use of concrete mixing machine in gren belt area near condensate tank farm
Watch Tower erection work in green belts area near ss-4
Watch tower roof sheeting repairing work near EIL site office
caustic circulation pump-A NRU cutting and welding for replacement to be done
Rain water pipe work by chipping at ss-2 for unblocking
Drain water pipeline work at SS1/OGT Gspc for ro system drilling work
Watch Tower erection work in green belts area near ss-4
use of concrete mixing machine in gren belt area near condensate tank farm
photography of sapling plantation
drilling of base bolt hole for on 11-P-107b motor skid
weooden partition wall in admin block
Drilling of 11-P-107B base plate through holes drilling m/c
General fabrication work at Sru
Watch tower work in green belt ara
Concrete mixing miller in green belt area
Cutting and welding of suction valve of 86 P 07B and recirculation valve
concrete chipping for rain water pipe in SS4
91 AT 3102 H2s analyser to be checked by using laptop
drilling of 11-P-107B base plate hole using hand drill
General fabrication work in SRU area
watch tower erection work in green belt area near ss-4
Concrete mixing miller in green belt area
cutting and welding of recirculation valve of caustic circulation pump (86-P-09A/B)
concrete chipping for rainwater pipe in ss-4
watch tower roof sheeting repairing work (tower no-5) near main gate
watch tower roof sheeting repairing work in grren belt area near eil site office
permission for taking snaps of all buildings at OGT for the purpose of punch points on civil work
drilling of 11-P-107B base plate hole
Concrete mixing miller in green belt area
watch tower roof sheeting repairing work in grren belt area near eil site office
watch tower roof sheeting repairing work in grren belt area (tower-2) near RWTP
welding/drilling/cutting activities to be done in SRU
welding/drilling/cutting activities to be done in SRU
CTM H2S analyzer , joint calibration with RGTIL
watch tower roof sheeting repairing work in grren belt area (tower-4)
Concrete mixing miller in green belt area
ETP first Floor toilet room false flooring repair work
General fabrication work in SRU area
Watch tower erection in green belt area
use of concrete mixing in green belt area
Admin building Staircase erection work
Fabrication in SRU
Watch tower erection in green belt area
watch tower roof sheeting repairing work in grren belt area (tower-4)
watch tower roof sheeting repairing work in grren belt area (tower-4)
use of concrete mixing in green belt area
Photography Fire Escapre Hydrants in building
Fabrication in SRU
watch tower erection work in green belt area near rwtp (watch tower-3)
watch tower roof sheeting repairing work in grren belt area (tower-4)
use of concrete mixing in green belt area (tnkage area)
CRWS TPI-2B oil skimmer bolts cutting by using grinding machine
earth work excavaion for laying cable for new rawwater reservoir from SS-4
General Fabrication in SRU (cutting, grinding, welding)
watch tower erection work in green belt area near rwtp (watch tower-3)
Watch Tower roof sheeting reapiring work WT-4
Watch Tower roof sheeting reapiring work WT-01 (near CST )
use of concrete mixing in green belt area (tnkage area)
photography in OGT site
Watch Tower roof sheeting reapiring work WT-01 (near CST )
watch tower erection work in green belt area near rwtp (watch tower-3)
use of concrete mixing in green belt area (tnkage area)
oil skimmer bolt cutting using grinding machine
Cutting of out side earthing strip near C-101 & 104with hacksaw
General Fabrication in SRU (cutting, grinding, welding)
Motor base stiffner Brace welding JoB For 11-P-107 B
General Fabrication in SRU (cutting, grinding, welding)
Watch Tower roof sheeting reapiring work WT-01 (near CST )
use of concrete mixing in green belt area (tnkage area)
watch tower erection work in green belt area near rwtp (watch tower-3)
use of concrete mixing in green belt area (tankage area)
hand wheel gearbox fixing plate cutting to be done of done of ows
photography of EOT 's in utilities , train 1 ,sru
modification of fire hydrants in sru area(only preparatory work)
watch tower erection work in green belt area near rwtp (watch tower-3)
use of concrete mixing in green belt area (tnkage area)
Watch Tower roof sheeting reapiring work WT-01 (near CST )
Photography EOT utilities
Earth work excavation for cable layimg new water reservoir from SS 4
watch tower erection work in green belt area near rwtp (watch tower-3)
Watch Tower roof sheeting reapiring work WT-01 (near CST )
use of concrete mixing in green belt area (tAnkage area)
drilling in wall for fixing of clam for rain water pipe
Earth work excavation from MCP 13 to MCP 14 for rectification of fire alrm cable
OWS TPI-2A valve jammed to be made operable
Brick work dismantling in east side of admin block fo fire emrgency exit
Earth work excavation for cable layimg new water reservoir from SS 4
Drilling in blo for fixing of stone out side of MCR
Emergency Exit work purpose admin block first tile cutting
ows TPI-1b oil skimmer bolts cutting &GEAR BOX PLATE CUTING
GENERAL FABRICATION IN SRU
FRP BOXES INSTALATION AND DM PLANT
CABLE TO BE TAKEN IN TO PANEL FOR GLANDING AND TERMANATION
USE OF CONCARET MIXING MILLER IN GREEN BELT AREA
WATCH ERACTION EORK IN GREEN BELT AREA RWTP
CABLE GLANDING CRIMDING AT PLANT SIDE AT SS4 SUBSTATION GLAND PLANT FIXING OFTER DRILLING
OWS TPL "A" oil skimmer bolts cutting & GEAR BOX HOLE ENTRAING
watch tower roof repairing work in green belt area WT-8
Taking photographs for near miss report at SS-4 using IS mobile camera
GENERAL FABRICATION IN SRU
watch tower roof repairing work in green belt area WT-8
OWS TPL "A" oil skimmer bolts cutting & GEAR BOX HOLE ENTRAING
Photography in train-2 area pump intermals
GENERAL FABRICATION at SRU
crwS TPI-2a gearbox enlargement
installation of signage board-drilling, grouting
admin building emergency door erechan
extrinal panel testing at ss4 for nrwr site pump house
watch tower erection work in green belt area near rwtp (watch tower-3)
use of concret mixing in green belt area
ss 1 hvac package unit 1 comporesor 3 boazing work
crus tpi oil skimmer bolts cutting using grinding m/c gear box bole enlargment using gas cutting
relocation of paga 125 located inicle CWPH
watch tower eraction in green belt area near ss-4
watch tower roof sheeting reraing work in green belt area wt-08(opp canteen building)
testing of extention panel at ss-4 for NRWR site pump house
CRWS TPI IB oil skimmes & gear box maintenance work
GENERAL FABRICATION at SRU
admin building emergency door erechan
GENERAL FABRICATION at SRU
admin building emergency door erechan
CRWS TPI IA oil skimmes & gear box maintenance work
Laptop for H2S Analyzer
General fabrication work in SRU area
Admin block emergency exit stair erection work
watch tower roof sheeting repair work nr sales gas boundary line area
Laptop for H2S Analyzer
photograhy for mock drill,safety comitee& contractor training
fixing of readrs/ EM lock atMCR main entry& control room/cable& conduit laying work
welding for fixing angle & bolts to gate frame
drilling on wal & fixing of access control reader & cable casing work
Access control reader fixing at MCR main gate casig And caping work
New watch tower 2 fabrication/hand railing work in green belt area near SS-4
Anchoring and clamping of gi pipe installed for MCP cable in Train-1
Safety Flim Shooting at OGT
Fabrication / hand railing work for watch tower 3 in green belt area
CCTV CAMERA FIXING FIRE STATION
SS-2 transformer deluge valve distribution line leak welding
Cable laying work in SS-4 area chipping and drilling pathway of fire water pump house
Chipping of concrete area near CSU battery limit area.
CCTV CAMERA FIXING FIRE STATION
relocation of alkali scrubber safety to outside dyke wall
relocation of alkali scrubber safety shower to outside dyke wall
welding of pinholes in impulse lines of deluge valve of 02-TR-22transformer
Grouting work at RWTP Pump house area
welding of pinholes in impulse lines of deluge valve of 02-TR-22transformer
New watch tower 2 fabrication/hand railing work in green belt area near SS-4
Fabrication / hand railing work for watch tower 3 in RWTP
Welding and grinding of gratings in train-2
CCTV CAMERA FIXING FIRE STATION
Treated water reservior inside grouting work with hand chipping tool
Photography at Process and non process area
Photography for 12-P-103B ( Lean Amine Charge Pump)
Drilling on admin building wall for fixing cctv cameras
hand railing/roof sheeting work for WT-2 near SS-4
CCTV CAMERA FIXING FIRE STATION
Bending of earth strip by hammering by brush hammer.
Quality policy fixing in OGT
Fixing of electrical siren at fire station
2 no of scba boxes at cpp boxes fixing at rwtp area (drilling)&installation
stifeener welding for 11-p-107 A motor base frame
hand railing roof sheeting work for WT 3 near RWTP
Emergency siren control panel fixing job at fire station
Attending 3" HP steam Header leak in train-1( Pipe rack area)
Fixing out door rack for (ctv network back bone along frimeter wall(wt1towt8)
Photography of pinhole leak formed on hp steam header in train 1
Ambient Monitoring to be done by APPCB using RDS
hand railing roof sheeting work for WT 2 near SS-4
substaion 2 02-TR-22 deluge valve system pressure transmitter upstream valve pin hole leak welding (in QBD line)
fixing of IP56 rated outdoor rac along perimeter wall (WT-1 to WT-8) boom barrier fixing at non-process gate near fire
station
Laser alignment for 11-P-107 A (pure ATM condensate pump A)
alignment of 11-P-107 A using laser alignment kit
fixing of IP56 rated outdoor rac along perimeter wall (WT-1 to WT-8) boom barrier fixing at non-process gate near fire
station
photography for 11-P-107 A/B & 19-P-107 A/B in Train 1&2
caustic circulation pump B (84-P-18 B)discharge piping replacement
outdoor rack fixing from watchtower 3 to watchtower 5 along boundary wall
caustic circulation pump B (84-P-18 B)discharge piping replacement
outdoor rack fixing from cppback side , workshop are &material gate
Photography for 12-P-103B ( Lean Amine Charge Pump)
cooling water return header flow transmiters supports to be welded & anchored
h2s analyser calibration by using labtop
hand rail fixed & roof sheeting
heating of collar for instalation on 12-p1032-b
photography for lean charge pump b 12-p-103-b intrnel insplchon
fixing of out door rack on top of the ss-1 cable and glanding work
h2s analyser calibration by using labtop
photography of 12-P-103B pump internals
roof sheeting work for WT-3 near RWTP
heating of couplimh hub of 12-P-103 B with oxy acetylene cutting torch
emergency turn out bel at fire station with electricaldepartment
drilling for installation of anchorimng bolts (CRWS TPI 1 B)
heating of coupling hub of 12-P-103 B with oxy acetylene cutting torch
photography of 12-P-103B pump internals
CRWS TP1-1B oil skimmer gear wheel belts cutiing and anchoring
h2s analyser calibration by using laptop
heating of coupling hub of 12-P-103 B with oxy acetylene cutting torch
fixing of out door rack on top of the ss-1, SS2, OHC, MCR and Canteen Terrace
photography of 12-P-103B pump internals
h2s analyser calibration by using laptop
gaurd pond -2sluice gate to be made operable (drilling on concrete based and installation of sluice gate base
door repairs work of ss 1,2,4 (drilling activity )
roof sheeting erection work for WT-3
h2s analyser calibration by using laptop
photography for gspc
roof sheeting erection workfor wt 3
cutting of anchoring bolts projections near n2 skid
indoor rack fixing for cctv & access control system
boom barrier fixing at ohc gate
fixing of screw for sand stone clading in transformaer bay in ss1
welding for HM feeder piller channel to lift the fedder pillar above the ground level
cheak list welding work for WT2 -near S S 4
roof sheeting work for WT-3 NR RWTP
fixing of screw for sand stone clading in transformaer bay in ss1
GT 1 inside grating fixing
Drilling on alluminium door for E.M lock fixing
fixing of screw for sand stone clading in transformaer bay D1-TR-23 in ss-2
roof sheeting erection workfor wt 3
cable laying and access control reader installation in Lab
Clamping of instrumentation cable and drilling
Functional verification by using Laptop HCDP analyser
Clamping of instrumentation cable and drilling
21-p-101A Suction volume bottle temperature to be checked by using infrared thermo image scanner
fabrication of shed of instrument air dryer
21-p-101B Suction volume bottle temperature to be checked by using infrared thermo image scanner
roof sheeting work for WT-3 NR RWTP
fixing screw to sand stand cladding in transformer bay (04-TR-22) in SS4
h2s analyser 91-AT-3102 verification to be done by conecting laptop
hsdp analyser (32-AT-1601 calibration to be done
drilling & vaporising work for doors
h2s analyser 41 -AT- 1102 hmI configuration to be done using laptop
cutting of granite for fixing the same to admin block column at back side of admin bldg
h2s analyser 41 -AT- 1102 hmI configuration to be done using laptop
91-AT-3102 H2S analyser to be checked by using laptop
roof sheeting work for WT-3 NR RWTP
fixing screw to sand stand cladding in transformer bay (04-TR-22) in SS4
mix structural work for WT-2 nr ss4
fixing / repairing of s granite stone / false ceiling of admin block
roofsheeting work and earth of WT-3& RWTPin green belt area
mioc strl work & fixing of lighting fixtures for WT-2 near ss-4
repairing of damaged false ceiling in admin block
fixing of screw to sand stone cladding in tramformer bay (04-TR-22) of ss-4
fabrication of shed for HMI panel of instrement air dryer-'A'
photography for HMI panel (shed)of instrument air dryer package
CTM H2S analyzer to be chacked with laptop
CCTV CAMERA FIXING AND CABLE LAYING WORK
fire station building cable dresing for emergency siren motor by using drilling machince
mix structural work and fixing lighting for WT2 at SS-4
rof shifting and mix structure work of WT-3 near RWTP
CCTV camera fixing closing caping for cable laying
Train-1 analyer 11-AT-1303 maintanance by using laptop
CCTV camera fixing closing caping for cable laying
H2S analyzer maintenance in GSU-1 by using laptop
Cutting of plant air line (3''-AP-51-5201-A3A) near battery limit
Lighting illumination check of slug cathcher area by using lux milar
H2S analyzer maintenance in GSU-1 by using laptop
Fabrication of shed for panel of instrument air dryr -B
providing anchorage to CGI sheets for duct openings on roof terrace of admin block
fixing/welding of loose grating for platform of tech str-1 of SRU
ambient air quality monitoring to be done by respirable dust sampler
fixing/welding of loose grating for platform of tech str-1 of SRU
fixing of light fitting for WT-2 ner ss-4
photography of OGT for OCTOPUS team (AP Police) for mock drill at OGT
fixing/welding of loose grating for platform of tech str-1 of SRU
96-P-08a/b/c 96-P-a,b,c pump skid area area routing to be done. Manual Concrete chipping
concrete chipping & cutting of pump skid for drain rerouting of 96-1A-003 A/B and 96-1A- 208B/C & 961A - 96 PA
01 A/B pumps
camera fixing inside mcr& top of the mcr building
lighter fixing of IOT -2 nr ss4
cable laying fir warehouse lighing dumping using drilling machine
concret chipping near pump skids for drai rerouting of 96-pa-008A/p
camara fixing inside m c r panel room wall
lights fixing for wt-2 near ss-4
Unwanted scaffolding pipes removel using hacksaw in train-1 battery lmt area near 11-pt-1107 A/B
fixing of pt2 at ss1&ss2 terrace
chipping pumps skids for drain rerouting of 96-PA-10 a&b
photographi at hm8
installation of Fire Extinguisher (FRP Boxes)
Fixing of SCBA set Box at MCR
Grouting work at ETP area
Grouting work at ETP area
Grouting work at ETP area
Drilling of 4 holes on cocrete base for anchoring of support for 3/4 line of Discharge line
Grouting work at ETP area
photography at RWTP
Photography & ICCP TRU maintennace activity
Grouting work at ETP area
Drilling work in aeration tank and rectification
Welding of lighting earth strip in RWTP Chemical House
Grouting work at ETP area
Grinding work in urinal area
Cable fault identification work by injecting supply
Cable fault identification work by injecting supply
lightening earth strip welding on roof top
Cable fault identification work by injecting supply
Chipping of base & cutting of 1-bolts welding of studs of acid unloading pump-B (85-P-06B)
Chipping of base & cutting of 1-bolts welding of studs of acid unloading pump-B (85-P-06B)
fire fighting training GSPC , O&M contractors using open tray
flp telephone fixing at train 1by drilling
Drilling at SRU blower A & B local HMI panel bottom side for optical cable termination
drilling holes for installing emergency exit signs at OHC
drillIng holes for installation of emergency exit signs at vip canten
Groove cuting in roof terrace of DM plant
Taking picture of slugcatcher unit installed gratting
Groove cuting in roof terrace of DM plant
tower bolt fixing at emergency exit door
Fixing of choqured plate overflow cover to tank overflow line manhole in dm plant
Making V Groove of 6*6 mm size for sealing filling in roof terraceof control room
Fixing of choqured plate overflow cover to tank overflow line manhole in dm plant
Making V Groove of 6*6 mm size for sealing filling in roof terraceof control room
Pinhole welding of saturation vessel of air compressor in ETP
aluminium door repair of SS-2
aluminium door repair of SS-2
photography to be taken at n2 plant area
Photography to be taken within the site
To take photograph of stagnated water at the roof of substation
Installation of cage ladder inside raw water pump house
Installation of cage ladder inside raw water pump house
96-A0-001Aaugur drivealignment(grinding of base pole and cutting of thin plates work
Cutting of Jack bolts and plumber block bolts for alignment if OWS skimmer
use of laptp in microwave tower near mcr
use of laptp in microwave tower near mcr
31-psv-1401/1409 platform cutting of the guard that obstacleing the pasaage towrods the monkey ladder
Welding of pin hle leak in formulation header near ssf
surveying (for laying natural gas line from CTM to GITL area) using battery operated instrument (toal station)
use of laptop for checking h2s analyser 11 AT 1303
photography of WT-8 lighting PDB nr canteem
use of laptop for commisioning of 91 at 3103
Use of laptop in Train-1 for the maintenance of H2S analyser (11-AT-1303)
Use of laptop at CTM for the maintenance of HCDP analyser (91-AT-3103)
AQMS bulding sun shed providing
AQMS bulding sun shed providing
AQMS bulding sun shed providing
concreting of pipe calvat near ss-4 for road from ss-4 to helipad
concreting of pipe culvert near ss-4 for road from ss-4 to helipad
AAQ monitoring using HVAS near Main gate, Material gate, SS-1 & RWTP for continuous 24 hrs
Drilling on wall for fixing of clamps for installation of fire extinguisher in Admin building
Drilling on wall for fixing of clamps for installation of fire extinguisher in Main gate
Drilling in 02-PC-301 panel for 96-PM-09B motor ( treated effuelent discharge) power cable shiftng to spare feeder
Dismelting of tata telecom tower near eil site cutting of towers grouted leg at ground level
Manual chipping for floor rectification in chemical dozing area at ETP
Manual chipping of floor connect in chemical dozing area of ETP
Fencing removing of train-2 area battery limit by ack saw cutting
Rectification f C.P TRU shed''s
Drilling work for fencing of FRP BOX for installing fire extingusher
Cooling tower cell-C HC&H2S detector location shifting in HC&H2S detector hanger fixing by drilling
Train-2 bettery limit area fencing removed work
Manual shipping of floor concrete of chemical dosing area-ETP
Ambient air quality monitoring at main gate, material gate, ss-1,RWTP USING high value air samples
rectification of trv shed nr ss4 in greenbelt area
lighting arrestor erection in cooling tower area and cell-C side welding and drilling
Sludge (84-THK-05) plant air &service water line support and welding
Train-2 bettery limit area fencing removed work
Lighting strip ercting in CETP near cell C side (drilling work)
oil skimmer to be made operable
earth strip welding connection of NR water reservior
Photography for SS-2 GPS server
earth strip welding connection of NR water reservior
Photography for RWTP area
photography at mcr conference hall for safety commitee meeting
RCC permet cheeping for providing cp referance cool in train-02
Drilling of hole for anchoring of support plate of pinion gear of ows 111-2A
Rcc parmanent chipping for previding c.p reference cells in train-2
Photography for durgapooja at ware house
Aluminium glass door repair and ISO certification boards fixing at MCR
Fixing of ISO Freame Boards
Rcc promutech chipping for provding CP Reference ceiis in train-2
Fixing ISO boards at canteen ohc and admin for Racks support with drilling to wall
Fixing of ISO boards at main gate
support installlation at N2 fuel gas purging lines for HP flare at 2 locations
Rcc pavmanent chipping for providing c.p reference cells in train-2
Drilling of holes for anchoring of support plate of pixing gear of ows TPI-2'B'
RCC parament chipping for providing C.P system reference cells in train-2
Rcc pavmanent chipping for providing c.p reference cells in train-2
Cuttiing of rebars in RCC pavemnt for installation of CP reference cell
support installlation at N2 fuel gas purging lines for HP flare at 2 locations
installation of HSE policy at mcr conference room, sic rooom
aluminium glass door repair and crew change room
drilling of holes for fixing hse policy board
Aluminium glass door repair with drilling
Pin hole leak attending for 11-E-101 cooling water return line
Formulation dosing pin hole welding near SSP-B
Aluminium glass door repair
RCC permanent chipping fox instalation of new referance cells fox cp system
Photography in MCR conference hall
Rcc perement chipping for installation of new cp referance cells in train-1
Rcc chipping work for cctv cemera pole installation at mai gate out
Drilling of hole in argonite room for spare cylinder supports anchoring (3 postiom)
RCC pavement chipping for installation of new reference cell for CP protection. Cutting of rcc bars for excavation
upto 1 meter depth
drilling activity at cell b for HC & H2S detectors location shifting
drilling activity at cell b for HC & H2S detectors location shifting
Photography for onshore gas pipeline test station near slugcatcher area
Removal of thereaded spool in drinking water line that is routed to sewer
Fixing of wall clock & notice board in process area managear room in MCR using Drilling machine
Photography permit of grass cutting in OGT
Photography permit at 01-TR-021 power transformer yard
grass cutting near fwph area
RCC permanent chipping for installation of new reference cells for cp system
Grass cutting and drainage cleaning actiaits opp fire station & adminbeilding and at non process areass
RCC Pavement chipping for instalatlion of CP new reference cells prading in train-1
Loding gantry earth strip drilling using portable drilling machine
Photography for 3'' HP steam header upstream flange leak
catapture of photos at process area for covering grass cutting & drainage activities
Grass cutting and drainage cleaning at process area
Installation of aeration header (welding of pipes&grinding) in guard pond-1
Photography work at all process area / ogt GSPC
Glass doors repair with drilling
Drilling key board box out MCR
Grass cutting and drainage cleaning at process area(nr mcr,ss1 , nr site off)
modificationjob by cutting of 02-HT-201 panel inside door for easy removal of side door and inspection of incoming
power cables
Ambient air quality monitoring to be carried out by using High volume sampler at SS-1, RWTP, Material gate, Main
Gate
Grass cutting and drainage cleaning at ETP,RWTP
At MCR perimisson for photography during training session
RCC Pavement chipping for instalatlion of CP new reference cells prading in train-1
Gross cutting at condensate storage tank area surrounding and inside dyke area by manually
91-T-101 B (condensate storage tank -b) manhol leak attending by applying soap to the flangr
91-T-101 B(stabilized condensate storage tanks) west side man hole C clamp fit up checking
Silicon sealant appilication for 16" outlet flange of 91-T-101 B (stabilized condensate storage tank)
Concrete joint chipping work in SRU near SRU air blower (for highting cable fault indentification)
Photography of (1) 1" aeraction header installed in gurard pond-1 in ETP (2) Cooling tower cell-B fills condition
For taking photographs of grass cutting and drainage cleaning
Removal of moves comb at flare area
Removal of moves comb at RWTP area
clamp fit up inspection&installation for west sicle man hole of stabilized condensate storage tank B(91-T-101B)
Drainage cleaning &Grass cutting with maintenance for grass cutting only
Photography inside cell-A in cooling tower
Cutting of chequer plate beside 02-HT-202 11KV isolator panel-2 for removal of earth strip.
