You are on page 1of 29

D I R E K TO R A T JENDERAL SUMBER DAYA AIR

II

15

50
L 100 x 50 x 8 L 100 x 50 x 8

L 100 x 50 8

L 100 x 50 8

L 100 x 50 8

L 100 x 50 8
900

65
10
PL 10 x 180 x 105

dua tiang
h

double spindle
L 100 x 50 x 8 L 100 x 50 x 8

50
satu tiang

15
single spindle 30
10

7
I 100 100

30

40
M12

530
L 100 x 50 x 8

100

100
40 20
L 100 x 50 x 8
L 60 x 60 x 6
L 60 x 60 x 6 L 100 x 50 x 8

530

PL B x h = ( 8 + 50 )
100 10

h
DETAIL II S.B
A L 60 x 60 x 6 L 60 x 60 x 6

530
A

CNP 6 1/2 100


CNP 6 1/2 CNP 6 1/2

III B-14
L 100 x 50 x 8
100 B 100

50
B-30

10
TAMPAK DEPAN POTONGAN PLAT PINTU
S.A B-B S.A S.A L 100 x 50 x 8

FRONT VIEW SECTION GATE PLATE tn 55 45

tn

t
tn

L 100 x 50 x 8
tn
drat
7
thread Tr.36x6 250

5 5
27 27
1250

50

catatan
notes
M16 L 60 x 60 x 6
angkur sks
12

400mm untuk bentangan 0.50m-1.50m ukuran tebal pelat sama dan tinggi air max 2.00m
anchor clc 1
for span 0.5m-1.50m plate thicknes is the same and max water level
baut
M15
46

46
40

40

bolts
semua ukuran dalam mm kecuali yang tertulis
10

100
all dimension in mm unless indicated otherwise
paku keling atau baut sks ukuran H.Bh berubah diaambil dari masing-masing gambar bangunan
200 3
40

40

river or bolt clc variable dimension H.B.h are indicated on the structural drawings 20 50 30 L 100 x 50 x 8
52

52

L 100 x 50 x 8
55 540 tiang pengangkat rangkap untuk mengangkat dimana
4 B>1000mm dan/atau h>1000mm
double spindle lift and gearing mechanism were and/or
detail standar alat pengangkat lihat gaambar no.713 100
5
8

40 40 for standerd detail hoisting device see drawing no.713

12 2 16 8 16 2 12 8 70 70 8
0 200 400 600 800 1000mm
S.A = 1:10 DETAIL III S.B
DETAIL I POTONGAN
S.B A-A S.B 0 50 100 150 300mm

SECTION S.B = 1:2

STANDAR PERENCANAAN IRIGASI STANDAR ALAT PENGATUR PINTU SORONG 701


D I R E K TO R A T JENDERAL SUMBER DAYA AIR

cincin penutup
washer (welded) cincin penutup
washer (welded) cincin penutup
washer (welded)

0.06
0.25

0.06
0.10

0.22

0.20
B + 0.30
B + 0.24
B + 0.20

cL cL
0.28 0.28
0.20 0.20
cL
B + 0.20

0.10
0.20

0.20

0.10
0.20

0.20
BALOK SEKAT TYPE I PANJANG 1.80 m - 2.30 m BALOK SEKAT PANJANG
STOP LOG LENGTH TYPE 2 0.80m - 180m PANJANG
STOP LOG LENGTH 0.40m - 0.80m
BALOK SEKAT LENGTH
BENTANG TYPE 3
1.50 m - 2.00 m BENTANG STOP LOG
SPAN 0.60m - 1.50m BENTANG
SPAN 0.20m - 0.60m
cL cL SPAN
cL
0.18 0.03
0.12 0.12
0.15 0.15 0.12 0.03 0.05
0.10

0.06

0.06
0.10
0.15

0.05

0.10

0.04
0.10
0.04

0.07
0.15 0.15

0.30 min
0.30 min

0.16

0.30 min
0.01 0.01

semua sponing diberi adukan 0.01 m

0.10

0.10

0.10 min
semua sponing diberi adukan 0.01 m

0.10
0.10
0.15

0.15

all grooves mortar rendered 0.01 thick all grooves mortar rendered 0.01 thick
ALAT PENGANGKAT BALOK SEKAT
0.15 min

0.10 min
HOISTTING DEVICE FOR STOPLOG
0.08

R B = bentang
B = bentang
B = span
B = span

B = bentang
B = span SPONING UNTUK BALOK SEKAT SPONING UNTUK BALOK SEKAT
TYPE 2 TYPE 3
GROOVES FOR STOP LOGS GROOVES FOR STOP LOGS
SPONING UNTUK BALOK SEKAT
TYPE I
GROOVES FOR STOP LOGS

NOTES : CATATAN :

- stop log to be made of wood class I (Pkk I) - papan sponing terbuat dari kayu kelas I (Pkk I) BUKAAN PANJANG PAPAN LEBAR VOLUME BERAT
differential head for stop log type I = 200 m; types 2 and 3 = 175 m TYPE OPENING PLANK LENGTH THICK VOL RANGE WEIGHT RANGE
- beda tekanan air rencana tipe I = 200 m; tipe 2 dan 3 = 175 m (m) (m) (m) (m)3 Kg
LEGENDA
- stoplog type and width varies with span, in three types (table I) tipe dan lebar balok sekat berubah menurut bentang, dalam 3 tipe (tabe I) 1 1.50 - 2.00 1.80 - 2.30 0.10 0.036 - 0.046 270 - 34.5 LEGEND
pasangan batu kali
- groove size and spacing vary with opening in three types - ukuran dan jarak sponing berubah menurut bukaan dalam tiga tipe 2 0.60 - 1.50 0.80 - 1.80 0.06 0.010 - 0.0209 7.56 - 15.66
masonry
3 0.20 - 0.60 0.40 - 0.80 0.06 0.0048 - 0.0096 3.6 - 7.20
- these standards to be used for all stop logs except where specified other wise - gambar standar ini berlaku untuk semua balok sekat kecuali ditentukan lain adukan 1Pc : 2 pasir
mortar rendering 1Pc : 2 sand
TABEL I DATA BALOK SEKAT
kayu
TABLE STOP LOG DATA wood

0 20 40 60 80 100 cm

STANDAR PERENCANAAN IRIGASI STANDAR ALAT PENGATUR BALOK SEKAT 702


D I R E K TO R A T JENDERAL SUMBER DAYA AIR
B
D

0.07
s 0.005
ak
H im
= >2 C
R

1:m

0.015
1:1 SITUASI BANGUNAN
S, 1 : 2000

1:m
SITUATION
m

m
1

1
w.1 h.1 A A w2 h2 0.115
b

b
1:3 1:6

w1
m m
1

1 1

0.30
m

1:1

m
1:m

h1

0.3
0
0.3
1:m

0
R= > H1 maks
> 2H
imak
s C

0.30

0.30
b
D
DENAH B
PLAN POTONGAN
SECTION D-D
0.30 b 0.30 2.15 0.30 b 0.30 2.15
papan duga
gauge 0.44 0.44
2 - 3 H1 maks 0.40 0.40
w1

w1
w2

w2
m m
1 1

0.30
> 1.75 Hi maks
h1

1:m

3 6

h2
1:m
0.30

0.3
1

0
p

0.3

0
0.60

0.60
0.15
0.30

0.30
0.10 0.30 b b
0.10 0.30 0.10 0.10 0.30

POTONGAN POTONGAN
POTONGAN B-B SECTION C-C
A-A SECTION
SECTION

papan duga
gauge
2 - 3 H1 maks

R > 1.75 H1 maks


w1

w2

> 1.75 Hi maks 6


h1

1:m

1:m

h2

6
1
0.30

R
p

1
0.60

p
0.60
0.15
0.30

R = 0.2 Hmax

R = 0.2H1 maks
0.10 0.30
0.30 0.10 0.10 0.30

MERCU ALTERNATIF
ALTERNATVE CREST 0 1.0 2.0 3.0 4.0 5.0
S , 1 : 50

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR AMBANG UKUR LEBAR POTONGAN SEGI EMPAT 703
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

0.005

0.07
B C D
SITUASI BANGUNAN

0.015
SITUATION S, 1 : 2000
CL

0.115
m

m
1:m

1:m

1:m

1:m
b
1

1
A A

w1

0.3
0
0.3
m m

0
h1
1:3 1:6 1 1
b

b
w1 h1 w2 h2

0.30
0.10 0.10
1:m

1:m

1:m

1:m
0.30 0.30
1

1
b + m.2p
m

m
POTONGAN B-B S, A

B C D
SECTION

DENAH S, A
PLAN
CL CL

papan duga b b + m2p


gauge 2-3 H1 maks

w1

w2
w1

w2

0.3
0

0.3
0
0.3

0.3
m m

0
m m
> 1.75 H1maks 1 1 1 1
h1

1:m

h2
1:m

1:m
6

h2
1:m

1 1

p
p
0.60

0.60
0.30

b + m 2p
0.30 0.10
0.10 0.30 0.30 0.10
0.10 0.30 0.10 0.30

POTONGAN A-A S, A
POTONGAN C-C S, A POTONGAN D-D S, A
SECTION SECTION SECTION
CATATAN
NOTES
papan duga tinggi energi di hulu
H1 = upstream head
gauge 2-3 H1 maks
R > 1.75 H1 maks
w1

w2
1:m

> 1.75 H1maks 6


h1

1:m

6 R
1:m

h2

1
1:m

1
p

p
0.60

0.60

+ 7.76
R = 0.2 Hmaks S, B
0.30
0.10
0.30

0.30 0.10
R = 0.2 H1 maks
0.10 0.30

0 1.0 2.0 3.0 4.0 5.0 m


S,A, 1 :50

MERCU ALTERNATIF S, A 0 2.0 4.0 6.0 8.0 5.0 m


S,B, 1 :50
ALTERNATIVE CREST

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR AMBANG UKUR LEBAR POTONGAN TRAPESIUM 704
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
700 50 280
L VI 5

Catatan :
Note

70
25

L 60 x 60 x 8
L 60 x 60 x 8
meja pada
mutu baja
posisi terendah
steel qualitas
25

cair in lowest
baja untuk stang B.J 50 position
143 steel for spindle B.J. 50 15
baja baja lain B.J. 37
75 25 all other steel B.J. 37
L detail IV dan VI lihat gambar no 173
35 detail for IV and VI see drawing no 173
25
H

meja pada

10
posisi tertinggi dan

X - W - H - V - 830
250 250 pintu bawah tertutup

40

40
cair in highest

40

80
position and battom
IV gate closed

10

10
70
L

130
pintu bawah
II

180
.

