You are on page 1of 8
‘Contract: D-104865 Maintenance of Power Transformer ansformers heck List Repair Maintenance of 33/11KV Power" at Abu Dhabl-Eastern Region. [Substation name [mia Pay [Location TaL-Duprya fete D lore Date of Maintenance | 9 2. a7 ransformerMake | Davey ambient Temperature | 9 moc ransformer SLNO 7 Humiaity 5G ‘This report along with related test reports shall be prepared and submitted with photographs showing photos before repair and after the repairs carried out should be compiled and submitted. [i-Transtormer Bathing [sxe Description of tank “Raton taken |Supply, Installation and re commissioning of complete bushing set both HV 1 fond Nera alog wth suppor instars, cable cst an suppor rem ler Requseen |suppiy of addtional extra seme quantity (4 complete sets of bushings HV land tv) as spare tems for future use No Reguraen [axa] —tonponent Tote Teeoton Terai acion ker sig csrmton fy sect aig Wo trem ne Apes un 1 fe. ree No cvace ioe vat smageoten ps ND Puysteal Darnotne sno cement dogradation. Maes [ENo.| Component Note of exception Remedial acion token Bushing Designatin- |pny sign of arching ) wo Srins OF Agcurailn cracks 2 | Wee. plo canes take Physical damoge/broken parts Now Peearcnint . 0 Pavarcar. Damen leno. cement degradation “ so: Formen No-[ Component te of exception Remedial ation taken [Bushing Designation- [any sign of arching alo 4 = oo Stil OF Agcu tals eras 3 [ie No ceacy htake Physical damage/broken parts No Puy sccat Dasraine sno. froewseeninen | abr Tuomem id Cntr pc observations on Bushings {| Tesmarton “Resrorance Tesr Tose Roth by AuvSine | [ox] z over. : : 7 eB bore py A My. Eo eee ee ee a Page 1of 8 Contract 0104865 ‘Repair Maintenance of 33/11KV Power Transformers at Abu Dhabi-Eastern Region. “Maintenance of Power Transformer heck ist [i Waintonance of curant carving componente [Sno.] Component | Phase [Note of excapton Temedial econ taken [an sian of hot pot tle Scion OF Ponspor [ects No cencKs scl dmope/roken pars ~ No. BitArehie Bacau |Material degradation Ne Moereeter Dei Raoarrnn [imeta/aonbimetal [chek or vehines chen. Jan stan of hot spor Mn Gciont O€ Unrepat leracs no Cears 1 frvecstine vy Physical domagebroken parts glo Pussccas Damaae Jconnections [Material degradation Na wMateota Denpanatted [imett/nonbimetal : [heck oF ahiness Garten [Any sign of hot spot glo Steam OF Hotepat [racks no C@aces Prva dmage/oroken pas pio Puwscce, Daaerae No \erey te Demcanarn simeta/nonbimetal e [check of tigress Coscvey Jan sign of bot spot tle Soon OF werent lerace Nn Ceeces [Phila megs /oroen pars [ietai/nonbimetal [Check of tighiness ny sgn of hotspot racks [ov euings Phi damage/roken ars [Connections |Material degradation bimetai/nonbimetal [Creek orsigneness cuecven ay sign of hotspot le Grint Oo Barger racks Mo coacus 8 No Pavstcal Tamene Material desradetion der gaa fe simetanontimetal = [check oftghinass Caccten Jan sign of nor spot NeScrast Oe foespal frais nin COncKs Aes [Pris domce7oroen parts In Poucrel, Danone [material degradstion rere: [ineta/nonbimetal [check of tighiness Page 20f8 + Contract: 0-104865, Repair Maintenance of 33/11kV Power Transformers at Abu Dhabi-Eastern Region. ‘Maintenance of Power Transformer Check ist fr randiormer OUTC mapecion and maintenance ‘tity ‘ote of exception ‘OK/NoLOK | Remedial action taken lear reaTNTes ORSON counter and record numberof 2 operation as given by counting and - Ole Checeep nding struments Perform visual inspection ofthe cnecneo® 2 [etive components lok for any No ABroemat abnormality or damage. = Ok Samo [eck OLTC control pancl aT We 4 ftehtness station of contactors, Crecren eye and fuses for any damage or _ i looseness. Gls Foun 0% heck the crive shaft, check the me 4 nts and bevel gear for any _ F Jeamage and mechanical inter ok al a, check oi tevein drive motor gear WECEED 5. JooxTop up/ replace the drive gear . s oti apptiabe 2 SF. Fenn ne [Gontrm that the tap poation ae GpeceeD 6 |pead cover and diving mechanism _ ee Le ert oe Cade ok 7 [spection the ve motor carbon rushes appicabe) - = SL lubricate / Grease the erve components recommended by the Jot Use the recommended . 