Photography at Train-1 area
87-K-01`B'' (LP compressor-B) quarterly preventive maintenance
304-p-101 B (driking water pump-B ) quarterly preventive mainteance
12-p-102 A&B (regenerator reflux pump) monthly preservation
12-p-113 A&B (anti foam injection pump) monthly preservation
12-P-114 A&B (corrosion inhibitor pump) monthly perservation
Chlorine toners (1836-350) toner side first islation valve operability chacking
87-km-101B and its AOP electrical P.M job
OGT lighting maintenance
11-LT-1904 (FLARE KOD ) valve troubleshuting work
96-pa-009 A (treated efflunent pump ) motor shifiting to 96-pa-009 B
96-pa-032 B (STP to green belt pump ) gland packing replacement
change of old wind socks & instalation of new one at cooling tower and helipad ares
Temporary 11-TT-3124 (11-p-103 A) Erratic valve troubleshooting work
87-k-01`B'' (LP compressor-B) instrument maintenance work
utilities motors online greesing
DM plant office room split AC blower moter instalation
tallarevu pump house battery bank mainatenance
Drain channels clening at codensate tanks
Dryer -A heater bank side lug replacement
lighting maintenace in utility area
Sludge thickner (84-THK-01)air & high pressure water inlet line spool piece
Daily routine maintenance health checks of plc's in utilities
Replacement of 22-pi-1704 to 21-pi-1704 location ar thear no guage installed at the 21-pi-1704
HOT WORK PERMIT RECORD
DEPARTMENT /CONTRACTOR NAME AREA
EIL / csu/wt-7
EIL / DEC
EIL / all area/unit
projectc(E&C dept) pipeyard
EIL TR-2
EIL / DEC mcr
EIL/ ICON csu
EIL/DEC loading gantry ,main gate
EIL/ csu
eil and kppl Admin building
mr muralikrishana p w ph
mr alising fire station
Joseph Besti / Shiva SRU
EIL Train 2
EIL/Commtel Microwave tower
EIL/CHEMTROL SRU
EIL/CHEMTROL Train-2
eil/kepl kepl store
commtel/eil opp canteen
eil/dec flare, ss-1,2,3, dws,warehouse
EIL/CHEMTROL SRU
eil/kepl kepl store
eil/dec weigh bridge
eil/dec AQMS-2
GSPC Instrumentation offsite
EIL/CHEMTROL train-2
GSPC Mechanical Utilities
eil/dec south wes t corner
GSPC Mechanical csu
eil / dec infront of canteen
eil/kepl kepl store
EIL/ KEPL SS2
EIL/ DEC Fencing area
EIL/KEPL SS_2
EIL/IR Compressor area
EIL/DEC Finishing area
IT department Admin Building
RWTP
EIL/KEPL nr kepl store
csu csu
csu csu
eil/dec warehouse
EIL/RRk ss-2
EIL/RRk Green Belt area
EIL/RRk admin building
EIL/RRk Green Belt area
EIL/RRk tower-6
GSPC
EIL/RRk Green Belt area
EIL/RRk Green Belt area
EIL/RRk tower-6
GSPC mechanical utilities
EIL/RRk ss-2
KK water/Aqua system ltd SS-1
EIL/RRk Green Belt area
EIL/RRk Green Belt area
gspc hse loading gantry\
GSPC Mechanical train 1
EIL/RRk admin building
Gspc mech Train 1
GSPC mech SRU
EIL/RRk SS4
EIL/RRk Green Belt area
GSPC mech Cooling Tower
EIL/DEVI SS 4
GSPC Insr Offsite
GSPC mech train-1
GSPC mech SRU
eil/rrk green belt near ss-4
eil/rrk green belt near CST
GSPC mech utilities
eil/devi ss-4
eil/rrk near main gate
eil/rrk near eil site office
Gspc all areas
GSPC mech train-1
eil/rrk green belt near CST
eil/rrk near eil site office
eil/rrk green belt area Tower-2
SRU
SRU
CTM
future area(train 3)
eil/rrk green belt near CST
ETP
GSpc mech Sru
EIL Green belt area
Eil Green belt area
Rajesh Admin building
EIL SRU
EIL Green belt area
EIL Green belt area
EIL EIL office
Eil Green belt area
HSE OGT Buildings
GSpc mech SRU
eil/rrk Green belt area (WT-3)
eil/rrk Green belt area (WT-4)
eil/rrk tankage area
GSPC mech utilities
EIL/TPL SS-4
GSPC mech SRU
eil/rrk RWTP (WT-3)
eil/rrk WT-4
eil/rrk WT-1
eil/rrk tankage area
GSPC Warehouse OGT
eil/rrk WT-1
eil/rrk RWTP (WT-3)
eil/rrk tankage area
GSPC mech ETP
gspc electrical Train-1
GSPC mech SRU
mechanical Train-1
GSPC mech SRU
eil/rrk WT-1
eil/rrk tankage area
eil/rrk RWTP (WT-3)
eil/rrk tankage area
GSPC mech utilities
GSPC mech
GSPC mech SRU
eil/rrk RWTP (WT-3)
eil/rrk near tankage area
eil/rrk WT-1
Gspc Mech utilities
eil/rrk SS4
eil/rrk RWTP (WT-3)
eil/rrk WT-1
eil/rrk near tankage area
eil/rrk SS 4
eil/rrk Admin/fire station
Gspc Mech utilities
eil/rrk Admin
eil/rrk SS4
eil/rrk MCR
eil eil/rrk
Gspc Mech utilities
Gspc Mech SRU
HSE DEPT DM Plant
EIL\TATA SS 4
EIL\RRK tankage area
EIL\RRK RWTP (WT-3)
EIL\TATA SS 4
GSPC MECH utilities
EIL/RRK WT-8
GSPC HSE SS-4
Gspc Mech SRU
EIL/RRK WT-8
GSPC MECH utilities
GSPC MECH Train-2
GSPC MECH SRU
GSPC MECH utilities
hse utilities
eil/rrk admin building
eil/tpl ss 4
eil /rrk RWTP (WT-3)
eil/rrk tankage area
gspc/airon ss-1
GSPC MECH etp (96)
IT department Cooling Tower
EIL/RRK SS-4
EIL/RRK WT-08
EIL/TPL SS-4
GSPC Mechanical utilities
GSPC MECH SRU
eil/rrk admin building
GSPC MECH SRU
eil/rrk admin building
GSPC Mechanical utilities
Instrumentation CTM
GSPC Mechanical SRU
EIL/RRK admin building
EIL/RRK WT-05
Instrumentation CTM
gspc hse ogt
admin substaiton
eil/ ramakrishna wt 3
GSPC instrumentation offsite
admin ogt
eil/ ramakrishna
GSPC Mech
WIPRO/ Security/IT lab building
WIPRO/ Security/IT ohc gate
EIL/DEVI ss1
GSPC ware house
GSPC/RRK GREEN belt area
EIL/RRK green belt
EIL/RRK SS-1
GSPC CPP
WIPRO fire station
EIL/RRK ss-2
eil/ ramakrishna
WIPRO/ Security/IT
Instrumentation
Instrumentation
Instrumentation
mechanical
mechanical utilities
mechanical train 1
EIL/RRK green belt
EIL/RRK ss 4
Instrumentation ctm
Instrumentation train 1
admin ss2,ss4
Instrumentation SRU
eil/rrk WT-3
eil/rrk WT-3
eil/rrk WT-3
GSPC PG receiver
GSPC Electrical substaiton -03
Wipro IT Infront of OHC
Wipro IT ware house
EIL MCR
Wipro IT site office
mechanical utilities
utiliites utilities
Wipro IT mcr
EIL/RRK greenbelt area
electrical / mainatiance ware house
gspc mechanical/vatech wabag utilities
Wipro IT MCR
EIL/RRK greenbelt area
gspc/mechanical process/train-1
wipro limited ss2&ss1
gspc mechanical/vatech waba etp
gspc electrical ctm
GSPC-HSEF train-1
GSPC-HSEF MCR
Vatech-WABAG ETP
Vatech-WABAG ETP
Vatech-WABAG ETP
Gspc Mech Train-1
Vatech-WABAG ETP
gspc/mechanical utilities
gspc electrical maintenance
Vatech-WABAG ETP
Vatech-WABAG ETP
gspc electrical RWTP
Vatech-WABAG ETP
Admin MCR
gspc electrical ss-1 ss-2
gspc electrical ss1,dm plant ss2
gspc electrical fire station
ss2
gspc electrical ss2, SRU
HSE CSU
gspc electrical DM Plant
gspc electrical OHC
gspc electrical slugcatcher
gspc electrical SS1, SS4
gspc electrical SS1, Admin Building
gspc electrical SS3, RWTP
gspc electrical SS#3, CPP
gspc electrical SS2, CTM
gspc electrical Train 2
HSE CSU
gspc mechanical OHC
gspc mechanical DM line
gspc mechanical SS-1
gspc mechanical ss-3
gspc mechanical RWTP
gspc mechanical ohc & laboratory
GSPC mechanical off site
electrical / mainatiance SS-1 & Admin
electrical / mainatiance SS#3, CPP
electrical / mainatiance SS-4 & Fire Pump house
electrical / mainatiance SS#3, CPP
electrical / mainatiance SS3, RWTP
Admin SS-1
GSPC Electrical SS-1
GSPC Electrical SS#3, CPP
GSPC Electrical SS-2 Maingate
Admin SS-1
GSPC Electrical SS-2
GSPC Electrical SS-1
GSPC Electrical SS-2
GSPC Electrical SS-4
GSPC Electrical SS-3
Admin/Satyanarayana(capenter) SS-1
GSPC Electrical SS-2
GSPC Electrical SS-1
Admin/Satyanarayana(capenter) SS-1,2
Gspc ETP
gspc SS-1, ss-3
GSPC Mechanical ETP
electrical / mainatiance Open Cable Yard/ Future area
GSPC process Utility
GSCP HSE DM Plant & EIL Office
GSPC Mechanical ETP
GSPC Mechanical ETP
GSPC Mechanical SRU
GSPC Process Process
GSPC Process utilitiy
GSPC Mechanical utilitiy
GSPC Mechanical TRAIN-02
Gspc HSE MCR
GSPC Mechanical OGT
GSPC Mechanical Utilities
GSPC Mechanical Utilities
wipro fire station
GSPC HSE OGT
GSPC Mechanical utilities
WIPRO lab building
GSPC Mechanical Train-1
Instrumentation ctm
electrical ss2
electrical Utility
mechanical ware house
Admin fire station
Process MCR
Admin Admin building
Admin fire station
mechanical Utilities
OGT
mechanical Utility
Admin SS-4
mechanical FWPH
hse RWTP
GSPC Electrical Utilities
GSPC Electrical Utilities
Instrumentation weigh bridge
GSPC HSE RWTP
GSPC HSE DM plant
gspc electrical/system protector utilites
Gspc/inst CTM
VATECH/EIL ETP
GSPC/HSE Fire station
GSPC Mech fire station
GSPC mech Utility
GSPC HSE fire station
Admin Overhead tank
Admin Overhead tank
GSPC-HSE DM plant
GSPC-mechanical Utilities
GSPC-mechanical Utilities
GSPC-mechanical UTILITIES
admin ohc
Utilities DM plant
Utilities DM plant
Admin/security Materail gate
Gspc/mechanical Workshop
VATECH/EIL ETP
EIL SS1&2&4
EIL SS1
Admin/security Material gate
VATECH/EIL ETP
Admin/security Material gate
chalam Sudakar
gandhi Ravi Kiran
Krishnan KSV
B B Gandhi PKN Prasad
B B Gandhi PKN Prasad
B B Gandhi A S Rajan
Near RWTP west side B B Gandhi A S Rajan
Infornt of RWPH B B Gandhi A S Rajan
Train-2 south side B B Gandhi A S Rajan
Krishnan A S Rajan
96-10P8-ETP Krishnan gurrale
kevin shah gurrale
mujahid gurrale
mujahid Rajan
Mujahid Rajan
Kevin shah Rajan
MCR t s challam Rajan
mujahid A S Rajan
Kevin shah A S Rajan
mujahid ravi kiran
Guralle sudhakar
near condensate tank TS Challam ravi kiran
gsv pavan kumar ravi kiran
TS Challam ravi kiran
train-2 TS Challam ravi kiran
Train-1 mujahid Arun Teja
Arun Teja Arun Teja
Arun Teja Arun Teja
train 1 TS Challam sudhaker r
sru TS Challam sudhaker r
Cooling Tower bb gandhi sudhaker r
FWPH bb gandhi sudhaker r
warehouse/workshop bb gandhi sudhaker r
Slugcatcher kevin shah Sudhakar
Canteen Building Kiran Kumar Rajan
MCR ravi kiran
Green Belt area Mujshiad ravi kiran
ware house Pavan ravi kiran
SS4 kevin Shah Ravi kiran
slug catcher mmujahid ravi kiran
SRU ravi kiran ravi kiran
OWS Mujahid ravi kiran
Green Belt area Ravi kiran Ravi kiran
SS4 P Balakrishna ravi kiran
SRU T S Challam Arun Teja
slug catcher kevin shah Arun Teja
Green Belt area T S Challam Arun Teja
SS4 Kevin Shah Arun Teja
OWS T S Challam Arun Teja
m mujahid
rajan
m mujahid
Arun Teja
m mujahid gurrale
m mujahid gurrale
m mujahid
gurrale
Pavan gurrale
cp balakrishna rajan
Kevin Shah gurrale
bb gandhi gurrale
gurrale sudhakar
Pavan gurrale
Guralle sudhakar
mmujahid kns
mmujahid ksv
Gs pavan KSV
Kevin Shah KSV
Coloumn 5 Mujahid Rajan
Mujahid Rajan
Mujahid Rajan
Kevin Shah Rajan
Laxman Rajan
B B Gandhi Rajan
Mujahid
Green Belt area Rajan
Mujahid Rajan
g s pawankumar Arun Teja
pll office Mujahid Rajan
Kevin Shah Rajan
Mujahid Rajan
satya rajesh Rajan
ctm mujahid gurrale
mujahid gurrale
near rwtp mujahid gurrale
mujahid gurrale
pawan gurrale
ogt mujahid gurrale
satya rajesh gurrale
satya rajesh gurrale
chalam gurrale
chalam gurrale
chalam Sudhakar
chalam gurrale
LAB tata l n murthy Ravi Kiran
Mujahid Ravi Kiran
Mujahid Ravi Kiran
Mujahid Ravi Kiran
Green Belt Krishnan Sudhakar
Green b\Belt Mujahid Arun Teja
Green b\Belt Mujahid Arun Teja
Mujahid Arun Teja
Green b\Belt chalam Rajan
Green b\Belt chalam Rajan
chalam Rajan
chalam Rajan
mujahid rajan
mujahid Rajan
behind slugcatcher mujahid Rajan
greenbelt b b gandhi gurrale
greenbelt Gurrale gurrale
b b gandhi gurrale
kevin shah gurrale
Gurrale mriyal rampru
Mujahid gurale
Mujahid Guaralle
Mujahid KSV
mujahid ksv
Laxman ksv
Green Belt area mujahid Arun Teja
Green Belt area mujahid Arun Teja
Admin building mujahid Arun Teja
ogt mujahid Arun Teja
ss-4 Kevin shah Arun Teja
Green Belt area mujahid Arun Teja
Green Belt area mujahid Arun Teja
Admin building mujahid Arun Teja
ss-4 Kevin shah Arun Teja
41 mujahid Rajjan
Green belt RWTP mujahid Rajan
CST green belt mujahid Rajan
Admin/ Main gate mujahid Rajan
SS4 mujahid Rajan
Green Belt area mujahid Rajan
Green Belt area mujahid Rajan
near cst mujahid Rajan
mujahid Rajan
B B Gandhi v arun teja
green belt area mujahid Gurrale
mujahid
admin building & green belt area Gurrale
Green belt area mujahid Gurrale
GSU-1 Mujhahid ksv
Green Belt area Mujhahid ksv
Green Belt area Mujhahid ksv
Green Belt area Mujhahid ksv
admin building bb gandhi ksv
mujahid
- ksv
warehouse/workshop gsv pavan kumar ksv
ss-2 kevin shah ksv
mujahid v arun teja
Green Belt area mujahid v arun teja
Green Belt area mujahid v arun teja
tower-6 mujahid v arun teja
B B Gandhi Rajan
v saibaba gurrale swamy
gurrale swamy
gurrale swamy
Greenbelt B B Gandhi V arun teja
Train-1 B B Gandhi V arun teja
OGT B B Gandhi V arun teja
Greenbelt BB Gandhi V arun teja
fire station Anuj kumar dixit V arun teja
SS-2 kevin shah Rajan
SS-4 kevin shah Rajan
CSU T S Challam Rajan
fire station Akhil Rajan
rwtp B B Gandhi gurral swamy
rwtp B B Gandhi Ravi Kiran
deluge valve system kevin shah Ravi Kiran
Treated water reservoir B B Gandhi Gurrala swamy
deluge valve system kevin shah p k n prasad
Greenbelt BB Gandhi p k n prasad
Greenbelt BB Gandhi p k n prasad
Train-2 BB Gandhi rajan
fire station Akhil rajan
RWTP BB Gandhi rajan
OGT Ravikiran mrinal raman
train 2 chalam KSV
ogt Man bahadur p k n prasad
ogt B B Gandhi p k n prasad
fire station Man bahadur p k n prasad
Train-1 p k n prasad p k n prasad
OGT bb gandhi p k n prasad
fire station Venugopal srinivasan rajan
bb gandhi p k n prasad
Gsu chalam p k n prasad
chalam p k n prasad
Venugopal srinivasan p k n prasad
Gsu KSV
B.B Gandhi KSV
KSV Ravi Kiran
OGT S.VENUGOPAL Gurrala swamy
bb gandhi ksv
kevin shah
02-TR-22 DV Sytem ksv
bb gandhi
ksv
GSU-1 TS Challam gurrale swamy
GSU-1 TS Challam Arun Teja
bb gandhi
Arun Teja
Train I/II bb gandhi rajan
RWTP b b gandhi rajan
boundary wall b b gandhi rajan
rwtp b b gandhi Gurrala swamy
boundary wall b b gandhi Gurrala swamy
csu b b gandhi Gurrala swamy
Cooling Tower b b gandhi Gurrala swamy
ctm b b gandhi Gurrala swamy
wt-2 b b gandhi Gurrala swamy
csu ksv
csu ksv
ss-1 Saibaba ksv
ctm ksv
GSU TS Challam ksv
bb gandhi ksv
GSU bb gandhi Gurrala swamy
fire station S.VENUGOPAL ksv
etp bb gandhi ksv
GSU TR-2 V.arun teja V.arun teja
GSU TR-2 V.arun teja V.arun teja
ETP(96) V.arun teja V.arun teja
CTM V.arun teja V.arun teja
GSU TR-2 S.Ashok Babu V.arun teja
SS1/ SS2/ Canteen, MCR, OHC Kevin Shah Rajan A.S
GSU TR-2 chalam Rajan A.S
CTM Rajan A.S
b b gandhi
etp A S Rajan
b b gandhi
etp rahul Prasad
b b gandhi rahul Prasad
b b gandhi rahul Prasad
Pawan rahul Prasad
etp KSV ravi kiran
KSV ravi kiran
KSV ravi kiran
KSV ravi kiran
ss2&ss1 ksv ksv
etp ksv Ravi Kiran
ctm ksv srinivas
train-1 Arun Teja p k n prasad
MCR Arun Teja p k n prasad
chemical House Arun Teja p k n prasad
chemical House Arun Teja p k n prasad
chemical House Rajan Rajan
GSU b b gandhi Rajan
chemical House b b gandhi Rajan
RWTP(84) S.Ashok Babu tanveer
Arun Teja p k n prasad
chemical House chalam Rajan
ETP p k n prasad p k n prasad
chemical House chalam Rajan
chemical House chalam Rajan
MCR chalam Rajan
ss-1 ss-2 Kevin Shah Rajan
ss-1 ss-3 Kevin Shah gurrale swamy
fire station gurrale swamy gurrale swamy
kevinshah
OGT gurrale swamy
OGT BB Gandhi srinivas
CSU BB Gandhi srinivas
OGT BB Gandhi srinivas
OGT BB Gandhi srinivas
OGT BB Gandhi gurrale swamy
OGT BB Gandhi, Kevin Shah srinivas
OGT BB Gandhi, Kevin Shah srinivas
OGT BB Gandhi, Kevin Shah srinivas
OGT Kevin Shah srinivas
OGT BB Gandhi srinivas
OGT BB Gandhi, Kevin Shah srinivas
CSU BB Gandhi srinivas
OHC BB Gandhi srinivas
MCR BB Gandhi, Kevin Shah srinivas
SS-4 Kevin Shah Arun Teja
RWTP Kevin Shah Arun Teja
Kevin Shah Arun Teja
Kevin Shah Arun Teja
drinking water BB gandhi Arun Teja
SS-1 & Admin Kevin Shah Rajan
SS#3, CPP Kevin Shah Rajan
SS-4 & Fire Pump house Kevin Shah Rajan
SS#3, CPP Kevin Shah Rajan
SS3, RWTP Kevin Shah Rajan
SS-1 Kevin Shah Rajan
SS-4 Kevin Shah Rajan
SS#3, CPP Kevin Shah Rajan
SS-2 Maingate Kevin Shah Rajan
SS-1 Kevin Shah Rajan
SS-2 Kevin Shah Rajan
SS-1 Kevin Shah Swamy
SS-2 Kevin Shah Swamy
SS-4 Kevin Shah Swamy
CPP Kevin Shah Swamy
SS-1 Kevin Shah Swamy
main gate Kevin Shah Swamy
admin Kevin Shah Swamy
SS-1,2 Kevin Shah Swamy
96-P-09B FOR: AS Rajan AS Rajan
Kevin Shah Arun Teja
BB Gandhi Rahul
Kevin Shah AS Rajan
ETP B B Gandhi mrinal raman
B B Gandhi mrinal raman
B B Gandhi AS Rajan
B B Gandhi AS Rajan
SRU B B Gandhi AS Rajan
MCR B B Gandhi AS Rajan
ETP B B Gandhi AS Rajan
ETP B B Gandhi srinuvas
dpdu b b gandhi Ravi Kiran
Ravi Kiran
b b gandhi Arun Teja
ETP b b gandhi Arun Teja
ETP 96 b b gandhi gurrale swamy
fire station S.VENUGOPAL gurrale swamy
OGT b b gandhi gurrale swamy
ETP 96 b b gandhi gurrale swamy
lab building Tata Murthy gurrale swamy
GDU b b gandhi KSV
b b gandhi
train-2 KSV
ETP 96 b b gandhi KSV
ETP b b gandhi KSV
Admin building b b gandhi KSV
Train-1 & Train-2 b b gandhi KSV
Train-1 & Train-2 TS Challam Arun Teja
Radio Room TS Challam Arun Teja
S.VENUGOPAL
OGT Rahul Prasad
IA-PA BB GANDHI mrinal raman
etp b b gandhi ravi kiran
etp b b gandhi ravi kiran
DM( 85) b b gandhi rahul
etp b b gandhi A S Rajan
mcr p k n prasad p k n prasad
DM plant bb gandhi gurrale
DM plant bb gandhi S.Rajan
M.R p k n prasad p k n prasad
DM plant chalam S.Rajan
DM plant chalam S.Rajan
RWTP chalam S.Rajan
DM plant chalam gurrale
Srinivas Kolanu
Rajan
gsu Srinivas Kolanu mrinal raman
wt 8&12 am 105b Srinivas Kolanu mrinal raman
ctm Srinivas Kolanu mrinal raman
GSU Srinivas Kolanu Ravi Kiran
CTM Srinivas Kolanu Ravi Kiran
Srinivas Kolanu Arun Teja
Srinivas Kolanu Arun Teja
Srinivas Kolanu Rajan
Srinivas Kolanu Rajan
ss4 B B Gandhi rahul
B B Gandhi rahul
akella laxman
Admin Building Rajan
Saibaba
Main Gate Rajan
GDU Srinivas Kolanu mrinal raman
slugcatcher canteen aaqms1 Srinivas Kolanu mrinal raman
Main Gate Saibaba Ravi Kiran
Main Gate Saibaba Rajan
loading gantry Srinivas Kolanu Rajan
MCR Srinivas Kolanu Rajan
helipad g s v pawan gurrale swamy
fire station Panchdev Kumar gurrale swamy
GSU Srinivas Kolanu
Kevin Shah
salil roy
ctm Srinivas Kolanu salil roy
Kevin Shah salil roy
Instrument Air B B Gandhi salil roy
ware house B B Gandhi salil roy
fire station Panchdev Kumar Rajan
MCR B B Gandhi Rajan
Admin building man bahadur Rajan
fire station Panchdev Kumar Rahul
Cooting Tower B B Gandhi ravi kiran
man bahadur Arun Teja
Cooling Tower b b gandhi ravi kiran
Kevin Shah rajan
FWPH Srinivas Kolanu rajan
chemical House B B Gandhi ravi kiran
Cooling Tower B B Gandhi p k n prasad
Cooling Tower B B Gandhi Arun Teja
weigh bridge Srinivas Kolanu salil roy
RWTP B B Gandhi salil roy
DM plant B B Gandhi A S Rajan
air dryer-A B B Gandhi RAVI KIRAN
ctm B B Gandhi RAVI KIRAN
ETP B B Gandhi Arun Teja
Fire Station Panchdev Kumar ravi kiran
fire station krishnan.K Rahul
RWTP B B Gandhi Salil Roy
B B Gandhi Salil Roy
B B Gandhi Rajan
B B Gandhi RAVI KIRAN
Acid bulk storage B B Gandhi Salil Roy
DM-85 DM-85 Salil Roy
ETP B B Gandhi A.S. RAJAN
ETP B B Gandhi salil roy
s ashok babu salil roy
DM plant Srinivas Kolanu salil roy
DM plant B.B Gandhi Ravi Kiran
OGT V.Saibaba Ravi Kiran
Workshop N.sarvann Ravi Kiran
ETP BB.GANDHI Salil roy
SS1&2&4 KEVIN SHEA Salil roy
SS1 KEVIN SHEA Ravi Kiran
Saibaba Ravi Kiran
ETP B.B Gandhi Ravi Kiran
Saibaba
KEVIN SHEA
ETP B.B Gandhi Ravi Kiran
ETP B.B Gandhi A.S. RAJAN
battery limit SRIRAM A.S. RAJAN
KEVIN SHEA V.S. PRASAD
EIL OFFICE B.B Gandhi A.S. RAJAN
8C B.B Gandhi A.S. RAJAN
battery limit B.B Gandhi A.S. RAJAN
ETP B.B Gandhi A.S. RAJAN
OGT B.B Gandhi A.S. RAJAN
Kevin Shah salil roy
utility
RWTP B.B Gandhi p k n prasad
utility B.B Gandhi p k n prasad
CWTP B.B Gandhi p k n prasad
ETP B.B Gandhi A.S. RAJAN
SS-4 Kevin Shah Rahul
SS-2 Kevin Shah p k n prasad
SS-4 Kevin Shah Rahul
RWTP B.B Gandhi A.S. RAJAN
conference hall Srinivas Kolanu salil roy
ETP(96) B.B Gandhi V.AMMER
train-2 Srinivas Kolanu A.S. RAJAN
OGT-Warehouse gsv pawan A.S. RAJAN
MCR Srinivas Kolanu A.S. RAJAN
OHC,CANTEEN,ADMIN man bahadur Teja
Train-2 Rahul prasad
OHC,CANTEEN,ADMIN man bahadur Teja
Main Gate Nithin B Rao A.S. RAJAN
GSU/GDU B.B Gandhi RAVI KIRAN
train-2 B.B Gandhi RAVI KIRAN
ETP(86) B.B Gandhi p k n prasad
train-2 Srinivas Kolanu p k n prasad
train-2 Srinivas Kolanu p k n prasad
train-2 Srinivas Kolanu Rahul
train-2 Srinivas Kolanu Rahul
Srinivas Kolanu salil roy
abhishant salil roy
laxman salil roy
ware house g s v pawan salil roy
GSU Srinivas Kolanu salil roy
Cooling Tower Srinivas Kolanu salil roy
ware house Kiran kumar salil roy
GDU & GSU Srinivas Kolanu V.AMMRAN
MCR Srinivas Kolanu salil roy
Srinivas Kolanu V.AMMRAN
Non process V.Saibaba V.AMMRAN
MCR Srinivas Kolanu V.AMMRAN
Srinivas Kolanu
salil roy
CT B B Gandhi salil roy
86 B B Gandhi Ravi kiran
V.Ammran p k n prasad
drinking water V.Ammran ravi kiran
Drilling Srinivas Kolanu p k n prasad
OGT V.Ammran A.S. RAJAN
01-tr-021
tankages A S Rajan
,DM Plant,Cooling tower V.Ammran salil roy
CT 86 V.Ammran salil roy
02-HT-202 R.N.Ramesh salil roy
Train-1 gurrala salil roy
RECEIVER PERSON HSE CLOSING DATE
Riju de Nikhil
Abhisant Nikhil
Srinivasan Drashti Goel
Srinivasan Drashti Goel
Suresh Drashti Goel
Suresh Mayank Jain
Suresh Mayank Jain
Anil Kumar Mayank Jain
Anil Kumar Mayank Jain
Riju de m m ajith
t. Krishna m m ajith
Anil Kumar m m ajith
anil kumar m m ajith
nikhil
suresh nikhil
CHVV Satyanarayana Drashti Goel
Sriram Drashti Goel
Suresh Mayank Jain
Anil Kumar Mayank Jain
Anil Kumar Mayank Jain
Suresh Mayank Jain
Anil Kumar Mayank Jain
Suresh m m ajith
Anil Kumar m m ajith
Joseph Anuj Kumar
Abdul kayyum Mayank Jain
Anil Kumar Drasthi Goel
Abdul kayyum Mayank Jain
Anil Kumar Mayank Jain
Anil Kumar Mayank Jain
vimal prasad m m ajith
Abdul kaiyum m m ajith
sri ram panda m m ajith
sri ram panda m m ajith
Abdul kaiyum m m ajith
bhupendra sharma m m ajith
sri ram panda Anuj Kumar
Abdul kaiyum Nikhil
Abdul kaiyum Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Anuj Kumar
Anil Kumar Mayank Jain
Abdul Kaiyum Mayank Jain
Anil Kumar Mayank Jain
Abdul Kaiyum m m ajith
Anil Kumar m m ajith
Anil Kumar m m ajith
Anil Kumar m m ajith
Anil Kumar m m ajith
CHVV Satyanarayana Anuj Kumar
Anil Kumar Anuj Kumar
Anil Kumar Anuj Kumar
Siva Prasad Anuj Kumar
Hemanth Abhishant
Y.V.Naga Vasu Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
K.Sravan Dileep Drashti Goel
Abdul Akhil Pradeep
CHVV Satyanarayana Akhil Pradeep
Akhil Pradeep
Rayudu Akhil Pradeep
M S Reddy Akhil Pradeep
Abhisant m m ajith
mr kushi krishna Abhishant
Satya narayan Nikhil
Anuj Nikhil
s ram Nikhil
sriram Nikhil
Veeraju.G Ajith
Subhadip Manna Drashti Goel
CHVV Satyanarayana Drashti Goel
Sriram Panda Drashti Goel
S.Ram subhadip
Subhadip manna/ Y.Phannendhar Drashti Goel
CHVV Satyanarayana Drashti Goel
Murali K Drashti Goel
Suhas Kasalkar Drashti Goel
v.hemanth Drashti Goel
JOSEPH BESKI Drashti Goel
srinivas/s.vivian Drashti Goel
Hemanth Mayank Jain
Anil Kumar Mayank Jain
Kishore Mayank Jain
Anil Kumar Mayank Jain
sriram m m ajith
sriram nikhil
Murali K nikhil
Anuj Nikhil
Anil Kumar Nikhil
Anil Kumar Nikhil
Anil Kumar Nikhil
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