W -200
25 250 250

250
W

35 meja pada

W -200
posisi terendah

50

50
cair in lowest
I position

70
L 60 x 60 x 8

20
450 v
70 330
meja pada

900 V
posisi tertinggi 50 100 300 100
cair in highest
L 100 x 50 8

L 100 x 50 8

position

L 60 x 60 x 8

L 60 x 60 x 8
L 60 x 60 x 8

70
HW 9

A A
B 10 V

meja pada
posisi terendah R 70

480 v
75 110

410 V
cair in lowest
position 490
10

8
13
37.5
V
40

70
70

10
20

18
30
500 500 37.5
100

526 100

10
PINTU ATAS S.A
PINTU BAWAH S.A 75 98 25

KERANGKA UPPER GATE LOWER GATE

40
S.A
FRAME L L

20
40
0
ulir 20
thread Tr.36x6 angkur
L 100 x 50 x 8
9

paku keling atau baut


50

50

65 25
25 138 35
L 60 x 60 x 8
14

14

8 13 15 13 8
8 25 8

5
46

46
40

40

5
40

40

52
L 60 x 60 x 8
52

L 100 x 50 x 8
5
40 5
8

20 40
8

5 60 50
80 100
40 40
10

8 70 70 8 26 8
14 14
POTONGAN DETAIL III
85 53 35 25

DETAIL I 2 6 A-A S.C S.B


S.C SECTION
DETAIL II S.C

0 50 100 150 200mm

STANDAR PERENCANAAN IRIGASI STANDAR ALAT PENGATUR PINTU UKUR ROMIJN B =50CM,H=33CM 705
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
L L L
VI

W - 200
catatan
note 65
mutu baja

50
steel qualities
baja untuk stang Bj. 50

200
steel for spindle Bj. 50
o =8
80 143 35 25 baja baja lain Bj. 37
125

alll other steel Bj. 37


70
detail IV dan VI lihat gambar no. 713
60 75 detail for IV and VI see drawing no. 713 L . 60 x 60 x 8

L 60 x 60 x 8
50
III

570 + V
40
100 50 450
H > V + 705

L
H > 900

X = H + W - V - 1000
B/2 B/2

40

70
5 5

IV meja pada

130
II 8

L. 60 x 60 x 8

L. 60 x 60 x 8
posisi terendah

95

190
weir in lowest
15 position

580 - V
35
53
o =8

250
I

8
W

50
L 60 x 60 x 8

70

70
80 x 20 40 x 13
25
LG. 80
M.A.M meja pada B

10
F.S.L posisi tertinggi

L 60 x 60 x 8

L 60 x 60 x 8
V

600 + V

8
dan pintu bawah
M.A.R
meja pada tertutup
PINTU BAWAH

40
D.W.L

40
posisi tertinggi
100 500
weir in lhighest
S,A

80
gate in highest position and bottom
LOWER GATE
L 100 x 50 x 8

L 100 x 50 x 8

position gate closed


100 100

10

10
50

6
B - 10 75 110
pintu bawah
bottom gate 10
37.5

100
13
B = 1000 37.5
o =8
1150 + V

R =100 B/2- 100 B/2- 100

10
meja pada

8
posisi terendah

650 + V
gate in lowest B = 500, 750 meja pada

18
A A position B - 200 posisi terendah

50
70
weir in lowest
position
55 x 65 x 16

10
8
40 x 25 40 x 25

20

20
75 98 25
40

70
V L 100 x 50 x 8
B - 10700
L 100 x 50 x 8 L
S,C
30

70
B
B = 500; 750;1000

20
40
100 B + 26 100
PINTU ATAS S,A
KERANGKA S,A UPPER GATE 9 o = 10

h + 75
FRAME L 40
L 138 60 25

ulir Tr. 36
thread Tr. 36

0
8 25 8

20

110
65

40
65
75
anker s.k.s
400
50

50

anchor c.t.c

130
40 x 20
L. 100 x 50 x 8
CNP. 65 paku keliling atau baut s.k.s

40
14

14

LG. 65 200
L. 60 x 60 x 8 rivet or bolt c.t.c
80

25
26

46

46

40

8 13 10 13 8
35

8
8

5
92

25
5

5
5
8
40

40

20 40 40 85 53 25
52

80
110 L. 60 x 60 x 8

L. 100 x 50 x 8 DETAIL - III S,C


10 8

45 x 13
8

5 60 50
40 40 15 0 200 400 600 800 1000 mm
S,A = 1 : 10
8 70 70 8 14 26 8 14 POTONGAN A - A S,C 0 100 200 300 400 500 mm
DETAIL - I S,C DETAIL - II S,C
2 6
SECTION S,B = 1 : 5

0 50 100 150 200 mm


S,C = 1 : 2

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PINTU UKUR ROMIJN B 100CM 706
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

catatan
note
143 50 10 mutu baja
steel qualities
75 baja untuk stang Bj. 50

III steel for spindle Bj. 50


baja baja lain Bj. 37
alll other steel Bj. 37
detail I dan II lihat gambar 706
detail for IV and VI see drawing 706
detail III lihat gambar 708

H + 75
B/2 B/2 detail for III see drawing 708
detail IV lihat gambar 703
detail for IV see drawing 703
80
125

H + W - V - 1100
0 70

130 40
75
60
H > 900 atau H > V + 705

50
53
II
H

40 25 B/2 B/2
85

W - 300
30
35

250
20

50
50

50
10

IV

300
65 65

700 + V
W

570 + V
60 x 60 x 8

60 x 60 x 8
100 B/2- 100 B/2- 100 100

60 x 60 x 8
M.A.M
F.S.L

70
V

M.A.R meja pada


D.W.L posisi tertinggi
gate in highest B - 10
position

L 60 x 60 x 8
650 + V
100 500

580 + V
L 60 x 60 x 8
A A 50

6
6

18
40 x 25

100
R1
1150 + V

0
L 100 x 50 x 8

L 100 x 50 x 8

meja pada 0 o=8

70
posisi terendah
gate in lowest
position
B B
B = 1250 , 1500

40 x 25
PINTU ATAS PINTU BAWAH
8

L 100 x 50 x 8
V UPPER GATE LOWER GATE
40

70
30

100 B + 26 100
0 200 400 600 800 1000 mm

S = 1 : 10

KERANGKA
FRAME

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PINTU UKUR ROMIJN B > 100CM 707
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

debit lebar pintu B (m)


discharge gate width B (m)
Q (l / dt) I
Q (l/s) 0,7 5 1,00 1,2 5 1,5 0
9,0 0 497 90 80 80
890 494 89
880 490 88
870 486 87
75 75
860 483 86
850 479 85
840 475 84
830 471 83 75 75
820 468 82
810 464 81
800 460 80
790 456 79 65 65
780 453 78
770 449 77
760 445 76
60 60
750 497 441 75
740 493 437 74
730 489 433 73
720 484 429 72 55 55
710 480 425 71
B =0,50 m
700 475 421 70
690 471 417 69
680 466 413 68 M8 300 50 50
670 461 409 67
660 457 405 66
650 452 401 65 45 45
640 448 397
250
64
debit lebar pintu B (m)
discharge 630 443 393 63
gate width B (m)
Q (l / dt) I 620 438 388 62
Q (l/s) 0,5 0 0,7 5 1,00 1,2 5 1,5 0 610 433 384 61 40 40
3,0 0 497 380 314 270 239 30 600 497 429 380 60 200
290 486 372 307 264 234 29 590 492 424 376 59
280 475 363 300 258 229 28 580 486 420 372 58
223 35 35
270 464 354 292 252 27 570 481 415 367 57
260 452 345 285 246 218 26 560 475 410 363 56
250 441 337 279 239 212 25 550 469 405 359 55 150
240 429 328 270 233 206 24 540 464 400 354 54 30 30
230 417 318 263 227 201 23 530 458 395 350 53
220 405 309 255 220 195 22 520 452 390 345 52
210 393 300 247 213 189 21 510 446 385 341 51
200 380 290 239 206 183 20 500 441 380 337 50 100 25
190 367 280 231 199 177 19 490 435 375 332 49
180 354 270 223 192 170 18 480 429 370 328 48
170 341 260 215 185 164 17 470 423 365 323 47
20 L .100x50x8
160 328 250 206 178 157 16 460 417 360 318 46
150 314 239 198 170 151 15 450 497 411 354 314 45 L . 60x60x8
140 300 229 189 163 144 14 440 490 405 349 309 44
130 285 218 180 155 304
50
137 13 430 483 399 344 43 15
120 239 183 151 130 115 12 420 475 393 338 300 42
110 225 195 161 139 123 11 410 468 386 333 395 41
100 239 183 151 130 115 10 400 460 374 328 390 40
90 223 170 141 121 107 9 390 452 374 322 385 39 10
80 206 157 130 112 99 8 380 444 367 317 380 38
70 189 144 119 103 91 7 370 437 354 311 275 37
60 170 130 107 93 82 6 360 429 354 305 270 36 skala liter
5
50 151 115 95 82 73 5 350 421 348 300 265 35 liter scale
40 130 99 82 71 63 4 340 413 341 394 260 34 L .100x50x8
30 107 82 88 58 52 3 330 405 334 288 255 33
20 82 63 52 44 39 2 320 397 328 282 250 32 0
10 52 39 33 28 25 1 310 388 321 276 245 31

SKALA cm
cm SCALES
LITER INDIKASI (I) dalam mm dari 0 SKALA LITER
LITER INDICATION (I) in mm form 0 LITER SCALES
0 5 10 15 20 S =1:2

STANDAR PERENCANAAN IRIGASI STANDAR ALAT UKUR SKALA CM DAN LITER UNTUK PINTU UKUR ROMIJN (A) 708
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

120 120

8
85 100 L
60x60x8

80 80 L

10 16 10 8 8
100x50x8
5 60
10
75 75 5
8
50
9

6
L 100x50x8
75

70 70 10

100
8
27

65 65 10 6
75

15 15
25 20

60 60

50
75
300

250

55 55 200

10 6
100

litre scales
150

skala liter
8

h + 75
50 50 50 65 8

h
100

B = 0.50m 20 20

50
H = 0.33m
45 45 10

10.50
50
160
16

25
160

5
M8 80

40
110

40
40 40 75

65

75
0

70

130
35 35

25
5
100 5 5 65

5
10 10 10

60
10 10

370
15

h + 75 = 403

L 100x50x8
55
15

30 30 25 20 50

h = 328

80 x 10 mm
cm scales
45

skala cm
25

50
25 40

35

65
L 100x50x8
25 M8
biru
blue 9 30

40 10

40
20

L 100x60x8
25

5
putih

400
50

4
white 5 37.5 37.5 20

3
15

2
15

110

1
10
75
65

0 5

25
10 60
50
0
5

40

25
5 75
8
15 35
10 10 10

8
10 10

0 SKALA LITER S, B DETAIL MISTAR UKUR S, A


LITER SCALES DETAIL OF MEASURING SCALE
25

S, B

25
40 10

50

0 100 200 300 400 500 mm


S, A = 1:5
0 50 100 150 200 mm
S, A = 1:2

STANDAR PERENCANAAN IRIGASI STANDAR ALAT UKUR SKALA CM DAN LITER UNTUK PINTU UKUR ROMIJN (B) 709
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
10

