Professional Documents
Culture Documents
Warta Kerajaan
DITERBITKAN DENGAN KUASA
SUSUNAN PERATURAN
Bahagian I
PERMULAAN
Peraturan
1. Nama
2. Tafsiran
Bahagian II
KUASA PENGARAH
Bahagian III
KEBENARAN BERTULIS
Peraturan
4. Permohonan dan pengeluaran kebenaran bertulis
5. Tempoh kebenaran bertulis
6. Mendapatkan semula fi dan caj
Bahagian IV
Bahagian V
PENYERAHAN PELAN
Bahagian VI
PENGUATKUASAAN
19. Penggeledahan
20. Penyitaan
21. Pelucuthakkan
2623 Sel. P.U. 139.
Peraturan
Bahagian VII
PENDAKWAAN
26. Pendakwaan
27. Penalti kerana kegagalan aktiviti pengubahan sumber
28. Penalti am
29. Pengkompaunan kesalahan
Bahagian VIII
AM
Pada menjalankan kuasa yang diberikan oleh seksyen 43(1) dan 127 Enakmen
Lembaga Urus Air Selangor 1999 [Sel. En. No. 2/1999], Lembaga dengan
kelulusan Pihak Berkuasa Negeri membuat peraturan-peraturan seperti yang
berikut:
Bahagian I
PERMULAAN
Nama
Tafsiran
pegawai yang diberi kuasa ertinya mana-mana pegawai yang diberi kuasa
secara bertulis oleh Pengarah;
Bahagian II
KUASA PENGARAH
3. Pengarah boleh
(a) mengarahkan mana-mana orang yang mengendalikan aktiviti pengubahan
sumber untuk mengumpul atau membuang sisa kerja yang mempunyai
kaitan secara langsung atau tidak langsung dengan aktiviti pengubahan
sumber;
(b) mengarahkan mana-mana orang yang mengendalikan aktiviti pengubahan
sumber untuk mengambil sebarang tindakan yang difikirkan wajar
oleh Pengarah untuk memelihara dan memulihara kualiti, kuantiti dan
keadaan fizikal mana-mana sumber air dan alam sekitarnya; dan
(c) menetapkan keperluan teknikal, prosedur dan borang-borang bagi
pelaksanaan aktiviti pengubahan sumber.
Sel. P.U. 139. 2626
Bahagian III
KEBENARAN BERTULIS
(2) Pengarah boleh menentukan terma dan syarat kebenaran bertulis untuk
dipatuhi oleh pemegang kebenaran bertulis sebagai tambahan kepada terma
dan syarat sedia ada.
5. (1) Suatu kebenaran bertulis yang dikeluarkan atau diperbaharui adalah sah
selama tempoh setahun melainkan jika dinyatakan selainnya dalam kebenaran
bertulis itu.
Bahagian IV
KAWALAN AKTIVITI PENGUBAHAN SUMBER
(3) Segala kos yang terlibat di bawah subperaturan (2) hendaklah ditanggung
oleh orang yang bertanggungjawab tersebut.
Bahagian V
PENYERAHAN PELAN
Kewajipan jurutera
(5) Jurutera yang memperakui pelan hendaklah dalam masa satu minggu
selepas selesai aktiviti pengubahan sumber itu memberitahu kepada Pengarah
dengan mengemukakan Borang B dalam Jadual Ketiga bahawa aktiviti
pengubahan sumber itu telah selesai.
(2) Jika relevan, kiraan dan segala aras bumi dan kontur yang dirujuk dalam
Peraturan-Peraturan ini hendaklah dibuat dengan merujuk kepada datum yang
diberi oleh Jabatan Ukur dan Pemetaan Malaysia.
14. (1) Pelan dan butiran yang dikehendaki di bawah peraturan 13 boleh
diserahkan secara berasingan dengan kebenaran Pengarah.
(2) Apa-apa pelan dan spesifikasi yang dirujuk di bawah subperaturan (1)
hendaklah diperakukan di bawah peraturan 10.
(3) Walau apa pun peraturan ini, tiada apa-apa aktiviti pengubahan sumber
boleh dimulakan sehingga semua pelan dan spesifikasi yang dikehendaki
di bawah Peraturan-Peraturan ini telah diluluskan.