siddharth jain Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
v.hemanth Drashti Goel
anil kumar
Nikhil
aditya Abhishant
Anil Kumar akhil
a. Venkatrao Abhishant
Anil Kumar m m ajith
Anil Kumar Nikhil
Anil Kumar Drashti Goel
Anil Kumar Drashti Goel
Anil kumar Mayank Jain
Anil Kumar Mayank Jain
Anil Kumar Mayank Jain
Mayank Jain
K Ananda Srinivas Mayank Jain
Sriram Panda m m ajith
a venkat rao m m ajith
a venkat rao Anuj Kumar
M S Reddy m m ajith
k aditya m m ajith
Drashti goel Drashti Goel
Anuj Dixit Nikhil
S.Sriram Mayank Jain
Balakrishna Mayank Jain
Sambasava Drashti Goel
sri ram Mayank Jain
m m ajith m m ajith
m m ajith m m ajith
ms reddy Drashti Goel
Drashti goel Hemant Kumar Singh
v.hemanth Drashti Goel
p.balakrishna nikhil
K R Murthy Mayank Jain
K R Murthy Mayank Jain
Raju Mayank Jain
JOSEPH BESKI Abhishant
aditya Abhishant
rajamurthy Nikhil
rajamurthy Nikhil
rajamurthy Nikhil
rajamurthy Nikhil
Joseph Rajeev Nikhil
Aditya Nikhil
p.kiran kumar drashti goel
drashti goel Hemant Humar Singh
SRAVAN DILEEP drashti goel
Kiran Panda Mayank Jain
Mayank /Arvind Mayank Jain
Riju de m m ajith
reddy Nikhil
reddy nikhil
Riju de ajith
ajith ajith
suresh nikhil
suresh nikhil
A.Venkatarao Drashti Goel
M.S.Reddy Drashti Goel
M.S.Reddy Drashti Goel
joseph beski Drashti Goel
JOSEPH BESKI Drashti Goel
M.S.Reddy Drashti Goel
naga vasu Nikhil
naga vasu Nikhil
Anuj Nikhil
Aditya Nikhil
Anuj Dixit Nikhil
Joseph Mayank Jain
Riju de Abhishant
Hemanth Abhishant
Nikhil
Venkat Rao Nikhil
Anuj Hemant Kumar Singh
Satya Rajesh Ajith
KBC Murthy Nikhil
KBC Murthy Nikhil
Gopal Nikhil
Sriram Nikhil
Riju de Mayank Jain
Riju de Mayank Jain
g k s naidu Abhishant 5/8/2015
M S Reddy m m ajith 5/6/2015
Murali Nikhil 5/4/2015
Murali Nikhil 5/5/2015
Venkat rao, Nikhil 5/1/2015
Admin Department Nikhil 5/8/2015
Admin Department Ajith
Aryan Mayank Jain 5/5/2015
S.Ram Drasti Goel 5/8/2015
S.Ram/ Naidu ajith 5/13/2015
S.Ram/ Naidu ajith 5/13/2015
k. Aditya ajith 5/7/2015
s. Poosalayya ajith 5/7/2015
Riju de Nikhil 5/11/2015
Admin Department Nikhil
Admin Department Nikhil
B Bamba Siva subhadip
A.Venkat rao Subhadip 5/13/2015
Kevin shah subhadip
M Ramesh subhadip 5/13/2015
S Ram subhadip
K.Siva shankar subhadip
S Ram subhadip 5/17/2015
Riju de subhadip
ch venugopal swamy m m ajith
lokesh chouhan Abhishant 5/15/2015
r gobah Abhishant
m v v suresh verma Abhishant 5/15/2015
s poosalayya abhisant 5/15/2015
lokesh chouhan Anuj Kumar 5/25/2015
Sravan Ajith 5/16/2015
A.Venkatarao subhadip 5/18/2015
lokesh chouhan Drashti Goel 5/26/2015
swami Mayank 5/26/2015
reddy Mayank 5/27/2015
reddy Mayank
reddy Mayank
gangadhar Mayank 5/12/2015
s. Ram abhishant
lokesh chauhan akhil 5/29/2015
Siminan Ghorar Anuj Kumar 5/26/2015
S ram subhadip
samian ghorai Drashti Goel
samian ghorai Drashti Goel
ch k katayan Anuj Kumar
reddy Drashti Goel
swami Akhil
N.Pardhu Akhil 5/29/2015
samian ghorai Akhil
M.S.Reddy Akhil
M.S.Reddy Akhil
samian ghorai Abhishant
samian ghorai Abhishant
Venkat rao subhadip
Abhisant Hemant Kumar Singh
s.ram drashti goel
s.ram drashti goel
riju de drashti goel
s.ram drashti goel
pardhu drashti goel
Kevin shah mayank
S Ram Mayank
venkat rao ajith
Venkat rao ajith
k savan dilip Abhishant
k savan dilip Abhishant
s.ram/r krishna Abhishant
Mrul subhadip
S Ram subhadip
Saliya Rajesh anuj dixit
ajay Anuj
S ram Abhishant
S Ram anuj
pulkit anuj
Venkata Rao Drashti Goel
pulkit Drashti Goel
S Ram Drashti Goel
S Ram Drashti Goel
N Pardhu Drashti Goel
samian ghorai Drashti Goel
S Ram Drashti Goel
S Ram Drashti Goel
pulkit Drashti Goel
lokesh chouhan 16.06.2015
abhishant
Hemant Kumar Singh 17.06.2015
akhil
m m ajith Ajith 16.06.2015
Venkata Rao Ajith 16.06.2015
S Ram 6/23/2015
Abhishant
S Ram Abhishant 6/23/2015
s.ram Abhishant 6/23/2015
Lokesh chouhan Abhishant 6/23/2015
s.ram Abhishant 6/23/2015
Sriram Panda Ajith
satya rajesh Abhishant
hemath Ajith 6/24/2015
S Ram Ajith 6/24/2015
S Ram Ajith 6/24/2015
S Ram Ajith 6/24/2015
gsv pawan Ajith 6/24/2015
S Ram Ajith 6/24/2015
satya rajesh Ajith
satya rajesh Hemant Kumar Singh
S ram ajith 6/25/2015
S Ram s manna 6/25/2015
Samir Ghorai S manna 6/25/2015
S Ram S manna
Venkat Prasad Anuj 6/26/2015
S ram Panda 6/27/2015
Lokesh Chouhan Anuj 6/26/2015
reddy Anuj 6/26/2015
S.Ra m Drashti Goel 6/27/2015
S.Ra m Mayank 6/29/2015
S.Ra m Mayank 6/29/2015
S.Ram Mayank 6/29/2015
s. Ram Mayank 6/30/2015
s. Ram Mayank 6/30/2015
Kashinath Mayank 6/30/2015
Kashinath Mayank 6/30/2015
n sarkar abhishant 7/1/2015
n sarkar abhishant 7/1/2015
sriram panda abhishant 7/1/2015
m. Sarkar abhishant 7/2/2015
m. Sarkar abhishant 7/2/2015
m. Sarkar abhishant 7/2/2015
kevin shah abhishant 7/2/2015
abhishant c h n s prasad 7/2/2015
m. Sarkar Subhadip 7/3/2015
m. Sarkar Subhadip
sarin manna 7/4/2015
sarin manna 7/4/2015
sarin manna 7/4/2015
m.sarkar Hemant Kumar Singh 7/6/2015
m.sarkar Hemant Kumar Singh 7/6/2015
m.sarkar Hemant Kumar Singh 7/6/2015
Sriram panda Hemant Kumar Singh 7/6/2015
s.ram Hemant Kumar Singh 7/6/2015
s.ram Mayank 7/7/2015
m.sarkar Mayank 7/7/2015
m.sarkar Mayank 7/7/2015
s.ram Mayank 7/7/2015
Pardhu Mayank 7/8/2015
S ram Mayank 7/8/2015
S ram Mayank 7/8/2015
S ram Mayank 7/8/2015
S ram Mayank 7/8/2015
S ram Abhishant
S ram Abhishant
s.ram Abhishant
s.ram Abhishant
m.sarkar mayank
s.ram abhishant 7/11/2015
s.ram 7/11/2015
abhishant
s.ram abhishant 7/12/2015
N.Pardhu Drashti Goel 7/13/2015
s.ram Drashti Goel 7/13/2015
s.ram Drashti Goel 7/13/2015
s.ram Drashti Goel 7/13/2015
s.ram Drashti Goel 7/13/2015
s ram 12/16/2015
Anuj
p s n jago pathi raju Anuj 12/17/2015
p s n jago pathi raju Anuj 12/17/2015
s ram Anuj 12/18/2015
s ram Anuj 12/17/2015
s ram Anuj 12/18/2015
s ram Anuj 12/17/2015
s ram manna 12/19/2015
s ram manna 12/19/2015
s ram manna 12/18/2015
s ram manna 12/18/2015
sravan dileep manna 12/18/2015
sravan dileep manna 12/18/2015
sravan dileep manna 12/18/2015
v saibaba manna 12/18/2015
suresh varma phanibhusan 12/18/2015
S.ram S.Manna
S.ram S.Manna
V.saibaba S.Manna 12/19/2015
v.hemanth S.Manna 12/19/2015
V.saibaba Drashti Goel 12/21/2015
Vikranth Drashti Goel 12/21/2015
naga basu Drashti Goel 12/21/2015
samiran ghorai Subhadip 12/21/2015
Hemanth Drashti Goel 12/22/2015
AKHIL Akhil 12/22/2015
Y.V.Nagavasu 3/16/2016
Drashti Goel
K.Sravan Dileep Drashti Goel 3/16/2016
K.Sravan Dileep Drashti Goel 3/16/2016
v.saibaba Drashti Goel 3/16/2016
Y.V.Nagavasu Drashti Goel 3/17/2016
Y.V.Nagavasu Abhishant 3/18/2016
mihir bhavsar Hemant Kumar Singh 3/18/2016
Chaitanya 6/17/2016
akhil
p s n jago pathi raju Anuj 6/18/2016
p balakrishna Anuj 6/18/2016
p s n jago pathi raju Anuj 6/18/2016
bhupendra sharma Abhishant Extension 21-06-2016
bhupendra sharma Abhishant 6/19/2016
P ramana rao Abhishant 6/22/2016
P ramana rao Drashti Goel 6/23/2016
P ramana rao akhil 6/24/2016
S RAM akhil 6/24/2016
S RAM anuj 6/27/2016
abhishant 7/19/2016
Akhil
abhishant 7/19/2016
Akhil
Sarvan dileep anuj 7/20/2016
anuj Abhishant 7/21/2016
manna Abhishant 7/22/2016
aditya Akhil 7/26/2016
abhishant Akhil 7/26/2016
laxman Akhil 7/27/2016
Akhil Abhishant 7/28/2016
v saibaba anuj 7/29/2016
laxman manna
subhdip manna Abhishant 11/19/2016
S.ram GOEL 11/22/2016
laxman GOEL 11/22/2016
naga vasu ch n s prasad 11/22/2016
K Sravan Dileep Akhil 11/23/2016
K Sravan Dileep Akhil 11/23/2016
u durga vara prasad Akhil 11/23/2016
cutting grinding & welding work for steam drain piping arrangement
cutting grinding & welding work for steam drain piping arrangement
Bitumen filling in pavements slab joints work.
false flooring repair work in rack room drilling activity. Aluminium sheet fixing
repair of false flooring in rack room
repair of false flooring in rack room
Cutting,grinding,welding work for BOP area steam traps drain piping
Repair for false flooding in back room
Roof top work in SWAS Room
Cutting,Grinding,welding for BOP area
Installation of wind socks on CPP building
grinding,cutting, welding work for steam traps drain header fabrication
false flooring repair work in rack room,drilling screw
roof treatment work , making 6 mm groove& filling pv solvent with cold application
Cutting,grinding,welding work for BOP area steam traps drain piping
False floor celing repair drilling
Stack monitoring of HRSG
To check lighting circuit in gas skid area
Repair of false flooring
modification of dischrge airline of pneumatic pump cutting of exposed angles in GT halls area-
taking photographs of co2 flooding system
driling for installing mirror @ RO water purifier
modification of Gas condensate drain line of gas skid
Welding of breaker (ACB) trolley wheel near switch gear
taking photographs of co2 flooding system
Modification of gas condensate dain
Toe guard welding outside CPP control room
Modification of gas condensate drain line
Dearator Area platform to be strengthness by support welding work
hrsg-1 & 2 TANK SERVICE WATER VALVE approach platform fabrication work
hrsg-1 & 2 TANK SERVICE WATER VALVE approach platform fabrication work
hrsg-1 & 2 IBD TANK SERVICE WATER VALVE approach platform fabrication work
Drilling of hole in auxillary junctioon box at HRSG 1,2 stack of curve & drilling of hole in shelter
HRSG 1 IBD tanks service water valve approch platform fabrication work
Drilling hole in auxillary junction boxes at HRSG 1and 2
HRSG-1 TBD tanks CC.w operating platform fabrication & blow down pit pump-A discharge line modification work
drilling of hole in auxillary junction box at HRSG 1,2 stack & welding in HRSG 1,2 shelter for cylinder mounting
HRSG-1 TBD tanks CC.w operating platform fabrication & blow down pit pump-A discharge line modification work
making holes by driling on the chequer plate platform of hp dosing & burning mgmt system platform
feh (riser) modification at middle of staircase (2 floor)
rectification of water leakage from side of control room
brazing for gt1> 2
submersible pump dewatering discharge line modification
driling in brickwall at west side of toilet in switch gear building in cpp
pumps disharge ling modification work
Fix the RO System
Steam leakage atending job from hp steam net work HRSG-2 ms line MIV DIS pin hole, steam leakage arresting work
HRSG-2 main steam line pressure safety valve drain pipe hole cutting work by welding & gas cutting
HRSG-1 flue gas duct upper half rain protection roof fabrication work by welding
Stack Monitoring (HRSG#1) Using Stack Monitoring Kit
VFD panel base fabrication work by cutting and welding
VFD panel base fabrication work by cutting and welding
VFD Panel support base frame fabrication work
RK PERMIT RECORD
SECTION/ AUTHORIZED
AREA UNIT
CONTRACTOR NAME PERSON
42174
6/23/2015
6/23/2015
6/24/2015
6/24/2015
6/24/2015
6/25/2015
6/26/2015
6/26/2015
6/29/2015
6/30/2015
7/1/2015
7/3/2015
7/4/2015
7/4/2015
7/6/2015
7/6/2015
7/7/2015
7/8/2015
7/13/2015
7/14/2015
8/5/2015
14.08.15
8/18/2015
8/18/2015
8/18/2015
8/19/2015
8/19/2015
8/20/2015
8/20/2015
9/1/2015
9/1/2015
9/1/2015
9/5/2015
9/7/2015
9/7/2015
9/8/2015
9/8/2015
9/8/2015
9/9/2015
9/15/2015
9/15/2015
9/22/2015
9/23/2015
9/30/2015
9/30/2015
10/1/2015
10/3/2015
10/12/2015
10/13/2015
10/13/2015
10/8/2015
10/14/2015
10/15/2015
10/15/2015
10/16/2015
10/17/2015
10/19/2015
10/26/2015
10/27/2015
10/28/2015
10/29/2015
11/2/2015
11/3/2015
11/3/2015
11/9/2015
11/9/2015
11/10/2015
11/10/2015
11/12/2015
11/26/2015
11/26/2015
11/30/2015
12/1/2015
12/2/2015
12/5/2015
12/8/2015
12/9/2015
12/9/2015
12/11/2015
12/14/2015
12/16/2015
12/17/2015
12/18/2015
12/19/2015
12/22/2015
12/29/2015
1/4/2016
1/5/2016
1/7/2016
1/8/2016
1/11/2016
1/12/2016
1/13/2016
1/13/2016
1/14/2016
1/14/2016
1/16/2016
1/18/2016
1/20/2016
1/20/2016
1/22/2016
1/22/2016
1/22/2016
1/29/2016
2/2/2016
2/2/2016
2/2/2016
2/3/2016
2/3/2016
2/4/2016
2/5/2016
2/6/2016
2/8/2016
2/11/2016
2/24/2016
2/25/2016
3/1/2016
3/9/2016
3/9/2016
3/23/2016
3/23/2016
3/24/2016
3/29/2016
3/31/2016
20-04-2016.
4/28/2016
5/4/2016
5/9/2016
5/11/2016
5/12/2016
5/13/2016
5/13/2016
5/21/2016
5/23/2016
5/24/2016
5/25/2016
5/25/2016
5/26/2016
5/26/2016
5/27/2016
6/3/2016
6/4/2016
6/4/2016
6/7/2016
6/8/2016
6/9/2016
6/14/2016
6/15/2016
6/15/2016
6/16/2016
6/16/2016
6/17/2016
6/22/2016
6/22/2016
6/23/2016
6/23/2016
6/24/2016
6/27/2016
6/27/2016
7/2/2016
7/21/2016
7/30/2016
8/8/2016
8/9/2016
8/10/2016
8/20/2016
8/26/2016
8/30/2016
8/31/2016
9/2/2016
9/14/2016
9/19/2016
9/19/2016
9/22/2016
9/23/2016
9/26/2016
9/26/2016
9/27/2016
9/27/2016
9/27/2016
9/27/2016
9/29/2016
10/1/2016
10/1/2016
10/3/2016
10/5/2016
10/5/2016
10/6/2016
10/6/2016
10/25/2016
10/25/2016
10/26/2016
10/27/2016
10/29/2016
11/2/2016
11/2/2016
11/3/2016
11/3/2016
11/11/2016
11/12/2016
11/17/2016
11/17/2016
11/19/2016
11/23/2016
11/24/2016
11/25/2016
PERMIT DATE TIME ( VALID FROM TO) TYPE OF PERMIT
NO
64 1/3/2015 9.30 am to 5 pm CONFINED SPACE ENTRY
65 1/6/2015 09.30 to 05.00pm
67
1/9/2015 10.00am to 05.00 pm CONFINED SPACE ENTRY
68 1/9/2015 11.00am to 05.00 pm CONFINED SPACE ENTRY
70 1/23/2015 10.00am to 05.00 pm CONFINED SPACE ENTRY
71
07.02.2015 9.00 am to 5.00 am CONFINED SPACE ENTRY
72
09.02.2016 9.00 am to 5.00 am CONFINED SPACE ENTRY
75
2/11/2015 10.00 am to 5.0 pm CONFINED SPACE ENTRY
76
2/11/2015 10.00 am to 5.0 pm CONFINED SPACE ENTRY
80
2/19/2015 10.00 am to 5.0 pm CONFINED SPACE ENTRY
81
2/23/2015 10.00 am to 5.0 pm CONFINED SPACE ENTRY
82 18.03.2015 10 am to 5 pm CONFINED SPACE ENTRY
26 23.03.2015 10 am to 5 pm CONFINED SPACE ENTRY
27 25.03.2015 10 am to 5 pm CONFINED SPACE ENTRY
28 26.03.2015 9 am to 5 pm CONFINED SPACE
84 24.4.2015 2 pm to 5 pm CONFINED SPACE
86
01.05.2015 9.30-17.00 CONFINED SPACE
87
01.05.2015 2.30-5.00 CONFINED SPACE
88
5/2/2015 2.30 pm to 5 pm CONFINED SPACE
89
5/4/2015 10.30 am to 5 pm CONFINED SPACE
90
91
93
6/12/2015 10 am to 5 pm Confined Space
92 17.06.2015 10.00-17.00hrs Confined Space
94 17.06.2015 10.00-17.00hrs Confined Space
95 6/29/2015 9.45-05.00 Confined Space
96 6/30/2015 9.45-05.00 Confined Space
87-V-01 ,87-V-02 ,(LP AIR RECIVER ,HP AIR RECIVER)BOTTOM BOOT HANCE KEEPING TO BE DONE
functional checking of actuator in rimseal fire protection by applying external nitrogen pressure
condensate tank A Rim seal system foam module pressure switch calibration set point 10 kg /cm2
condensate tank B Rim seal system foam module pressure switch calibration set point 10 kg /cm2
condensate tank A Rim seal system foam module pressure switch calibration set point 10 kg /cm2
condensate tank B Rim seal system foam module pressure switch calibration set point 10 kg /cm2
HRSG#1 economizer area inspection for the work of hydrotesting and fixing of insulation plates
ADITYA UTILITY 1
D V HEAMENTH KUMAR UTILITY RWTP
gspc instrumentation cooling tower
gspc
instrumentation/prumatech/Somba
nsi CSTB CSTB
gspc
instrumentation/prumatech/Somba
nsi CSTA CSTA
gspc
instrumentation/prumatech/Somba
nsi csu CSTA
Hemanth Utilities Cooling tower
gspc/brpl cpp gt-1
Feroze CPP GT-1
Feroze CPP GT-1
GSPC Utilities Cooling tower
GSPC
Bhupendra Sharma
checking of opering F/B in MOV of slug catcher gas inlet tag: 1502-MOV-1904
pm job for hc fbre blodown pump "a" 89-p-0 1 A
maintenance of field imhumently 11-ft-5301,11 ft 5303,11 e 111 pg to rechfy the line of iop
maintenance of hp air compressor pt-2115-87 to rectifly the imue of enatrc
roof treatemat mainly as grooves & filling bthe joints with poly uiethene sealant
adminbuilding avac dhu-3- dhu -4- dor cleening one by lone
dewatering from fire waqter valve bil cut north sird of sru (power suplu from train 2 )
replacement of gasket in 51-f-102
maintanance of prummer guages 11-p5100/5301/1101/and d1 1708 to rectfly the value
liquid nitrogen unloding
maintance of cooling tower 11-86 it 1101 to retefied of inside earth valvu
preventvu maintence for lean amain air coolea b -11-am-108 b train 1 gsu
ct 1 and ct 2 calibracation is done
csu 15 lt - 1106A b c and 51 lt -1102 calibracation to be done with filling hidrocorbon condanset
maintance of dm plant on/off vallv 85-uv 1105 and to rectify open close valve
green belt development phaseto inside plant
ss1 ss2 blue star ac pakage unit air filter cleening
cooling water treat ment plant earth bit mainteance
11-am -108-b leayan amine air collor electrical pm
aid unloding pump a disharge pc vent line to be replaced
thickness sarvy of pipe line s/c ares
logging of battry vollage spectic greaviti at ups room in ss1 and ss2 and ss4
pest control (rat/snake reflax spray
Level Transmitter (21-LT-1206) maintanance work
96-P-M-09A (Treated off pump-A) motor Greasing checking
Degasser air plant-B, 85-B-01B bearing replacement
trouble shooting of RWTP 84 THK-01A 84-af-01A sludge thinkess scrapper
trouble shooting of Run feedback issue of tr-1 11-Am-108 B to rectifier the issue
Maintanance of instrument in utilities 87-P1-1105 88-UV-4105
Corrosion inhibitor pump PM job
Painting of structural items at green belt area
Chlorine tonner leakage to be attended
Maintenance of RWTP turbidity analyser 84 AT 101 to rectify the erratic value
HP compressor AOP leak at NDE side and at discharge line
85-UV-1105 On/Off valve diaphram to be replaced
MCR Lighting checking
To transfer pump RC Filter & along work
Lighting fitting fixture bulb charge & installation
SS-3,SS-4, bluestar AC package filter cleaning
Fire Water pumphouse earth pit maintenance
Excavation for earth pits at SS-1,2
87-PCB-1201 Calibration HP air repair work
84-P-09B pump to be checked
Providing crown barrier at Slug catcher area
Housekeeping & backfiling work south from fire station
Civil rectification work in ETP south side clraguv
Civil rectification at Loading gantry
Civil rectification work at back side of control building
Not issued
hse copy n/a
monthly preservation of 41-p-104A&B (KOH solution pump)
monthly preservation of 41-p-105A&B(catalyst dosing pump)
monthly preservation of 41-p-109(catalyst solution sump pump)
monthly preservation of 51-p-3301A&B(cooling water pumps for off gas compressor)
84-abl-03A clarifies sludge sump air flower annual pm
96-pa-32 A&B (stp to green belt pumps) strainer cleaning
96-pa-001a cows transfer pump nrv passing attending
dechoking of sprinkler facing telphone booth nr off gas compresor B in csu
preservation of valves, nuts and bolts in 22-c-101,22-V102,22-v-103
pm job of s1-pm-3301B & s1-pm-3202B cw pump & AOP
Pm job of 86-Lg -10c&86-LG-10D exhact fan
PM of 51-ft 1201 A/B(LP steam to HC cond heater)
near cpp high mast 1 and 2 path way construction leveling work
fire water pump house area inside control panel area cross over steps work and approach work
TRAIN-2 field instrument monsoon protection
SRU field instrument monsoon protection
Train-1 field instrument monsoon protection
fire water diesel engine (308-DG-01 B) and diesel driven pump-B (308-P-102B preventive mainatanance
calibration & pm to be done for 11-AT-1303/1301 h2s analyser
Functional testing of msd and mcp in ss-1
RWTP 84-abl-m -3A motor electrical P.M (clarifier sludge sump)
FWPH diesel engine-B charger panel electrical maintanance(308-pm-102B)
S1-E-107 outlet to tank 2" end blind instalation
troubleshooting for line PT voltage variation in 04-HT-20111KV isolator panel
Glycol fiter replacement for 21-G-103B
308-p-103 b jockey pump-b annual pm
84-p-201 a[raw water feed pump-a] annual pm
monthly preseruvation of 11-p-108 a&b [wash water circulating pumps]
monthly preseruvation of 11-p-109 a&b [wash water makeup pumps]
colour coding for eot&mono rails in train-2 csu & sru [from green to blue]
maintence of main gate in & out gates [providing washers for support bolts & bearing for move ment of main gate
UT thickness measure ments of static equipment [pipings &vessels] in takage area
PM of 51-ft-1105[slop to hp separator and flow 51-ft-5201 inst air to isbl of csu
308-pm-101A VCR fire water main pump -A PM jobe
feeder pm of 86-pm-103A & 86-pm-04A H2SO4 transfer pumpes
preservation activity for VFDS 01-VFD -851 01-VFD -852 & 01-VFD-853 VFD s for 32-km-102 31-km-102A & 31-km-102 B res
PM of AAQMS-2 near water house
csu logic checks
functional testing of msd and mcp to be done in OHC [list is attached]
calibration of mullti sencer portable detectors to be done in mcr calibration room
308-pm-103 b fire water jockey pump b acr pm
rwtp 84-pm-201a rawwater feed pump a motor electrical pm
fwph 308-pm-103b fire water jockey pump b motor electrical pm
maint. Of inspection of fixed fire fighting sytem
canteen building acousting ventilation fans maint.
maint work for 31-at-1601 /1602 hcdp analyser
trouble shooting of 11-LT-1312, 11-LT-1306 reading mismatch
86-lg-10f exhaust fan feeder pm at ss 01
shifting of used teg barrels & 2 nosof lube oil barels to spent chemical area usiig froklift
installation of dewatering pump in guard pond 1 to transfer water guard pond 2
preventive maintenance of 51-ft-5202/5203
monthly preservation of 11-p-113 A&B(anti foam injection pumps)
monthly preservation of 11-p-114 A&B (corrosion inthibitor pumps)
monthly preservation of 11-p-117 A&B (surfactant doing pumps)
preservation of valves nuts & bolts in glycol regenerator glycol stripping column glycol reflux condenser in trail-2
scaffloding removal near cctv camera at train-1 GDU PSV plat form
11-p-107A pure atmospheric condensate pump annual pm
308-p-103 a jockey pump-a annual pm
84-p-01A cooling water make up pump annual pm
Fire water jockey pump A/308-pm-103A-A&B pm
Fire water jockey pump A/308-pm-103A motor electrical pm
RWTP cooling waret make up pump-A (84-pm-01A) motor electrical
ETP treated effluent pump (96-p-09B) motor tooubleshooting, motor decoupling
utilies area lighting checking
functional testing of MSD's & MCP's in LAB to be done
Excavation for reparing cable fault of c.p system punch points attanding OGT all area
84-8-09A effluent disposal pump bearing replacement
scaffloding removal near to be done for 152-GDU-201/401/402 in slug catcher
chlorine toners changing from completely exhausted to partially exhausted ones in cooling tower
ETP (96-p-09B) motor trouble shooting (treated effluent pump)
ETP (96-p-09B) motor trouble shooting
Preventive maintence of main gate and fire sations MSD to prevent the occurence falulty alaram
maintenance of 21-g-103 gdu catridge fillter dp guage to rectify erratic value
Maintenance of fire water flow transmitter 308-FT-101
providing hand wheel for plant air isolation valve at utility hose station nr 51-k-101 b
01-mcc-314 panel dc source line up
treated gas kod samplepoint blind opening
11-FT-1609 LP lopping and flange leak attending
GC-1 Helium cylinder replacement.