15
III

50
8
L 100 x 50 x 8
L
L 100 x 50 x 8

7 78 78 7
IV PL 10 x 180 x 105

66
10
L 100 x 50 x 8 L 100 x 50 x 8

L. 100 x 50 x 8

100
L. 100 x 50 x 8
L 100 x 50 x 8
900

L 100 x 50 x 8

50
8

105
108 100

15
50 x 6
30
B - 120 100 60 M 12

7
100

30
L 100 x 50 x 8 L 100 x 50 x 8

40
plat = 6 mm L 100 x 50 x 8 50 50
untuk B 1000 - 1250

hl max + F +150

100
plate = 6 mm

105
for B 1000 - 1250

45
60 60 60
plat = 6 mm
untuk B - 1500

20
I I

hl max + 0,5 F
plate = 6 mm
for B - 1500

6
L 100 x 50 x 8
hl max + F + 50

DETAIL - III S,B

30
100
R

R
L 100 x 50 x 8

6
45 B - 10 45
R 0,33R

10
B + 80
R = 0,375 hl max
L 100 x 50 x 8

L 100 x 50 x 8
PINTU S,A
55 45

II GATE 50 10 50

100
100 B 100
400 to 1000
L L paku keling s.k.s
rivet c.t.c 200

L 100 x 50 x 8
KERANGKA S,A
FRAME

L 100 x 50 x 8
ulir Tr. 36 ulir Tr. 36
thread Tr. 36 x 6 thread Tr. 36

L 100 x 50 x 8
27.5 27.5

50
415
50

20 50 30
14

14
L. 100 x 50 x 8
L 100 x 50 x 8
L. 60 x 60 x 8

100
anker s.k.s
400
anchor c.t.c
46

46
40
10

100
8

92
paku keling atau baut s.k.s
40

200 L. 100 x 50 x 8
rivet or bolt c.t.c 55 5 40
52

DETAIL - II S,B

10 8
8

15 40 40

14 8 70 70 8
26 8 14
0 200 400 600 800 1000 mm
2 6
S,A 1 : 10
POTONGAN I - I S,B DETAIL - IV S,B 0 50 100 150 200 mm

SECTION S,B 1 : 2

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PINTU UKUR CRUMP DE GRUYTER 710
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

A 30 810 7 50 10 50 7 hl

0.28

30

40
h + 16 30 0.27
100

20 hl

105
h + 40 18
20 0.26

45
POTONGAN 0.25

20
B - B S,A 0.24
20

1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0 0.23
0.23
SECTION 0.23
0.22
0.21
0.20 0.22
0.19
0.18
0.17
0.16
0.15
I 0.21

0.20
0.14
0.13

c 0.12
c 0.19
W

0.11
0.10
0.18
dt 0.09
0 l/
45 l/dt 0.08
0
40 l/dt
350 dt
0.07
POTONGAN 0.17
300
l/
250 l/d t
t
0.06
0.05 C - C S,A
200
l/d
150 l/d
t
0.04
0.03
SECTION 0.16
t 0.15
100 l/d 0.02
0.01
0.00 4mm 30 t
L 100 x 50 x 8 /d 0.14
0l

bukaan pintu dalam m


1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 M 10 90

gate opening in m
dt 0.13
l/
60

0
c c M 12
80
/d
t 0.12

3 32 5 8
II 0l

3 7 3
70 0.11
dt
878

M8
20 0 l/
mistar 60 0.10
ruler 2 10 1 t
baja stainless /d
0l 0.09
0.00
stainless steel 3 10 3 5 50
perunggu t 0.08
bronze 0 l/d
40
0.07
DETAIL I S,B
510 - W

t
W + 18

l/d 0.06
300
0.05
1.5 mistar
l / dt
ruler 200 0.04

15
0.03
l / dt
100

30
0.02

10
0.01

10
30

M 12 M 10 0.00

20
2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.6 0.40 0.20 0.00
III
4mm
3 7 33 5 15
kedalaman air diatas ambang dalam m
waterdepth above sill in m

DETAIL II S,B
200

30 var
LEMBAR PINTU
tergantung pada hl 25 30 20 15 1.50m S,B
dependent on hl GATE SIDTH
20

10
15
12

0 50 100 150 200mm

S,B 1 : 2

A 0 20 40 60 80 100mm

S,B 1 : 1
DENAH POTONGAN A - A S,A DETAIL III S,B
PLAN SECTION

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PAPAN DUGA ; PINTU UKUR CRUMP - DE GRUYTER 711
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

0.24 0.24
0.24 0.24
0.23 0.23
0.23 0.23
0.22 0.22
0.22 0.22
0.21 0.21
0.21 0.21
0.20 0.20
0.20 0.20
0.19 0.19
0.19 0.19
0.18 0.18
0.18 0.18
0.17 0.17
0.17 0.17
0.16 0.16
0.16 0.16
0.15 0.15
0.15 0.15
0.14 0.14
0.14 0.14
0.13 0.13
0.13 0.13

bukan pintu dalam m / gate openingin m

bukan pintu dalam m / gate openingin m


0.12 0.12

bukan pintu dalam m / gate openingin m

bukan pintu dalam m / gate openingin m


0.12 0.12
dt
0 l/ 0.11 0.11
0.11 0.11 35

l/dt dt
0.10 0.10
0.10 450 0.10 0 l/
30
l/dt 0.09 l/dt 0.09
0.09 400 0.09 l/dt 200
l/dt 250
450 t 0.08 l/ dt 0.08
0.08 l/d 0.08 175
l/dt 350
400 l/dt
200 0.07 l/dt 0.07
l/ dt 0.07 l/dt 0.07 150
350 300
t 0 l/
dt l/dt 0.06 l/dt
0.06
30 0 l/d 0.06 25 0.06 150 125
l/dt 0.05 0.05
l/dt 125 t
250 0.05 l/dt 0.05 100 l/d
200 l/dt
l/dt 100 0.04 0.04
200 0.04 0.04
l/dt 5 l/d
t 75 l/dt
150 7
l/dt 0.03 0.03
150 0.03 0.03 d t
t 50 l/ 50 l/dt l/dt
l/dt l/d 100 l/dt l/dt 25
100 50 50 0.02 0.02
0.02 0.02
0.01 0.01
0.01 0.01
0.00 0.00
0.00 0.00
1.60 1.40 1.20 1.00 0.80 0.6 0.40 0.20 0.00 1.60 1.40 1.20 1.00 0.80 0.6 0.40 0.20 0.00
1.80 1.60 1.40 1.20 1.00 0.80 0.6 0.40 0.20 0.00 1.80 1.60 1.40 1.20 1.00 0.80 0.6 0.40 0.20 0.00

kedalaman air diatas ambang dalam m kedalaman air diatas ambang dalam m
kedalaman air diatas ambang dalam m kedalaman air diatas ambang dalam m
waterdepth above sill in m waterdepth above sill in m
waterdepth above sill in m waterdepth above sill in m

LEMBAR PINTU LEMBAR PINTU LEMBAR PINTU LEMBAR PINTU


1.25m 1.00m 0.75m 0.50m
GATE SIDTH GATE SIDTH GATE SIDTH GATE SIDTH

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PAPAN DUGA ; PINTU UKUR CRUMP - DE GRUYTER 712
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
660 / 2 L 560 / 2

40 x 6
30 1 /2 L = 300 1 /2 L = 250

10
30

dimensions pin

dimensions
ukuran pen
75 25 6 100 148 128 100

ukuran

125
18
12 28 3.3 7

12 16 411 18
20

20

27

27
8
7 50 66 50 7 8 10

12 16 4
30 70

32
36

55

36

130

130
145

83

83
5

30
40 40

40
52
55

15

15
105

105
L 100 x 50 x 8 2 x L 100 x 50 x 8

20

20
45
6

62

62
47

47
55
20

20
8 150 8
30 30
untuk B > 500 mm untuk B > 500 mm
L 100 x 50 x 8 L 100 x 50 x 8 for B > 500 mm for B > 500 mm
6

8 10
40

L
5 20

41 98 41

12
5

180
30

L 100 x 50 x 8
L 100 x 50 x 8

32

150
80

12

16
5 55

DETAIL - IV S,A

32
L 100 x 50 x 8
L 100 x 50 x 8

12 20
5 100
100 baut
M16
bolt s
M 16 L 100 x 50 x 8
50

L
8 13 10 13 8

37
7 31
50

nipel pelumas
greasing niplle

73
50

L 100 x 50 x 8 L 100 x 50 x 8

150
L

18

4
50 13 10 13 50 36
33

73
29.5
paku keling s k s 200
rivet or bolt c t c 200

90 90
180 catatan

32
5 20 20 L 100 x 50 x 8
note
60

mur perunggu mutu baja


L 100 x 50 x 8

steel qualities
38.2
bronze nut

20
110

baja untuk stang Bj. 50


20 50 30

20
60
steel for spindle Bj. 50
20 19.8
55

L 100 x 50 x 8 L 100 x 50 x 8

20
baja baja lain Bj. 37
alll other steel Bj. 37
31
33 ulir tr 36 X 36
M 16 20 70 70 20
45

100 36.5 thread tr 36 X 36 0 50 100 150 200mm


180 S,A = 1 : 2

S,B 0 20 40 60 80 100mm

DETAIL - V S,A DETAIL - VI S,B S,B = 1 : 1

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PENGANGKAT STANG TUNGGAL 713
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

25 mm 25 mm

CC
LL CL
saluran jalan
canal road
0.50

47 mm
CL tanggul

0.65 0.35
dyke
1 : 20 0.50 nomor hektometer
hektometer number

0.35
jalan

0.65
sungai road
river

LOKASI PATOK KEKTOMETER PADA SALURAN S,A


HECTOMETER POST LOCATION ON CANALS LOKASI PATOK HEKTOMETER PADA TANGGUL S,A
HECTOMETER POST LO0CATION ON DYKES

50 mm
singkatan nama saluran
abbreviated canal name

100 mm
A di cat warna kuning
yellow paint
0.02

0.05 0.10 0.15

di cat warna biru


angka pertama angka kedua angka ketiga
0.08

angka - di cat hitam blue paint 25 mm 25 mm


134 figure - black paint 27 first figure second figure third figure

100 mm
BG huruf di cat kuning
PA TAMPAK
0.35

letters yellow paint batas cat biru


C -C
45 mm 45 mm VIEW limit blue paint

47 mm
DETAIL HURUF UNTUK PATOK Hm <= Hm 99
LETTERING DETAIL FOR Hm POST <= Hm 99
nomor hektometer
hektometer number CATATAN : S,C
CL - patok hektometer dipasang pada tiap 100 m sepanjang saluran dan tanggul
lokasi patok hektometer lihat pada gambar trace saluran dan tanggul.
DETAIL PENGECETAN - untuk hm 1 s/d 99 99 km, ukuran patok 0.1 x 0.1 x 1.00 m.
DETAIL OF PAINTING - untuk hm 100 (10 km) atau lebih besar, ukuran patok 0.15 x 0.10 x 1.00 m.
- patok hm tersebut dari beton bertulang pre - cast k-175seperti yang terlihat
1.00

pada gambar ini.


- huruf harus helvetica medium, ukuran tinggi 5 cm, dibentuk oleh tarikkan
B B terlihat pada gambar.
- takikan nomor diisi dengan cat.