15. Pengarah atau pegawai yang diberi kuasa boleh pada bila-bila masa
berkenaan dengan sesuatu aktiviti pengubahan sumber menghendaki
(a) penahan enap dan kemudahan pengawalan pemendakan lain diadakan
dengan cukup serta diselenggarakan dengan sepatutnya;
(b) struktur penahan diadakan di mana perlu;
(c) cerun dilindungi dengan cukup bagi mengelakkan hakisan;
(d) segala langkah yang berkesan diambil untuk mengawal kelodak yang
mungkin timbul disebabkan oleh aktiviti pengubahan sumber;
(e) pemuliharaan tanah dijalankan;
(f) aras asas tanah yang telah diluluskan oleh Pengarah dipatuhi.
16. Pengarah boleh melalui jurutera Lembaga, jika difikirkan perlu, menghendaki
pelan spesifikasi dan butiran lanjut diserahkan atau memberi arahan lanjut
Sel. P.U. 139. 2630
atau membuat pindaan lanjut kepada pelan itu atau mengenakan syarat lanjut
yang difikirkan patut olehnya dan arahan, pindaan atau syarat itu hendaklah
dipatuhi.
17. Sumber air yang bersambungan dengan tapak aktiviti pengubahan sumber
hendaklah diselenggarakan sepanjang tempoh aktiviti pengubahan sumber dalam
pelan yang dipersetujui dan hendaklah terus diselenggarakan dalam keadaan
yang sama sehingga memuaskan Pengarah.
Bahagian VI
PENGUATKUASAAN
Penggeledahan
19. Jika Pengarah atau mana-mana pegawai yang diberi kuasa berpuas hati
atas maklumat yang diterima bahawa dia mempunyai sebab yang munasabah
untuk mempercayai bahawa
(a) satu kesalahan di bawah Peraturan-Peraturan ini telah atau sedang
dilakukan; atau
(b) apa-apa keterangan atau benda yang perlu untuk penyiasatan apa-apa
kesalahan di bawah Peraturan-Peraturan ini boleh ditemui,
dia boleh tanpa waran, memberhenti dan memeriksa mana-mana orang atau
memasuki dan menggeledah mana-mana premis menurut kuasa yang diberi
di bawah seksyen 99 Enakmen.
Penyitaan
20. (1) Pengarah atau pegawai yang diberi kuasa boleh menyita tanpa waran
apa-apa benda yang semunasabahnya dipercayai olehnya sebagai mempunyai
kaitan dengan, atau dapat memberikan keterangan tentang pelakuan suatu
kesalahan di bawah Peraturan-Peraturan ini.
(2) Pengarah atau pegawai yang diberi kuasa menyita apa-apa benda
di bawah subperaturan (1) hendaklah menyediakan suatu senarai benda yang
disita dan dengan segera menyerahkan suatu salinan yang ditandatangani olehnya
2631 Sel. P.U. 139.
(3) Jika kawasan atau premis itu tidak berpenghuni, Pengarah atau pegawai
yang diberi kuasa menyita itu hendaklah bilamana mungkin menampalkan
senarai benda yang disita itu di tempat yang mudah dilihat di kawasan atau
premis itu.
(5) Jika, oleh sebab jenis, saiz atau amaunnya, tidaklah praktik untuk
memindahkan apa-apa benda yang disita di bawah Peratuan-Peraturan ini,
Pengarah atau pegawai yang diberi kuasa menyita itu hendaklah dengan apa-
apa cara menyelak benda itu di kawasan itu atau apa-apa cara yang sesuai
untuk penyitaan.
(6) Seseorang yang tanpa kuasa yang sah memecahkan, mengganggu atau
merosakkan lak yang disebut dalam subperaturan (4) atau memindahkan apa-
apa benda yang dilak atau cuba berbuat demikian adalah melakukan suatu
kesalahan.
Pelucuthakkan
22. (1) Jika ada pendakwaan yang melibatkan apa-apa benda yang disita
di bawah Peraturan-Peraturan ini, maka pelucuthakkan atau pelepasan mana-
mana benda sedemikian hanya boleh dibuat mengikut perintah mahkamah yang
di hadapannya pendakwaan itu telah diadakan.