Flow transmitter 51-ft-1401A/B pm job
Treated gas kod Level gauge valve minted with lgs trouble shout work
Oil in water analyzer 96-at-404 errtic valve trouble shout work
96-PA-010 A&B (Drain & over flow sump pump) striner Cleanings
Battery bank maintenance job at sub stations # 1,2,4 and MCR
Electrical cable dressing job at train-1 area
Maintenance of 86-PCV-1102 to securely valve operation & 86-PDI-118 to check the LP,HP line choke issue
OGT lighting maintenance
12-PM-103 A/B and 31-KM-102 A/B and 32-KM-102 motrs manual rotation part of preser valve work
Sales gas pipe line and off shore to slug catcher pipe line C.P system reading maintenance
51-EOT-01 elinment P.M job
5l EOT-001 CSU EOT annual PM
11-P-118 A beasing looking water pump-A Quarterly PM
41-P-106 A/B chelate dosing pumps monthly preservation
Scaffolding removal near cctv camera at trin-1 GSU psv platform
86-p-01A cooling water reactivation pump-A strainer cleaning
84-P-15 A/B poly eloping pump common discharge header damper leak attending
86-P-05 B formulation dosing pump low flow issue attending
Annual maintenance of foam tender (1424)
CTM instrumentation joint calibration along with RGTIL for all instrumets & analysers
Swapping of Protection of 96-PA-09A & 96-PA-09B ETP
RWTP 84-PM-09A Protected effluent collection ds ps pumps motor electrical PM
Daily routine checms to se done for pccs in utilities
85-AT-1122/1131 A/ 1119 A silica analyzer veagen to be refillead in DMP
Diaphragm pa instalation for 96-PA-003 B (DAF) in ETP
Erection of scaffolding for dechoking of sprinklers for 51-K-101 B
Attending valve passing issue for 3/4" plant air globe valve & providing valve checknuts
803-HD29/lot maintenance work to be done
loop-01 MSDS in (canteen showin) troubles trouble shooting work to be done
Scaffolding errection work to be done for AHU-1&2 rooms in MCR
maintenance of CST-tank A level trancmeter 91-lt-1101
PAGA station no 19 at train-01 volame and sensetivity adjuestment
Blinding of insertiry temporay bland in the of 91-mov-1201(loding gantry inlet mov) 10"
32-k-102 sales gas compresser monthly pressersaction
12-p-118-a/b bearing looking water pumps monthly preseration job
12-p-111 cbp pump monthly preservation
11-a-108d lean amine air looker-d quartelt PM
84-p-02-a service water pump-a quartely -PM
functinal testing of msds in ahu rooms 122 in mcr area
96-pa-009b efflnet train for pump -b abc braker pm job at ss-2
power distbution board pm jab at ss-2 01,02,03,and 04
cold dressing work for cable hangang hear 11-pa-118a pupm motor
96-pa-009b efflnet train for pump moter trouble shooking
train-2 hc/h2s detection function checking to be done
hc/h2s detection sru functional testig to be done
11-b riser valve gear box replacement
slug catcher gas detectors to be estabatined with gas deatection scade system along with vender
84-pm -02a seavice warer pump-a moter electical pm rwtp
canteen cold storage ac out dore fan repalacement
dm plant opp plc room house station lp steam isolation valve bonet replacement
Fire Sttaion building emergency siren checking
PM of AAQMS-3 near RWTP
Dma Plant Split AC Maintenance and blower replcemwent
PM of 86-PM-5A/6A feeder module
151 GDT 102/103/303 gas detector maintenance
31-K-102-A/B sale gas compressor -A/B monthly presaration
93-EOT-001 workshop EOT annual PM
308-p-101A fire water main electrical pump-A annual PM
88-TSV-1135 liq N2 ATM vaporiser TSV set point adjusting
Dechoking of sprinkler facing telphone booth near off gas compressor-B
Green belt development maintanance work for OGT
308-pm-101-A fire water main pump VCR breaker PM job at substaion-01
86-PM-07-A biocide obspersant dossing pump-A feedback module PM job at SS-01
86-LG-09A"canstic recisanlation pump-A feedback module pm job at SS-01
96-LT-0102 (floor wash sump level) valve fluctation observal for trouble shooting work
86-AT-1101 Cooling water heades supply PH analyser showing eratic valve for trouble shooting
flow transmitter 51-ft-5101/5202
Moiture analyzer PM checks 21 AT 1201&1202
DCS&GD cabinet PM check
152-ED-101 slugcatcher flame detector maitanance work to be done
CSU H2S detector functional testing to be done
FWPH 308-pm-101A fire water main pump-A motor electrical P.M
SCAFFOLDING removal at saturation vessel
Partially exhasted toner to be replaced with chlorine toner(416) completely exhasted
OHC building spilt A/C drain line arrangement
slug catcher area H2S detector maintanance work to be done
all stand by motors space heaters current measurement at SS-01,SS-02,SS-03&SS-04
Pest control work at all respective building at OGT
31-Ek-101 A/B expander compressor-A/B monthly preservation
41-K-101 A/B/C acoustic chamber partition removal for modification.
UT thickness measure ments of static equipment [pipings &vessels] in tankage area
Scaffolding removal at 91-PSV-2104,2105,21069(top of slope tank)
Scaffolding removal at 11-PSV-1102 A/B/C
84-LLF-01A Clarifier-A annual PM
Belt filter press-B bottom nozzles changing
Functional testing of MSDS to be done in MCR AHU room-2
PM of 51-PM-330/A cooling pump for 51-KM-101A
PM of 51-PM-3202A AUX lube oil pump for 51-KM-101A
Online greasing of B-series motors at train-1
Maintenance &Inspection of fire fighting system(hydrant,monitor,MVWS,HVWS)
Identification&removal of fault display of HC detectors in OGT
Scaffolding etrraction be done for msds in ahu room3 in mcr
power cable to be done from PDB to GDS pannel
91-MOV-1201 Loading gantry inlet MOV moter replacement
DM plant UPS battery replacement
RWTP filter pump house ventilation fans moter installation after re wind work
21-AT-1501 HC detector maintence work to be done
Scoffolding removal to be done at MCR AHU Room-2
86-PDI-118 (SSF) Showing ERRATIC reading(hp & lp tapping suspected to be choked)
Reversing of spectacle blind in rich amur SC3 located in down stream 11-FV-1202
Area cleaning near watch tower 2,3 in green belt area
pmjob 31-Lg- 1103 inlet kod 31-lg-1401 condensate seperator LT
Quaterly pcp measurement for onshore pipeline & sale gas pipeline
Weak cells individual charging throughcell booster in SS-01 battary bank-2
Monthly preservation of off gas compressor-A(51-K-101A)
Monthly preservtion of off gas compressor-B(51-K-101B)
Excavation near workshop, warehouse for installation of plant airline in workshop
Sludge thickner scapper abnormal noise issue attending
Loading gantry field instruments cleaning& protection
PM activiter of 85-UV-1109/1111A,B/1112A,B of SOV and its accessavies
Identification & removal of fault display of HC detectors in OGT
Excavation for repairing cable fault of c.p system punch points attanding OGT all area
32-MOV-1601 DPDU out let volve concractor removal and replacement for 91-MOV-1201
Beacons installation to be done at sludgecatcher area
91-MOV-1201 Loading gantry inlet MOV testing
fire station building wipro & room split ac checking ccctv room
mcr ahu room 3 msd 802--D 65,66,67,68 / L03 maintaince work.
gdu stripping column diff pressure 21-pdt-1506 showing erratic value,for attending
etp ows outlet to gp toc analyser 96-at00304 erratic value shown, for attending
Painting of instrument air volume bottles of pneumatic values in IA-PA plant
lube top up in SRU blowers A,B & C (41-K-101 'A''B'& 'C')
(1) hose connection from PG point of 84-p-11'C'(belt fitter press feed pump). (2) sludge thickener drain valve inspection
Guard pond-1 aeration line inlet valve passing attending
shifting of chorine tonner from RWTP to CT using hydra and empty tonner from CT to RWTP.
main gate smoke detector (D22) trouble shooting
cooling tower pump 86-p-01A pressure guage not working replaced with new one
maintenance of level transmitter 84-LT-1110
OHC doctor room spilt A/C water leak arresting
87-K-01`B'' (LP compressor-B) quarterly preventive maintenance
304-p-101 B (driking water pump-B ) quarterly preventive mainteance
12-p-102 A&B (regenerator reflux pump) monthly preservation
12-p-113 A&B (anti foam injection pump) monthly preservation
12-P-114 A&B (corrosion inhibitor pump) monthly perservation
Chlorine toners (1836-350) toner side first islation valve operability chacking
87-km-101B and its AOP electrical P.M job
OGT lighting maintenance
11-LT-1904 (FLARE KOD ) valve troubleshuting work
96-pa-009 A (treated efflunent pump ) motor shifiting to 96-pa-009 B
96-pa-032 B (STP to green belt pump ) gland packing replacement
change of old wind socks & instalation of new one at cooling tower and helipad ares
Temporary 11-TT-3124 (11-p-103 A) Erratic valve troubleshooting work
87-k-01`B'' (LP compressor-B) instrument maintenance work
utilities motors online greesing
DM plant office room split AC blower moter instalation
tallarevu pump house battery bank mainatenance
Drain channels clening at codensate tanks
Dryer -A heater bank side lug replacement
lighting maintenace in utility area
Sludge thickner (84-THK-01)air & high pressure water inlet line spool piece
Daily routine maintenance health checks of plc's in utilities
Replacement of 22-pi-1704 to 21-pi-1704 location ar thear no guage installed at the 21-pi-1704
11-pm-102-b regaderater deflux pump-b moter and its feeder modul pm job
slucatcher and tanking area eart pits pm job
insrment air bloyer heater bank 01 troubleshoos in cooling mode
Annual maintenance of 11-p-102-b
monthly presrvation of 41-p-112
monthly presrvation of 41-p-113
monthly presrvation of 41-p-114
mcr manulu call point functional testing
Excavation for reparing cable fault of c.p system punch points attanding OGT all area
loading cantry 91mov 12101 logic chik
abnormal sound attending near garbox for 91-t-101 91-mov-1102
choking tones shifting for rwtp to cooling tower and tower two
308-p-102-b fire disel enging cooling water returen hose to make uo tank inspection
Monthly preservation of 41-p-111 A/B
Monthly preservation of 41-p-101 A/B/C/D
Green belt develoment and plantation of additional area
quaterly PM of 89-p-01 B
monthly preservation of41-p-115
PM of 96-p-015 A (dry slop oil transfer pump-A)
PM of 96-p-015 B (dry slop oil transfer pump-B)
PM Of 96-KA-01 "B"
PM of 89-PM-01B HC flare blown down pump-B
41-LT-1215C lube oil tank LT (41-K-101C) showing erratic
DCS&GD cabinet PM check
Scaffolding errection for MSD's IN AHU room-3(MCR)
Train-2 logic checks
wind socks replacement at train-1
dry instrument air dryer-B heater bank-2 lugs replacement
tallarevu pump house 201-pm-102c motor cable lugs replacement
4 steam ISBL isolation valve gland leak attending
Painting of suction and discharge valva of alkali unloading pumps (85-p-07 A & B)
scaffolding erection near sludge thickenes for installation of dewatering pump
cable laying from warehouse fire panel to fire station fire panel
Lube oil console breather vent instrument air regulation to be attending
41-K-101 C (Air blower-C) housekeeping near lube oil tank accoustic chamber (lube oil spillege cleaning)
86-PA-032 A & B (STP to green belt pump) strainer cleaning
Scaffolding removed work to be done in MCR AHU ROOM-3 (for detector job)
Reagents top up to be done in oil and water analyzers in ETP
PM of 11-P-111
PM of 96-K-01 B (OWS Daf saturation vessel air compressor B)
PM of 96-K-102 A
Monthly Preservation of 12-P-107 A/B
Monthly Preservation of 41-P-103 A/B KOH solution dosing pump
Monthly Preservation of 41-P-104 A/B KOH solution dosing pump
Fire Pump Diesel enginf B Coolant replacement
Installation of dewatering pump for sluudge thikner
RWTP Flow totaliser not getting reset rectification work
Process area instruments greasing work
11-PM-111 CBD pump motor PM Job
MCR UPS system PM Job , electonic card replacement
96-KA-02A filter back washer blower-A pinhole leak attending
LP stream Isoalation Valve bonnet leak attending
ETP96-PA-09B motor & feders checking for inductance resistance
Admin HVAC AHU filter cleaning
Inspection and maintenance of fixed fire fighting syatem in OGT
External visual inspection and UT thickness measurement checking of static equipments in train -1 and train-2
Excavation for Cable rectification & Reference cell changing in TRU-I loop ( CP system punch points attending job of CW line at
Excavation for Reference cell changing in TRU-O loop (CP system punch points attending job of FW line at Air/N2)
Dismentling of Argonite Cylinder (11 nos) for send to SHM warehouse at Kakinada for refilling purpose.
86-AT-1101 Cooling water heades supply PH analyser showing eratic valve for trouble shooting
maint of 85-uv-116 ub to rectify the faulty feeedback
pm of 86-p-01 a
pm of 96- ka-01 a
monthly presrvation of 41-P-102 A/B/C
monthly presrvation of 12-P-104 A/B
monthly preservationof 41-p-105 a&B
mist diminator of lubeoil tank claeaning for 41 - K- 101 C
ut thickness measuremnt of piping & tanks in condensate tankage area
Weak cells individual charging throughcell booster in SS-01 battary bank-2
86- pm-01 acooling water recirculation pump a vcb pm
mcr ups system 01-US- 701 A&B pm jobalong with m/s hivel
MSD's & MCP's functional testing at canteen
cwtp cooling water recirculation pump a moter electrical pm
pipeline cleaning work @warehouse ogt -gspc
calibration for 91- TT- 3107 A/b/C, 91- PT- 3101 / 3108/3109
51- FV- 1401 control valve struckat 49% ,valve mainta to be done
relay testing of 85-Pm- 03a,3b,3c .01b &2 spare feeder
scaffolding and erection work for 802-l07-59/63/64/50/56 MSD's fucntional testing
level transmitter 86-LT- 1105 Maint. & calibtration
11-pt-1304,11-pt- 1404pm job
MONTHLY PRESERVATION OF 41-P-107 A/B
MONTHLY PRESERVATION OF 41-P-106 A/B
MONTHLY PRESERVATION OF 51-P-3301 A/B
REMOVAL OF SCAFFOLDING ERECTED FOR DECHOKING OF SPRINKLERS IN CSU
SCAFFOLDING REMOVAL AT AQMS NEAR WATCH TOWER-5
LAB AHU NO:2 BELL REPLACEMENT JOB
86-CT-01A COOLING TOWER FAN-A FEEDER PM
Inspection and maintenance of LONG TRAVEL MECHANISH OF TRAIN-2 (12-E0T-001)EOT
PM OF 86-CT-01 A
EXCAVATION FOR ROPING CEBLE FANTL OF CP SYSTEM (TRV -Q RAN WATER PIPE LINE)
ALL MCP & MSD FUNCTIONAL CHECKING IN CANTEEN
trouble shooting of DOWATERING PUMP IN RWTP
FLUSHING OF DISHCHARGE PIPING OF 11-P-118 A
86-ct-01A COOLING TOWER FAN-A motor electrical p.m
Tallarevu pump house panel relays testing
mcr hvac maintenance (air fillter cleaning)
plant cp system reading measurement
Preventive maintenance for glycol filteration differential pressure Transmitter 21-PDT- 1405a/b
Trouble shooting of sru air blower-c (41-cm-101c) canopy fam starting problem
Battery bank maintenance job at sub stations # 1,2,4 and MCR
21-pg-1704 land teg suspecting glycol leak in PG for troubleshooting
86-lg 02-a chlorinator-A maintenance vacuum not developing
84-agt-07a thickened sludge sump agitator maintenance
11-p-113 a and b (anti foam injection pump) monthly preservation
11-p-114 a&b corrosing inhibitor pump monthly preservation
96-11-007 b (ows daf b oil skimmer ) half yearly pm
96-au-00b (augar drive -b of ows daf -b ) hafyearly pm
sru battery limit servicing water line spectacle blind (2) instalation job
train -02 battery limit stream condensate line spectacle blind instalation (3)
51-psv -1602(a) 1st inter staqge kod calibration on test bench
51-psv -1702 (b)2nd inter staqge kod calibration on test bench
manual rotation of electrical stand by motor line 31-km-102a &31-km-102b)
manual rotation of electrical stand by motore line 12-pm-103a&b &32-km 102
pm of 51- eh 3201 b lube oil heater for 51-km-101 b
OGT lighting maintenance
cooling tower PH analyser 86-at 1101 to be attended showing wrong reading
96-pa-09a motor side cable line recrimping (treated effluent pump)
Pressure transmitter instalation at teg pump a&b damper
ditterential pressure transmitter pm check 21-PDT-1401 A/B & 21-PDT-1403 A/B
functional testing of MSD's to be done in mcr
21-PT-1205 Absorber PT showing wrong reading to be attended
instrument air line flushing near etp of workshop installation for new isolation valve and spool piece near workshop
detector are hanging to be fixed to celing
CT- H2SO4 Storage tank overflow line UT measurement
volvo tender water cum foam tender annual maintenance cum servicing (1425)
pest control at OGT
152-pm 1010-slug catcher cbd pump flut nicl pm job
96-pm -09,b motor power cable of control cable swiping to sprae feeder at ss-2
11-pg-116 showing wrong reading to be attended
86-AT-1104 HC detector to maintanance work to be done
SRU blower canosy fan cable checking and termination (A,B,C)
Functional testing of msd's mcp's and heat detectors to be done in admin building
utilities lighting mainatanance
85-B-01 'C' (degaccer blower-'C') half yearly PM
85-B-01 'B' (degaccer blower) half yearly PM
152-P-1010 (CBD Pump) quarterly PM
Daily routine maintenance activities to be carried out for PLC's installed in utilities
Leam glycol TSG pump 21P-101B damping PG to be replaced with man
Silica analyzer showing eratic to be attended 85-AT-221/1119A
PM of level transmitts in RWTP 84-LT-503/504/505/506/507
Gas detection system SCADA punch points rectification work by vendor
hvac chillars relay testing in mcr admin and lab
greenbelt development work plantation of aditional area
gas detection (hc&h2s) relocation & cable layingin cooling tower cell-B
800-D18/L01 detector maintenance work to be done
pm of level transmitts in DMP for 85-LT-1101/1102/1106/1107/1109 &1110
21-PDT-1703/1506,21-LT-1201/1301 transmittes prevertoin maintenance work to be done
96-XV-309 on off value maintenance work to be done
Caustic sample line dechocking in recerculation system
Fuel Gas porge LP flare header rotameter Dechoking , Nitrogen purging line to LP flare
Lube oil sample collection for 11-P-103A/B from lube oil tanks
Quarterly PM of 31-P-103 A/B (lube oul pumps)
monthly preservation of 41-p-109(catalyst solution sump pump)
41-p-109 A/B/C (catalyst solution sump pump) pumps motor yearly preservation
41-p-109 A/B/C Filtrate pump) pumps motor yearly preservation
04-TR-502 Lighting trasformer feeder relay testing .
04-FPC-301 and its upstream feeded relay testing
HVAC and pressurization fan feeders relay testing
Process area instruments greasing work
Cooling water supply line PH analyser trouble shooting
CP system punch points attending in OGT all areas
CP system communication cable dressing and cable fault finding in OGT all areas
Glycol absorver diff pressure transmitter cheking
DCS&ESD cabinet PM check
MSD's & MCP's functional testing at SS_1
scaffolding erection nera caustic storage tank
Inspection and maintenance of fixed fire fighting syatem in OGT
ETP lighting transformer 2 Electrical maintenance
HVAC electrical panel maintenance
PM Job of 86-CT-1101/02/03/04/05
OWS TPI oil skimmer maintenance
Manuala removal of sludge from thickner
EOT operation checking for 12-EOT-001
Pressure transmitteramine absover PM Job
PM Job of 86-CT-01 B
Preservation of 12-P-105
Preservation of 41-P-108 A/B
PM Job of 31-P-151 A/B
41-PM-104 A/B Preservation pump motors
308-pm-103 b fire water jockey pump B feeder relay testing
308-pm-101 b fire water main pump B feeder relay testing
PM Job of 86-CT-01 B feeder PM
Caustic storage tank & absorption tower connecting flange leak attending
PM Job of 86-CT-01 B motor electrical pm
201-PM -102C motor terminal installation
Spilt Ac maintenance
CP system punch points attending in OGT all areas
201-PM -102B balancing
Manuala removal of sludge from thickner
PM job in dm plant 85-UV-1113/1114/1116/1117 A/B
21-LT-1602/1603/1604 PM
door repairs work in Main Gate Building
pm of 21LT1606(glycol sump drum level),21LT1703(ESD)Glycol surge drum level
Maintenance of 800-D18/L1 (store room , firesation) multisensor detector
PM of 96-TT-007 A ows daf A oil skimmer
defective locks replacement at substations-1,2,3&4 fur panel door's
maingate house & fireslation MSD's fordnight preventive maintenance
nitrogen purging line to LP flare FI-5507,RO-5508 spool piece dechoking by dismantling and cleaning
gasdetection ( slug catcher ) panel side door fixing in rack room
Train-1&2 emergency puh button stand pipes painting work
green belt devolpment works and additional area plantation
Battery bank maintenance job at sub stations # 1,2,4 and MCR
pm & calibration of 51-LT- 1106 A/B (levels of HP seperator)
PM of 51 -LT_1106C/1404A & calibration of instrument as per calibration schedule.