C singkatan nama saluran


abbreviated canal name

50 mm
NOTES :
- hectometer posts to be installed every 100 m along all canals and dykes.
5m - hectometer posts number and chainage to be indicated on plan.
m

100 mm
- hectoneter number and location o be indicated on canal and dyke
CL alignment drawings.
- hectometer posts to be made of precast reinforced concrete k -175 as
m
8m

shown in this drawing.


0.02

- lettering to be helvetica medium format 5 cm high, formed by templete and


grooved as shown on this draing.
takikan angka (isi dengan cat hitam) - letter grooves to be paint filled.
figure groove (fill with black paint) 25 mm 25 mm

POTONGAN A
A-A
SECTION
DETAIL UNTUK PATOK Hm >= Hm 100
S,C
PATOK HEKTOMETER takikan huruf (isi dengan cat kuning) LETTERING DETAIL FOR Hm POST >= Hm 100
S,B TAMPAK C - C
HEKTOMETER POST letter groove (fill with yellow paint)
VIEW C-C 0 2,0 4,0 6,0 8,0 10,0 m
0.02 S,A = 1 : 100
8 mm

5 mm 0 0,1 0,2 0,3 0,4 0,5 m


Stirrups
S,B = 1 : 5
0.15

0.02 m

0 20 40 60 80 100 mm
DETAIL PERMUKAAN PATOK Hm S,C S,C = 1 : 1
0.15 DETAIL OF Hm POST FACE

POTONGAN
B-B
SECTION C

STANDAR PERENCANAAN IRIGASI STANDAR ALAT PENGATUR PATOK HEKTOMETER 714


D I R E K TO R A T JENDERAL SUMBER DAYA AIR

marmer 12 x 12
marble 12 x 12 bout
bolt

marmer 12 x 12
1M marble 12 x 12

0.20

0.15
0.10
NO.

0.10 0.10 0.10 0.10 0.15 0.10


0.10 0.20 0.10

pen kuningan level


brass level control pin

0.01

0.01
0.20

0.20
0.20

tanah asli tanah asli tanah asli


ground level ground level ground level
1.00

0.65
0.65
0.65

beton 1:2:3
concrete 1:2:3

0.10

0.10
0.15

0.30 0.35

pasir tanah keras


sand (compacted) original ground
0.20

TANDA AZIMUT BETON


CONCRETE AZIMUTH MARK
0.40

TITIK TETAP BETON


0 10 20 30 40 50 cm
CONCRETE BENCHMARK S=1:5

STANDAR PERENCANAAN IRIGASI STANDAR TITIK TETAP BETON TITIK TETAP DAN TANDA AZIMUTH 715
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
permukaan tembok sayap Ds P P Campuran beton k - 175
alternatif untuk tanda
slop protection face concrete class k - 175 TANDA DATA / SIGN DATA
rencana saluran kedalaman ruangan huruf pra cetak
panjang panjang tembok dalam tebal
canal design sampai nama tinggi yang tersedia ____________________
TANDA sayap
(nama standar)
lekukan pelat
dasar nama standard (L) huruf option for precast
SIGN kapasitas jagaan depth to letter spaces depth of slab
tidak diskala length of length of slope lettering depth sign
capacity freeboard bottom of standard protection (L) height available identa
not to scale (Ds) DPc W T
(min) sign (A) (G) (standar sign) tion (P)
satuan kira kira
ALTERNATIF I - COR DITEMPAT S,B unit m /dt. m m m m cm approx no cm cm cm cm mm

ALTERNATIVE I - CAST IN PLACE TYPE - 1 15 0,80 0,48 3,05 3,45 15 16 1,5 14 15 15 10

TYPE - 2 1 - 15 0,60 0,38 2,30 2,55 10 17 1,0 9 10 10 6

adukan DPc TYPE - 3 1 0,40 0,26 1,40 1,60 6 17 0,6 9 10 10 6


permukaan tembok sayap P P DPc las anyaman kawat
mortar w
slope protetion face 2 welded wire mesh

cat warna biru


tidak diskala blue paint
not to scale G
0.75
1.15 1.15
0.124
ALTERNATIF II - TANDA PRECAST S,B

0.15
ALTERNATIVE II - PRECAST SIGN

0.24
5
SAL. SEK.BUNGGU

0.22

0.15
0 .3
24
L

0.31

0.15
0.7
5
CL saluran 0.15 0.25

LUAS 6.587 HA
canal

R0.15

0.15
A tanda / sign

0.263

0.244

0.22
R0

0.15
tembok bangunan tembok sayap .1
2 88
1 structure wall slope protection
tanda 0.225
sign cat warna putih huruf dilekukan - lihat tabel huruf - tinta hitam
0.413
white paint letters indented - see table letters - black paint
0.60 0.563
S,A
0.25
CATATAN
0.10 NOTES
NAMA SALURAN TIPE ALIRAN RENCANA
POTONGAN TAMPAK SAMPING
CANAL SIGN TYPE
1 DESIGN DISCHARGE >15 m /dt Nama saluran dipasang pada permulaan tiap saluran
induk dan saluran sekunder
S,B S,B 1.
SECTION SIDE VIEW Canal sign to be installed at start of each primary
and secondary canal
G
0.50 0.90 0.90 Nama saluran boleh dibuat ditempat atau precast
0.
22
2. dan dipasang di tempat
Canal sign may be cast in place or precast and

0.10 0.10 0.10 0.10 0.10


mortared in to place

0.16
0.5 L
0 saluran Tipe nama dan datadiperlihatkan pada gambar
CL

A
canal
0.10

tanda / sign
0.15
R0
.1
5
SAL. SEK. LANGGON 3. yang bersangkutan
Sign type and data to be shown on relevant

0.20
drawing

0
R0.1
Data harus dicek oleh direksi sebelum dicetak
4.
1,5 tembok bangunan tembok sayap
LUAS 2.617 HA Data to be confirmed by engineer before

0.16
tanda

0.15
1 structure wall slope protection fabrication

12
sign
5. Semua huruf harus "Helvetica Medium"

0.
R
0.15 All lettering must be "Helvetica Medium"
S,A
0.60

Nama bisa diperpendek jika memungkinkan


0.275 6. tetapi posisi semua huruf harus simetris
0.30
0.375 Sign may be shorted if lettering allows but
0.10 all lettering must be centered

POTONGAN TAMPAK SAMPING NAMA SALURAN TIPE ALIRAN RENCANA


SECTION
S,B
SIDE VIEW
S,B
CANAL SIGN TYPE
2 DESIGN DISCHARGE >1m /dt - 15 m /dt

G
0.30 0.56 0.56
0.05
0.

saluran
07

0.06 0.06 0.06


CL L

0.09 0.12 0.09


canal
R0.

0.06 0.06
0.

0.05 0.15 09
SAL. SEK. TAWANGA
30

6
.0
tanda / sign R0
0.20

LUAS 337 HA
0.11

0.10

tembok bangunan tembok sayap


1
1 structure wall slope protection
tanda R0.08 S,A
sign 0.09
0.60

0.165
0.225
0.10 2,0
0 4,0 6,0 8,0 10,0 m
0.30
S , A = 1 : 100
TAMPAK SAMPING NAMA SALURAN TIPE ALIRAN RENCANA
POTONGAN S,B 3 <1m /dt 0 2,0 3,0 4,0 5,0 m

S,B SIDE VIEW CANAL SIGN TYPE DESIGN DISCHARGE S , B = 1 : 50

SECTION

STANDAR PERENCANAAN IRIGASI STANDAR ALAT PENGATUR PAPAN NAMA UNTUK SALURAN 716
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
B 0.60 0.20
B 0.50 0.60 0.01
p p p L p dengan anker r r r
r with anchor
0.21 L 70x70x9 dengan anker
0.21 B 0.21 B B 0.21 with anchor

t
t
0.40
0.40

0.62

0.03
0.03
0.20
0.03

0.62

0.03
sendi 100x30

h < 1.60
elastomeer sendi 100x30
elastomeer

0.20 0.20
0.30-0.40
min. 0.30

0.20 0.20
0.30-0.40

h > 1.60
q q q q q

S, A

hd=0.60

0.30
0.15 0.15
max. 0.40

max. 0.40
0.15 0.15

0.30
0.15 0.15
A

A
p B p p B B p

0.55 0.50 0.55 0.30 0.40 0.30

hd=0.80
min. 0.30
hc

h < 1.60

0.30
0.30
0.30-0.40
0.30-0.40

untuk
B < 2.50 r = 0.21
for
untuk 0.70 0.60 0.70 0.30 0.40 0.30
B > 2.50 r = 0.26
q q q q q for POTONGAN A-A
S, B S, B
SECTION A-A
untuk
A > 0.40
tanpa plat peralihan PERLETAKAN / KEPALA JEMBATAN
for no transition slab PERLETAKAN BETON CONCRETE PIER / ABUTMNET
untuk plat peralihan harus ada
for
A < 0.40
transition slab required
CONCRETE ABUTMENT
S, B
0.30 0.30 A
min. 0.15

0.03
t
p B p

0.20
tinggi puncak dasar
height top bottom 0.01
h p q r
h

dalam m dalam m dalam m r r


in in in
0.30

0.80 0.30 0.35

t
sendi

h
0.90 0.30 0.40 0.20 0.50 B (max. 5.00 m) 100x30
elastomeer

0.03
1.00 0.30 0.45 sengkang

0.20
q B q r stirrup
1.10 0.30 0.50 sengkang
TIPE untuk B < 0.50 stirrup
I 1.20 0.30 0.50
TYPE for sengkang
1.30 0.30 0.55
t
min. 0.15

stirrup
0.30 0.30 1.40 0.40 0.60
p B p 1.50 0.40 0.65 0.03

h
0.22

1.60 0.40 0.70


1.70 0.45 0.70
S, A
1.80 0.50 0.80
1.90 0.50 0.80
h

hd
h

2.00 0.50 0.85 plat peralihan


2.10 0.55 0.90
0.30-0.40

transition slab

0.50

0.30
2.20 0.60 0.95
0.30-0.40

2.30 0.60 1.00


2.40 0.60 1.00 0.30 1.72 0.30
0.30 q 0.30
2.50 0.60 1.10
q B q
2.60 0.70 1.10 A S, B

hd
TIPE untuk 2.70 0.70 1.20
TAMPAK PONDASI JEMBATAN ORANG

0.50
II B > 0.50 2.80 0.70 1.20
TYPE for
2.90 0.75 1.25 VIEW FOODBRIDGE FOUNDATION
3.00 0.80 1.30
0.30 q 0.30 untuk : B < 2.50m r = 0.21 m
hd
a

for
DIMENSI DINDING PASANGAN
0.50

B > 2.50m r = 0.26 m


KEPALA JEMBATAN / PERLETAKAN PASANGAN BATU
DIMENSIONS OF MASONRY WALLS
0.30-0.40

h < 1.60m hd = 0.60 m


hc

STONE MASONRY ABUTMENT / PIER


0.30-0.40

h > 1.60m hd = 0.80 m


0.30 q 0.30 S, B

q q
PERLETAKAN PASANGAN BATU
B
STONE MASONRY ABUTMENT
GORONG-GORONG
CULVERT h = hc + 1/12a S, B

STANDAR PERENCANAAN IRIGASI STANDAR PERLETAKAN PERLETAKAN UNTUK GORONG 2 DAN JEMBATAN 717
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
C

pipa G.I
G.I pipe

B a B
sengkang

e
dengann angker stirrup

d
L . 70 x 70 x 9
with anchors
b
x x
c
A a A
dengann angker
L . 70 x 70 x 9
d

e
with anchors

b
x x

c
TAMPAK ATAS PLAT JEMBATAN S,A C
TOP VIEW BRIDGE SLAB
a d

sengkang c b e b,c c
stirrup

0,
POTONGAN
15 B-B S,A
SECTION
pipa G.I
G.I pipe

TAMPAK ATAS PLAT JEMBATAN S,A ukuran dalam m


TOP VIEW BRIDGE SLAB dimension in m

0,10
0,35 0,15 sengkang
stirrup B a,b,c d,e x t

0,10
1,00 0,31 0,14
pipa G.I
G.I pipe
1,50 0,39 0,15
0,15
1,00

2,00 0,27 0,17

0,40
sengkang 2,50 0,56 0,19
x a d x stirrup

0,90
3,50 0,68 0,20
pipa G.I
G.I pipe 3,50 0,75 0,21
b
4,00 0,82 0,23
0,60

0,40
0,03 0,03
c e sengkang 4,50 0,90 0,25
B
stirrup
sendi 100 x 30 sendi 100 x 30 5,00 0,98 0,27
bearing bearing beton kelas K.175
concrete class K.175 5,50 1,03 0,31
a