23. (1) Jika tiada pendakwaan yang melibatkan apa-apa benda yang telah
disita di bawah Peraturan-Peraturan ini, maka benda itu hendaklah diambil
dan disifatkan telah terlucuthak apabila tamat tempoh satu bulan kalendar dari
tarikh penyitaannya melainkan jika suatu tuntutan telah dibuat baginya sebelum
tamat tempoh itu mengikut cara yang dinyatakan dalam subperaturan (2).
(2) Seseorang yang mengatakan bahawa dia adalah pemilik apa-apa benda
yang disita di bawah Peraturan-Peraturan ini dan bahawa benda itu tidak boleh
dilucuthakkan boleh, sama ada sendiri atau melalui ejennya yang diberi kuasa
secara bertulis memberikan notis bertulis kepada Pengarah untuk menuntut
benda yang disita itu.
(5) Pada hari yang ditetapkan di bawah subperaturan (4), dan setelah
dibuktikan bahawa saman telah disampaikan dengan sewajarnya kepada setiap
orang yang disebut dalam perenggan 4(a) dan 4(b), Majistret hendaklah terus
memeriksa perkara itu, walaupun seseorang itu tidak hadir.
(6) Jika, setelah selesai pemeriksaan yang dibuat di bawah subperaturan (5)
berkenaan dengan sesuatu benda itu, Majistret berpuas hati bahawa
(a) suatu kesalahan terhadap mana-mana peruntukan Peraturan-Peraturan
ini telah dilakukan; dan
(b) benda itu ialah hal perkara bagi atau telah digunakan dalam melakukan
kesalahan itu,
25. (1) Pengarah atau mana-mana Pegawai yang diberi kuasa boleh, apabila
difikirkan sesuai mengeluarkan notis bertulis mengarahkan mana-mana
pemegang kebenaran bertulis yang menjalankan aktiviti pengubahan sumber
untuk mengalihkan atau mengambil semula apa-apa benda berkenaan dengan
aktiviti pengubahan sumber tersebut.
(3) Apa-apa benda yang diambil oleh Pengarah atau Pegawai yang diberikuasa
di bawah subperaturan (1), akan menjadi milik Lembaga, dan berhak untuk
melupuskannya atau melaksanakan apa-apa tindakan yang difikirkan wajar
oleh Pengarah.
Bahagian VII
PENDAKWAAN
Pendakwaan
27. Jika sesuatu struktur fizikal atau sesuatu bahagiannya gagal, sama ada
pada masa pengendaliannya atau selepas ia siap, atau jika terdapat apa-apa
kegagalan berhubungan dengan sesuatu aktiviti pengubahan sumber atau
sesuatu bahagian daripada mana-mana aktiviti pengubahan sumber, sama ada
pada masa menjalankan aktiviti pengubahan sumber itu atau selepas ia siap,
dan kegagalan itu adalah disebabkan oleh mana-mana satu atau lebih daripada
faktor yang berikut:
(a) struktur fizikal atau bahagian struktur fizikal itu atau aktiviti pengubahan
sumber atau bahagiannya itu tersalah bina atau tidak adanya penyeliaan
yang sepatutnya semasa pembinaannya;
(b) struktur fizikal atau bahagian struktur fizikal itu atau aktiviti pengubahan
sumber atau bahagian daripada aktiviti pengubahan sumber itu tersalah
reka bentuk atau tersalah kira; atau
Sel. P.U. 139. 2634
(c) struktur fizikal atau bahagian struktur fizikal itu atau aktiviti pengubahan
sumber atau bahagian daripada aktiviti pengubahan sumber itu tersalah
guna,
orang yang bertanggungjawab atas
(i) salah binaan atau tidak adanya penyeliaan yang sepatutnya
itu;
(ii) salah reka bentukan atau salah kiraan itu; atau
(iii) salah gunaan itu,
boleh apabila disabitkan, didenda tidak melebihi lima puluh ribu ringgit atau
penjara selama tempoh tidak melebihi dua tahun atau kedua-duanya.
Penalti am
Pengkompaunan kesalahan
29. (1) Pengarah dan mana-mana Pegawai yang diberi kuasa boleh mengkompaun
mana-mana kesalahan yang dilakukan di bawah Peraturan-Peraturan ini.