2 erase ubrieant andthe quantity OK es fs per OEM. rest manual operation (oy hanale jsthout engaging the dive motor) necks ofthe OLTG operate LTC Teer 4, |rsnvaly fom norrl operating tap ke e fov-3taps Dugan! - © ” loveration visually inspect the drive Peercrme. ponents fr tele function eect switches operation, ary out meesurement of rans 10 resistance and compare with the = lame plate values. Ok Crpcreo 11 eryout measurements on loninear resistance (arin. - ole Anes fare conse wpe outoneatin | Cason Denessrterl 12 [ofthe OLTC. From ocal From Os remote. Found TN Contée ox a faci treme VisuAL 13 [operation athe end ofthe = at raintenance. Oo}. CHEckeO “ater specie Uberti a Ta rs ero) A Dust Remnved Cageon Deport. e Wee 2 xe Page 3 of 8 Contract: D-104865 ‘Maintenance of Power Transformer Repair Maintenance of 33/21KV Power Transformers st Abu Dhabl-Easter Repon. ‘Note of exception ‘OK/Not OK | Remedial action taken lnorough cesning and biowing of transformer 1 [Tank & Radiators |tank, its bushings, fittings, radiators etc. A LeAweD [complete re-gaskting fal and every mechanical Revasmersn couplingin the transformer. 2 oases Ole Dewe [check al gaskets and” rings condition ond relaceit found defective Ole Done [nciudes but not limited to repair/eplacement of 3 Valves & Pumps atitypes of valves N Ole jo DAMA caer outa laces eetng Yor oor ave mechanism panel and be sue that al three phase 4 [Pave motor lar in symmetrical operation condition ok Lecce caeeren an Jmecanism panel Jepiace any faulty ransducers/contactors and aecuieo bitched in motor deve mechanism cabinet. Ok Cate oe |Ghocing oF ioveln conservator and bushings and orl LeveL 5 boitewi looping uo new i of eoerect BV, ke Bees [check oiLlevel inthe Breather unit ogt Level oe CHECKED. [eer ou ot purication using Heat/vacuum/coal Pa Putteation, jlessor method to IEC 60422 (2005) nk Casesen out | [cerry out ol regeneration restoring ol scoring lovneeeneaton forza - Nor Requezen| at samolng for both main tank and OLTC Tank and ta Te oe be 7 Jotsampling lnen perform DGA in ation to ait, interfacial leasion and ov ow (Beroee Mast) [check siicagel condRion ard vaplace and ako a 8 oreather& lica gel [check oitlevelin the Breather unit and recttying cnege eo [the defects. oe I ieAeL Decdako eae thing [Check Transformer Earthing & Record it, Attend |CompteT EAetH ransformer earthing. Inetects BAR CreANED O)<. [check the aver al conditions of plinth rewal, CHECKED 10 |eristrctues —_ferecktme on a Fousip Ole [cnr ot parting and other anitcoreson Jrocedures to estore external condition of leanstormers ok Done 41 }[fahnting/Rix/Olrt [Paint the transformer with suitable Chromate sin and then apply =i coat with suitable lake pan. ole Cone [cleaning the area around the transformer of wai, 12 House Keeping irbage, water and leaked oil etc, ak CicaneD replace all rusted nuts and bolts with approvec [RepLAceD 7 as esos asd is andbots wit aproved : P “anyother specie Observations y &, TED A -MEO pApre bry wves, Cave 4p Steir NG ASS Rucughz Ceray , Teanstoemee Top Crue obec. Per atuee Comvletiy Cleaned %& RewloreO Silica Cre: ‘Check ist Page 40f8 + Contract: 0-104865, ‘Maintenance of Power Transformer Repair Maintenance of 33/13KV Power Transformers (Check List ‘at Abu Dhabi-Eastern Region. [5 Control cabinets and Marshaling boxer = Corl abet desgration Note ofexception | Remedial aon taken ESENCE O SANED 1 |Inspect for dust and dirt. if present carry out vacuum cleaning PeeseNce OF (Cu Dysr/prer | Foy ow 2 [osenvensistin opening ppc). Replace er smog ry - ot Renysrven| 3. [Check condition of door seal, handle and lock. Repair defects if any. Heck ep» alo Repare Foun, Or. 4 [onecal abe land holes if any ope, seal ; Crecwen ther Eno | GLE 5 [Check for any rusting and corsion if present cay out tout pining Pantene Fist Bon G_[eheckthe sate of inspection lamp and power socket (if provided) Altend Cnecuro ® ececive, ee ee | esse conrT sap vhage: Teal oe npey aap aloe CueereD thin 24% and 106% ofthe ted vote. = Enulin oe. 8 |Check for the correct connection and continuity of all wirings. CHEEKED = tain oe. > [ec ononren cana conrl ent and pas este check oct setting ofthe hermosa - Not Remurve| 10 [Check tightness of all cable terminations in marshalling box - uapeeen Found pic 11 [rested fused and replace incase of signs of deteriorations = CHEGK EP Comprerely Brae Syauirn Fundional Testing of OTC Surge Protection Relay smo] Activity Note of exception ‘OK/Not OK | Remedial ation taken espe ar TTS COME OK Cueckeo ad Creanen * Iooe ener amy sen water inges ok Wo ssine eres ofthe termina tox cover somages replace the seating