Maintenance of compressor capacity selector switch to rectify its functionality
41-PM-105-a, 11-pm-105,b 41-pm-106a and 41-pm-106b,sru yearly pressurization job
road tanker loading pumo (91-p-101 a) quarterly pm
ut thikness measurement of piping in tankage area
lp flare fuel gas purge point dechoking in csu
mcr hvac chilled water circulation pump-a- quartely pm
admin hvac chilled water circulation pump-a-quartly pm
Weak cells individual charging throughcell booster in SS-01
OGT lighting maintenance
308-pm-103-a fire water jockey pump (a) relay testing along with m/s system protection
308-pm-103-a fire watermain pump (a)relay testing along with m/s system protection
86-p-01c (cooling water recirculation pump_c) strainer cleanings
train_01 unit shut down button painting &tagging
scafolding removal to be done in ss-01 for MSDs 802-loop 07 59,63,64,50,49,56,
calibration of mullti sensor portable detectors to be done in mcr calibration room
Functional testing of MSDS to be done in admin building
etp and dm plant ups battery bank maintenance
utilities lighting maintenance
manual cleaning of sludge of the rwtp
daily routine maintenance activities/visual checking of pcc in utilites
pm of radar is instaled in rwtp (dwpe dosing tank,b, line d tank a-b, caustic solution tank)
blinding of over flow line of H2SO4 storage tank & de dlinding after completion of spool piece replacement
maintenance of 21-p1-110, &21,p1,1205 to rectify the issue of erratic valve
maintenance of 84-fv-02507-to rectify the issue of faulty feedback at PLC
maintenance of 96-at-0301 to rectify the issue of valve mismatch between field and PLC
ss-1 ss-4 6.6 kv pump spare feeders protection relay testing
ss-1 ss-4 04-epc 301 panel bus coupler panel relay testing
monthly preservation of 22-p-101 ab
quarterly pm of 91-p-101 b
monthly preservation of 22-p-102
04-ht-201 04-ht-203 i/c 701
41-pm-107 a/b 109 & 111 a/b
inspectin & genaral maintenance of fire fighting equipment system(hydrants , monitors,mvws,hvws
formalation dosing pump -a (86-p-05 a) pg flange leak attending
21-pdt-1506 (stripping) erraluic troubleshooting work
ss-2 hvac panel annual preventiv maintenance
admin ups battery bank monthly prevenyiv maintenance
scoffolding erection in cooling tower for lighting arrestor
86-2g-d2 chlorinator-a drain valve asssembly replacement
replacement of cooling tower pumps 86-p-01 a/b/c
maintenance of silica analyser 85-at-1119 (mb o/l) , 85-at-1119(comm o/l) & 85-at-1113 to rectify issues of valve
Not Issued
Civil foundation work for 6mtrs CCTV poles at vehicle entry/exit area at mainagate /MCR/FIRE STATION
51-PM-104 CBD pump motor & feeder modual PM
OGT lighting maintenance
02 MCC-311/IC-2 controle tranceformer trouble shooting
02 ELB -323/IC-2 controle tranceformer trouble shooting
PM of 51-p-104
Monthly preservation of 12-P-106 A/B
Thickness measurment of piping in train-2
Scaffolding removel near lp flare puging lines in train-2 erected for supports provision
PM of 84-p-401 A
PM of 84-p-401 B
Condition monitoring for 11-p-103 A & 21-p-101 A
Pressure trancemetre PM 11PT 1408/1406/1518/5204
86-P-04 A/B pump discharge pressur gauge showing
11-p-108 B vibration switch showing high alaram
96-XV-0303 on /off valve showing wrong feedback in PLC
Lighting maintenance in utility area
84-CLF-01B (Clarifies-B) gear box oil leak attending
HC Gas dector funcational testing
Analyser pannel painting job in CTM &Train-1
MLPS line ine erection-VATMS Project
Thickened sludge sump agitator base bolts tighting
Canteen MSD d s6/L5 and hooter fixing job
Firestation MSD D01/L1 fucational testing
mantanance of 800-D21,D22/L2 msd at maingate
mantanance of DMF Valve 96-xv-306
mantanance of 85-u-1119 & 85-u-1120 (acidmeas measuring tank )
pm OF 308-P-103 b
Mpnthly preservation of 32-K-102
Preservation of nots bolts connecdng 32-V-102 32-E-101 & 32-E-102
01-DCP-201 L&T DCP Pannels cooling fans trouble shooting at substation-01
01-LB-323 /IC-1 Input analog ammeter checking
86-P-04 A/B H2SO4 Dosing pumps strainer cleaning
Admin ups battery bank maintence
DM plant DM warer transfer pump -A 85-PM-01A PLC Tripping issue
Flare HC dectir 89 AT-1101/1102/1103 Funcational checking
DCS &ESD Daily health checking PM activites
Train-2 drain pump (22-P-103) installation & preservation
PM Of 84-P-201 'A'
PM Of 84-P-04 'A' (fire water make up pump - 'A'
Fuel gas KOD out let main line Main /Standby Strainers Cleaning To Be Done One after Another
Scaffolding Removal (Erected For PSV 21-PSV-1301/1302 Dropping For Calibration)
CP System Train -2 House keeping Activity
Preventive Maintenance For 11-PT-5304 (HP steam To GSD)&11-PT-5306
MCP-64 (Narth West Of CSU) Traubleshooting & Maintenance work
96-KA-02A (OWS DMF Air Scouring Blower) Local/Remot Indicater Mismatch attending
Test control Work All Respective Area
12-E-104 B (Lean/Rich Amine Exchanger)Lean Amine Outlet Isolation Valve Operability Issue Gear Box
RWTP Weighing System Not Working Properly (Traubleshooting To Be Done )
Fire water make up pump A 84-P-03 A
pump A 84-P-19 A
88 GN-103- B After filter B of N2 Skid cleaning
PM of 11- PT-5402 & 11-PT-5404
11-AT-1303 H2S Analyser troubleshooting
H2SO4 dosing pump discharge PT Maintenance
Maintenance of H2S analyser 11-A1-1303 AC
Trouble shooting 11-PT-1301,11-FT-1303,11-FT-1102 B/A to recently the issue of repeated CNF alarm
51-K-101-A/B off gas compresser-A/B preservation
84-P-01 A cooling water make up yearly pm
CTM U-loop LPD blind removal for condensate draining
84-P-02 A service water pump pm
Condition monitoring for running equipments in Train-1
N2 skid-B after-B (88-GN-103 B ) cleaning
IA-PA/N2 painting of corroded grating at battery limit
fortnightly manual rotation of Motor shaft for 31-KM-102 A/B & 12-PM-103 A/B
On shore pipeline and sale gas pipeline cp system TBU readings measurment at OGT
Space Heater Current Meassueanent Of A-service Motors
Online greasing of B-series motors in process area
Painting of corroded structures,nuts & bolts , valves,tanks in DM plant
HCDP analyzer 91-AT-3103 maintenance work
Analyser 21-AT-1201 / 1202 pm job
daily routine maintenance health check of PLC's installed in utilities area
DM plant HVAC AC package units maintenance
UT thickness measurement of service water header
CELL-B for HC & H2S location shipting,cable laying and detection installation in new location
CST area HC detectors 91-AT-103 / 104 / 2101 functional checking
SRU blower-A BOV stroke test & UV functional testing
Scaffolding erection on the top of 12-C-102 vessel for aviation lamps maintenance
Painting of HVAC structear in MCR,LAB,Sub-Stations& Admin building
41-K-101 'C' SRU blower lube oil filter cleaning
51-P-102 'A' Atm condensate pump strain cleaning
12-P-11 CBD pump preservation
308-P-101 'A' fire water main pump 'A'
Scaffolding removal inside clarifier A (84-CLF-01-A)
Condition monitoring of running equipment in utilities
PM of 01-TR-26 01-PC-302-IC1-ACB, 01-TR-26-VCB and indoor dust busduct
PM job to be done to instrument 11-PT-5406/5503 in GSU
Joint calibration of CTM instrument and analysers to be done along with RGTIL
Punch point in train-01 and train-2, house keeping and cp readings in train-1 and train-2
tallarevu pump house battery bank mainatenance EDG electrical maintanance
Canteen building AC package units air filles cleaning maintenance
N2 skid-B after-A cleaning
Ware house and work shop beam detector functional testing
MCR building over headtank cleaning
Preventive maintenance/calibration of 11-u-1404(calib), 21-ft-1501,11-PT-3104A/3105A(calib)
Preservation of 12-P-103 A& B pumps (shaft rotation & lube oil circulation)
PM of 84-P-01 A (cooling water makeup pump 'C')
PM of 01-TR-26 01-PC-302-IC1-ACB, 01-TR-26-VCB and indoor dust busduct
Schedule maintenance of fixed & portable fire fighting system
Belt filter press pump-B (84-p-11 B) maintenance
STP to green belt pump-B (96-P-032'B') gland leak attending
Formulation dosing pump-A (86-P-05A) low flow issue attending
Admin building split A.C maintenance
Fan blade angle checking for 11-A-108 A
201-P-102 'B' (Thallarevu feed pump-B) assembly
Train-1 HCDP analyzer 31-AT-1601 N2 Cylinder replacement with new cylinder
PM & Calibration of analyzers installed in utilties(list enclosed)
Shifting of cylinders from AQMS-1 to workshop
Battery bank maintenance at SS-01,02,04 and MCR
Loading of used/waste oil 200ltrs MS drums to lorry through forklift
PM of 308-P-103 A
Blade angle modification for 11-A-108 C ( lean amine air cooler C)
PM of 11-P-118 A
Coupling instalation for 22-P-103
Monthly preservation for 31-EK-101 A/B
Multiple orifice inspectin in fuel gas purging line to HP Flare in CTM area
UT thickness measurement for piping n train-2
Thallarevu diesel generator (21-DG-101) preventive maintenance
96-PA-010 B (Drain & over sump pump ) strainer cleaning
Belt filter press A & B high pressure water nozzles dechoking
Preventive maintenance of 21-11-1601/1607
Maintenance of 11-PDI-1615 section strainer DP of lean amine charge pump-11-P-103 B
Maintenance of SBA-B alkali measuring tank B level transmitter 85-U-1139/1140
PM of 11-PM-118A bearing cooling water pump A
OGT lighting maintenance
Lighting maintenance in utilities area (CWTP,ETP/N2 Plant.RWTP)
Analyser panel platform & instrument stand pipes painting job in train-1
Cooling tower cell-A HC& H2S Detector location shifting job
Loading of used/waste oil 200ltrs MS drums to lorry through forklift for sending to disposal unit
SS-1 MM Module 802-MM-21/L6 maintenance work
On shore pipe line and sale gas pipe line quarterly cp system reading measerement
Monthly preservation of 31-k-102 A/B
Multiple orifice dechoking for fuel gas purging to LP flare in CTM area
Preservation of studs valves in piping connecting 32-V-101&32-V-102
Cooling tower cell-A HC& H2S Detector location shifting job
House keeping at Train-1',2,ETP&F/W pump house alage cleaning
DCS &ESD cabsets& systems health checks
84-P-03 A DM feed pump -A NRV passing attending
96-P-10 A drain& overflow pump-A gland leak attending
96-P-10 B drain&over flow pump-B strainer cleaning
VATMS 2 mbps instruction at microwave rack/Tower
85-P-08 C N pit transfer pump-C discrage PG assembly maintenance
Fire water network isolation valve -96 gear box maintenance
Maintenance of 11-AT-1301 H2Sanalyser AC
Maintenance of drain& overflow pump 96-P-10 B dicharge pressure gauge
Vibration Monioring (measurement)For 11-P-103B & 21-P-101B
Grating Modification At North East Corner Due To Bend Of The Water Drain Pit
Cell-A HC & H2s Detectors Location Shifting
CSU H2S detector 9nos As per Attached functional Checking
Cooling tower Chlorination room Chlorine Line Cross Over Channel Painting
Pert Control Work At All Respective Buildings
Removal of Glasses From Windons of Overhead Tank
Fire Water Network isolation valve -89 gear box maintenance(Towards North East Side Of CSU)
SRU H2s Detectors 41-AT-1101A/1101B Functional Checking
Maintenance OF ETP Do Analeges 96-AT-0403
Maintenance Of Argonite System Stand By Bank Cylender Pressure Guages
Foam Nurser-1 [UP85 AF 9178] Ain Kicken Pump Maintenance & Replacement
Troubleshooting Of CEW DME Feed Pump 96-P-07B Run Feedback Issue At DCS End
tightening of upsteram flange of 3'' isolation gate vale of train 2 b/c hp steam header
96-xv-0410 (cwrs dme- 2b vent vale) 96-xv-0409(cwrws dme-2b inlet vale )not getting operali from plc
Functionality checking of Train-2 H2S Detectors
Maintenace of 800 D21/L02 main gate out punching area.
cp System monthly reading measurment at ogt
84-pm-1b,84-pm -2b, 84-pm 3b ,84-pm-1 c , 84-pm-6b, 84-pm-7b, feeder pm at ss#03
montly presrvation of 11-p-112 a/b (antimate injected pump)
monthly preservation of 11-P-114 a/b corrosion in inhibitor pump)
valves ,nute ,bolts preservation in lines of 22-v-101 to 22-v-102
fire water monitor isolation valve (m 73 ) operatabilty to be attended
grating Modification At North East Corner Due To Bend Of The Water Drain Pit
87-k-01b (lp air compressor-b) pm job
pm job to be done for 11-TT-1111 & 11-TT-403
Painting of corroded ladders of H2O2 storage tank; 96-PA-009 A/B Pump skids, guard pond aeration header along guard pond
Condensate storage tank-B outlet line (16'') flange online tightening
Painting of fire water header line arrounding MCR
Ut thikness measurement for pipe lines and pressure vessels in train-2
Monthly maintenance of 11-P-113 A/B (Antifoam injection pump)
Monthiy preservation of 11-P-114 A/B (Corrossion inhibtor pumps)
Monthly preservation OF 11-p-107 A/B pure condensate pumps
51-PV-1204 Upstream flange leak
CSU ISBL Globe value gland leak
Fire water monitor isolation valve M-09 Passing issue to be attended
PM Of 01-TR-23,01-23-IC2 - AC2 &01-TR-23 VCB
OGT lighting maintenance job
PM OF 11-TT-1108 (iop csu off gas inlet to KOD) , 11-TT-1901 (Temperature of CBD)
11-PT-1903 Pressure leak attenting in top of CBD 11-V-111 pressure
96-PA-1101 A NRV passing attending
Daily maintenance visual checks to be done for PCCS IN UTILITES
Calibration of maintenence activity to be carried out for analyzers in utilities
Maintenance of diesel tank C level transmitter
Overhead tank drain line threaded spool removal before attending sewer
External vessel inspection and UT thikness measurement of pressure vessels in train-1 & CSU
Train-1,N2 plant operator cabin split AC &DM Plant split AC maintenance
PM of 01-TR-23, 01-PC-301-IC2-ACB&01-TR-23-VCB
Cleaning of clarifier A
UT thickness mesurement of pressure vessels in DM PLANT Cooling tower
Canteen bulding air curtain maintenance
Maintenance of 801 D72/L4 801 D75/L4, MCP 64
Ttrain -2 b/l routing of steam straps drain in train-2
pressure vessels inspection in plare area
Monthly preservation of 22-P-102(Glycol transfer pump)
Monthly preservation of 41-P-111 A/B (Recirculationpump)
Quarterly PM of 31-P-113 A/B (lube oil pumps of sale gas compressor-B)
11-P-1103 A dicharge NRU downstream LPD flange leak, 11-P-103 A dicharge FT-1609 LP tapping blind flange minorleak
Pm of 11-TT-1202 Temp of 4/ray of 11 c 101,11-TT-1203 temp of 8/ray of 11 c 101
DCS and ESD cabinets & system Daily health checks
RWTP 84-PM-03 B DM water feedpump B motor maintenance
utility area lighting maintenance
Sobboding Ereeting Near Dryer skiots in N2 plant
86-LG-09B Cowetic Pump-B oiler Leak attending N2
(91-V-102) Sump veesel of wading gantry manhole cover box up
12PCV-1601 & 12 PCV-1062 Calibration JOB to be done
Trobleshooting of 96-XV 303 feedbock & 96 P-10A drain & ones flow pump PG showhs erratic value
Fire water sprinkler system elbow joint leak attending near 51-P -101 A/B
96-P-10B Drain & overflow pump-b strainer cleaning
fire water monitor isolation valve (tag no:M-73) yoke sleeve issue o be rectified (located towords east side of flare stack)
Train-1 and CTM area Instrument yoke supporls & pipings painting job
Preventive Maintenance of 11-TT-1204/21-TT-1504
Maintenance of 11-LT-2007/2008 & 11-lt-2004/2005
Battery Removed at SS-01, 01-BATT-101 For revival and boot
Calibration of GC-2 analyzers
Scaffolding erection at RWTP
Aluminium glass door repairing at mcr
Cable leying from ss-4 to NRWR pump house
Green belt Maintenance work in OGT
Pest Control work at rappetive Building
Foam Nurser-1 [UP85 AF 9178]fuel inspection
temparery hose correction to high pressure pump-A
802-D25/L8 showing dirty Maintenance to be done
41-P-101 A/B/C/D (sulpher slurry pumps) monthly preservation
41-p-112 squeezing pump, 41-p-113 sclurry pump monthly preservation
Hose connecting from liquid nitrogen tanker to liquid naitrogen tank for unloading
Movable tanker earthing at air of N2 plant for N2 tanker unloading
Grass cutting
Temperture transmitter 21-TT-1506/1701
84-P-19A (high pressure pump) strainer connection normalisation and dewatering pump suction line normalisation
PM & Colibration of 21-TE/TT-1704 (rich teg o/l from 21-E-102) and 21-TE/TT-1079 (lean teg o/l of 21-e-102)
96-AT-0406 gp outlet ph -analyzer showing
41-p-114 cloth wash water pump monthly preservation job
01-TR-21 power transformer PM job work at sub-station-01
41-P-115 Cake wash water pump monthly preservataion job
41-P-109 cs sump pump monthly preservation job
41-P-111 A/B recisulation pump-A/B monthly preservation
91-P-15 A/B dry slop oil transfer pump mech pm
TLF bay 1&2&3 water spray system (manual) isolation valve mantenance
FIRE water isolation (V-25) near cooling tower rcc walk way flange leak attending
Glass doors repairs at main gates pass section
MCR HVAC AHU-4 poerventive maintenance
Suction strainer & cylinder cleaning for 11-P-114 A/B
Scaffolding removal N2 plant
monthly presrvation of 12-P-108 A/B (wash water circulation pumps)
monthly presrvation of 12-P-109 A/B (wash watemakeup pumps)
monthly presrvation of 41-p-102 A/B/c (catsol solution circulation pumps)
condition monitoring of all running rotatory equipment in train-01
annual prevention maintenance of 21-p-102 (glycon transfar pump)
pm and calibration of 21-te/tt-1701 (lean teg to 21-e-102)and 21-te/tt-1712(temp of surge drum21-v-105)
31-FV-1101 (dehydrated gan to dpdu ) showing essatic feed
01-TR-31 power transformer pm job work at sub station -01
RWTP caustic scrubber tank man hole gas kit replacement
inspection of unloding hose of LIQID NITOZEN
painting of correcled structures grathing etch in rwtp
PM of temperater transmitter for cw inlet and outlet aras
inspection of electanic cyodvle for foow dramsmiltas in etp
MCR HVAC AHU-3 poerventive maintenance
scaffolding erection instment air air doyerr a for lighting maintenance
cleaning of sludge in Guard pond 01
discharge header choke inspection for 11-p-114 a/b flange leaks attending
96-pm-10 b drain overflow sump pump b suction line dechoking
96-FI ouol Guard pond 01 outlet ft shower erralc maintenance to be done
PM job to be done for 21-TT-1715 (I/L lear 417101 cooler) 21-TT-1718 (O/L of lean 417101 cooler)
Valves preservation in lines connecting 12-E-102 (sour gas water cooler) & 12-V-101 (inlet gas knock out drum)
Monthly preservation of 11-P-108 A/B (wash water circulation pumps)
Monthly preservation of 11-P-109 A//B (wash water makeup pumps0
Quarterly PM of 21-P-103 (glycol drain pump)
304-P-01 B (driking water pump-B) PM
Fire water monitor isolation valve (M-10) Passing issue to be attended (located towards south side of condensate storage tanks
86-CT-01 A (Cooling tower fan-A) PM job
Feeder PM of 84-PM-04A fire water makeup pump-A
Feeder PM of 84-PM-07A clorine booster pump-A
Schedule maintenance of fixed and portable fire fighting systems
MCR HVAC AHU-122 preventive maintenance
Loading gantry absorbent return pump motor A&B earthing to be done
96-KA-02 A (filter back wash blower) bearing replacement
Painting of corroded structures, gratings, pipe lines in ETP
Train-2 motor &ICS earth strips repaiting
Maintenance work (fuel tank cleaning, filter cleaning work of foam nursur-1 (UP-85-AF-9178)
Painting of correded structures, ladders in IA-1A Plant
Maintenance of 11-FT-1402 to arrest manfold leak
91-T-101A Condensate storage tank-A O/L isolation valve GLAND leak attending
85-T-11 N-pit acid measuring tank overflow line elbow pin hole leak attending
85-FT-1124 (DM-water to CPP) is showing erratic valve
OGT lighting maintenance job
Transformer oil sampling at ss-1,2,4
31-TT-1601/1602 TT''S PM job to be done
Monthly preservation of 41-p-108 A/B (catsul solution storage pumps)
Monthly preservation of 41-P-103 A/B (Filtrate pumps)
Quarterly PM of 89-P-01 B (HC flare blow down pump)
84-ABL-04 B (caustic blower ) vibration meassurement & motor guard fixing descarge line support is also to be checked
Scaffolding removal in Instrument air for lighting maintenance
6 MTR & Poles erection & installation of CCTV cameras
Calibration of GC-2 analyzers
PM of 85-UV-1122 A,B /1123 A,B /1124 A,B for process water & SBA caustic service line
Chlorinator room exhaust fans meshes cleaning & fixing in cooling tower
NRWR 84-PM-401 A&B control cable termination & simulation checkes
Leveling of reference cells pits in train-1 & 2
1.Chlorinator A&B back guards fixing 2.Chlorine tonner FRP hoods fixing to avoid chlorination leak to outer atmosphere
Maintenance of batteries of all fire tenders (charging condition , acid level etc...) with help of electrical department
Valve bonnet leak attending 91-PSV-1103
Maintenance of SS-1 TR-22, MM-21 to rectify the trouble
Gc-2 Helium cylinder change over
Battery bank maintenance work at SS-1,2,3,4 & MCR
11-PT-1402 pump dicharge flow of 11-P-106 A/B LP tapping leak to be attended
Monthly preservation of 41-P-104 A/B(KOH solution metering pump
monthly preservation of 41-p-105A&B(catalyst dosing pump)
Belt filter press (84-BFP-01 B) dechoking
Quarterly PM of 152-P-1010(CBD) pump
Fire Water Monitor isolation volve (tag NO:M-11) isolation valve Passing issue to be attended (LOCATED TOWARDS west side of
Power and control cables dressig at Train -2 area
DCS and ESD cabinets & system health checks
PM of flow Caitol volve in HP campressar & Rad-B for 87-FCV-270 1 /142 /2702/2601 2701
Cooling tower Chlorination room exhaust fan-1 Tooubleshooting
Utillity near lighting maintenance
Scaffolding erection on the top of 12-C-102 vessel for aviation lamps maintenance in Train-2
MCR hvac chilled water pump-B monitor electrical maintenance
Admin HVAC AHU-1 preventive maintenace (Fillter cleaning)
MCR HVAC chilled water pump-B mech pm
84-ABL-04 B caustic blower -B dismantling the casing for balancing
maintenance of radar of CST -A & B (91-U-1101&91-U-1103)
51-FT-5201/5202 plant air & inst air FT`s mino-leak to be attended
Foom nurser-2 (9178) diesel tank cleaning and topup in house
Gvan cuttinhg work of all area /OGT-GSPC
51-LT-1101, 51-LT-1103 PM job to be done
cooling water I/L rotameter maintenace work to be done (86-FI-1116)
Scaffolding removal near alkali scrubber in RWTP
Fire water header isolation valve(valve no:69)gear box maintenance (located towards west side of condensate storege tanks)
PM of smoke detection in main gate house fire station as per the below CST 800d14,16,18,21,22/L2 800-D1,9,10,14,18/L1
Pest control work at all builidings
Maintenance of green belt development work
85-FT-1124 flow transmitter(DM-water to CPP)maintenance work to be done
S
battery bank maintenance at SS-01,02,04 and MCR
Cooling water flowe trammittes 84-FT-307 & 86-FT-1109 valve traubleshooting work
Main gate MSD D21/L2 and canteen VIP dinning hall MSD D11/l05 Maintenance work
11FT140 valve fuctionl troubul shooting
41-P-106 A/B (chlelate dosing pump) monthly preservation.
41-P-107 A/B (surfactant dosing pump) monthly preservation.
31-P-151 A/B (Expander compressor-A lube oil pump) quarterly pm
Water cum foam monitor isolation valve maintenance (M-44) between train-02 &sru
DM storage tank -A- to dm regenaration pumps inlet line isolation valve gland leak attending
84-P-19 A (high pressure pump-A) gland leak attending
HP-8, LP-8 steam trap by pass valve passing attending (opposite train-01 B/L) HP-2 And LP-2 in train-1 mainteance
84-P-13 A (alum dosing pump) low flow issu attending
88-PSV-1131 (liquid N2 storage tank ) passing inspection & attending
84-P-18 B (caustlic pump) abnormal issu attending (suport inspection)
Painting of cormded structures in IA-PA-plant
Painting of cormded structures 11-UA-1501 in train-1
31-KM-102 A/B, 32-KM-102, 12-PM-103 A/B prevations job
Onshore and salegas pipeline CP reading (test points) measurment
Cooling tower cell-B HC detector 86-AT-1104 work
Control valve 85-PV-1154 trableshooting work
Level tramnitte P.M check 11LT1301 A/B/C & 11LT1101C
DCS / ESD cabinets pm check & dialy check
Daily vovhine visual checks to be done for PCCS IN utillites
96-KA-002 A pg not work
PM of 85-UV-1125A/B, 1126A/B , 1120 A/B , for prosess wali line on/off valve
ETP,DM plant, FWPH battery bank maintenance
Admin HVAC AHU-2 poenentive maintenance
Scaffolding errection cooling tower area for stoeet light maintence
Aviation lighting maintenance at 12-C-102 columan in train-2
01-BATT-101-1 battery bank weak cells maintenance and boost charging through cellbooster
Manual cleaning of guard pond-1
Lean amine tank n2 inlet line to lean amine tank isolation valve passing attending by dropping the valve
Removal of air sparges line & supports inside guard pond-1
MCP-64 , condenstate storge tank is showing trouble to attend
Cell-B riser valve operability checking
11-LT-3101B(11-P-103B lube oil reservoir level) PM
84-CLF-01B (clarifier-B) impeller rpm is showing 50 in PLC while in stopped condition.
84-FIT-0202(RGF outlet FT) erratic value
51-P-3301A/B (off gas compressor CW pumps) monthly preservation
51-P-3202A/B (off gas compressor Lube oil pumps) PM
Mobile scaffolding erection near Train-2 B/L
Inspection and Maintenance of IV-75
96-KA-02B (Filter backwash blower) PM
96-KA-001B(DAF air saturation vessel air compressor) PM
Train-2: UT thickness measurement of pipeline/static equipments
01-TR-24 (6.KV/415V) distribution transformer PM
PM of Admin HVAC AHU-3
84-PM-13B(Alum dosing pump) motor bearing replacement
AFC-800-D21/L-2 (main gate out punch area smoke detector) troubleshooting
UT thickness measurement of sampling lines of turbidity/PH analysers near TWR in RWTP
PM of 85-UV-1127A/B,1128A/B,1129A/B,1130A/B
2Mbps VATM link RF Radio installation job in Microwave tower
Cleaning of Clarifier outlet channel & RGF-1
12-P-118A &B (Bearing cooling water pumps) monthly preservation
Road tanker loading pump-A (91-1-101 A) preservation maintenance
Scaffolding erection (for 51-FT-52010 HP tapping leak attending)
Saturation vessel air compressor-A (96-KA-001 A) preventive maintenance
Valves preservation in lines connecting 12-E-102 (sour gas water cooler) & 12-V-101 (inlet gas knock out drum)
PM of 01-TR-24, 01-PC-301-IC1-ACB, 01-TR-24-VCB at SS#01
packing installation for HP steam header, cooling water header (supply & return)
Preventive maintenance for 11-FT-1102 A&B ( CSU offgas FT)
85-FT-1124 (DM-water to CPP) flow transmitter valve got struck
Temperature transmitte 21TT1618 ( alycol cooler outlet )
Calibration of 12-PCV-1601/1602 (N2 Blanketing to leam amine tank)
Scheduled maintenance of fixed & portable fire fighting system
Acid Flare pilot-no:5 not working
PM of 85-uv-1131A,B; 1133A,B for process water & SBA alkali lines, on lost valves
Admin building AHU-4 Preventive maintenance
General canteen AC package-2 compressor-2 outdoor unit motor installation
Loading gantry main cable& branch cable status checking
22-P-101 A/B (glycol injection pump) discharge flow transmitter orifice inspection
21-P-101 A&B (glycol injection pump) dischrge FT orifice plate inspection
12-P-105 (Amine drain pump) monthly preservation
12-P-111 (CBD pump) monthly preservation
91-P-101 B (road tankers loading pump) PM
51-Ft-5201 (plant area battery limit) HP tapping leak attending
84-P-09 A ( effluent transfer pump-A) discharge pipes leak attending
Instalation & clamping of aeration line in guard pond-1
Admin HVAC chilled water pump B preventive maintenance
PM of 02-TR-21 power transformer at ss-2
OGT Lighting maintenance
11-FT-1103 (HC condensate to CSU) & 11-FT-1104 (LP steam to sour gas heat exchanger) PM job to be done
Admin HVAC chilled water pump B motor electrical PM
GC-2 calibration to be done
General canteen AC package-3 out door unit motor bearing replacement
RWTP , weigh bridge split AC maintenance
Loading Gantry MOV-1201 earthing meter calibration trolley motor cable terminator
PM of on/off valves for 87-UV-1101/1102/1103 & pressure switch 87-PS-1401
GC-1 Preventive maintenance job to be done
Quaterly maintenance of semi fixed foam system for CST-A (FLUSHING)
11-FT-1201 PM to be Done
12-P-103 A&B (Lean amine charge pump) monthly preservation
91-P-101 C (Road tanker Loading pump ) PM
Scaffolding erection for supports installation for fuelgas to lp flare and acid flare in Train-1
Painting of corroded structures in Loading gantry
MCR HVAC chilled water pump-A Preventive maintenance
Admin HVAC chilled water circulation pump-A PM
85-B-01 'B' (degaser blower-B) PM
PM of 02-TR-21 , 02-TR-21,-11KV-VCB & 02-HT-201
Touchup Painting for 02-TR-21 Power T/F cut SS-02
Maintenance of semi fixed foam system (flushing,Cleaning) for Condensate tank-B
Scaffolding removal in cooling Tower area for lighting
Admin HVAC chilled water circulation pump-A motor electrical PM
MCR HVAC chilled water pump-A motor electrical PM
VIP canteen pack-3 AC-3 motor out door unit motor bearing replacement
PM 206 to be done for 85-UV-1134 A/B,85-UV-1135 A/B, 85-UV-1136 A/B
Calbration & PM of HC&H2s Detectors in cooling tower cell-B
Maintinance of Trailor pump (trolley monted)(Cleaning of air filters)
LP steam to GSU reboiler drip leg isolotion valve (4''150 #) end blinding
Canteen kitchen ventillation fan installation
11-P-103 'B' lean Amine Charge Pump Quarterly PM
87-K-01 'A' (LP Compressor-A) Quarterly PM
96-PA-032 `B` (STP to green belt pump) spider replacement
Condition monitoring of rotary equipments in Train-1
01-HT-203 bus coupler -VCB PM (6.6Kv panel)
GC-2 Sample line heat trace cable installation
Semifixed Foam system of slope tank inspection & maintenance
87-KM-01A LP air compraser-A motor electrical P.M
Loading gantry Power DB healthines checking and charging , 3 welding recptacle helathiness and charging
Functional testing calibration of HC & H2S detectors in cooling tower cell-A
PM job to be done 85-UV-1137A/B,85-UV-1138A/B,85-UV-1137A/B (on-on volve)
Foundation work for spun pole (excavation-700mm width,2000mm depth)
Sapling plantation for green belt development tank-2 in OGT
Pest control activity @ all respective buildings
Painting of rungs in guard pond-1 in ETP
Removing ventillaton fans in canteen kitchen room for cleaning
PM & Calibration of 11-LT-1201A & 1201B
11-P-114A (corrosion inhibitor pump-A) no flow issue to be attended
11-P-103 B Lube oil FILTER replacement (lean amine charge pump)
Battery bank maintenance job at MCR
Grass cutting work boundary wall non process area
87-TI-2613 reg cooler oil temperature transmitter maintenance work to be done
84-PGT-204,RGF-2 back wash isolation valve is not setting fully. To be attended.