Bahagian VIII
AM
30. (1) Apabila mula berkuat kuasa Peraturan-Peraturan ini, maka Kaedah Air
Selangor (Fee Lesen) 1989 [Sel. P.U. 4/1990] sejauh mana ia terpakai kepada
Negeri Selangor hendaklah terbatal.
2635 Sel. P.U. 139.
(2) Apa-apa notis, perintah atau kenderaan yang telah dikeluarkan sebelum
tarikh kuat kuasa Peraturan-Peraturan ini hendaklah terus terpakai dan berkuat
kuasa seolah-olah telah dikeluarkan atau dibuat di bawah Peraturan-Peraturan
ini sehingga dibatalkan atau tamat tempohnya.
Jadual Pertama
[peraturan 2, subperaturan 9(4)]
1. Sungai (a) Kelebaran laluan air sungai 50 meter dari kedua-dua belah
(Alur antara tebing melebihi 40 tebing sungai
semulajadi) meter
(e) Kelebaran laluan air sungai 5 meter dari kedua-dua belah tebing
antara tebing tidak melebihi sungai
5 meter
2. Sungai (a) Kelebaran atas pada alur ialah 3.7 meter dari sebelah tebing sungai
(Alur 6 meter atau kurang dan 1 meter dari sebelah tebing
buatan) sungai yang lain
(b) Kelebaran atas pada alur 3.7 meter dari kedua-dua belah
melebihi 6 meter tebing sungai
4. Badan air (a) Untuk tujuan melindungi kualiti 5 meter hingga 30 meter dari tebing
lain air atau sempadan sumber air
(c) Untuk tujuan input makanan, 5 meter hingga 10 meter dari tebing
habitat air atau mengekalkan atau sempadan sumber air
tahap pencahayaan atau suhu
(d) Untuk tujuan menyediakan 30 meter hingga 500 meter dari tebing
makanan dan perlindungan atau sempadan sumber air
untuk hidupan liar air dan
daratan
Sel. P.U. 139. 2636
(f) Untuk mengurangkan banjir 20 meter hingga 150 meter dari tebing
di hiliran atau sempadan sumber air
Jadual Kedua
[Perenggan 4(1)(a)]
CAJ AKTIVITI
1. Pembinaan (a) jeti persendirian yang digunakan RM0.20 se tan tertakluk kepada caj
jeti: untuk mengimport dan minima RM1,000 setahun
mengeksport barang-barang
sendiri
(b) jeti yang digunakan untuk RM0.25 se tan tertakluk kepada caj
mengimport dan mengeksport minima RM1,500 setahun
barang-barang lain (kecuali
logam)
(c) jeti yang digunakan untuk RM0.35 se tan tertakluk kepada caj
mengimport dan mengeksport minima RM2,000 setahun
logam
(d) jeti yang digunakan sebagai RM70.00 per vesel tertakluk kepada
tempat untuk membina vesel caj minima RM2,000 setahun
(e) jeti yang digunakan sebagai RM100.00 per vesel tertakluk kepada
tempat untuk memperbaiki caj minima RM2,500
vesel
(f) jeti persendirian yang digunakan (a) RM2,200.00 setahun bagi jeti
bagi maksud yang tidak untuk tujuan pelancongan
dinyatakan di (a), (b), (c),
(b) RM600.00 setahun bagi jeti-jeti
(d) dan (e) di atas
lain
Jadual Ketiga
Borang A
NOTIS MEMULAKAN AKTIVITI PENGUBAHAN SUMBER
[subperaturan 11(4)]
Pengarah,
Lembaga Urus Air Selangor,
Saya memberi notis bahawa selepas tamat tempoh tujuh hari bekerja dari tarikh notis diterima saya
bercadang untuk memulakan aktiviti pengubahan sumber dan memperakui bahawa aktiviti iaitu:
Jalan ...............................................................................................................................................
bagi ................................................................................................................................................
menurut pelan yang diluluskan No. ...............................................................................................
Tandatangan: ......................................................
Nama: . ...............................................................
Profesion: . .........................................................
Alamat: ..............................................................