0,10

0,10
POTONGAN 0,25 0,10
A - A S,A baja tulangan U 22
6,00 1,12 0,34
SECTION DETAIL TEMBOK SAYAP S,A reinforcement steel U 22 UKURAN DAN PENULANGAN PLAT JEMBATAN
d
e DIMENSION AND REINFORCEMENT OF BRIDGE SLAB
DETAIL WING WALL

t
1,72 selimut beton 0,03m
0,15 0,50 1,50 1,50 0,50 c concrete cover 0,03m
b
0,15 0,15 diameter tulangan
0,10

ukuran dalam m ( mm )
diametre reinforcement
0,10
dimension in m
DETAIL TIANG SANDARAN S,A
0,40

B x t
a,b,c d,e 0,40 DETAIL RAILING
1,00 0,31 0,16 jarak batang
( cm )
0,90

1,50 0,39 0,18


sengkang sengkang bar distance
stirrup stirrup
0,40

d a
0,40

2,00 0,47 0,20


0,03

t + 0,03
2,50 0,56 0,21
d a
0,10

3,50 0,68 0,24 0 50 100 150 200 cm . S,A = 1:10


0,20

e b
3,50 0,75 0,26
0,10t

c
4,00 0,82 0,28
e c
b 0 20 40 60 80 100 cm . S,A = 1:20
4,50 0,90 0,31
perletakan sendi
4,00
neopreen bearing
5,00 0,98 0,34 100 x 30
POTONGAN MELINTANG PELAT JEMBATAN S,B
CROSS SECTION BRIDGE SLAB
POTONGAN
C-C S,B
SECTION

0,50 1,50 1,50


STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PELAT BETON BERTULANG UNTUK JEMBATAN 718
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
y + 0.15
bahan pengisi
0.01
0.15 y + 0.15 jointfiller

0.04
b b a d

0.10

t
c B a,b,c d,e x y t

0.02
e

0.20
0.03
1.00 0.31 0.60 0.17
0.10 0.10 x x
B < 1.00
x - 0.15 x - 0.15 1.50 0.39 0.80 0.20

2.00 0.47 0.80 0.22

2.50 0.56 0.80 0.24

UKURAN DAN TULANGAN PLAT BETON


> 0.30 YANG DIPAKAI DI JALAN
DIMENSIONS AND REINFORCEMENT
OF CONCRETE SLABS IN ROADS
a
d e
b
b

0.15
B a,b,c d,e x y t
c
1.00 0.25 0.60 0.14

1.50 0.33 0.60 0.15


1.00 < B < 2.00 y + 0.15
0.10 0.10 2.00 0.41 0.60 0.17
y + 0.15 bahan pengisi
jointfiller

0.03
a b
2.50 0.50 0.80 0.19
d

0.50
UKURAN DAN TULANGAN PLAT BETON

t
YANG TIDAK DIPAKAI DI JALAN

0.05
b e c

0.03
adukan 1:3
DIMENSIONS AND REINFORCEMENT
x
mortar
x - 0.15 x - 0.15 OF CONCRETE SLABS NOT USED IN ROADS

> 0.30 < 0.40


UKURAN TULANGAN
1.00

a
d e
DIMENSIONS OF REINFORCEMENT
b
b

c
PLAT PELAYANAN klas beton K 175
OPERATION DECK concrete class
baja tulangan U 22
reinforcement steel
bahan pengisi
jointfiller
lapis beton min. 0.03
bahan pengisi concrete cover
d a b jointfiller
a b d

DATA RENCANA

t
c e
0.05
e c
DESIGN DATA
0.20

x x x x
min. 0.10

2.00
0.15 0.15

0.15 > 0.40 0.15

0 50 100 150 200 cm S=1:2


1.00

PLAT PERALIHAN
TRANSITION SLAB GORONG-GORONG PASANGAN BATU
STONE MASONRY CULVERTS

STANDAR PERENCANAAN IRIGASI STANDAR PELAT BETON BETON BERTULANG UNTUK GORONG =2 DAN PELAT 719
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
JEMBATAN JALAN SETAPAK
FARM ROAD BRIDGE

105.50
0,15 1,50 - 2,50 0,15

EL.3

t1
0,50 0,50

EL.2 road/jalan EL.3

w=0,30min
0,5 w EL.2
EL.1
bentang bentang tebal pelat tulangan tulangan

0,25
1 bersih pelat rencana pokok pembagi

0,40
1

h
slab design span main distribution
clear span(B) span(L) thickness (t1) reinforcement reinforcement
EL.1

t
(m) (m) (m)
0,30 0,30 b 0,50 0,70 0,125

POTONGAN A - A S,A
0,60 0,80 0,125

SECTION POTONGAN C - C S,A 0,70 0,90 0,125


SECTION 0,80 1,00 0,125

0,90 1,10 0,125


C B 1,00 1,20 0,150

1,10 1,30 0,150


tulang pokok
main reinforcement 1,20 1,40 0,150

tulang pembagi 1,30 1,50 0,150


distribution reinforcement
1,40 1,60 0,150
1:1

1:1
A A 1,50 1,70 0,175

EL.1 1,60 1,80 0,175

1,70 1,90 0,175

3 mm timah 1,80 2,00 0,175


1:1

1:1

lead
EL.3 1,90 2,10 0,175
0,10 B 0,10 2,00 2,20 0,200

TABEL DETAIL-DETAIL JEMBATAN


TULANGAN S,B
TABLE OF BRIDGE DETAILS
C B REINFORCEMENT
DENAH S,A
PLAN CATATAN
NOTES
0,15 L 0,15
diameter dalam mm
diameter in mm
104.47

EL.3
saluran bangunan jarak dalam mm
t1

canal structure elevasi distance in mm


elevation
0,10

1 1 petak tersier dimensi (m) dimensi (m)


EL.2 tertiary unit kode dimension (m) dimension (m)
4 4 code
1 h b B L t1 t2 EL 1 EL 2 EL 3
h

1
EL.1
0,25

0,40

b
0,20 0,20
t2
POTONGAN B - B S,A
SECTION

DAFTAR DIMENSI BANGUNAN


STRUCTURE DIMENSIONS 0 50 100 150 200 cm
S, A = 1 : 20
0 20 40 60 80 100 cm
S, B = 1 : 10

STANDAR PERENCANAAN IRIGASI STANDAR JEMBATAN JEMBATAN JALAN PETANI 720


D I R E K TO R A T JENDERAL SUMBER DAYA AIR

159.99

0,06
sengkang
(B)
stirrup

(t1)
(t1)
(A)

(t)
(D)

(A)
(B)
(t)

(t1) (A)
(t1)

sengkang ( B )

H
0,06
stirrup
159.99

DETAIL PIPA BERTULANG


DETAIL REINFORCED PIPE

1009.01

(B) (S)
(ts)

(ts)

(Ls)
UKURAN UNTUK STANDAR PIPA BETON
DIMENSIONS FOR STANDARD CONCRETE PIPES
tulangan
reinforcement
D W H t t1 ts Ls Ds Dp S B A B
(m) (m) (m) (m) (m) (m) (m) (m) (m) (m) (m)
( Dp )
( Ds )
( Dp )

( Ds )

(D)
(D)

0,50 1,00 0,30 0,055 - 0,04 0,07 0,645 0,630 0,12 0,06
0,60 1,20 0,30 0,065 - 0,04 0,07 0,765 0,750 0,12 0,06
0,70 1,30 0,30 0,085 0,025
0,80 1,40 0,35 0,10 0,03
(t)

1,00 1,80 0,45 0,11 0,03


1,25 2,00 0,60 0,12 0,03

dalam mm dalam mm
in mm in mm
(ts)

(ts)

cincin sekat atau sekat bitumen dalam cm jumlah batang


rubber sealing or bituminized rope in cm no of bars

DETAIL PIPA BETON TANPA TULANGAN


DETAIL UNREINFORCEMENT PIPE 0 20 40 60 80 100 cm
S, 1 : 10

STANDAR PERENCANAAN IRIGASI STANDAR PIPA BETON PIPA BETON BERTULANG DAN TANPA TULANGAN 721
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
B
b

4.05 A 30/30

30/150
0.75 3.30
0.124

0.10
BENDUNG.SUTAMI
ram kawat

0.20

0.40
wire mesh
25
0 .2

H
h
0.10
0.75

MENGAIRI : 14527 HA
1.00

0.20

0.20
R0
0.488

.15
ram kawat

0.10
0.263

0.244
wire mesh 25/200

0.
88
DIDIRIKAN. 1-4-1971

0.40
0.20
30/30

0.09
0.225 30/50
0.413 huruf dilekukan lihat tabel
letters indented see table
0.563

cat warna biru cat warna kuning cat warna putih huruf - cat hitam

1100
blue paint yellow paint white paint letters black paint 60/100 60/100 60/100

1200
POTONGAN 850

200
50
B-B S,B
40 SECTION
25 10
150

100
100
tinggi tanggul tempat untuk mistar ukur

95 bank level place for FSL - plate

150
CATATAN
A

300
NOTES B B

150
pelat nama untuk bendung dipasang pada sayap tegak 90 tube plastik
plastic tube
300 300 300

x x 250
1
bendung kiri & kanan diatas M.A.N
TAMPAK DEPAN PAPAN EKSPLOITASI S,B POTONGAN A-A S,B
name plate for the weir is installed at the left & right
SECTION
abutments above N.W.L

semua huruf harus "HELVETICA MEDIUM"