Monthly preservation of 12-p-105 (amine drain pump)
Monthly preservation of 12-p-111 (amine drain pump)
91-T-101 B outlet flange leak inspection & clamp cheaking
Quarterly pm of 11-P-111 (CBD pump)
86-CT-01 B (Cooling tower fan-B) PM job
84-PM-06A , 84-PM-01A , 84-PM-02A,84-PM-03A,84-PM-09A,RWTP feeders pm at SS#03
01-BATT-101-1 battery bank weak cells maintenance and boost charging through cellbooster
84-PGT-0204 valve at fully getting closed
87-TT-2611,2612,2613,2614,2615 in comperssor area in drger-A
Lighting maintenance in utillites area
U.P.S and battery bank maintenance in admins builiding ETP and DM plant
Admin AHU -1,2 Blowers
Maintenance of CO2 analyic 11-AT-1304
Preventive maintenance of CTM H2S analyser (91-AT-3102) and HCDP analyser (91-AT-3103)
Functional testing calibration of slug catcher detectors 151-FDT-101/102
88-UV-1409/06/02 ON/OFF valve maintenance
21-PM-101B LCC and feeder trouble shooting
91-T-101 A/B west side monhole flange leak to be attended
Frame glass fixing with gum
Maintenance of H2S analyser 11-AT-1301 AC
PM of 11-FT-1203 (water wash column cerculation pump descherge FT) 11-FT-5107 (bearing cooling FT)
Trouble shooting for 21-PM-101B
Schedule maintanance of fire fighting equipment/systems as per attached list
11-p-102- A (Regenerator reflex pump-A quarterly pm job
22-P-103-(Glycon drain pump) monthly presrvation
leak amine transfer pump (12-p-106 b)mothly presrvation
mcr ahu blouers 1,2,3,4, quartly pm job
85-B-01 'a' (degaser blower-a) quartly pm job
ut thickness measurement of static equipment in train-02
84-PM-12a(Alum dosing pump) freeder pm job
transformer replacement ss-04,
ctm joint calibration h2s,hcd ,pt,tt
11ft-1607 flowtaiting showing valve changing tank 01
flow taiting pm chek 11f 1204 and 11-ft1301
valve maintenance
dcs andcabinets pm check
tp-h (201-ft-0102)getting up with out flow
tallarevu pump house battery bank mainatenance(battery charger
ohc doctor room spit ac maintenance
84-pm-04-b freeder preventence maintenance
stram house connution for acid flare pilon filling
cleaning of filter (91-str-120-120 of unloding aras inspection of loading aras and vapour arms
11-p-114A (corrosion inhibitor pump-A) no flow issue to be attended suction disharge line valves inspection
cylinder no replacement with new one for hcdp analysi 11-at-1602
trouble shooting for 0202 rgt outlt
Valves preservation in lines connecting 12-E-102 (sour gas water cooler) & 12-V-101 (inlet gas knock out drum)
12-P106A (lean amine transfer pump) monthly preservation
NRWR pumps discharge FT orifice inspection & 12" pump discharge header to OGT gasket replacement
Scaffolding removal near guard pond-1
Trouble shooting of lean glycol tank level transmitters 21-LT-1601/1602/1603/1604
Monsoon protection for loading gantry inst# JBS
HFT1202 & 31TT1601 Field instruments PM checking
01-pc-301 Panel bus-compler ACB breaker pm job
Loading gantry sump pump-B motor electrical maintenance 91-pm-102B
91-P-102B (loading gantry sump pump-B) quarterly PM
Daily routine visual check for PLC'S in utilities
84-P-09B pump discharge PG is not works
84-FT-0202 showing invalid
PM of 84-FT-1101/1103/2601&2602 in drain-A area
Calibration of N2 blanketing PCV's lean amine tank
Maintenance of safety showers in train-2
Flow transmitter p1-ft-1205 (makup water line) & 11-FT-1501 (acid gas) pm job
51-k-101 A&B off gas compresser monthly preservation
11-A-105-A regenerator air coller-A quartly PM
Vallues presservation near 11-V-102 ( treated gas kod
84-P-09 A ( effluent transfer pump-A) Assiemble
OGT halyrly maintenence
02-TR-22 Power transfermer yearil pump job
Preventive maintence for 11-FT-1604 (Pure mdea to iear amaine storage tank flow 11-FT-1607A (Lean amaine stroge tank N2)
Maintenence of HC dector 86-AI-1103 HC dector in cooling tower cell-A
02-TR-22 SS-2 Power transfer touch up painting
House keeping with the help of JCB
Callebration of GC-2
32-K-102 Sale gas compressor monthly preservation
11-A-112A Pure atmosperic condensate air cooler annual pm
Scaffolding erection for support installation for fuel gas to lp flare & acid flare in train-1
Scaffolding erection for calibration of 11-PSV-1102 a/b
86-P-05 B Formulation dosing pump-B low flow issue attending
85-p-06 a Acid unloading pump discharge value maintenence
PM of 02-TR-22 , 02-TR-022 11KV -VCB and 02-HT-202
SS-2 Battery charger 1&2 maintenence
11-FT-1607B/11-FT-1608 P-M job to be done
Foundation work for SPM pole instalation around boundary wall
Functional checking of spare HC gas dectors in project material
Main gate power DB power cable relugging
04-dc-103-2 ss-4 FCBC-2 Trouble shooting
81-P_102B Loading gantry sump pump -B maintenence
Pest control work at all ogt
Puting of sampling lines of PH analyser in RWTP near treated water reservoir
Replacing glass for MCP 114 west of train-1
Honey bee treatment at train-2 /ogt gspc
85-P-06''A'' [acid unloading pump-A] Oil seal leak attending
85-T-08''B'' [MB acid measuring tank] drian valve passing attending
Preparation of booth for support installation of fuel gas line to lp flare & acid flase in TR-1
PM job to be done for 11-FT-1701/1801 in GSU
Green belt development work in OGT
Dropping of drain valves of aeration tank & flash mixer in RWTP
AREA UNIT EXTENDED STATUS
Utilities IA
Utilities DM plant
Utilities IA
SS2 SS2
North from Sru North from Sru
Utilities IA
OGT
TR-1 Tr-1
Utilities ETP
Utilities DM plant
TR-1 GSU
SS2 02-EPL-301
ss-1 and MCR EXHANST FANS
OGT OGT
ss-1,2,and 4
TR-1 11-PM 108 'B'
N2 slid-A 88-UV-1305
ss-1
ETP 96-ETP-13P8
TR-1 21
TR-1 11
all area
canteen
admin buildig battery bank of UPS
utilites IA
offsite
south of E.T.P
loadig grantry
all OGT
TR-1 GSU
TR-1
slug catcher slug catcher
RWTP RWTP
Train-1 SS-1
Train-1 GSU
N2 skid B 88
SS-1,2,3,4 Ss-1,2,3,4
Building & Train-2 All over OGT
Slug Catcher West side of Slug catcher
All over OGT All over OGT
OGT FW Network
OGT OGT
PS Area Near FWPH Area
MCR HVAC
RWTP Earth pit
Utilities Utilities
31 Train-1
31 Train-1
Train-1 GSU
slug catcher slug catcher
Train-1 GSU
2661`
Utilities PSA
MCR Rack room
Coolong tower 86
N2 skid A 88
Train-1 GSU
Utilities Cooling water
SS-2 SS-2
All area
CTM
DM plant AC package unit
ETP Earth pits
SS-2,SS-3 Material Gate
SS-1,MCR Exhaust fans
OGT Fire water network
Around ontrol room
Utilities RWTP
Utilities Cooling water pumps
RW pump
Slug catcher Slug catcher
Utilities IA
Near OHC `
Flare Area 89
Landfall point 3 KM away from OGT
Train-2 DPDU
Security fire station
Instrumentation Train-1 GSU Srinivas Kolanu
cpp BOP
process sru4
process sru4
process sru
process csu
utilites RWTP
utilites etp
utilites etp
csu
tr-2 Gdu22
process csu
process ss2
CSU CSU
cpp
fwph
tr-2 tr-2
sru SRU
TR-1 tr-1
utilites FWPH
TR-1 GSU
ss-1 ss-1
utilites RWTP
utilites FWPH
CSU
SS-4 11KV ISOLATOR PANEL
TR-1 GDU
utilities fwph[308]
utilities rwtp
train 01 gsu 11
utilities fwph
ogt
canteen acousting ventilation
train 01 dpdu
train 01 gsu
ss1 86-ct
train 01 gdu
utilities etp
csu csu
train-1 GSU(11)
train-1 GSU(11)
process sru
train-2 GDU(11)
train-1 GDU
train-1 GDU(11)
utilies FWPH(308)
utilies RWTP(84)
process FWPH/SS4
utilies FWPH
utilies RWTP
utilies ETP
utilies lighting
LAB LAB
OGT OGT
utilies(84) RWTP
slug catcher slug catcher
utilies(84) CT
utilies ETP
utilies ETP
main gate and fire sation main gate and fire sation
Train-01 GDU-01
utilies fwph
process csu(51)
SS1 SS1
process GSU(11)
TRAIN-01 GSU
offstes ctm
csu csu(51)
GSU-1 GSU(11)
ETP ETP(96)
utilies ETP(96)
S/S # 1,2,4 and MCR
train 01 Train 01
utilites CWTP
OGT
train-01&02
C.P system
C.S.U
C.S.U
train-1 GSU
SRU
trin-1
utilies (86) CT
RWTP utilities
utilities CT
fire station fire station
CTM CTM
utilities ETP
utilities RWTP
utilities utilities
utilities DMP
utilities ETP
CSU
CSU
S.S-4 S.S-4
canteen canteen
MCR AHU-1&2
CST-A
train-01 GSU
loding gantry offsite
train 2 dpdu
train-2 gsu
train-2 gsu
train-2 gsu
utilites 84 rwtp
mcr ahu room
ss-2 ss-2
all ss all ss
train -1 train -2
etp etp
train-2 train-2
sru sru
Ct ct
mcr mcr
RWTP rwtp
canteen canteen
dmp DMP
fire station fire station
RWTP RWTP
DM P DM P
SS-1 SS-1
Slug catcher Slug catcher
Train-1 DPDU
OFFSITES(93) workshop
UTILITIES(308) FWPH
UTILITES(88) LIQ N2
CSU
GREEN BELT AREA
SUB-STATION-01 SS-01
SUB-STATION-01 SS-01
SUB-STATION-01 SS-01
96-ETP ETP
86-cwtp 86-cwtp
CSU CSU
GDU-01 GDU-01
MCR MCR
Slug catcher Slug catcher
CSU CSU
utilites FWPH
UTILITES ETP
cooling tower CT
OHC building split A/C Drain line
Slug catcher Slug catcher
SS-01,02,03,04 SS-01,02,03,04
ALL AREAS
Train-1 DPDU
SRU
Offsites tankages [91]
Offsites tankages
Train-1 GSU
Utilities(84) RWTP
Utilities(84) RWTP
MCR AHU room-2
CSU
CSU
Train-1
OGT OGT
OGT OGT
mcr AHU3
MCR RACK ROOM
UTLITIES loading gantry
UTLITIES dm plant ups
UTLITIES RWTP
Train-1 GDU
MCR AHU ROOM-2
CT
GSU-1 process
watch tower 2&3 OGT
train 01 dpdu
SS-01,
Process CSU-51
Process CSU-51
Workshop workshop
utilities RWTP
loading gantry loading gantry
utilities DMP
OGT OGT
All areas OGT
train-2 DPDU
Sludgecatcher Sludgecatcher
Offsite loading gantry
fire station fire station
mcr mcr
train1 gdu
96 etp etp
utilities IA-PA plant
Process SRU (41)
utilities RWTP(84)
utilities ETP(96)
utilities RWTP,CT
main gate main gate
utilities cooling tower
utilities DM palnt
OHC building OHC
utilities IA-pa 87
utilities driking water 304
train-02 GSU 12
train-02 GSU 12
train-02 GSU 12
utilities CT (86)
N2 plant
OGT
GSU-1 11
utilities ETP(96)
utilities ETP (96)
ogt cooling tower,halipad
GSU-1 11
IA 82
utilities
utilities da plant
utilities tallarevu pump house
tanks CT tanks
utilities Dryer-A
utilities light maintenace
utilities Rwtp
utilities Dm,Rwtp.
train-01 gdu-01
train-1 train-01
Slug catcher Slug catcher
utilities utilities
train -1 train-01
sru sru
sru sru
sru sru
mcr mcr
cooling tower cooling tower
loading gantry loading gantry
UTLITIES utlites
UTLITIES utlites
UTLITIES utlites
SRU
SRU
opp N2-plant ogt
flare
SRU
ETP ETP
ETP ETP
ETP ETP
FLARE
41-SRU 41-SRU
MCR MCR
MCR MCR
train-2 train-2
train-1 GSU regenarator lop
utilites air dryer-B
utilites tallarevu pump house
utilites PM-85
utilites DM-85
utilites RWTP-84
ware house fire alaram panel
SRU 41-K-101 C
Process SRU
utilites ETP-96
MCR AHU-3
utilites ETP
Train-1 GSU
ETP ETP
ETP ETP
Train-2 GSU
SRU SRU
SRU SRU
FWPH FWPH
RWTP RWTP
RWTP RWTP
Train-1, 2 Sru Train-1, 2 Sru
Train-1 Train-1
MCR MCR
ETP ETP
utilities DM
ETP ETP
ADMIN ADMIN
OGT OGT
train -1 and train-2 train -1 and train-2
DM DM
Air/N2 Air/N2
MCR MCR
Utilities Cooling tower
Utilities DM
Utilities cooling tower
etp
train 2 gsu
sru
sru
sru
tankage area
Process ss1
ss1 ss1
Process mcr
canteen canteen
Utilities cwtp
ware house
ctm ctm
csU csU
Utilities DM
ss1 ss1
cwtp 86
gsu -1 11
SRU
SRU
CSU
CSU
WATCH TOWER-5
Process LAB
SS-1 CWTP/SS-1
train-2
CT
SS-4/CPP
CANTEEN CANTEEN
Utilities RWTP
TRAIN-1
obllils cwtp
obllils Tallrevu pump house
mcr hvac
OGT
21-gdu 21-gdu
sru sru
ss-1,2,4 mcr
21-gdu 21-gdu
UTLITIES ct(se)
utilites 84 rwtp
train -01 gsu (11)/11-p-113 a&b
train -01 train -01 (11-p-114 a&b)
utilites ETP (96)
utilites ETP(96)
Process sru(41)
Process train 02
Process csu(51)
Process csu(51)
train 01
train 02
sru 51-eh-3201 b
ogt
cooling tower
utilites etp
train 01 gdu
mcr MCR
train-01 gdu
offsites
mcr mcr console room
utility ct
fire station fire garage
ogt ogt
Slug catcher
ETP SS#02
GSU GSU
utilites cooling tower
SRU SRU
ADMIN ADMIN
utilities lightings
utilities DM(85)
utilities DM-85
Slug catcher Slug catcher
utilities DM,N2,RWTP,ETP
GDU-01 TRAIN-01
utilities DM
utilities RWTP
MCR MCR
mcr,admin,lab
N2 plant OGT
cooling tower cooling tower
fire station fire station
utilities DMP
train-01 GDU
utilities ETP
cooling tower cooling tower
CSU CSU
Train-1 Train-1
Train-1 DPDU
SRU SRU
SRU SRU
SRU SRU
SS-4 SS-4
SS-4 SS-4
SS-4 SS-4
Train-1/ CSU/ SRU Train-1/ CSU/ SRU
CWTP CWTP
OGT OGT
OGT OGT
Train-1 Train-1
MCR MCR
SS-1 SS-1
cooling tower cooling tower
OGT OGT
ETP ETP
DM Plant DM Plant
cooling tower cooling tower
ETP ETP
RWTP RWTP
train-2 train-2
Train-1 Train-1
cooling tower cooling tower
train-2 train-2
SRU SRU
Train-1 Train-1
SRU/SS-2 SRU/SS-2
SS_4 SS_4
SS_4 SS_4
SS_1 SS_1
cooling tower cooling tower
cooling tower cooling tower
Talarevu Talarevu
OGT OGT
OGT OGT
Talarevu Talarevu
RWTP RWTP
DM Plant DM Plant
Train-1 Train-1
Main Gate Main Gate
Train-1 GDU-1
fire station fire station
ETP ETP
ss-01 ss-01
main Gate house & fire station main Gate house & fire station
CSU
MCR MCR Rack room
process(T-1&2) Train-1&2
opp N2-plant
process ss1,2, 4 & mcr
CSU csu
CSU csu
Air N2 Air N2
sru
offsites tanking
offsites tanking
process csu(51)
mcr mcr (hvac)
ADMIN ADMIN
ss#1 ss#01
ogt ogt
ss#4 ss#4
ss#4 ss#4
utilites cooling tower
train#01 train#01
ss#01 ss#01
mcr inst calibration room
ADMIN ADMIN BUILDING
utilites etp,dmplant
RWTP 84-thk-01a
utilities dm Plant
RWTP RWTP
utilites cooling tower
train-01 gdu-1
utilites rwTP
utilites etp
SS4 SS4
SS4 SS4
train-2 gdu
tankage area tankage area
train-2 gdu
ss-4 ss-4
sru sru
ogt ogt
utiliti cooling tower
gdu-1 21
ss-2 hvac
utilities admin building
utilities cooling tower
utilities cooling tower
utilities cooling tower
utilities dm plant
CSU CSU
Utilities ETP
cooling tower cooling tower
SRU SRU
SS-4 SS-4
SS-4 SS-4
train-2 GSU
CSU CSU
OGT OGT
FWPH FWPH
Slope Tank Slope Tank
Slug catcher Slug catcher
Main Gate Main Gate
train-2 train-2
SS-4 SS-4
AQMS-2 AQMS-2
Utilities Utilities
train-2 train-2
SS-3 SS-3
CSU CSU
OGT OGT
cooling tower cooling tower
Train-1 GSU
Train-1 GSU
Train-1 GSU
Train-1 GSU
SS-3 SS-3
cooling tower cooling tower
cooling tower cooling tower
SS-3 SS-3
Talarevu Pump House Talarevu Pump House
Talarevu Pump House Talarevu Pump House
N 2 Plant N 2 Plant
ETP ETP
ETP ETP
RWTP RWTP
Utilities C
SS-1 SS-1
SS-1 SS-1
opp N2-plant nr canteen
process ss1,2, 4 & mcr
Train-1 GSU
Utilities cooling tower
ohc ohc
Utilities fwph(308)
Utilities IA-PA(87)
Utilities ETP
TR-01 GSU
train-2 GSU
sru sru
process SS-2
process sru
process SS-2
process sru
TR-01 gdu
TR-01 GSU
Utilities fwph(308)
TR-01
ogt ogt
Utilities rwtp
Utilities fwph(308)
mcr dcs room
process csu
process tr01,gdu
train -01 gdu
ogt OGT
utilites rwtp
process train-01
process ss-02/csu
process ss-01
utilites utilites
TRAIN-01 GDU
train- gsu
ADMIN ADMIN
MCR MCR
ss-1 ss-1
ss-2 ss-2
ss-2 ss-2
ogt
Slug catcher,loding gantry
UTILITIES etp
UTILITIES RWTP
utilities ETP
SS-4 SS-4S
TRAIN-1 Process/train1
TRAIN-1
ss-4 outside boundry wall
utilities
utilities
TRAIN-1 GSU
loading gantry
train-2 DPDU
process train-1
process train1-2
OGT
process ss-2
train-2 DPDU
offsites CTM
offsites CTM
utilities ETP
utiilites Cooling tower (86)
utiilites Cooling tower (86)
OGT OGT
utilities RWTP
ETP ETP
Workshop Workshop
CSU CSU
Train-1 GDU
SLOP Tank
SLOP Tank
SLOP Tank
Train 1 GSU
Train 1 GSU
Cooling tower
Train 1
SS#02
CSU
Weigh bridge offsite
CTM CTM
Flare Flare
utilities cooling tower (86)
utilities RWTP (84)
utilities ETP
Train-1 GSU -1
Train-1 GSU -1
Train-1 GSU -1
tank farm Slop Tank
utilities ETP (96)
SS#2
Process train 1
SS-2
TRAIN 1 GSU
Flare
11-GSU 11-GSU
21-GSU 21-GSU
21-GDU 21-GDU
SRU
SS-2
SS-2
Slug catcher
CSU
CSU
CSU
CSU
11-GSU 11-GSU
MCR MCR
train-2 12-GSU
RWTP 84
Utilities Utilities
Utilities IA Skid
CSU 51
SS-1 SS-1
utilities cooling tower
MCR HVAC
offsites Sulphur weigh bridge
Train1 gsu-1
RWTP
SS-2
Train-1 GSU
SS-1, SS-2, SRU
SS-2
Utilities cooling tower
Utilities IAC/N2
Train-1 GDU-1
SS-2
ADMIN ADMIN
CSU CSU
SRU SRU
OGT OGT
Slug catcher Slug catcher
FWPH FWPH
Train-1 GSU
MCR MCR
Train-1 GSU
Utilities ETP(96)
Utilities loading gantry
Train-1 GSU
Train-1 gdu
ss1 cooling water plant
Slug catcher
ss2 ss2
ss2 ss2
tr1,tr2 ,csu,slugcathcer
dm plant HM-05
ss2
Utilities ups
offsites hvac
ADMIN ADMIN
train 1
mcr
Train-1 GSU
GSU GSU
Train-1 GDU(21)
Train-1 GDU(21)
Train-1 GDU(11)
Train-1 GDU(11)
Train-1 GSU(11)
Train-1 GSU(11)
Train-1 DPDU (31)
Train-1 DPDU (31)
utilities IA-PA(87)
ss#2
ss#2
ss#2
OGT
TRAIN-1 GSU
ss-1 pressurisation room
Utilities lightings
Utilities cooling tower
ss-2 87-km-01B
ss-2
utilites DM, RWTP, ETP, N2
utilites ETP
utilites CT
ss-4 ss-4
ss-02
Train-1 GSU,GDU
TRAIN-1 GSU
CSU
TRAIN-1 & 2
TRAIN-1 gsu-1
utilites RWTP
ss-1
opp N2-plant OGT
utilites RWTP(84)
utilites RWTP(84)
TRAIN-1
OGT OGT
loading gantry
dringking water sump near over head tank
MCR UPS ROOM 01-US-701/A
utilities dm plant
train-1 DPDU
process 11-GSS
process train-2
process train-2
process sru
train-1 gsu
offsites tank farm area
utilities etp
utilities etp
utilities etp
train-1 gdu-1
train-1 gdu-1
utilities drinking water system
ss 1
ss 1
ss 1
sru
ogt
ss-1 2 & 4
utilities etp
utilities
offsite train-1
ss-1 ss-1
utilities n2 -skid-a
train-1 gsu-1
utilities etp(96)
utilities dm plant
utilities cooling tower
offsite tank farm area
Process CSU
Utilities DM plant
Utilities DM plant
Utilities DM plant
Process GDU-1
utilities ETP
utilities CWTP
Process CSU
utilities RWTP
Process MCR, Water Overhead tank
Process MCR
utility utility
utility Cooling Tower
process Train1
process Chemistry Lab
utility RWTP
utility CWTP
Train1 GDU
slug catcher 152
process CWTP
ss-4 ss-4
utility RWTP
GDU-1 GDU-1
utility instrument air dryer-A
ss-1 ss-1
all areas all areas
utility N2 Plant
SS-1,2,4 and MCR SS-1,2,4 and MCR
OHC OHC
Process Train-1 GSU
FWPH 308
Train-1 11
process train-1
96 ETP 96 ETP
train-2 GSU
train-2 GSU
train-2 GSU
Train-1 GSU
Utilities DM
Utilities DM
Utilities DM
OGt
SRU & CSU
Utilities RWTP
GDU-1
Off site
train-1
train-1
main gate
lab
SS-4
CST
train-1
CST
train-1
train-2
Etp
Train-1
Gdu-GSU
SRU
MCR
utilities
Process CWTP/SS-1
Process TRAIN-1
TRAIN-1
off sites (loading gantry) 91
slug catcher 152
train-1 GSU
condensate tank Slop Tank
OGT OGT
utilities RWTP
utilities RWTP,ETP,DM,N2
train-2 GSU12
utilities cooling tower(86)
admin HVAC
utilities CWTP
CTM 91
ss#2
utilities utilities
train-1 GSU, GDU
ss-1/train-1 11
utilites flare
train-2 GSUS
CTM CTM
ss-1/train-1 ss-1/train-1
ss-1/train-1 ss-1/train-1
train-1 GSU
train-2 GDU
train-2 GDU
Process SRU
Process SRU
utilities cooling tower
utilities DM plant
flare 89
utilities DM-85
utilities RWTP
in front of n2 plant
Train-1 31
Train-1 GSU
Fire station
Train-1 GSU
Process CSU
Process SRU
Process Train-1
Process Train-1
Process Train-1
Utilities DM Plant
Utilities Cooling tower
Utilities DM Plant
process Train-1/ CSU
Train-1 GSV
Utilities RWTP
FWPH
slugcatcher Slugcatcher
Utilities ETP
Utilities CST
Utilities Cooling tower 86
Utilities Drinking water 304
ss-1 01-PC-302/IC#L
Utilities CWTP
Utilities Blower bell
Utilities Cooling tower
MCR MCR
CTM 91
TRAIN-1 GSU
Utilities DM-83
All areas OGT
Utilities Cooling tower
TRAIN-1 GSU
flare flare
Main Gate/Fire Station Main Gate/Fire Station
Utilities DM Plant
EIL Site Office Area
train-2 GSU-2
Behind Slug Catcher AAQMS-2
process Train-02
Process Train-01
air dmge air damg
train-01 gsu-01
ss-04 & MCR ss-04 & MCR
Utilities air-n2
utilities flare
utilities ETP
Train-2 GDU
SRU sulphur separation system
train-2 GSU
Flare(89) Fuel gas Kod
tank farm Slope Tank
Utilities CT
Utilities (85) DM
Utilities (85) DM
train-1 GSU
process GSU
Utilities 85-DM
OGT OGT
CSU&SRU CSU&SRU
train-1 train-1
train-2 train-2
utilities motors
utilities
utilities/96 ETP
CSU 51
utilities RWTP
utilities RWTP
CTM 91
GREEN BELT AREA GREEN BELT AREA
GSU-TRAIN-1 GSU TRAIN- 1
CSU CSU
utilities ETP(96)
utilities ETP(96)
utilities DM(85)
utilities DM(85)
CSU(51) CSU
SLUG CATCHER
TRAIN-1 GSV
TRAIN-1 GSV
offsites(91) tank farm area
CSU(51)
CUS(51)
offsite admin and cateen
Process Train-1,2/csu/sru
OGT OGT