............................................................................
............................................................................
No. Pendaftaran Lembaga Jurutera:
............................................................................
.................................................
Cop rasmi
Borang B
NOTIS TAMAT AKTIVITI PENGUBAHAN SUMBER
[subperaturan 11(5)]
Pengarah,
Lembaga Urus Air Selangor,
Tandatangan: ......................................................
............................................................................
Nama: . ...............................................................
Profesion: . .........................................................
Alamat: ..............................................................
............................................................................
............................................................................
No. Pendaftaran Lembaga Jurutera:
............................................................................
.................................................
Cop rasmi
Bertarikh: ..................................................
Adalah dengan ini disahkan bahawa aktiviti di atas telah disempurnakan dengan
Borang C
BORANG SERAHAN PELAN TERUKUR
[peraturan 12]
Pengarah,
Lembaga Urus Air Selangor,
Saya/Kami dengan ini menyerah sesalinan pelan terukur untuk kerja yang dicadangkan seperti
berikut:
........................................................................................................................................................
........................................................................................................................................................
........................................................................................................................................................
........................................................................................................................................................
Saya dengan ini bertanggungjawab sepenuhnya untuk reka bentuk, spesifikasi dan perjalanan
kerja tersebut.
Tandatangan .......................................................
Nama . ................................................................
Profesion ............................................................
Alamat ...............................................................
............................................................................
No. Pendaftaran Lembaga Jurutera:
............................................................................
.......................................................
Cop rasmi
Tarikh: ..........................................
No. rujukan fail: ................................................................ (kegunaan pejabat)
ARRANGEMENT OF REGULATIONS
Part I
PRELIMINARY
Regulation
1. Citation
2. Interpretation
Part II
POWER OF DIRECTOR
Part III
WRITTEN APPROVAL
Part IV
Part V
SUBMISSION OF PLAN
Regulation
Part VI
ENFORCEMENT
19. Search
20. Seizure
21. Forfeiture
22. Forfeiture in case of prosecution
23. Forfeiture in case of no prosecution
24. No costs or damages arising from seizure to be recoverable
25. Power to remove and dispose
Part VII
PROSECUTION
26. Prosecution
27. Penalty for failure of resource alteration activity
28. General penalty
29. Compounding of offences
Part VII
GENERAL
In exercise of the powers conferred by sections 43(1) and 127 of the Selangor
Waters Management Authority 1999 [Sel. En. No. 2/1999], the Authority with
the approval of the State Authority makes the following regulations:
Part I
PRELIMINARY
Citation
Interpretation
disturbance refers to
(a) a reduction in flow rate of water resources;
(b) a reduction in quantity of water resources;
(c) pollution of water resources or its environment;
(d) damage to physical structure of a water resource or its environment;
or
(e) affect or alter the state boundary; or
(f) any other circumstances deem fit by the Director which may have
adverse effects on water resources;
buffer area means such part of land adjacent to a river or water body
that is designed or designated to remain in an undisturbed, natural state or
any other circumstances determine with its distance or width is as stipulated
in the First Schedule;
Part II
POWER OF DIRECTOR
Part III
WRITTEN APPROVAL
(2) The Director may determine any terms and conditions of written approval
to be complied with by written approval holder in addition to the existing
terms and conditions.
Recovery of charges
Part IV
(3) All costs incurred under subregulation (2) shall be borne by such
responsible person.
9. (1) A person who operates any resource alteration activity, shall evaluate
or cause to be evaluated the contribution of such activity to peak drainage
or flood flows and shall include such measures to control and mitigate the
adverse effects of drainage including the provision of on-site facilities, off-site
repair work and the cost of such measures.
(2) An evaluation under subregulation (1) shall comply with the guidelines
and procedures made pursuant to any existing law or as prescribed by the
Authority.
(3) Where the evaluation under subregulation (1) shows that the proposed
activity will have a contribution to peak drainage or flood floors that is greater
than zero, a person who operates such activity shall
(a) take all necessary measures to control the estimated contribution to
peak drainage or flood flows on-site; or
(b) make a contribution to the Authority or relevant public authority for
the full cost of constructing, operating and maintaining all works
necessary for the offsite control of the contribution to peak drainage
or flood flows created by the proposed activity.
