BILL OF MATERIALS @ 3RD FLOOR

THIRD FLOOR MATERIAL COST

COST
. G.I. PIPE PHP 68,400.00
. ANGLE BARS PHP 39,600.00
. ANGLE BARS PHP 83,200.00
. WELDING ROD PHP 12,000.00
. 1/4 PLATE PHP 32,000.00
. ROOF TILESPAN PHP 98,000.00
. HOLLOW BLOCK PHP 100,000.00
. 10MM PHP 180,000.00
. CEMENT PHP 57,500.00
. SAND PHP 12,000.00
. DOOR JAMB/DOOR PHP 48,000.00
. PAINT PHP 160,000.00
. CEILING PHP 110,000.00
. PINLIGHT PHP 35,000.00
. TILES PHP 140,000.00
. WIRING PHP 35,000.00
PHP 1,210,700.00

LABOR COST THIRD FLOOR PHP 308,000.00


THIRD FLOOR MATERIAL COST PHP 1,210,700.00
3RD FLOOR TOTAL COST PHP 1,518,700.00
2ND FLOOR TOTAL COST PHP 1,090,400.00
PHP 2,609,100.00