Skeldon 69.000 95.382 -2.3 0 0 0 0 Virtual Bus No 53 Village 8.386 2.448 76.6 96.0