(4) A person who operates a resource alteration activity shall plan and
ensure that a buffer area is provided as stipulated in the First Schedule unless
permitted otherwise by the Director.
Part V
SUBMISSION OF PLAN
10. (1) Plan relating to resource alteration activity shall be submitted to the
Authority as required by the Director.
Duty of engineer
11. (1) The engineer certifying the plan under regulation 10 shall be responsible
for the proper execution of the resource alteration activity and shall continue
to be so responsible until the completion of the resource alteration activity
unless
(a) with the agreement of the Director, another engineer is appointed to
take over; and
(b) the Director agrees to accept his withdrawal.
(3) The engineer certifying the plan shall supervise and make such inspection
as may be necessary to ensure that the resource alteration activities are
carried out in accordance with the plan, specification, direction, amendment
or condition imposed by the Authority and generally with provisions of these
Regulations.
(4) The engineer certifying the plan shall notify the Director seven working
days before the commencement of the resource alteration activity by submitting
Form A in the Third Schedule.
(5) The engineer certifying the plans shall within one week after the
completion of the resource alteration activity notify the Director by submitting
Form B in the Third Schedule of the completion.
(7) For the purpose of these Regulations the term engineer certifying
plan shall include any engineer appointed to take over.
12. A person who has completed a resource alteration activity, shall submit
a copy of as-built drawing to the Director in Form C in the Third Schedule
after fourteen days from submitting Form B.
13. (1) Unless permitted otherwise by the Director, the required reports,
plan, specifications and particulars shall be submitted to the Director within
stipulated time.
(2) Where relevant, the calculations and all ground levels and contours
referred to in these Regulations shall be drawn with reference to the datum
given by the Department of Survey and Mapping Malaysia.
Sel. P.U. 139. 2646
14. (1) Plans and specifications required under regulation 13 maybe submitted
separately with the permission of the Director.
16. The Director through the engineer to the Authority may, where it
considers it necessary, requires further plans, specifications and particulars
to be submitted or give further directions or make further amendments to
the plans or impose further conditions as it deems fit and such directions,
amendments or conditions shall be complied with.
17. Water resource in the adjoining site of the resource alteration activity
shall be maintained throughout the duration of the resource alteration activity
as in the approved plans and shall continue to be maintained in the same state
until it satisfies the Director.
18. The engineer who supervise the resource alteration activity shall inform
the Director of any ground movement, earth slip, any failure or any changes
in the water table that occurs on the site or adjoining site of the resource
alteration activity.
2647 Sel. P.U. 139.
Part VI
ENFORCEMENT
Search
he may without a warrant, stop and inspect any person or enter and search
any premises pursuant to the powers conferred under section 99 of the
Enactment.
Seizure
20. (1) The Director or an authorized officer may, without warrant, seize
any thing which he reasonably believes to have a bearing on, or can furnish
evidence of, the commission of an offence under these Regulations.
(2) The Director or an authorized officer who seizes any thing under
subregulation (1) shall prepare a list of all things seized and forthwith deliver
a copy signed by him to the written approval holder, owner of such thing, or
to his servant or agent, present at such seized place.
(3) Where the area is unoccupied, the Director or an authorized officer who
seized shall whenever possible post a list of the things seized conspicuously
at the area or premis.
(4) Any thing seized under subregulation (1) shall be admissible as evidence
in any proceeding under these Regulations.
(6) A person who, without lawful authority breaks, tampers with or damage
the seal referred to in paragraph (4) or removes any thing under seal or
attempts to do so commits an offence.
Forfeiture
22. (1) If there is prosecution involving any things seized under these
Regulations, the forfeiture or release of any such thing may only be made by
the order before the court in which the prosecution is held.
the court shall forfeit the thing notwithstanding that no person has been
convicted of such offence.
(3) All thing forfeited under these Regulations shall be delivered to the
Director and shall be disposed of in accordance with the directions of the
Director.
23. (1) If there is no prosecution involving any thing seized under these
Regulations, such thing seized shall be taken and deemed to be forfeited on
the expiry of a period of one calendar month from the date of seizure unless
a claim thereto is made before the expiry of such period in the manner set
out in subregulation (2).