85 tinggi dasar saluran
FRONT VIEW EXPLOTATION BOARD
2
all lettering must be "HELVETICA MEDIUM" bed level
PEMASANGAN MISTAR UKUR PADA PILAR BETON
nama bisa diperpendek jika memungkinkan tetapi 80 FASTENING WATER LEVEL GAUGE TO CONCRETE POLE
KETERANGAN
posisi semua huruf harus simetris

500
3 REMARK
1 nama papan
sign may be shortened if lettering allows but
all lettering must be centered C C 2 eksploitasi
ukuran
size
name of
H h B b
3 exploitation board
biru
4
blue tersier

40
20

150
tertiary 1000 800 1200 1000
5
primer/sekunder
550 1200 1000 1200 1000
150 primary/secondary
bendung
TAMPAK SAMPING PILAR BETON
15 weir 1200 1000 1200 1000
mistar ukur
1 = water level gauge
putih SIDE VIEW CONCRETE POLE plat karet
white 500 (S,B) 2 = untuk tiang dan papan dibuat dari kayu kelas I
rubber slab
poles and boards are made of wood of good quality
baut panjang
10 10
3 = bolt

klamp
4 = clamp
long
200 mm
cat untuk tiang dan papan adalah hitam dan cat untuk huruf adalah putih
paint for the poles and board is black and for letters white
10
tube plastik
0 200 400 600 800 1000 mm
S,B 1 : 10 5 10 5 = plastic tube jika dipandang perlu papan eksploitasi dapat diberi
600

24 20 tambahan pintu dengan ram kawat, bukaan samping


10
if considered necessary, the exploitation board can
0 100 200 300 400 500 mm 10 5 5 be provided with and additional gate of wire mesh
S,A 1 : 5 10 13 8 17 with side opening
10
0 50 100 150 200 mm 120 20 15 20 semua ukuran dalam mm
S,C1 : 2 all dimension in mm
17
MISTAR UKUR (S,C) POTONGAN KLAMP
C-C S,B S,C
ENAMEL WATER LEVEL GAGE SECTION CLAMP

STANDAR PERENCANAAN IRIGASI STANDAR ALAT PENGATUR PELAT NAMA UNTUK BENDUNG / PAPAN DUGA 722
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
TANGGA CUCI PADA SALURAN IRIGASI
D
WASHING STEPS IN IRRIGATION CANAL
CL
CL

1:1,5/1:2 1:1,5 1:1,5


0,50

0,50
A A B B

0,50
C C
2,00

2,00
1,00
1,00

SATU TANGGA

2,00
1,00
CL
1:1,5/1:2 SINGLE STEP
0,50

0,50

0,50 0,50
0,30 varies 0,35 tanggul saluran
tanggul saluran canal bank
canal bank
DUA TANGGA

2,00
1,00
CL
varies varies varies DOUBLE STEP

0,50
DENAH DENAH SATU DAN DUA TANGGA
PLAN PLAN 1:1 1:1 SINGLE AND DOUBLE STEP

SATU TANGGA SATU TANGGA D


SINGLE STEP SINGLE STEP
CL CL DENAH
PLAN 0,50 1,00 0,50 0,50 1,00 0,50
0,45 0,45
0,30 0,45 0,45 D min 1,50 0.21 0.30 0,20 0,20 0.30 0.21
0.30 0.30
1:1,5/1:2 1:1,5/1:2 1:1,5/1:2

0,30 0,30
1 1

0,30 0,30
0,30 0.30
1 1

0,50 0,30 0,30


0,50

0,50
A A

0
0,3
1 1

0,50
1,00

1,00
var

1,5 1,5

D
4,00

4,00
1,00

1:1,5/1:2
B 1,00 B
POTONGAN C-C POTONGAN D-D
1,00

1,00
var

SECTION SECTION
0,50

0,50

0,30 varies
LEBAR DASAR 3.00 m TALUD 1:1
0,35
BEDWIDTH SIDE SLOPE
B 0,30 0,30
0,20 var 1,50 0,20
0.30
varies < 300 varies

DENAH DENAH
PLAN

0,30
PLAN 0,30

0,60

0,60
DUA TANGGA DUA TANGGA
DOUBLE STEP DOUBLE STEP
A A

0.30
0.50 0.50

1.00
CL POTONGAN A-A

2,00
CL
0,225 for 1:2

tanggul saluran
SECTION
for 1:1,5

0,45 0,45
canal bank 0,45 0,20 0,30 1.50 0,30 0,20

1.00
0,300,45 0,45 0,45 0,45 0,30 0,45
0,30 0,30

CL
0,225

1,5(2) 1,5
0,225

0,30 0,30

1 1 0,30
0

0.30 0,30
0

0,30

0,3
0,3

1,5 1,5
var

0,30 0.30
0,75

1 1 1
0,30

0,3
1,5(2)

0
0
0,35

0,3

0,30
POTONGAN POTONGAN

0,30
A-A SECTION B-B B 0,35 0,35
SECTION
LEBAR DASAR LEBAR DASAR 3.00 m TALUD POTONGAN B-B
3.00 m TALUD 1:1,5 / 1:2 1:1,5
SECTION
BEDWIDTH SIDE SLOPE BEDWIDTH SIDE SLOPE

STANDAR PERENCANAAN IRIGASI STANDAR LAIN - LAIN TANGGA CUCI 723


D I R E K TO R A T JENDERAL SUMBER DAYA AIR
B 1,50 1,50

1:4

1:4
0,40 0,40

1,50

1,50
1:3,50 1:3,50
1:4 1:4

1,5

1,5
1:1,5

1:1,5
1

1
A A A A
0,60

0,60
0,30

0,30

b + 3,00
0,60

0,60

b
2,00

2,00
D D

1:1,5
1:1,5
1

1
1,5

1,5
1:4

1:1,5
1:4
1:1,5

1:1,5

1:1,5

1:1,5
1
1

C C

5,00

5,00
B
B DENAH
S,D
PLAN

1
1

1:1,5

1:1,5
33,60

1:1,5
1:1,5
1,00

1,00

0,30
0,20

0,45
0,30
0,10
JALAN INSPEKSI
3,00

3,00
11,80 10,00 11,80
INSPECTION ROAD

POTONGAN
A - A S,D
1,00

1,00
SECTION

1:1,5
1:1,5

1:1,5

1:1,5

1
1

DENAH 1,00 1,00


0,50
S,A
PLAN

0,50
w
6,50 5,00 6,50 1,5 1,5 4
0,50 0,50 1 1 1

h
0

0,3
0,3

0,50
0
0,50
catatan b + 3,50
note POTONGAN
C - C S,A
0,80

0,80

untuk lantai dan tangga bisa dengan : POTONGAN SECTION


for floor and step can be used : B - B S,A
1,00 1,00
SECTION
POTONGAN 1 . pasangan batu
A - A S,A stone masonry
SECTION
2 . batu kosong
pipa galvanisir diisi dengan beton

0,30 0,50
riprap
0,20 0,20
galvanized piple filled with concrete

0,50
2,00 0,50
1,50 2,00 1,50 0,50
0,30

w
0,45 0,60 0,45
0,30
0,45

0,10 0,20
0
0,3
0,70 1,5
0,70

h
0,90
0,40

0,50
1

0,50
1,05
0,60

0,80

blok beton
0,30
0,30

0,60 1,00 concrete block

0,30
1,00

0,20
0,30 0,90 0,30

POTONGAN POTONGAN DETAI PATOK PENGARAH


B - B S,A D - D S,A POTONGAN
S,C
SECTION SECTION D - D S,B DETAIL GUIDING POLE
SECTION
0 5 10 15 20m

S,D 1:200

0 2,0 4,0 6,0 8,0 10,0m

S,A 1:100

0 1,0 2,0 3,0 4,0 5,0m


S,B 1:50
3,00

POTONGAN 0 50 100 150 200 cm

C - C S,A S,C 1:20


SECTION

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR PEMANDIAN KERBAU 724


D I R E K TO R A T JENDERAL SUMBER DAYA AIR

3. - bronjong yang berdekatan diikat satu sama lain oleh sisi vertikal dan
sisi sekat 1. - bronjong berupa anyaman kawat persegi, dibagi oleh sekat-sekat
harizontal yang terdekat sebelu bronjong diisi
side diapragm menjadi sel-sel.
ujung - ujung dan sekat tersebut dilipat ke posisi vertikal dan diikat - sisi atas dilipat / di tutup dan dikat ujung, sisi dan sekatnya setelah
end ujung bronjong di isi
satu sama lain dengan kawat untuk membentuk sel.
end - perlu di catat bahwa selama pelaksanaan akan lebih mudah untuk
- semua ujung jaring-jaring termasuk ujung dan panil sekat
diperkuat dengan kawat kerangka menempatkan bronjong yang berdekatan waktu masih kosong
- penempatan bronjong kosong harus diatur lebih dulu sebelum opreasi
tepi anyaman 1. - the gabion is a rectangular basket divided by diaphragms info cells. pengisian
selvedges - the ends, sides and diaphragms are lifted info a vertical position - permukaan batu yang rata ditempatkan dibagian luar bronjong yang
and loced together with wire to form the cells. kelihatan
sisi
side - all the edges of the mesh including those of the ends and diaphragm
3. - adjoining gabions are wired together by their adjoining vertical and
ponels are reinforced with perimeter wire ( selvedge wire ).
tutup horizontal edges before the gabions are filled.
lid - the top is folded shut and wired to the ends, sides and diaphrams after
the gabions are filled
- it should be noted that during construction it is easier to place adjocent
gabions togeher when they are emoty
tepi anyaman - the placing of empty gabions should be mode well in advance of the
selvedges filling operation.
2. - kawat pengikat harus dililitkan dalam satu ikatan menerus.
tutup - flat faced stones to be placed on the exposed face of the gabion.
- kawat dilewatkan melalui tiap jaring-jaring dan mengelilingi
lid
tiap ayaman, yang harus diikat satu sama lain, dengan dua kali
lilitan setiap dua jaring. lihat detail A. jaring bronjong
ujung 2. - the lacing wire should be placed in a continuous lacing operation. gabion mesh
end - the wire to be possed through each mesh around both selvedges
sekat which must be tightened together with two round turns after kawat pengikat ( lihat langkah 2 )
diapragm every second mesh see detail A. connecting wire ( see step 2 )
tepi anyaman
selvedge wire

tep[i sisi batu batu harus ditarik kuat


edges side stones stones to be tightened

adukan 1Pc : 4Ps DETAIL A


mortar 1Pc : 4Sand
ALTERNATIVE I ALTERNATIVE II
kawat pengikat isilah bronjong - bronjong dengan tangan, pastikan bahwa batu telah
DETAIL SIARAN connecting wires dipak erat - erat, dengan rongga yang sedikit mungkin
DETAIL POINTING fill the gabions by hand, marking sure that the stone is
fightly packed and has a minimum of voids.
DENAH

1m

3m 3m
1
PLAN isilah semua bilik luar dari bronjong - bronjong yang tingginya 1m dengan
sepertiganya dulu

