Intervening with Landscape along the riverbed to treat direct runoff from nearby settlements. Building bokashi towers for Primary treatment of solid waste Allocating spaces for final composting 3. Developing riverfront Development of existing Ghats through promenades and facilities like toilets, changing rooms and developing public ques etc Interconnecting the ghats Redevelopment of Parmat market. Creating green buffer zone for control access to river. Development of Crematorium Re structuring cremation ground into defined complex Separating ghat from cremation ground Densifying slums Redevelopment of High density residential area between rani ghat and Ganga barrage 4. Adaptive re use of Heritage buildings Adaptive re-use of mills (TAFCO, Elgin, Flex) Developing Public buildings ( Cultural gully, Exhibition Area, Craft, Library and Kanpur haat) Development of promenades and squares Introducing Alternative farming techniques Workspace for building biodegradable Pooja material Revitalization of Rave 3 mall Development of promenades and squares around Rave 3 Interconnecting mall plaza with the new developed square