(2) A person asserting that he is the owner of any thing seized under
these Regulations, and that the thing is not liable to be forfeited may, either
personally or by his agent authorized in writing, give notice in writing to the
Director that he claim the thing seized.
(3) On receipt of notice under subregulation (2), the Director may direct
that the thing be released with or without cost or that the matter be referred
to a Magistrate.
(5) On the day appointed under subregulation (4), and upon due service of
the summons on each of the person referred to in paragraphs 4(a) and 4(b)
being proved, the Magistrate shall proceed to the examination of the matter,
notwithstanding, of the non appearance of any of the person.
2649 Sel. P.U. 139.
(6) If, upon the conclusion of the examination under subregulation (5) in
respect of a thing seized, the Magistrate is satisfied that
(a) an offence against any provision of these Regulations has been
committed; and
(b) such thing is the subject matter of or has been used in the commission
of the offence,
the Magistrate shall order the forfeiture of the thing, but if the Magistrate is
not so satisfied, he shall order that the thing be released and delivered to the
person who in his opinion has a right to such thing.
24. No person shall in any proceedings before any court in respect of any
thing seized in the exercise of any power conferred under these Regulations, be
entitled to the costs of such proceedings or to any damages or other relief.
25. (1) The Director or any authorised officer may, as he deems fit, issue
a notice in writing requiring any person to remove or retrieve any thing in
relation to such resource alteration activity.
(2) If there is failure, refusal or neglect by the person served with written
notice under subregulation (1), the Director or any authorised officer may take
such thing and reclaim the cost or expenses incurred therefore from the said
person.
(3) Any thing taken by the Director or any authorised officer under
subregulation (2), shall vest in the Authority and shall be entitled to dispose
or take any other action as deemed fit and proper by the Director.
Part VII
PROSECUTION
Prosecution
26. A prosecution for an offence under these Regulations shall not be instituted
except by or with the consent in writing of the Public Prosecutor.
27. Where any physical structure or part of it fails, whether in the course
of performance or after completion, or where there is any failure in relation
to any resource alteration activity or part of it, whether in the course of the
Sel. P.U. 139. 2650
carrying out of the resource alteration activity after completion thereof, and the
course of such failure is due to any one or more of the following factors:
(a) misconstruction of such physical structure or part of it, or, of such
resource alteration activity or part of it or lack of proper supervision
during construction;
(b) misdesign or miscalculation of such physical structure or part of it,
or, of such resource alteration activity or part of it; or
(c) misuse of such physical structure or part of it, or, of such resource
alteration activity or part of it;
General penalty
commits an offence and may upon conviction be liable to a fine not exceeding
ten thousand ringgit or imprisonment not exceeding six months or both.
Compounding of offences
29. (1) The Director and any authorized person may compound any offence
committed under these Regulations.
(2) All money received under this regulation shall be paid to the
Authority.
2651 Sel. P.U. 139.
Part VIII
GENERAL
30. (1) Upon coming into force of this Enactment, the Selangor Waters
(Licences Fees) Rules 1989 [Sel. P.U. 4/1990] in so far as it is applicable to
the State of Selangor, is hereby repealed.
(2) Any notice, order, compound, licence or document issued prior to the
commencement date of these Regulations shall continue to be applicable and
remain in force as deemed to be issued or made under these Regulations until
revoked thereunder or upon expiry of its term.