1
fill aal the outside compartments of 1m high gabions only
B B batu belah dipasang bersama - sama pada adukan dengan
kawat kerangka
one - third full to begin with
jarak yang dekat dan belahannya disusun rapi di permukaan
selvedge wire kemudian ikatkan kawat penguat datar didalam bronjong persis diatas
siaran split riverstnes embedded in mortar closely tinggi batu di dalam bilik-bilik tersebut
pointing together with the split face smoothly arranged at the surface.
then fix horizontal bracing wires in the gabions directly above the level
batu belah kemudian dipasang pada adukan dengan of the stone in those compartments.
muka belahannya disusun rapi di permukaan
lalu isilah sampai 23 bagian, dan ikat lagi.
split riverstnes embedded in mortar with the split face
next fill to two - thirds, and repeat the bracing.
10-15cm smoothly arranged at the surface.
siaran permukaan (adukan 1Pc : 2Ps) lakhirnya isilah sampai penuh.
mortar pointing (mix. Pc : 2sand) min. 10mm finally fill to the top.
pelesteran ( adukan 1Pc: 3Ps )
min. 10mm
plaster surfacing ( mix 1Pc : 3sand )
min. 10mm

adukan 1Pc : 4Ps


mortar 1Pc : 4sand

batu-batu tanpa dipotong


uncut stones
POTONGAN
B-B
SECTION

DETAIL PENYELESAIAN PASANGAN BATUSECTION DETAIL KONTRUKSI BRONJONG


DETAILS FOR FINISHING OF MASONRY DETAILS FOR GABION CONSTRUCTION

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN UKUR DETAIL BRONJONG / PEKERJAAN PASANGAN 725
D I R E K TO R A T JENDERAL SUMBER DAYA AIR
10 besi beton
reinforc. steel
dilas
B A plat penutup 20 welded 20

6
6.40.22

50

50
closure plate 49 100

plat penutup 6x40x22

80

50

50

50
closure plate
dilas

50

50
welded

100
plat pengisi 10x20
filing plate L 60.60.6

besi beton

100

500
reinforc.steel

560
100
15
tempat rantai
A A hook for chain 6
plat tebal
baja L 60.60.6 6
dilas dilas
100

steel L plate thickness


welded welded

16
10

10
L 40.40.4

baja L
PEN PENGUNCI S,A
40.40.4 97.5694
steel L LOCKER PEN
dilas PELAT PINTU S,B
welded 150

GATE PLATE

550
50
plat penutup 6.40.22
40
closure plate
dilas titik
point welded

6
dilas titik
baja L dilas L 40.40.4 point welded
C steel L 40.40.4 C
dilas welded dilas
welded plat tebal 6
welded plate thickness
plat pengisi 10x20
B L 60.60.6 filing plate
150

anker
L 40.40.4
B anchor dilas
50
welded

TAMPAK DEPAN POTONGAN


SIDE VIEW
S,B B-B S,B DETAIL A S,A
SECTION

150
plat tebal
dilas plate thickness6
anker welded plat pengisi 10 x 20 60

anchor filing plate plat tebal 6 14 11 20 5 10 catatan :


plate thickness plat pengisi 10x20
dilas filing plate ukuran b berubah
welded diambil dari masing-masing
sumber
baja L baja L

22
40.40.4
steel L steel L 60.60.6 dilas titik notes :
point welded

12
L 60.60.6 10 10 dimensions of b are changed
40 plat penutup taken from different sources
POTONGAN closure plate 6.40.24 50

A - A S,B
SECTION bila plat pintu akan dicat kembali
maka plat penutup dapat dibuka DETAIL B S,A
dilas baja L 40.40.4 in case the gate plate will be
welded steel L repainted, the closure plate can be opened

baja L 60.60.6
steel L DETAIL PINTU BOKS TERSIER S,A
POTONGAN DETAIL GATE TERTIARY BOX 0 20 40 60 80 100 mm
C-C S,B S,A = 1 : 1
SECTION 0 100 200 300 400 500 mm
S,B = 1 : 5

STANDAR PERENCANAAN IRIGASI STANDAR ALAT PENGATUR PINTU SORONG TERSIER 726
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

B
c

EL.3
EL.3

1:1
EL.1 1
EL.1

EL.3

1
2:1

1
1:1
A A

MA.2
1:1
MA.1
1

EL.4
1
EL.5 EL.4

b1

b1
EL.2

1
1

1:1
h1 h1

1:1

1
EL.3
1 EL.1

1
2:1
EL.1

1:1
1

EL.3
c EL.3

B
DENAH S,A
PLAN

0,30 0,30
EL.1 2
1
MA.1 w1 EL.3

1:1
h1
EL.2
0,30 Z

1:1
0,30
0,25 MA.2 q a L1 L2 t1 t2 L1 L2 t1 t2 L1 L2 t1 t2
L.2 h l / sm m m m m m m m m m m m m m

a
EL.4 0 - 200 0,10 1,80 1,10 0,50 0,30 2,40 1,25 0,60 0,40 3,00 1,30 0,70 0,50
EL.5 0,20
t.2 200 400 0,12 1,80 1,40 0,50 0,30 2,40 1,50 0,60 0,40 3,00 1,65 0,70 0,50
0,30
400 - 600 0,16 1,80 1,70 0,50 0,30 2,40 1,75 0,60 0,40 3,00 1,90 0,70 0,50
t1 t1
600 - 800 0,20 1,80 2,00 0,50 0,30 2,40 2,00 0,60 0,40 3,00 2,15 0,70 0,50

1,50 800 - 1000 0,23 1,80 2,20 0,50 0,30 2,40 2,25 0,60 0,40 3,00 2,35 0,70 0,50
L1 L2
0,25

POTONGAN TABEL
: DIMENSI STANDAR
A-A S,A TABLE STANDARD DIMENSIONS
SECTION

b2+0,20 kode elevasi / elevations dimensi (m) / dimension (m)


b2 saluran bangunan
b1 b1 canal code
EL.1 EL.2 EL.3 EL.4 EL.5 h w Z b1 b2 t1 t2 L.1 L.2
1 EL.1 EL.1 1 1 EL.1 EL.1 1 structure
1 1 1 1
1 1 EL.3 EL.3
1 1
EL2 1 EL.2
1

MA.2

EL.4
EL5

0 1,0 2,0 3,0 4,0 5,0 m


S, A = 1 : 50

POTONGAN POTONGAN DAFTAR DIMENSI BANGUNAN


B-B S,A C -C S,A
SECTION SECTION STRUCTURE DIMENSIONS

STANDAR PERENCANAAN IRIGASI STANDAR BANGUNAN TERJUN AMBANG UKUR LEBAR POTONGAN SEGI EMPAT 727
D I R E K TO R A T JENDERAL SUMBER DAYA AIR

DIMENSI STANDAR DIMENSI STANDAR


STANDARD DIMENSIONS STANDARD DIMENSIONS
B q y1 T a L1 L2 L3 L4 L5 t1 t2 q y1 T a L1 L2 L3 L4 L5 t1 t2
m 2 /s m m m m m m m m m m m 2 /s m m m m m m m m m m
1

0.50 0.30 1.09 0.03 6.00 0.60 2.65 2.65 3.98 0.80 1.19 0.50 0.30 1.29 0.02 12.00 0.60 4.85 4.85 4.98 1.60 2.18

m
m

1
0.75 0.39 1.37 0.05 6.00 0.78 2.78 2.78 4.89 0.80 1.25 0.75 0.39 1.57 0.03 12.00 0.78 4.98 4.98 5.89 1.60 2.24

1.00 0.47 1.61 0.06 6.00 0.94 2.91 2.91 5.71 0.80 1.31 1.00 0.47 1.81 0.05 12.00 0.94 5.11 5.11 6.71 1.60 2.30

1.50 < Z < 2.00 m

3.50 < Z < 4.00 m


1.25 0.55 1.84 0.08 6.00 1.09 3.02 3.02 6.46 0.80 1.36 1.25 0.55 2.04 0.06 12.00 1.09 5.22 5.22 7.46 1.60 2.35
m

1.50 0.62 2.05 0.10 6.00 1.23 3.12 3.12 7.15 0.80 1.41 1.50 0.62 2.25 0.07 12.00 1.23 5.32 5.32 8.15 1.60 2.40

m
A A
1

1
R=0,5yl 1.75 0.68 2.24 0.11 6.00 1.36 3.22 3.22 7.81 0.80 1.45 1.72 0.68 2.44 0.08 12.00 1.36 5.42 5.42 8.81 1.60 2.44

2.00 0.74 2.43 0.13 6.00 1.49 3.32 3.32 8.44 0.80 1.49 2.00 0.74 2.63 0.09 12.00 1.49 5.52 5.52 9.44 1.60 2.48
b1

b2
2.25 0.80 2.61 0.14 6.00 1.61 3.41 3.41 9.04 0.80 1.53 2.25 0.80 2.81 0.10 12.00 1.61 5.61 5.61 10.04 1.60 2.52

2.50 0.86 2.79 0.16 6.00 1.72 3.49 3.49 9.62 0.80 1.57 2.50 0.86 2.99 0.11 12.00 1.72 5.69 5.69 10.62 1.60 2.56
w1 y1 R=0,5yl
w2 y2
1

2.75 0.92 2.95 0.17 6.00 1.84 3.58 3.59 10.18 0.80 1.61 2.75 0.92 3.15 0.12 12.00 1.84 5.78 5.78 11.18 1.60 2.60

1
m

m
3.00 0.97 3.12 0.19 6.00 1.94 3.66 3.66 10.72 0.80 1.65 3.00 0.97 3.32 0.13 12.00 1.94 5.86 5.86 11.72 1.60 2.64

0.50 0.30 1.14 0.03 7.50 0.60 3.20 3.20 4.23 1.00 1.44 0.50 0.30 1.34 0.02 13.50 0.60 5.40 5.40 5.23 1.80 2.43

0.75 0.39 1.42 0.04 7.50 0.78 3.33 3.33 5.14 1.00 1.50 0.75 0.39 1.62 0.03 13.50 0.78 5.53 5.53 6.14 1.80 2.49

1
1.00 0.47 1.66 0.06 7.50 0.94 3.46 3.46 5.96 1.00 1.56 1.00 0.47 1.86 0.04 13.50 0.94 5.66 5.66 6.96 1.80 2.55
m

2.00 < Z < 2.50 m

4.00 < Z < 4.50 m


1

1.25 0.55 1.89 0.07 7.50 1.09 3.57 3.57 6.71 1.00 1.61 1.25 0.55 2.09 0.05 13.50 1.09 5.77 5.77 7.71 1.80 2.60

B 1.50 0.62 2.10 0.09 7.50 1.23 3.67 3.67 7.40 1.00 1.65 1.50 0.62 2.30 0.06 13.50 1.23 5.87 5.87 8.40 1.80 2.64

DENAH 1.75 0.68 2.29 0.10 7.50 1.36 3.77 3.77 8.06 1.00 1.70 1.75 0.68 2.49 0.07 13.50 1.36 5.97 5.97 9.06 1.80 2.69

PLAN 2.00 0.74 2.48 0.11 7.50 1.49 3.87 3.87 8.69 1.00 1.74 2.00 0.74 2.68 0.08 13.50 1.49 6.07 6.07 9.69 1.80 2.73

2.25 0.80 2.66 0.13 7.50 1.61 3.96 3.96 9.29 1.00 1.78 2.25 0.80 2.86 0.10 13.50 1.61 6.16 6.16 10.29 1.80 2.77

