JOB SAFETY ANALYSIS
Tangguh Expansion Project
WORK ACTIVITY (JOB) TITLE:
Instalasi pipa air besrih, air kotor dan limbah domestic /Plumbing Clean water, Black water and | DATE: 05/09/2017
‘grey water Installation work
LOCATION EARLY CAMP PTWNO: JSANO
WORK TEAM Reviewed by, TSA PREPARED BY.
CSTS Construction 4. Fanny Kartaria
1 Fanny 7 : FCMMED. | 2. adam Gunelesmana
2 Adam. G 8 coed Ax | 3. David Cao
3 van 8 4 Sigit
4 Mui 10 cSTS HSSE subeln: &
Swan " Name ae %
8 bobby 2 sone OY 4 |r Signature.
CRITICAL QUESTIONS: Everyone Ready/Capable To Work? WV Potential Spill/Gas Release Addressed? [) Worst Case Discussed?
Lee ‘Miiginy
« Bejan tnt Wlay 4 wy q me
* Re-type tle JA and add at ey
ad
ZiEnea
eM eee!
PNR Ue ee Leavy
PZGoey
Persiapan Material dan Resiko pengangkatan manual, | PPE, Sarung tangan, ergonomic, beban PH, Supv,
peralatan kerja serta dokumen | dokumen tidak sesuai sehingga | pengangkatan manual < 25 KG Crew.
dan checklist. arahan kerja menjadi tidak tepat
Material and Tools Manual Handling Injury, un Complete the document properly, PPE, Hand
Preparation., document and appropriate document make work | glove, ergonomic, < 25 KG load for manual
check list. instruction failure. handling.
Pembersihan area kerja.
Housekeeping.
Memetakan jalur pipa yang __| Terjatuh, terpeleset, tertimpa Barikade, menggunakan tangga platform atau __| PH, Supv,
akan dikerjakan sesuai material yang jatuh, tertusuk perancah, sabuk keselamatan, sarung tangan, | Crew
gambar.
Marking pipe line as per
approval drawing
material tajam.
Falling, slipping, falling object,
sharp object.
PPE
Barricade, using platform ladder, full body
harness, hand gloves, Standard PPE.
Bekerja berdasarkan gambar yang telah
ditentukan.
Following the approval construction drawing
Pembersihan area kerja.
Housekeeping.Memasang pipa air untuk air | Terjatuh, terpeleset, terlimpa | Pemasangan Barikade, menggunakan tangga | PH, Supv,
bersih, air kotor dar material yang jatuh, bahaya platform, sabuk keselamatan, peralatan listrik | Crew
domestic system tersetrum alat listrik, tertusuk | yang aman dan telah di inspeksi, sarung tangan
dengan aksesoris pipa dan _| material tajam. dan APD standard.
klem sesuai gambar.
Installed Plumbing pipe line for Barricade, using pl rm ladder, full body
clean water, Black water and electrical tools hazard, sharp harness, electrical in good working
grey water system c/w object. condition and inspected, hand gloves, Standard
accessories and Clamp as per PPE.
marking line accordingly.
Pembersihan area kerja.
Housekeeping.
Menandai dan membuat Terjatuh, terpeleset, tertimpa | Pemasangan Barikade, menggunakan tangga__| PH, Supv,
lubang untuk jalur pipa keluar | material , bahaya platform, sabuk keselamatan, peralatan listrik | Crew
dari bangunan, rik, tertusuk | yang aman dan telah di inspeksi, sarung tangan
Marking, el
drilling the
material tajam.
electrical tools hazard, sharp
object.
Lokasi kerja berdebu.
Dusty area condition.
1g object,
dan APD standard.
form ladder, full body
Menggunakan masker
Using masker while working.
Pembersihan area kerja.
Housekeeping.Instalasi Tabung pemanas air
mandi dan aksesorisnya.
Water heater Installation ciw
accessorize.
Terjepit, tertimpa tabung heater,
tergores benda tajam, tersetrum
alat listrik.
Pinch point, hit by weight object,
scratch, electric shock by tools.
‘Standard PPE + hand glove, Ergonomic, proper
manual handling < 25 KG load, periksa peralatan
listrik sebelum digunakan dan memastikan tidak
ada arus listrik saat proses penyambungan kabel
terminal heater.
APD standard+sarung tangan, posisi ergonomic,
pengangkatan manual yang sesuai standard < 25
KG, inspected electrical tools properly and make
sure electrical power is shut off and isolated while
wiring jobs.
Pembersihan area kerja.
Housekeeping.