ss-01,02 ss-01,02
ss-01-csu ss-01-csu
Workshop cable laying
utilities/buildings lights
SLUG CATCHER SLUG CATCHER
DPDU-1 31
utilities(86) CT/RWTP
utilities(85) DM
utilities Drinking water
utilities new raw water reservoir/fwph
utilities cooling tower(86)
MCR Argonite room
process CSU
process SRU
process SRU
process SRU
process SLUG CATCHER
csu csu
DPDU-1 DPDU
OGT SALE GAS
utilites DM-PLANT
OGT GOT
OGT OGT
MCR HVAC DEHUMIDIFIER
utilities ETP
CSU oppisite
admin outside
MCR mcr
CST-TANK-A CST-TANK-A
IA IA
condensate tank
SS-01
ss-02
utilities DM-PLANT
CST CST-A
Process TRAIN-1
OFFSITES TANK AREA
CSU CSU
MCR MCR
MCR HVAC AHU-3
utilities DM,ETP,RWTP N2
Utilities DMP
utilities RWTP
utilities DM Plant
CSU 51
Maingate OGT
SRU 41
OGT
SRU SRU
SS-1 SRU AIR BLOWER-A
SRU 41
utilities CWTP
ADMIN OGT
utilities DM Plant
MCR DCS &CSD
Train-1 GSU-1
UTILITS CWTP
SRU 41
Offsiter Tank farm
Offsites (91) Tank farm
Train-1 GSU
Utilities CT
Utilities CT
Fire station 15618
CWPH
Train-1 GSU
SS#1 ALL AREAS
UTILITIES
UTILITIES RWTP
UTILITIES UTILITIES
Lab, ware house
Process TRAIN-1
OHC OHC
Train-1 GSU
TARIN-1 11
Process 41-SRU
Utilities ETP
Utilities ETP
Utilities ETP
Train-1 GSU
TRAIN-2 TRAIN-2
SRU SRU
Utilities RWTP
Utilities ETP
Utilities Drinking water
Utilities ETP
EIL site office area EIL
Slugcatcher 152
Utilities DMP
battery bank battery bank
Process TARIN-1
Process TARIN-1
Utilities ETP
Utilities ETP
Utilities ETP
dm plant 85
SS-01&train-01
Utilities (85) DM
Utilities (85) DM
Utilities (86) CT
train-02 DPDU
SRU
SRU
train-02 gsu
CSU
LAB
CSU CSU
Utilities (85) DM
Utilities (86) CT
Utilities (85) DM
LAB building Hvac
Utilities ETP
SRU SRU blower A,B,C
S.S#01 UPS
canteen canteen
All areas
ogt
SS-01,SS-02
SS-01/TRAIN-1 21
TRAIN-1 GDU
utilities ETP
TRAIN-1 GDU
utilities ETP
utilities(96) ETP
utilities(96)
SS-1
SS-01
SS-01
ss-01
ss-01
opp.n2 plant OGT
Process 51-CSU
Process 152-slugcatcher
Utilities CT,RWTP
fire station fire control room
offsite fire water lines
offsite tank farm area
labarotary
infront of canteen
CWTP 86
utilities DM(85)
ss-01/offsites
lab HVAC Chiller-A
train-1 GSU
SRU SRU
Train-2 GSU
train-1 GSU
utilities utilities
utilities DM
utilities 85 DM
Process 31-DPDU
Process 51-CSU
Process Train-1/2/SRU/CSU
ss-1/train-1
SS-01
SS-01
SS-01
OGT OGT
MCR MCR
CWTP 86
utilities ETP
utilities lightings
utilities DM(85)
utilities cooling tower(86)
utilities ETP
utilities DM-PLANT
Process train-2-ISBL
utilities CT
utilities N2 skid-B
utilities Dryer-B
train-1 GSU
SRU SRU
train-1 DPDU
TRAIN-1 TRAIN-1
lab lab
SS-1/TRAIN-1 11
SS-1 SS-1
SS-1 SS-1
CSU 51
utilities CWTP
utilities UPS battery bank
utilities Motor online greasing
ETP ETP
SS-1 SS-1
SS-1 SS-1
utilities Cooling tower(86)
utilities DM,ETP,RWTP N2
utilities ETP
ss-1/train-1 ss-1/train-1
Train-1& Train-2 Train-1& Train-2
ss-1
ss-1
TRAIN-1 GSU
SRU
TRAIN-1 DPDU
utilities 85 DM
utilities 86
utilities 304
General canteen HVAC Package Unit-2
Slug Catche Slug Catche
MCR MCR
utilities utilities
utilities ETP
utilities DM85
utilities ETP 86
utilities DM Plant
Ware House
OGT OGT
CWTP 86-PM-04A
utilities CWTP
CTM CTM
CSU CSU
Utilities DM
Utilities ETP
Utilities
Utilities DM
csu csu
mcr and admin mcr and admin
ss=1 ss=1
ogt ogt
train 1&2
cwtp 86
slug Catcher 152
csu 51
CST CST
CTM 91
utilities CT
SRU SRU
Utilities DMP
Utilities Cw
Process csu
Process csu
Process csu
CTM 91
SS1
slug Catcher slug Catcher
CSU
TPH(201)
CSU CSU
OFFSITE
train-1
SS#1
ss#1
OGT
CTM 91
admin HVAC AHU
TRAIN-1 DPDU,GSU,GDU
utilities ETP
ss-2 ss-2
Process GDU
utilities DM-PLANT
CWTP 86
opp tanks area
utilities DM-PLANT
CSU
UTILITY ETP
Train-2 GSU
Utilities Cooling tower
OGT OGT
CSU CSU
dm plant dm plant
Train-1 GSU
CSU CSU
SS-1 SS-1
SS-1 SS-1
SS-1 SS-1
Air N2 Air N2
cooling tower cooling tower
Talarevu pump House Talarevu pump House
Talarevu pump House Talarevu pump House
dm plant dm plant
cooling tower cooling tower
MCR building MCR building
cooling tower cooling tower
Train-1 & CSU Train-1 & CSU
Train-2 GSU
offsites offsites
Train-1 GDU
SRU SRU
SS-1 SS-1
SS-1 SS-1
SS-1 SS-1
SS-1 SS-1
Lab HVAC
Utilities Utilities
RWTP RWTP
fire station fire station
ETP ETP
ETP ETP
SS-1 SS-1
SS-1 SS-1
cooling tower cooling tower
dm plant dm plant
Train-1 GDU
Train-2 GDU
Train-1 GSU
Process Train-1&2
Process Train-1
Process SS-2
Process SS-1
Process SS-1
Process SS-1
Process Off site uilities
RWTP
Utilities 85
MCR MCR
MCR HVAC
Fire station bulding Emergency siren motor
Utilities RWTP 84
Train-1 GSU
Utilities DM (85)
FWPH RWTP
Utilities RWTP
Process Train-1
Process SS-1
Process SS-1
Process SS-1
OGT OGT
All areas
Train-1 GSU
Lab Building Chiller-2 Oil Replacement
N2 Plant Telephone Booth
Train-1 GSU
Utilities ETP
Utilities ETP
SS-2 01-PC-301
FWPH FWPH/ Utilities
Train-1 GSU-2
Train-1
Process Train-2
utilities RWTP
Utilities RWTP
S/S 1,2&4 & MCR S/S 1,2&4 & MCR
Train-1 Gsu-1
Utilities DM plant
Utilities CWTP
TRAIN-01 GSU
train-01 gsu-gdu
train -02 gsu
train -02 GSU
train -02 GSU
train-01
train-01 11-am-105-b
ss-01
ss-02
SS-01
ss-01
ss-01 .ss-02
train-01 dpdu
utilities cooling tower
utilities cooling tower
utilities DM(85)
utilities ct(86)
utilities ETP 86
utilities
utilities motor
utilities rwtp
ss-01
utilities n2(88)
MCR LVS
admin ADMIN AND OHC
fwph FWPH/ Utilities
utilities Utilities
train-01 gsu-01
process train-01
process train-02
process sru
PROCESS OGT
utilities FWPH/ Utilities
utilities rwtp
utilities etp
train-02
OGT OGT
OGT
train 01 gdu
Utilities dmp
utilities dmp
train-02 csu/gdu-02
utilities FWPH/ Utilities
ss-01
ss-01
mcr mcr
utilities
process train-1
train-1
train-2
train-1
process train-1
utilities FWPH/ Utilities
Utilities RWTP
Utilities RWTP
process train-2
process SRU
process SRU
process train-1
OGT OGT
flare
Utilities RWTP(84)
ctm ctm
workshop back side workshop
train-1 GSU
train-1 GSU
process TRAIN-1
Utilities RWTP(84)
MCR 01-us-701A
offsites CTM
Train-1 GSU-1
SRU SRU blower A,B,C
process train-1
Utilities DM Plant
cooling tower cooling tower
Train-01 Train-01
OGT OGT
MCR MCR
Utilities ETP
SS-1 SS-1
GSU GSU
Process TRAIN-2
Process TRAIN-2
Process SRU
Process SRU
TRAIN-1 TRAIN-1
MCR DCS&CDS
Utilities rwtp
CST CST
loading gantry Loading Gantry
CTM CTM
Ogt Fire station /MCR/ADMIN Fire alarm system
Utilities RWTP
Train-1 GSU
Train-2 Train-2
Train-1 Train-1
Main gate & Fire station Main gate & Fire station
All areas All areas
MCR MCR
train-01 train-01
Train-2 train-2 B/L
Utilities DM plant
Flare flare
Train -01 GSU
Utilities RWTP
Utilities RWTP
Utilities instrument air compresser
RWTP RWTP
RWTP RWTP
TRAIN-01 GSU
SRU
TRAIN-02 GDU
OGT
TRAIN-01
TRAIN-02
CTM 91
admin hvac
EIL BUILDING SPIH ,A/C
utilities Air N2
train-01 gsu-01
utilities etp-96
Ware House/argonite room
ogt
train-01 gdu
train-01 gdu
utilities plc health check
utilities etp(96)
utilities FWPH/ Utilities
SRU SRU
utilities flare
prosess SRU(41)
train-1 GSU(11)
train-2 GSU(12)
train-2 train-2
prosess train-2
train-1 GSU(11)
utilities cooling tower
utilities RWTP-84
UTILITIES-OFFSITES TPH-201
utilities RWTP-84
TSRV AND CSU
CSU CSU
Slugcatcher Slugcatcher
OGT OGT
utilities,buildings lightings
MCR HVAC,AHU-1
utilties Utilities
utilities DMP
TRAIN-2 GSU
outside MCP'S
MCR MCR argonite room
process train-1/GSU
train-1 train-1
train-2 train-2
process train-1
utilities RWTP
utilities RWTP
process SRU
offsite flare
OGT OGT
PROCESS train-1GDU
genaral canteen AC package
dm plant dm plant
utilities dmp
train-2 train-2
utilities ETP
COOLING TOWER CWTP
train-2 train-2
Admin Admin
Train-2 Train-2
Utilities FWPH/ Utilities
Train-1 Train-1
utilities RWTP
Train-1 GSU
utilities UPS battery bank
Train-1 GSU
Train-1 GSU
MCR MCR
SRU SRU
utilities cooling tower
OGT OGT
Offsites Flase
Offsites MCR
Process Train-1
utilities CT
utilities CT
utilities CT
Flare Flare
Train-1 Train-1
Substition.01,02,03&04 Substition.01.02.03&04
utilities 86-CWTP
Process 21-GDU
Off site Lab building
TR2 TR2
MCR DCS
All areas
MCR MCR
TR2 TR2
SRU SRU
process SRU
process SRU
utilities rwtp
utilities rwtp
utilities d m plant
utililies etp
overhead tank
train-01 GSU
SRU
taain-01
taain-01
SS-01 / Train-01
OGT
taain-01
SRU 41
substition AC package units
utililies cooling tower (86)
ware House ware house
TRAIN-01 DPDU
CSU DPDU
TRAIN-02 GSU
train -02 DPDU
ss-01 train-02
train-01 gsu-01
utility cwph
offsite ctm
cst-a 91-T-101-A
mcr ahu -04
building spit a/c
TRAIN-01 TRAIN-01
UTILITY FWPH/UTILITY
train-01 train-01
process train-01
UTILITY UTILITY
UTILITY RWTP
UTILITY RWTP
TRAIN-1 DPDUS
SRU
TRAIN-2 GSU
SS#1
CST-B
OGT
MCR MCR
UTILITIES-OFFSITES TPH-201
utilties RWTP
utilties etp(96)
utilites utilites
canteen,building,ohc
TRAIN-1 TRAIN-1
ss#1,2,4, MCR
mcR dcs
ctm ctm
utility split ac
utility admin building
utility
utility drinking water
utility dm(85)
UTILITY rwtp(84)
process
n2 plant N2 Plant
ss-1,2.4 battery bank room
TRAIN-1 GSU
process TRAIN-1 GSU
process TRAIN-2
process TRAIN-2
offisite
process TRAIN-2
utilities ETP
utilities cooling tower
offisite fire water lines
OGT
SS#3 RWTP
OGT
utilites CP CAMP-BS
utiiltes CWP
utilites RWTP
TRAIN-2 TRAIN-2
utilites etp(96)
utilites RWTP,CT
utilites TPH-201
utilities Motor online greasing
utilities etp(96)
UTILITES ETP(86)
tankform CST
offisite FW Network
process Train-2
process Train-2
process Train-2
process Train-2
peocess csu
process CSU
Off site fire water lines
Off site
OGT
Train-1 GSU
Train-1 GSU
UTILITIES ETP 96
UTILITES UTILITES
UTILITES UTILITES
UTILITES FWPH
UTILITES drinking water
TRAIN-1&CSU
Split AC
Split AC
Utiliti RWTP
Utiliti
Utiliti canteen
Lab Lab , CSU
TRAIN-2 TRAIN-2
offisite Flare
process Train-2
process SRU
Process Train-1
process Train-1
Train-1 GSU-1
MCR DCS&CDS
Utilities RWTP
Utilities
Utilities N2 Plant
Utilities CT
offsiter (91) LG
train-2 GSU-2
Utilities ETP
Process CSU
Utilitier(96) ETP
offsites fire water network
Train-1&CTM Train-1&CTM
Train-1 GSU&GDU
Train-1 GSU-1
SS-01
CTM CTM
Utilities (84) RWTP
MCR
ss-4 ss4
Green belt area
All areas
Fire station
Utilities (84) RWTP
ss-2 ss-2
process SRU
process SRU
utilities air/N2 plant
air/N2 plant
non gas areas Adimin,Air N2,OHC,Lab,gate
Train-1 21
utilities RWTP
process 21-gdu
utilities 96-ETP
SRU
ss-01 ss-01
SRU
SRU
SRU
utilities (96) ETP
TLF Loading Gantry
offsites
Main gate
cpp HVAC AHU-4
TRAIN-1 GDU
utilities N2 plant
process train-02
process train-02
process SRU
process train-01
process train-01 gsu
process train-01(21-gdu)
process train-01 (31-dpdu
ss-01 ss-01
utility rwtp (84)
utility N2 (88)
utility rwtp(84)
utility cwp
utility etp
MCR HVAC
utility
etp ETP
Train-1 11-p-114 a&b
utility etp(96)
utility etp
TRAIN-1 GDU
process train-2
process train-1- GSU
process train-1- GSU
process train-1- GDU
utiiltes drinking water
offsite fire water network
utilites cooling tower
process RWTP/SS-3
process RWTP/SS-3
OGT
MCR HVAC AHU-122
UTILITES Loading Gantry
utilites etp(96)
UTILITES etp(96)
TRAIN-2 GSU&GDU
FIRESTATION
utiilites IA-1A, N2
train-1 GSU-1
CST
utilties DM-PLANT
utilites 85-DM-PLANT
process process
process SS-1,2,4
train-1 DPDU
process SRU
offsites flare
utilites RWTP
utilites Instrument air
maingate,OHC,
Offsite CTM
utilites DMP
utilites CWTP
utilites NRWR 84-PM-401 A&B
train1,2 11-Dec
utilites Cooling tower(86)
Fire station Fire station
CST
SS-1 SS-1
Offsite CTM
SS-1,2,3,4 & MCR SS-1,2,3,4 & MCR
Train -1 GSU-1
Process SRU
Process SRU
utilites RWTP
Process Slugcatcher
Offsites Fire water network
Train-2 GDS,GDU,DPDU
offsites steamheader
Utillites rwtp (84)
Utillites N2 (88)
Utillites rwtp (84)
Utillites IA-PA
process train-1
Train-1,2
CWTP 86
dm plant 85
Train-1 GSU-1
MCR DCS / ESD
Utillites Utillites
Utillites ETP
Utillites DMP
Utillites battery bank room
ADMIN HVAV AHU-2
Utillites CWTP
train-2 GSU
S.S-01 01-BATT_101-1
ETP 96
train-2 gsu
Utillites ETP
offsite C.S.T.area
Utillites CT
TRAIN-01 11-GSU
Utillites 84- RWTP
Utillites 84- RWTP
process CSU-(51)
process CSU-(51)
process TRAIN-02
offisite FILTER WATER PUMP HOUSE
UTILITY ETP(96)
UTILITY ETP(96)
process TRAIN-02
SUB-STATION-01 SUB-STATION-01
ADMIN BUILDING HVAC-AHU-03
UTILITY RWTP
MAIN GATE MAIN GATE
UTILITY RWTP
UTILITY DM plant
MICRO WAVE TOWER RF RADIO
UTILITY RWTP
TRAIN-2 GSU(12)
offsite TANK AGES(91)
process csu(51)
utilities ETP(96)
Process TRAIN-2
SS#1
Process TRAIN-2
Process, (TRAIN-1) 11-GSU
utilities 85-DM-PLANT
TRAIN-1 GSU
process (train-2) 12-GSU
OGT OGT
utilities FLARE
utilities DM-PLANT
Admin bulding AHU-4
genaral canteen A/C PACKAGE UNIT-2
offisite Loading Gantry
process train-2 GDU
train-1 GDU(21)
train-2 GSU-12
train-2 GSU-12
offsites tankages (91)
CSU CSU-51
Utilities RWTP-84
Utilities ETP(96)
Admin HVAC
process ss-2
process process
train-1 GSU
admin hvac Chilled water pump-B
CTM CTM
genaral canteen PACK 3 A&B
utlities RWTP,Weigh bridge
Loading Gantry Loading Gantry
utlities utlities
CTM CTM
CST-A CST-A
Train-1 GSU
Train-2 GSU(12)
offsites Tankages (91)
Process Train-1
Offsites Loading Gantry
MCR HVAC
Adimin HVAC
Utilities dm(85)
Process SS-2
Process SS-2
CST-B
Utillites CWTP
Adiminbuillding HVAC chilled water pump-A
Utillities MCR HVAC chilled water pump-A
VIP canteen A.C pack-3 A.C-2
Utillites DM plant
Utillites Cooling tower-B
Fire station
Process TRAIN-1 GSU
canteen building Kitchen ventillation fan
Train-1 GSU
Utillites Train-1
Utillites ETP(96)
Process Train-1
SS-01
CTM CTM
Slope tank slope tank
Utillites instoument air
Utillites Loading gantry
Utillites Cooling tower cell-A
Utillites DN plant
Gate house
green belt
all
Utillites ETP
canteen kitchen ventillaton fan
Train-1 GSU-1
Process Train-1
Process train-1-GSU
MCR
Non process area
Dryer-A Dryer-A
Utillites RWTP
Utillites Train-2
Utillites Train-2
offsite tank area
Process Train-1
Utillites Cooling tower cell-B
SS#03 RWTP
SS#01 01-BATT_101-1
Utillites RWTP
Utillites RAC
Train-01 GSU-1
Train-01 GSU-1
ogt ogt
TRAIN-01 GSU-11
train-02 gsu(22)
train-01 gsu(12)
mcr ahu
utilits dm
process train-02
ss-03
ss-04
ctm ctm
gsu train-01
train-01
n2 plant n2 plant
mCR mcr
utility tph
utilits tph
ohc building ohc building
utilits rwtp
flare
utilit Loading Gantry
process train-01
train-01 dpdu-01
utility rwtp
process train-2
TRAIN-2 GSU(12)
utilities NRWR(401)
utilities ETP(69)
Process(train-1) 21-GDU
offsite 91-loading gantry
TRAIN-1 TRAIN-1
cpp
cpp bop
cpp gtg
cpp
CPP
CPP
CPP
CPP
CPP
CPP
CPP
CPP
CPP
CPP
CPP
CPP
CPP
Work Description
cep - a pm work
pm job of hp electrical heater 01 panel and its feeder
cpp hvac ahu 2 electrical panel maintaince
gtg 1 ratchet sequence sov 20 cs 1 leakage attend job
gt1 hyd. Trip pressure [olt-2a] checking
hrsg 1 scaanner air fan a&B collecting maint. work
to do the amc job of 220v dc battery charger #01 [station],load test of charger #01
cpp hvac ahu 3 electrical panel maintaince
maint. job [amc] of 220v dc battery charager #2 by vendor m/s statcom
hrsg2 scanner air fan b nrv trouble shooting
220 v battery bank 1 ups battery bank 1/2 and 125 v batterybank 1/2 battery cells dm water topup work
BFP-A PM job
PM job of 81-TR-115 lighting transformer and upstream, down stream feeders
CRE1/2/3/4/5/6/7/8/9/10/11/12/13/14 termination to be done
Cpp hvac main panel electrical maintaince
LP steam from CBD , steam trap flange - leak arresting work
HRSG-2 feed control station 30% control valve leakage checking work
ups battery bank -1 pm job
EDG battery bank -1&2 pm job
HRSG-2 feed control station 30% control valve bannet leak arresting work
CTM-PM Work
HTSG Scanner an fan -B Stiffner pads charging work
to replace the foulty lamps in GTG#1 compartment area
maintenace of limit for fabe feed sacu
ups battery bank -1 pm job
gt -hall niple fixing work for n2 plant air, service air line
to the pm job of bop mcc incomer upsteeam down stream beallers (abc)
fine filter#2 (ff#2) Drain header level gauge roof volve glad pasing arresting work
GT#1 SRV&GCV top face cleaning work
dearator storage tank on/off valve feedback checking
to check the lighting fault in fuel gas skid area
GT-2 Lube oil topup work
To check the direction rotation of GT-1 AOP spare feeder for AOP moter
maintaince of mulisensor detector d48/L04
lp line to deaertor mov - 1329 valve leak arresting work
lp steam to peerator loop line manual site valve gland leaking arrest work
To blind the HRSG-1 BMS pilot gas burner by removing the pilot gas
to do the painting of LP dosing skid base plate
CRE1/2/3/4/5/6/7/8/9/10/11/12/13/14 wiring termination details updating
HRSG pilot burner igntor power supply to be isolated
to do the pm job of substation 03 emergency breaker(03-EPMC-302) in pmcc 2
EDG battery bank PM job
GT-1 emergency lube oil pump motor electrical pm job
GT-1 EOP pm job
CPP hvac ahu air filter cleaning
Pending points rectification to be done along with bggts venalr in m6e and DCS system
CPP area indoor and outdoor lighiting maintenance job
Trouble shooting of MCP-124 near CPP (outside)
to replace the foulty lamps in GTG#1 compartment area
GT-1 load gear compartment cooling air fan pm job
GT-1 load gear compartment cooling air fan pm job
to replace the power contactaves (42,a,42b ) in gtg
speed power gap voltage and resistence checking job GTG 2
GTG marcvac power supply card to be relacement
LP ammoine to deater p/p (b)pm job
lp dosing hydraging to deater p/p (A) pm job
HYDRAZING to the aerater pump -a electrical pm job
GT-1 divinte damage scal air fan-2 PM job
maintanance of torbine bearing temperations of J1-2 and P1-2 in GT-1
Diesel engine coling water inlet and outlate line clamps arresting work
Pending points rectification to be done along with BHEL Vender
Line up of HRSG-1 / SWAS analyser
to remove the power cable of GT-2 to EOP motor for U/V DOP testing purpose
To shift oil purifier to GT-2 to GT-1
to troubleshot the alarm gt2 line PT mcb off alarm in scadu b 11kv gt2 i/c
gt2 load gear box coupling guard fixing work
gt hall eot longitudinal travel brake thruster fixing work
hrsg 2 main streamline steam line thermocouple flange gasket changing work
gt 2 mop discharge pressure gauge changing
ammonia to dearetor LP dosing pump b , do checking
gt1 eop gas cut modification
control room cre 01 cre 03 controller change
gps panel cable time soldering job
maintenance of mcp 124 outside cpp to be done
pending paint rectification of avr ^ecs to be carried ou t by bhel vendor
todo the trouble shooting of diverter dampar act mov of GTG-2
to check the opeation of BFPC hoist > hall eot
edg battery bank 1,2 pm job
22 dv dc battery bank-1 pm job
to do the pm of 220v dc battery bank-2
to do the pm job of GTG-2 Acc compartment vent fan -1 motor and feeder
lp heater-2 skin temperatureand flg temperatureand element transmitter checking
BFP-1 suction temprature element and transmitter MP stream pressure transmitter checking
feed water control station mov to be checked
Trouble shooting of hp electrical heater 01 & 02
GT-2 BA -1 PM JOB (acessory control cooling air fan)
HRSG-2 scanner air fan -b high vibration troubleshooting
gt hall eot longitudinal travel brake thruster long travel shaft run out checking work
hrsg 2 desh 11 drain mov bfp 3 discharge by pass mov checking
GT-2 divinte damage scal air fan-1 PM job
LP dosing ammaine to arresting job
220 v dc battry charger 2 amc choks and pending issu resolving
trams pump a section valve on and off limit switch checkinh
TO do the pm job of gtg 2 divetter domper seel air fan motor and lits feeder
relay testing for hvdc chillers in cpp
GT # ACC. Compartment pressure gauges PM work
To check the faulty lamps in indoor area and outdoor area lighting of CCP
To check the open/close feedback problem of HRSG 02 GTV-MOV-1888 MOV.