2.50 0.86 2.84 0.14 7.50 1.72 4.04 4.04 9.87 1.00 1.82 2.50 0.86 3.04 0.11 13.50 1.72 6.24 6.24 10.87 1.80 2.81

2.75 0.92 3.00 0.16 7.50 1.84 4.13 4.13 10.43 1.00 1.86 2.75 0.92 3.20 0.12 13.50 1.84 6.33 6.33 11.43 1.80 2.85

3.00 0.97 3.17 0.17 7.50 1.94 4.21 4.21 10.97 1.00 1.89 3.00 0.97 3.37 0.13 13.50 1.94 6.41 6.41 11.97 1.80 2.88
y1 w1

0.50 0.30 1.19 0.03 9.00 0.60 3.75 3.75 4.48 1.20 1.69
0,30

0,50

0.75 0.39 1.47 0.04 9.00 0.78 3.88 3.88 5.39 1.20 1.75

1.00 0.47 1.71 0.05 9.00 0.94 4.01 4.01 6.21 1.20 1.80

2.50 < Z < 3.00 m


y2 w2
0,60

=D
0,30

0,50

0,50 R 1.25 0.55 1.94 0.07 9.00 1.09 4.12 4.12 6.96 1.20 1.85
0,30
D 2a 1.50 0.62 2.15 0.08 9.00 1.23 4.22 4.22 7.65 1.20 1.90
5
T

1
0.75
1.75 0.68 2.34 0.09 9.00 1.36 4.32 4.32 8.31 1.20 1.94
a

0,30
2.00 0.74 2.53 0.10 9.00 1.49 4.42 4.42 8.94 1.20 1.99

0,50
0,30

2.25 0.80 2.71 0.12 9.00 1.61 4.51 4.51 9.54 1.20 2.03
L1 L2 L3 L4 2a L5 1,50
2.50 0.86 2.89 0.13 9.00 1.72 4.59 4.59 10.12 1.20 2.07

2.75 0.92 3.05 0.14 9.00 1.84 4.68 4.68 10.68 1.20 2.10

POTONGAN 3.00 0.97 3.22 0.15 9.00 1.94 4.76 4.76 11.22 0.20 2.14

SECTION A-A 0.50 0.30 1.24 0.02 10.50 0.60 4.30 4.30 4.73 1.40 1.93

0.75 0.39 1.52 0.04 10.50 0.78 4.43 4.43 5.64 1.40 2.00

1.00 0.47 1.76 0.05 10.50 0.94 4.56 4.56 6.46 1.40 2.05

3.00 < Z < 3.50 m


1.25 0.55 1.99 0.06 10.50 1.09 4.67 4.67 7.21 1.40 2.10

1.50 0.62 2.20 0.07 10.50 1.23 4.77 4.77 7.90 1.40 2.15

1.75 0.68 2.39 0.08 10.50 1.36 4.87 4.87 8.56 1.40 2.19
0,30 0,30
0,30 2.00 0.74 2.58 0.10 10.50 1.49 4.97 4.97 9.19 1.40 2.23

m m 2.25 0.80 2.76 0.11 10.50 1.61 5.06 5.06 9.79 1.40 2.28
1 1
2.50 0.86 2.94 0.12 10.50 1.72 5.14 5.14 10.37 1.40 2.31

m 2.75 0.92 3.10 0.13 10.50 1.84 5.23 5.23 10.93 1.40 2.35
z

1
3.00 0.97 3.27 0.14 10.50 1.94 5.31 5.31 11.47 1.40 2.39
0,50

t2
m
1
T

- catatan
notes
- berlaku untuk 1.50 < Z < 4.50 m
valid for 0.50m2/s < q < 3.00m 2/s
t2

- q = Q m2/s
POTONGAN B
B-B
SECTION

STANDAR PERENCANAAN IRIGASI GAMBAR STANDAR BANGUNAN TERJUN TIPE VLUGTER 728
D I R E K TO R A T JENDERAL PENGAIRAN

q yi yd LI L2 L3 t1 t2 t3 q yi yd LI L2 L3 t1 t2 t3
m2/s m m m m m m m m m2/s m m m m m m m m
B 0.05 0.44 0.57 1.00 0.88 4.15 0.67 0.32 0.47 0.50 0.44 0.67 2.50 0.88 5.26 1.04 0.77 0.50
1

0.75 0.58 0.84 2.50 1.16 6.45 1.10 0.79 0.57


m

0.75 0.58 0.70 1.00 1.16 4.99 0.72 0.32 0.52


1.00 0.70 0.98 2.50 1.40 7.44 1.15 0.79 0.63

z < 0,50 m
1.00 0.70 0.82 1.00 1.40 5.67 0.77 0.31 0.57
1.25 0.81 1.11 2.50 1.63 8.30 1.20 0.80 0.68
1.25 0.81 0.92 1.00 1.63 6.23 0.81 0.30 0.61

1,00 m < z < 1,25 m


1.50 0.92 1.22 2.50 1.84 9.08 1.25 0.80 0.73
1.50 0.92 1.00 1.00 1.84 6.66 0.84 0.30 0.64
B 1.75 1.02 1.33 2.50 2.04 9.76 1.29 0.80 0.77

m
m

1.75 1.02 1.08 1.00 2.04 7.06 0.87 0.30 0.67

1
1

2.00 1.11 1.42 2.50 2.23 10.40 1.32 0.80 0.81


2.00 1.11 1.16 1.00 2.23 7.41 0.90 0.30 0.70
A R= y1/2
A 2.25 1.20 1.23 1.00 2.41 7.73 0.93 0.30 0.73
2.25 1.20 1.52 2.50 2.41 11.00 1.36 0.80 0.85
rip rap 2.50 1.29 1.61 2.50 2.58 11.55 1.39 0.79 0.88
2.50 1.29 1.29 1.00 2.58 8.03 0.96 0.30 0.76
b1

b2
B

2.75 1.38 1.69 2.50 2.75 12.07 1.42 0.79 0.92


2.75 1.38 1.38 1.00 2.75 8.33 0.99 0.30 0.78
R= y1/2 3.00 1.46 1.77 2.50 2.92 12.55 1.45 0.79 0.95
3.00 1.46 1.43 1.00 2.92 8.66 1.03 0.30 0.81

w2
w1

y2
y1

3.25 1.54 1.84 2.50 3.08 12.99 1.48 0.78 0.98


3.25 1.54 1.49 1.00 3.08 8.93 1.06 0.30 0.83
1

1
m

m
3.50 1.62 1.92 2.50 3.23 13.42 1.51 0.77 1.01
3.50 1.62 1.55 1.00 3.23 9.19 1.09 0.30 0.86 0.50 0.44 0.69 3.00 0.88 5.49 1.14 0.91 0.52
B 0.50 0.44 0.61 1.50 0.88 4.63 0.30 0.48 0.48 0.50 0.44 0.69 3.00 0.88 5.49 1.14 0.91 0.52
0.75 0.58 0.86 3.00 1.16 6.74 1.22 0.93 0.59
0.75 0.58 0.76 1.50 1.16 5.64 0.86 0.48 0.54 1.00 0.70 1.01 3.00 1.40 7.79 1.27 0.94 0.64

0,50 m < z < 0,75 m


1.00 0.70 0.89 1.50 1.40 6.46 0.90 0.48 0.60 1.25 0.81 1.14 3.00 1.63 8.71 1.33 0.95 0.70
m

1,25 m < z < 1,50 m


1.25 0.81 1.00 1.50 1.63 7.17 0.95 0.48 0.64
1

1.50 0.92 1.26 3.00 1.84 9.53 1.37 0.96 0.74


1.50 0.92 1.10 1.50 1.84 7.78 0.98 0.47 0.68 1.75 1.02 1.37 3.00 2.04 10.28 1.42 0.96 0.79
DENAH 1.75 1.02 1.20 1.50 2.04 8.33 1.02 0.46 0.72 2.00 1.11 1.47 3.00 2.23 10.95 1.45 0.96 0.83
PLAN 2.00 1.11 1.28 1.50 2.23 8.79 1.05 0.45 0.75 2.25 1.20 1.57 3.00 2.41 11.59 1.49 0.96 0.87
2.25 1.20 1.36 1.50 2.41 9.23 1.08 0.45 0.78 2.50 1.29 1.66 3.00 2.58 12.19 1.52 0.96 0.91
0.30 2.50 1.29 1.43 1.50 2.58 9.63 1.11 0.44 0.81 2.75 1.38 1.75 3.00 2.75 12.75 1.56 0.96 0.94
0.30 2.75 1.38 1.50 1.50 2.75 9.99 1.13 0.43 0.84 3.00 1.46 1.83 3.00 2.92 13.29 1.59 0.96 0.97
3.00 1.46 1.57 1.50 2.92 10.32 1.16 0.42 0.87 3.25 1.54 1.92 3.00 3.08 13.79 1.62 0.95 1.01
z

3.25 1.54 1.63 1.50 3.08 10.64 1.19 0.41 0.89 3.50 1.62 1.99 3.00 3.23 14.27 1.65 0.95 1.04
0,55
yd

3.50 1.62 1.70 1.50 3.23 10.93 1.21 0.41 0.92


0.30
t3
0.50 0.44 0.64 2.00 0.88 4.98 0.92 0.63 0.50
t2

0.50
0.75 0.58 0.80 2.00 1.16 6.09 0.98 0.64 0.56
t1 t3
1.00 0.70 0.94 2.00 1.40 7.02 1.03 0.64 0.62
L1 L2 L3 0.50 L4=2.yd
1.25 0.81 1.06 2.00 1.63 7.82 1.08 0.64 0.66

0,75 m < z < 1,00 m


1.50 0.92 1.17 2.00 1.84 8.51 1.12 0.64 0.71

POTONGAN 1.75 1.02 1.27 2.00 2.04 9.15 1.16 0.64 0.75
A-A
SECTION 2.00 1.11 1.36 2.00 2.23 9.73 1.19 0.63 0.79
2.25 1.20 1.45 2.00 2.41 10.26 1.22 0.63 0.82

CL 2.50 1.29 1.53 2.00 2.58 10.72 1.25 0.62 0.85


2.75 1.38 1.61 2.00 2.75 11.18 1.28 0.61 0.88
0.30 0.30 3.00 1.46 1.68 2.00 2.92 11.60 1.31 0.61 0.91
m m 3.25 1.54 1.75 2.00 3.08 11.99 1.34 0.60 0.94
1 1
catatan 3.50 1.62 1.82 2.00 3.23 12.36 1.36 0.59 0.97
z

y1

notes
berlaku untuk 0,50m < z < 1,50m
yd

valid for 0,50m 2 /s < q < 3,50 m 2/s


t3

q = Q m 2/s
t3 B B

POTONGAN
B-B
SECTION

STANDAR PERENCANAAN IRIGASI GAMBAR STANDAR TERJUNAN TEGAK 729

You might also like