First Schedule
[regulation 2, subregulation 9(4)]
WIDTH DISTANCE OF BUFFER AREA
1. River (a) Width of the river waterway 50 metres from both side of river
(Natural between the banks is more bank
stream) than 40 metres
(b) Width of the river waterway 40 metres from both side of river
between the bank is between bank
20 meter until 40 metres
(c) Width of the river waterway 20 metres from both side of river
between the bank is between bank
10 meter until 20 metres
(d) Width of the river waterway 10 metres from both side of river
between the bank is between bank
5 metres until 10 metres
(e) Width of the river waterway 5 metres from both side of river
between the bank is not more bank
than 5 metres
2. River (a) Top width of engineered channel 3.7 metres from one sided of river
(Engineered is 6 metres or less bank and 1 metres from the other
channel) side of river bank
(b) Top width of engineered 3.7 metres from both side of river
channel is more than 6 metres bank
4. Other water (a) To protect water quality 5 metres until 30 metres from the
resources bank or water resource boundary
(c) To provide food input, aquatic 5 metres until 10 metres from the
habitat and maintain light or bank or water resource boundary
temperature level
(d) To provide food and shelter for 30 metres until 500 metres from the
riparian and aquatic wildlife bank or water resource boundary
(f) For downstream flood 20 metres until 150 metres from the
attenuation bank or water resource boundary
Second Schedule
[Paragraph 4(1)(a)]
activity charge
1. Construction (a) private jetty use for importing RM0.20 per ton subject to a minimum
of jetty: and exporting own goods charge RM1,000 a year
(b) jetty used for exporting other RM0.25 per ton subject to a minimum
goods (excluding metal) charge RM1,500 a year
(c) jetty used for importing and RM0.35 per ton subject to a minimum
exporting metal charge RM2,000 a year
(f) private jetty used for purpose (a) RM2,200.00 a year for jetty
not covered by (a), (b), (c), used for tourism
(d) and (e) above
(b) RM600.00 a year for others
jetty
2653 Sel. P.U. 139.
Third Schedule
Form A
NOTICE OF COMMENCEMENT OF RESOURCE ALTERATION ACTIVITY
[subregulation 11(4)]
Director,
Selangor Waters Management Authority,
This give notice that after the expiration of seven days from the date of receipt of this notice I
intend to commence earthworks and certify that the resource alteration activity:
On Lot/s..........................................................................................................................................
Mukim/Bandar.................................................................................................................................
Jalan.................................................................................................................................................
For...................................................................................................................................................
In accordance with approved plan No.: .........................................................................................
Signature: . .........................................................
Name: . ...............................................................
Profession: .........................................................
Address: .............................................................
............................................................................
............................................................................
............................................................................
Board of Engineers Registration No.:
............................................................................
...........................................
Official stamp
Form B
NOTICE OF COMPLETION OF RESOURCE ALTERATION ACTIVITY
[subregulation 11(5)]
Director,
Selangor Waters Management Authority,
............................................................................
Mukim/Bandar: . .............................................................................................................................
Jalan: ..............................................................................................................................................
For . ................................................................................................................................................
Sel. P.U. 139. 2654
Signature: . .........................................................
Name: . ...............................................................
Profession: .........................................................
Address: .............................................................
............................................................................
............................................................................
Board of Engineers Registration No.: ...............
............................................................................
.................................................
Official stamp
Date: . ......................................
It is hereby certified that the above activity has been completed with
Compliance to all conditions and needs of written approval that has been issued.
Form C
SUBMISSION FORM AS BUILT DRAWING
[regulation 12]
The Director,
Selangor Waters Management Authority,
I/We, hereby submit a copy of as-built drawing for the following proposed works:
........................................................................................................................................................
........................................................................................................................................................
........................................................................................................................................................
on behalf of (Name of Owner/Developer) . ...................................................................................
Drawing No. . .................................................................................................................................
2655 Sel. P.U. 139.
I hereby take full responsibility for the designs, specifications and performance of the works.
Signature: . .........................................................
Name: . ...............................................................
Profession: .........................................................
Address: .............................................................
............................................................................
............................................................................
Board of Engineers Registration No.:
............................................................................
.................................................
Official stamp
Date: . ......................................
Hakcipta Pencetak H
PERCETAKAN NASIONAL MALAYSIA BERHAD
Semua Hak Terpelihara. Tiada mana-mana bahagian jua daripada penerbitan ini boleh diterbitkan semula atau disimpan di dalam bentuk
yang boleh diperolehi semula atau disiarkan dalam sebarang bentuk dengan apa jua cara elektronik, mekanikal, fotokopi, rakaman dan/
atau sebaliknya tanpa mendapat izin daripada Percetakan Nasional Malaysia Berhad (Pencetak kepada Kerajaan Malaysia yang
dilantik).
DICETAK OLEH
PERCETAKAN NASIONAL MALAYSIA BERHAD,
KUALA LUMPUR
BAGI PIHAK DAN DENGAN PERINTAH KERAJAAN MALAYSIA