HRSG-2 scanner air fan 2 maintenance work
GT-2 e seal air fan-1 PM job
Turbine bearing and reduction gear bearing checking
81-TR-121 PM job
HRSG-2 scanner air fan 2 bearing replacement work
GT Hall EOT PM
GT-2 Flame sensor PM job
Turbine bearing and reduction gear bearing checking
GT Hall EOT PM Electirical
125V battery bank-1&2
pm job of edg battery bank 1,2
GT-2 accesssory gear box compartment cleaning work
GT 2 load gear compartment and excitor compartment xleaning work
Trouble shooting of hp electrical heater 01 & 02
electronic water level indicator for hrsg#01 leakage arresting work
ctp -b- pm job
hrsg#2 scanner air fan-b corrective maintenance work (bearing replacement)
gt hall eot longitudnal travel brake thruster fixing work
gt -01 filter dp tx 96 tf-01 showing erratic air inlet
803-loop 04 d37 msd maintenance work to be done
bfp-c pm job
pm job of hp elactric heater -3
maintenance of msd in 2nd floor of cpp contrle room 803-d52-l4
relay testing of ss-4 incomer (04-ht-201) ht panel by vender
GT-1 divinte damage scal air fan-2 PM job
cfp-b pm job
BFP-C alignment checking
PM work for GT-2
11 Kv, SS-4 ic-2 feeder relay tetsing job
11 kv Feeder ELR replacement work
PM job of lighting transformer 81-TR-116
BFP-A bearing replacement work
GT Hall EOT Maintenance work
BDV-09-6650 maintenance for LP filter seperation
HP dosing pump PM job
incomer 2 upstream and downstream feeder PM job
803-D48/L4 smoke detector maintenance
GT 2 Diesel engine PM job
DP Transmitter & gauge for fine filter checking
pm job of edg battery bank
bop & hrsg 1&2 area equipment clearing work
pm job of ups battery bank 1 &2
lp dosing ammonia to deaerator dosing tank agitator PM work
PM of 88-BA-01 of GT1
PM job of GT1 88-VG-1
electric gas heater space heater cleaning job
temperature transmitter adn sensor (TA-08 - 4610 ) for dump pond d/s checking
DP transmitter (DPT-09-6682) AND DP guage for fine filter-2 checking work
To do thePM of GT-2 lube oil mist eliminator fan-1 checking work
BFP-A Hoist PM job
GT-2 lube oil mist eliminator blower -1 PM job
to remove the scafffolding on GT hall EOT
To do the trouble shooting of remote operation of gas cond drain tank pump-1 feeds in BOP MCC
To do the PM job of BFP#A monarail hoist
Water wash heater 1,2,3 elec PM job
LP dosing hydrazine to dewater mixing tank agitater PM job
GT#1 bearing temp BT J2-2 problem
printer power supply isolation work
Exhaust Thermocouple checking for GT#2
Flow transmitter (FT-08-1329) DS to HP gas stream checking
GT hall (side wall) lamp verification job and DB panel
HRSG-1 HP Dosing mixing tank agitator PM job
HRSG#2 CEMS condenser fan blade replacement work
GT water wash pump PM job
HRSG-1 HP Dosing Pump-B PM Job
To do the PM job of water wash pump motor and feeder
HRSG-1 HP dosing mixing tank agitator motor decoupling and no load trail run
HRSG-1 CEMS analyzer checking by vendor
SWGR control panel JBs spare cable tapping job
MSD checking in ground / second floor
EDG battery bank PM job
ups battery bank -1 pm job
To do the oil filtration and oil topup job of 81-tr-121 transformer
GT-1 inlet air flter hoist pm job
GT-2 inlet air flter hoist pm job
GT-1 & 2 inlet air flter electrical hoist pm job
LP dosing ammaine to cst flowmeter glass leakage arresting work
HRSG -01&02 and bop area lighting problem ratification job
HRSG-1 CMS condenser blower alignment checkup work
HVAC Make up-water tank cleaning work
to do oil fillteration and top up of 81-TR-120 (BFP-B T/F) &81-TR-119 (BFP-A T/F)
fine filter#2 (ff#2) all pressure gauge checking work
PSV before fine filtler (6659-A) I/L gearbox2 I/L gearbox, PSV before fine filter (6659-B) I/L volve gearbox 2 O/L volve gearbox g
Transformer yard light circuit trouble shooting
gt-2 bt-1 (cooling comp air fan-1) pin job
gt-2 88bt-1 ele pm job
gt-2 all instrument tag plates instalation job
main claimce of temper aline gauge installed in gt-2
ups maintenance (amc) job by vender m/s hirel and also do the maintenance of ups incoming feeder
fine filter -2 n2 line spectable blind changing to through flange
Maintenance AMC of 11PS-2
PM work for centrifuge pump pressure gauges
Fine Fileter-2 Inspection work
Relay Testing of HP and LP Electric Feeder
to do the rain water protection for MOG TBs of all tramfformers
PMCC-1&2 panel spare feeders relay testing job
GT-2 ,VG-1 (load geen compt .cooling an fan-1)PM job
GT-2 guillotine damger seal air fan-2 pm job
GT-2 guillotine damger seal air fan-2 pm job
GT-2 load gear compantment vent fan-1 pm job
EDG Battery Bank PM job
220V Battery babk -1 & 2 PM Job
HRSG#2 all MOV's greasing work
cep-a inspection
All HRSG-2 Mov's greasing work
HP electrical heater-4 panel and feeder PM Job
PM Work for field job CTE-02-DIBE-1022
CEP-A decoupling work
11 kv swgr spare feeder SEL relay testing by vendor & bfp -b feeder
BFP b discharge bypass mov DJ checking
Boiler feed pump B PM job
Boiler feed pump A PM job
to replace faulty lamps by bharat energy system
CEP-A decoupling work and coupling work
Checking for LP scrubber drain valve (8 vy 6636B, 9vy 6636A)
To do the bearing replcement of CEP-A
Gas Turbine-1 ancillery , load gear box turbin & genarator vibration - condition monitoring work
Pm Work for HRSG-2 Field JB (CVP03_AJBS_2110) Feed water TT,LT,FT,PT
Gas Heater Condensate transfer pump-B PM Job
SWGR Room Operarator Cabin Splil AC 2ML Prevantive Maintenance
Gas Y-Stramer assembly (GT-2)Impection Work
BFP-A Discharge by pass MOV (GTV_MOV_18116A) Digital Input Checking
HRSG#2 Feed Control Station 100% MOV (5GTV 1888) Greesing Work
Flow transmitter LP Steam (FT-08-1324) checking work
Cep-A decoupling & coupling work
125 V DC battery bank-142 pm job
EDG battery bank-142 pm job
CEP-A alighment reading work
BFP-B&C hoists pm work
water wash detergent pump pm work
HRSG&BOP area all mov's greasing work
Fire detector (45FA-2A) for GT # 1checking work
Relay testing of CTP#B , blackstart cooligtowers mtr feedr and GTMCC#2
To do the pm job of GT water wash pump motar (detargent)
Lp filter detector A manul vant blaind removal work
Lp filter seperator BSV-6647 checking job
BFP-B&C eot hoist electrical pm job
Relay testing of BOP MCC I/C#1, I/C#2 and buscouples feeder by MIS system protection
GT-2 Diverter daimper scal air fan-2 PM job
HRSG-2 HP Dosing pump-A PM job
11KV SWGR GTG#2 inower relay testing and BFP-A feeder relay testing and PMCC#1 Buscoupler feeder relay testing
Gas Heater Condensate transfer pump-A PM Job
CEP-A decoupling and coupling work and bearing cover inspection (DF side)
To do the PM job of Gas kater condensate transfer pump#A motor and feeder
LP filter bdv 6650 checking job
PM work for GT#2 vibration sensors (proximity type)
To do the relay testing for all SS emergency feders in PMCC-2&CTP#A feder relay testing
CEP-A decopling & coupling work
GT-1 Guillotiue daper seal air fan-1 PM job
Pmwork for HP scrubber A drain valve (9uy 6604A
pm job of gy#1 guilliance damper seal air, fan # 01 motor and feeder
Gt-2 IGV Inspection
PMCC-2 I/C-1 and upstreme 81-tr-113 11KVfuder neley testing
CPP HVAC DHU-3 Dehumldifer heater element replacement
To do the relay testing for the feeders PMCC-2 BK-2 and 220V dc batteres chargers feeder-1
To do the level guage lamps replacement of HRSG-1 drum
Pmcc I/C-3 and upstream 81-TR-114 T/F VCB relay teasting work
CEP-A decoupling & clamping work
GT-1 turbine compartment colling air fan-1 pn job
GT-1 Lube oil sampling collection work
CPP HVAC AHU-2 dehumidifiers heats replacement
To replace the siemans relay with new relay in PMCC-1
EDG battery bank-1&2 pm job
125 v DC battery bank-2 pm job
To do troubleshooting of DC-1 / DC-2 fail alaram attend of GT-02 Annunciatol panel (SCAP-4)
LP filtter sep #A manhole opening & inspction work
To do the pm job of GTG#01 turbine compartment went fan #0(BT#01) motor and feeder
Elc pm job HRSG #02 scanner air fan-A
Scaffolinding erection work for flow transmitter (FL-08-1324) in lp stearm line
Maintenance of MSD 803-D4/L2 (cpp swichgear hall ) and cpp north west MCP-126
HRSG-1 scanner air fan-A PM job
HRSG-1 scanner air fan-A motor PM job
PM work for LP filter/sep DP transmitter (DPI-09-6649) And DP Gange
Dewpoint-aualysis at HP SKID inlet
To fix the view glass at GTG#2 Exciator
CEP-A decoupling and coupling work
HRSG-2 Economuser inlet bypass MOV greasing work
GTG-1 lube mist separater motor-1 PN job
DC FAN checking work on CRE'"S panels
PM work fan vibration sensors (39vs-11,12,21) for GT-2
GT-1 lube mist eliminator blower PM job
Emargency diesel genarator PM job
EDG panels & EDG incomer breaker PM job
To do PM of EDG AMF Panel by vendor
Flow transemetter for sarvice water (ET-08-5006) checking job
HRSG-2 Scanner air fan A PM job
Defective relay replcement of with spare relay in GT MCC-2 I/C-01 feeder (PMCC-2 panel)
All HRSG-2 Mov's greasing work
Flow Transmitter for LP Steam (FI-08-1324) Checking Job
To Fix the Thyristor control Card in HP Electric Heater #01 Panel
GT-1 Inlet Air Flter House Inspection Work
HYDRASTEP Boly Tighteng & Loosening & Gasket Replecent Work
Piperack Area Lighting Rectification
UPS Battery bank -1 &2 Elec pm job
Prevantive Maintenance Of MSD's In Cpp Cable Cellar Room & Second Floor Panage area &MCP134/125/35
EDG Battery banks-1&2PM job
HRSG#2 Manway and drum manway opening for inspection/preparation of hydrotest
Monthly preservation of 51-P-3301 A/B (cooling water pumps for off gas compressors)
Monthly preservation of 41-p-108 A/B (catsul solution storage pumps)
Monthly preservation of 12-p-105 (amine drain pump)
Vibraiton measurment for all running rotating equipment in Train-1
scaffelding removal at 11-PSV-1102 A/B (Sour Gas Heater To Flare PSV's)
Drain valve of N-pit alkali measuring tank (85-T-12) Hand Wheel Freely rotating to be attended
86-LG-08A (Caustic pump-B) lube Oil Leak from Oiler Cup to be Attended
Alkali inlet line to N-Pit 1 Dechoking to be done
Annual Preventive maintaince of 11-A-108 C Lean amine Aircooler
11-AM-1D8C (lean Amine air water -c )
Maintenance of 84 -AT -0104 (comm.o/l turb annaly), 84-AT-0202(RGF o/l Turb analy),84-AT-0201 (RGF O/L )
Maintenance of Diescl lank Level tranmitter 301-LT-102/103 to value fluctuatran 308-LT-101 to verlly valce mlumath with manu
preventive maintenance of 152-LT-2001/2002
Maintenance of 96-pa-002-A to rectify the issue of foalty feedback at PLC
preventive maintenance of 91-LT-1203
SAffolding eraction near cooling tower battery limit for service water header leak attending
Drinking water over head tank inlet &gitlet valves gland leak attending
01-PC-302/IC# L Data downloading from relay
CWTP 86-LG-817 causfic air blower moter electrical PM
Admin building AHU-1 general canteen AC Pack-2,ss-3AC package-1 blower belt replacement
Cooling tower lighting earth strip installation scaffolding errection
DCS&ESD System cabinet delay health check
CTM HCDP analyzer 91-AT3103 nitrogen cylender replacement job
belt installation& allgnment for 11-A,105-B
Acid bulk storage tank mang cover openins top
Pest control work at all over receiver building at OGT-gspc
86-PG-1101 Chlorination-A Water supply PG To be installed
11-TT-1207,11-TT-1610 at soruel inlet TT Checking to be done
UNIT EXTENDED TIME
GT 1
Common
LP scrubber-B/LP scrubber-A
CPP SWRG building
BOP
ROP
GF,FF,SF
HRSG-1
CPP
BUP
Gas skid
BOP
HRSG-2
GF,FF,SF
SS-1,2,3,4
bop
CPP GT-1
CPP HRSG-1
CPP GT-1
CPP GT-1
CPP HRSG-1
CPP HRSG-1
CPP BOP
CPP UPS System
CCP Hp Scubber
cpp hrsg-1
cpp gt-1
cpp bop
cpp gt-1
cpp
cpp BOP
cpp GT-1
cpp GT-1
cpp HAVC
cpp HAVC AHU-1
cpp GTG-01
CPP HRSG-1
CPP GT-1
CPP GT-1
CPP HRSG-1
cpp cpp
CPP Gas skid
cpp GTG-1
cpp HRSG-1
CPP 81-TR-111
cpp CONTROL ROOM
cpp HVAC AHU3
CPP HVAC Chilled water pump
cpp
cpp gas leaked
cpp bop
cpp HRSG#1
cpp HRSG#1
cpp HVAC
cpp HRSG-1
cpp GT-1
cpp switch gear room
cpp EDG
cpp GT-1
cpp GT-1
cpp GT-1
cpp gas skid
cpp GT-1
cpp GT-2
cpp GT-01
cpp GT-01
cpp GT-01
cpp HRSG#1
CPP HRSG#1
cpp 11-KV panel (ss-01)
cpp HRSG#1
cpp GT-01
CPP GT-02
cpp HRSG-1
cpp GTG#2
cpp HRSG-1
cpp GT-1
cpp HRSG-1
cpp GT-2
cpp HRSG
cpp HVAC
cpp CPP
cpp GT-1
cpp
cpp Common
cpp GT-1
cpp Water injection skid
cpp HRSG-2
cpp BOP
cpp EDG
cpp HRSG-1
cpp BOP
cpp GT-1
cpp gas skid
cpp cpp
cpp GT-1
cpp HRSG#2
cpp GT-1
cpp GT-2
CPP BOP
cpp GTG#2
CPP BOP
cpp BOP
cpp gas skid
cpp BOP
cpp GT#2
cpp HRSG#1
cpp HRSG#2
cpp BOP
cpp cpp
cpp cpp
cpp GT-1
cpp BOP
cpp BOP gas skid
cpp cpp
cpp HRSG 1,
cpp HRSG 1,2
cpp HRSG#2
cpp GT-2
cpp GT-2
cpp GT-2
cpp BOP
cpp
cpp GT#2
cpp BOP
cpp 220V DC system
cpp GT-2
cpp HRSG-1
cpp HRSG-2
cpp HRSG-1
cpp BOP(HP flelstm htr)
cpp HRSG#1
cpp EDG
cpp Common
cpp BOP
cpp BOP
cpp LP dosing skid
cpp GT#2
cpp hrsg-02
cpp Common
cpp hrsg-01
cpp gas skid
cpp gt-02
cpp gas skid
cpp hrsg-01
cpp electrical heater
cpp HRSG#2
cpp HRSG#2
cpp control room
cpp HRSG-2
cpp seap
CPP BATTERY
cpp common
cpp HRSG
cpp gasskid
cpp bop
CPP GTG-1&2
cpp HRSG-1
CPP bop
cpp EDG
cpp HRSG
CPP CPP
Train-1
process CSU
process SRU
process
process Train-1
process train-1
DM Plant
cooling tower
DM Plant
process Train-1/ CSU
Train-1 GSV
RWTP
FWPH
slugcatcher slugcatcher
utilities ETP
Utilities CST
utilities cooling tower 86
utilities drinking water 304
ss-1 01-PC-302/IC#L
Utilities CWTP
utilities blower bell
utilities cooling tower
MCR MCR
CTM 91
TRAIN-1 GSU
utilities DM-83
All areas OGT
utilities cooling tower
TRAIN-1 GSU
ELECTRICAL ISOLATION/ENE
PERMIT NO DATE TYPE OF PERMIT
4971 10/4/2016 Electrical Isolation
4972 10/4/2016 Electrical Isolation
4973 10/4/2016 Electrical Isolation
4974 10/4/2016 Electrical Isolation
4975 10/4/2016 Electrical Isolation
4976 10/4/2016 Electrical Isolation
4977 10/4/2016 Electrical Isolation
4978 10/4/2016 Electrical Isolation
4980 10/5/2016 Electrical Isolation
4981 10/5/2016 Electrical Isolation
4982 10/5/2016 Electrical Isolation
4983 10/5/2016 Electrical Isolation
4984 10/5/2016 Electrical Isolation
4985 10/6/2016 Electrical Isolation
4986 10/6/2016 Electrical Isolation
4987 10/7/2016 Electrical Isolation
4988 10/8/2016 Electrical Isolation
4989 10/9/2016 Electrical Isolation
4990 10/9/2016 Electrical Isolation
4991 10/10/2016 Electrical Isolation
4992 10/10/2016 Electrical Isolation
4993 10/10/2016 Electrical Isolation
4994 10/12/2016 Electrical Isolation
4995 10/13/2016 Electrical Isolation
4996 10/13/2016 Electrical Isolation
4997 10/13/2016 Electrical Isolation
4998 10/13/2016 Electrical Isolation
5001 10/14/2016 Electrical Isolation
4643 10/15/2016 Electrical Isolation
4644 10/15/2016 Electrical Isolation
4645 10/15/2016 Electrical Isolation
4646 10/15/2016 Electrical Isolation
5003 10/16/2016 Electrical Isolation
5004 10/16/2016 Electrical Isolation
5005 10/17/2016 Electrical Isolation
5006 10/17/2016 Electrical Isolation
4647 10/17/2016 Electrical Isolation
4648 10/17/2016 Electrical Isolation
4649 10/17/2016 Electrical Isolation
4650 10/17/2016 Electrical Isolation
4651 10/17/2016 Electrical Isolation
5007 10/18/2016 Electrical Isolation
5008 10/18/2016 Electrical Isolation
5009 10/19/2016 Electrical Isolation
5010 10/19/2016 Electrical Isolation
5011 10/19/2016 Electrical Isolation
5012 10/20/2016 Electrical Isolation
5013 10/20/2016 Electrical Isolation
5017 10/21/2016 Electrical Isolation
5018 10/21/2016 Electrical Isolation
5019 10/21/2016 Electrical Isolation
5021 10/22/2016 Electrical Isolation
5022 10/22/2016 Electrical Isolation
5023 10/23/2016 Electrical Isolation
4652 10/24/2016 Electrical Isolation
4653 10/24/2016 Electrical Isolation
4654 10/24/2016 Electrical Isolation
5025 10/24/2016 Electrical Isolation
5026 10/24/2016 Electrical Isolation
5027 10/24/2016 Electrical Isolation
5028 10/24/2016 Electrical Isolation
5029 10/25/2016 Electrical Isolation
5030 10/25/2016 Electrical Isolation
5031 10/26/2016 Electrical Isolation
5032 10/26/2016 Electrical Isolation
5033 10/26/2016 Electrical Isolation
5034 10/26/2016 Electrical Isolation
5035 10/26/2016 Electrical Isolation
5036 10/26/2016 Electrical Isolation
5037 10/27/2016 Electrical Isolation
5038 10/27/2016 Electrical Isolation
5039 10/27/2016 Electrical Isolation
5040 10/27/2016 Electrical Isolation
5041 10/27/2016 Electrical Isolation
5042 10/27/2016 Electrical Isolation
5043 10/27/2016 Electrical Isolation
5044 10/27/2016 Electrical Isolation
5045 10/28/2016 Electrical Isolation
5046 10/28/2016 Electrical Isolation
5047 10/28/2016 Electrical Isolation
5048 11/1/2016 Electrical Isolation
5052 11/2/2016 Electrical Isolation
5053 11/2/2016 Electrical Isolation
5054 11/2/2016 Electrical Isolation
5055 11/2/2016 Electrical Isolation
5056 11/3/2016 Electrical Isolation
5057 11/4/2016 Electrical Isolation
5058 11/4/2016 Electrical Isolation
5059 11/7/2016 Electrical Isolation
5060 11/8/2016 Electrical Isolation
5061 11/8/2016 Electrical Isolation
5062 11/9/2016 Electrical Isolation
5063 11/9/2016 Electrical Isolation
5064 11/9/2016 Electrical Isolation
5065 11/9/2016 Electrical Isolation
5066 11/9/2016 Electrical Isolation
4672 11/10/2016 Electrical Isolation
4673 11/10/2016 Electrical Isolation
4674 11/10/2016 Electrical Isolation
5067 11/11/2016 Electrical Isolation
5068 11/11/2016 Electrical Isolation
5069 11/14/2016 Electrical Isolation
5070 11/14/2016 Electrical Isolation
5071 11/15/2016 Electrical Isolation
5072 Electrical Isolation
5073 Electrical Isolation
5074 Electrical Isolation
5075 11/16/2016 Electrical Isolation
5076 11/16/2016 Electrical Isolation
5077 11/16/2016 Electrical Isolation
5078 11/17/2016 Electrical Isolation
5080 11/17/2016 Electrical Isolation
5081 11/18/2016 Electrical Isolation
5082 11/18/2016 Electrical Isolation
5083 11/18/2016 Electrical Isolation
5084 11/18/2016 Electrical Isolation
offsite tankages(91)
utilties ETP
ss#1
offsite tankages(91)
process ss-2
Offsites tankages(91)
utillities DML(85)
process SS-2
utillities cooling tower cell-B
Train-1 GSU(11)
utillities CT(86)
utillities
utillities ETP(96)
SS-1
utillities
utillities Cell-a
Train-1
utillities cooling tower cell-B
utillities RWTP
Train-1 GSU(11)
dm plant UTILITY
ss3 UTILITY
SS-01 SS-01
utillities loading gantry
utillities cooling tower cell-B
offsites loading gantry
train-1 GSU(11)
SS-2
utillities Cell-a
process csu
process csu
train-1 GSU 11
ss-2 ac pannel
process train-2
utillities DM(85)
ELECTRICAL ISOLATION/ENER
PERMIT NO DATE TYPE OF PERMIT
4862 10/4/2016 Electrical Isolation
4863 10/4/2016 Electrical Isolation
4864 10/5/2016 Electrical Isolation
4865 10/5/2016 Electrical Isolation
4866 10/5/2016 Electrical Isolation
4867 10/5/2016 Electrical Isolation
4868 10/5/2016 Electrical Isolation
4869 10/5/2016 Electrical Isolation
4871 10/6/2016 Electrical Isolation
4872 10/6/2016 Electrical Isolation
4873 10/6/2016 Electrical Isolation
4874 10/6/2016 Electrical Isolation
4876 10/10/2016 Electrical Isolation
4877 10/10/2016 Electrical Isolation
4878 10/10/2016 Electrical Isolation
4879 10/12/2016 Electrical Isolation
4880 10/12/2016 Electrical Isolation
4881 10/12/2016 Electrical Isolation
4882 10/13/2016 Electrical Isolation
4883 10/13/2016 Electrical Isolation
4884 10/13/2016 Electrical Isolation
4885 10/13/2016 Electrical Isolation
4888 10/15/2016 Electrical Isolation
4889 10/15/2016 Electrical Isolation
4890 10/15/2016 Electrical Isolation
4895 10/18/2016 Electrical Isolation
4896 10/18/2016 Electrical Isolation
4897 10/18/2016 Electrical Isolation
4898 10/18/2016 Electrical Isolation
4899 10/18/2016 Electrical Isolation
5101 10/19/2016 Electrical Isolation
5102 10/19/2016 Electrical Isolation
5103 10/19/2016 Electrical Isolation
5104 10/19/2016 Electrical Isolation
5105 10/20/2016 Electrical Isolation
5106 10/20/2016 Electrical Isolation
5107 10/21/2016 Electrical Isolation
5108 10/21/2016 Electrical Isolation
5109 10/21/2016 Electrical Isolation
5110 10/24/2016 Electrical Isolation
5111 10/24/2016 Electrical Isolation
5112 10/25/2016 Electrical Isolation
5114 10/26/2016 Electrical Isolation
5115 10/27/2016 Electrical Isolation
5116 10/28/2016 Electrical Isolation
5117 10/29/2016 Electrical Isolation
5118 10/29/2016 Electrical Isolation
5119 11/1/2016 Electrical Isolation
5120 11/2/2016 Electrical Isolation
5121 11/2/2016 Electrical Isolation
5122 11/2/2016 Electrical Isolation
5123 11/3/2016 Electrical Isolation
5124 11/4/2016 Electrical Isolation
5125 11/5/2016 Electrical Isolation
5126 11/5/2016 Electrical Isolation
5127 11/5/2016 Electrical Isolation
5128 11/7/2016 Electrical Isolation
5129 11/7/2016 Electrical Isolation
5130 11/7/2016 Electrical Isolation
5131 11/7/2016 Electrical Isolation
5132 11/8/2016 Electrical Isolation
5133 11/8/2016 Electrical Isolation
5134 11/8/2016 Electrical Isolation
5141 11/11/2016 Electrical Isolation
5142 11/11/2016 Electrical Isolation
5143 11/11/2016 Electrical Isolation
5144 11/15/2016 Electrical Isolation
5145 11/15/2016 Electrical Isolation
5146 11/15/2016 Electrical Isolation
5147 11/16/2016 Electrical Isolation
5148 11/16/2016 Electrical Isolation
5149 11/17/2016 Electrical Isolation
5150 11/17/2016 Electrical Isolation
5151 11/18/2106 Electrical Isolation
5152 11/18/2106 Electrical Isolation
5153 11/18/2106 Electrical Isolation
5154 11/18/2106 Electrical Isolation
5155 11/18/2106 Electrical Isolation
5156 11/19/2016 Electrical Isolation
5157 11/19/2016 Electrical Isolation
5158 11/19/2016 Electrical Isolation
5159 11/21/2016 Electrical Isolation
5160 11/21/2016 Electrical Isolation
5161 11/21/2016 Electrical Isolation
5162 11/22/2016 Electrical Isolation
5163 11/22/2016 Electrical Isolation
5164 11/23/2016 Electrical Isolation
5165 11/23/2016 Electrical Isolation
5166 11/24/2016 Electrical Isolation
5167 11/24/2016 Electrical Isolation
5168 11/24/2016 Electrical Isolation
5169 11/24/2016 Electrical Isolation
ECTRICAL ISOLATION/ENERGIZATION WORK PERMIT RECORD
TYPE OF WORK
GT-02 accesory compratment cooling air fan -02 pm job
GT-02 88BA#2 motor electrical pm, job
220V DC battery charger -II load test with salt water drum by vender
81-TP-111 transformer feeder upstream & down stream relays testing job by vender
GT-2 torbine compartment fan-2 PM job
GT-2 Load gear compartment fan-2 pm job
81-TR-112 upstream and down stream feeder relay testing
220VFC BC-2 feeding SFU contactor chattering problem rectifying
GT-2 diesel engine PM JOB
GT-2 lube mist eliminater blower-2 PM job
Relay testing of 81-tr-121 (BFP-C) feedr relay by vender
To do the relay testing of (pmcc-2) buspair-1 & HVAC INCOM-2
gas condensate drain tank pump B'' PM Job
GT#2 injection pump pm job
GT#2- 88HQ electrical PM job
To do the PM job of GT-2 turbine compartment vent fan -2 (BT-2) motor & feeder
Boiler feed water pump -A PM job
GT-2 diesel engine starting motor 88-DS-1
HM lighting feeder corrective maintenance
To do the pm job of black start cooling tower pump motor (81-pm-0854 ) & feeder
Black start cooling water pump pm job
GT-2 88VG-2 elactrical pm job
Hydrogine to deaerator pasing pump '"B"' pm job
GT#2 Water injection moter pm job
LP dosing NH3 to condensate storage tank pump ''A'' Job
GT-01 diesel engine pm job
GT-01 AOP pm job
GT-01 lube oil mist eliminator blower-2 pm job
GT-01 AOP motor and feeder pm
GT-01 diesel engine starting motor pm job
GT-1 damper seal air fan-2 pm job
GT-1 Directive damper seal air fan-1 pm job
GT-1 Load gate comp vent air fan-2 pm job
GT heater installation
Condensate extraction pump A PM job
CEP -A Motor dismonting work to trouble de high temparature problem
Condensate transfer pump-A-pin job
HRSG BLOW DOWN A
CTP-A PM JOB
GT-1 DIESEL ENGINE STARTING MOTOR
PM FOR GAS COND DRAIN TANK PUMP MOTOR # B
HRSG-1 flue gas dust and boiler drum inspection work
To do the PM of HRSG Blowdown sump pump#A motor and feeder (81PM151A)
To do the PM job of GT-1 load compartment cooling GTG-1 air fan-2 (81-P-88v2)
HRSG-1 flue gas dust inspection & cleaning work
Condensate Extraction pump A Motor Dimoutting Job For DE\NOE Bealing Replacement
CEP -A Coupling And Coupling For Motor Bearing Replacement Condensate Extraction pump A Motor
to do inspection of gt-01 genatator cooler comparatment
To be the inspection and cleaning of LAVT Panel of GT-1
To decouple the CEP-A motor
PM job of 4TMCC#01 inconer #2 breaker and feeder
To the maintenance of GT MCC-1 Incomer-1 up stream breaker
81-TR-111 T/F Inspection on HT
CEP #A Motor (Condensate extraction pump # A) Decoapling
HRSG-01 Main steam stop Valve Bypass MOV greesing work
GT-01 Hydraulic pump GT-Job
GT-01 Hydraulic oil pump motor (AHOP) pm job
GT-01 hydralic ratehat pump motor pm job
GT-01 Emergency lube oil pump motor (88QE-1)pm job
GT-02 Divertor deuper seal oil module coutetor hissiog dois reltisiction
pm of 01-ht-201 ss-01 isolation panel 11-kv vcb
GT-01 diverter damper seal air fan 02 pm job
11-kv panel ss-01 incomer 01 breaker (vcb ) pm job and cable chamber inspection
L.P dosing ammonia to CST A site for p.m job
G-T-1 diverter damper seal air fan-1 impellar removed for load trial work
P.M job-of LP dosing ammonia to CST agitator motor and feeder
condensate transfer pump and mptor pm job
GT-driverter damper seader fan-1 berring elinment job
condensate transfer pump and mptor pm job
To do the PM of BFP-C Motor and 11kv breaker PM
Boiler feed pump-C PM job
PM job of condensate extetion pump -B motor & feeder
PM job of condensate extetion pump -B
PM job of GT-2 GD seal air fan-01
GT-02 Divoter dangers seal air fan-1 PM job
GT-2 Guillotine danger seal air fan-01 PM job
PM of 02-HT-201, 11 kv isoictor panael SS-2 I/C
SS-02 Feeder-01 11 kv VCB maintenance and BIS lightings
GT-02 Labe oil mist blower -1 PM Job
HRSG-1 HP Dosing Pump -B PM job
HRSG-1 HP Dosing Pump -B Ele PM job
HT & LT teriminal box inspection of 81-TR-112 tif (PMCC# I/C#2) 81-tr-112 transformar
L.P dosing ammonia to dearrator pump-B p.m job (081-P-0874 B)
NH# to deatector bdosing pump-B elc pm job of motar and feader 81-PM-08-74B
electrical isolation -HRSG-1 HP dosing pump -a pm job