Professional Documents
Culture Documents
Supply Chain Management Abbot Pharmaceutical
Supply Chain Management Abbot Pharmaceutical
Introduction
Principal Activities
Company profile(vision, mission)
Core values and competencies
Supply chain mission and process
a) Supply chain integration
b) Supply chain structure
c) Supply chain process
i. Procurement process(including vendor approval requirements, Bid
sheets, vendor approval steps)
ii. Types of purchases
iii. Material classification
iv. Documentation for purchasing(local or imports)
v. Advising banks of Abbott
vi. Shipping companies through which Abbott import raw material
Abbott Pakistan has leadership in the field of Pain Management, Anesthesia, Medical
Nutrition and Anti-Infectives. Our wide range of products is managed and marketed
through three marketing arms.
On June 29, 2005 Abbott Pakistan Achieved Class 'A' accreditation against the Oliver
Wight ABCD Check list. This was an outstanding achievement, which puts Abbott
Pakistan amongst some of the best global companies in terms of operational
excellence.
The promise of our company is in the promise that our work holds for health and for life
General information
Head Office: Lahore:
Islamabad: Peshawar:
Principal Activities
VISION
MISSION
To deliver consistently superior products and services which contribute significantly to improve the
quality of life of the consumers? This will be achieved while ensuring that the interests of all
stakeholders including healthcare providers, employees, share holders and the communities are
secured. Abbott Pakistan will comply with the highest standards of local cGMP/EHS and adhere to the
corporate code of Business Conduct and Ethics.
DEDICTATED TO
Employees
Customers
Share holders
Suppliers
Public
Core values and competencies
ENDURING
ABBOTT
PIONEERING CARING
ACHIEVING
CAPABILITIES OF ABBOTT
INTEGRITY QUALITY
AGILITY OF
INTEGRITYY EXECUTION
LEADERSHIP COMUNICATION
PRODUCTS &
SERVICES
CUSTOMER
INTIMACY
OPERATIONAL
EXCELLENCE
PEOPLE
SUPPLY CHAIN MISSION
N RETAILERS/ WHOLESELLERS
F
DISTRIBUTORS
O
WAREHOUSE ( F O) PR
R O
Manufacturing D
M
U
A WAREHOUSE (M O)
CT
T TRANSPORTATION
I
SUPPLIER F
O
MARKETING L
N
O
W
F
L
ABBOTTS SUPPLY CHAIN STRUCTURE
CAPAPCITY
MASTER MASTER
PLANNER
SCHEDULER SCHEDULER
PRODUCTION PRODUCTION
PLANNER PLANNER
MATERIALS MANAGER
( Demand Generated)
Manufacturing Planning
(Demand Generated)
Material Planning
Vendors
(Quotations asked)
LC
Material in Warehouse
QA
Released by QA
FO Batches
Packing line
FO Quarantine
Central Depots
& Distribution
Institutions Wholesalers
Retailers
PROCUREMENT
ABBOTT Pakistan has two purchasing departments. One is for local purchases and the other one
is for imports.
There is a clause imposed by ABBOTT Int. Chicago on ABBOTT Pakistan that if the amount of
requisition value is above $ 1000, then at least 3 quotations must be taken.
GENERAL PURCHASES
General Purchases include routine items such as stationery, office equipments, transportations
and other minor items which are not directly related with production activities.
MATERIAL CLASSIFICATIONS
ABBOTT Pakistan classifies its materials according to the values or the cost of materials,
basically they have allotted three grades or types to their materials:
Grade A (very costly materials, e.g. erythromycin)
Grade B (moderate cost, e.g. clathromycin)
Grade C (least cost, e.g. bubble gum and artificial flavors like mint)
LOCAL PURCHASING
Local purchasing department of Abbott Laboratories Pakistan deals with local vendors concerning:
Designing FP Plastics, Al-Ahad Plastics, Thermoplas (Korangi) > Lead Time 30 Days
PrintingAmmara Commercial Printing (Memon Goth, Malir) > Lead Time 30 Days
Packaging Saima Packaging (Korangi Industrial Area) > Lead Time 30 Days
INDENTER
An indenter is a local supplier or the middle party, we also call them as an agent who gives
information to the manufacturer and tells then to arrange the material. They have link with
the manufacturer and paid commission by them.
Picking List
Form 3 and 7 (Imposed by Ministry of Health which contains Batch Certificate, name of
the manufacturer, raw material to get a Drug Import License from MOH)
Certificate of Analysis
Certificate of Origin
ADVISING BANKS OF ABBOT PAKISTAN
Detuche Bank
Standard Chartered Bank
ABN AMBRO
HSBC
Then after this process the LC is send to the concern suppliers and indenters and then they
set the raw material to be shipped, shipment is done through different shipping company and
this part is dealt by the imports department.
WAREHOUSE
Storage of raw/packaging
material after acceptance
MO
Manufacturing
End Product
Good
Warehouse FO
The process of warehousing starts when a consignment enters the premises of ABBOTT and
starts unloading. An actual physical cont is taken first and only then is the consignment allowed
to be fully offloaded. Two separate warehouse facilities exist: one for finished orders and one for
material orders.
While offloading material orders, if any individual packet is found to be damaged or exposed, it
is straight away placed in the Rejection Room which is located separately so that there is no
possibility that it might get mixed and be used up in the production process. Also, there are
certain raw materials which require a temperature range of 2-8C. In order to ensure that this
temperature range is maintained throughout its long journey, each packet has a temperature seal
attached to it and if, at any point in time during transportation, the temperature exceeds the said
limit, it changes color.
Indirect Suppliers
Cognizant Technology Solutions Quantum
Dell Staples
ManpowerGroup Solutions TAPFIN Verizon Wireless
Mindshare VWR International
PHH Arval
Contract Manufacturers
Besins Healthcare
Bionostics, Inc.
Catalent Pharma Solutions
RR Donnelley Global Turnkey
Solutions
Overview of documents & supplier rates
Supplier rates and date of consignment data from pral software abbott
work\Attachments_2012_12_20\CH 29 DRY FEB 2012.xls
Invoice
Picking List