gasket and ensure that Its Ok tho Daeanne Cieaven & Re-Gaskeren. Page S of 8 Contract: 0-108865 Repair Maintenance of 33/11kV Power Transformers at Abu Ohabl-Eastern Region. Functional Testing of Buchholz Maintenance of Power Transformer Check List cy Tot of ecepton ‘rvnot ox |e acon taken * [Check the Buchholz relay for gas colllection, oll, CrecteeD feskge and any other detects RE pgaesy oF, Led Enc the conet mounting decton of he rely [neck he mounting anal ofthe rely. ‘Ste ous pie pct te Rely ond 1 Inspect natin ox cove bls, open and — [es termined x linspect internals Check tightness of the a ‘Tso Enc ofthe emia box ovr i aeaged = cneccen fence the sang geet and nse that ee eteertam fete pasa 2 [esecomme ‘arm Ok Tesren fictenstetinod | “Trp c eT Functional Testing of Pressu re Relief device vaTonal Testing of OU Ter S.No. Activity: ‘Note of exception OK/Not OK Remedial action taken Inspect the state of PRO and ts components. oK Jorecren A CLEANED |inspect local terminal box cover bolts, open and. |nspectinternals Check tightness ofthe oe cueceeD A frspectsne Rey ana cf a fepectne Rely and mgcons Check for any ln of water iges SonTED [neck sea of he arminl box cover damaged ke oneckeD A fepace the sealing gasket and ensure that itis ol ReeuasKerINe esis Eoene [esha mero ach 2 encion i Ok Tecren perature ialeator DRINK OR amber smo.) Activity ote of exception Remedial action taken measured) [nspect he thermo welfnpect the themowel sea. conti tified Ceckeo & 1 fond capillary juith ranstorme Inspect capillary conduit for eonduting Jo damages OK Foond of [Tet start and stop of the cooling fan groups Jour as per applicable logic by shorting the Et lerminals atthe OT Tesrep. 2 fresting [Text Temperature alarm as per applicable loge by lnorting the termina at the O71 ol Tested [rest Transformer trp as per appliabe logic by lhorting the termina atthe OT Ole on tre and stop ofthe cooing fon groups/pump ‘Ole Teun ok 3 albeation [femperture alarm ol eT Franstorme tip Ale Foust ok Page Gof 8 Contract: 104865 ‘Repair Maintenance of 33/131 at Abu Dhabi-Eastern Region. &V Power Transformers ‘Maintenance of Power Transformer heck List sno] Actvity Note of exception eae Rema actin taken fnepeck he therno wolf rapect the Wrmaswal sal contr es Wed with a 1 fand captary lransformer ol inspect capilary conduit fr no iCieS eonduiting [damages oO Founin oe. [Test tart and stop of he cooling an graups/ um [sper applicable logic by shorting the terminals at je on Ol. Testeo. 2 [resting [ext Temperature alarm as per applicable logic by shoring he terminals the OT Ok Teste [rex Transformer pas per applicable oak by [shorting the terminals at the OT! tela Tesren [start and stop of the cooling an groups/pump a Faaso 3. catioravon [Femperature alarm sd Found au [ransformer tip Ox Foun ok fis. Maintenance of Transformer Cooling Sytem — sno] Activity Note of exception ‘OK/NoROK | Remedial action taken 1 festaransancits erect mareptreace teed ones Gasexen & lontol creuts on ok Found 0K [rest manval operation of cooling fans make note CHeckep A lotany abnormal noise. investigate andatendthe | le. 2 Manatand ao ican atmos noe acre Foon Ok peration [Aut faneonaity ie checed slong wth Yanctional leting of 1 and wn ow Teseee inspect terminal boxes ofthe drive motors. took Cneck eo io loose connection, broken termination pates ” oK oxve motor (Fans / oor neress of di, dust or water. Clean the terminal 3 Paumos) loxinterals. Attend noted detects OveRHAuLer pertorm lubrication ofthe bearings applicable Pouno _ Ole oie EOI Taw ncrator sno] Activiey Note of exception ORE OE Ee FT emeda acion taken inspect ocaT terminal box cove bos, open and CHemer inspect internal ok [check tightness of the connections ke CHECKED inspect the fow meter - a [nspectthe flow meter Toran sign of wetengrest ao CREED EE |check seal of the terminal box cover, ifdamaged lc Hecke & reslace the sealing gasket and ensure that tis ealed. al RE GAS Kerth hy 2 [Testthe function [alarm ow ATR Page 7 of 8 Contract: D-104865 [Maintenance of Power Transformer Repair Maintenance of 33/11kV Power Transformers at Abu Dhabi-Eastern Region. Inspect the MOG terminal box, inspect for any 1 finspect she MOS ingress of dust, dit or water Investigate and repalr na nate operation oF Tliowing By sharing Te lerminat. = NA 2 fesstetnaton felon of aces iow eve Aer) ~ MA. [A signal when ol reaches max level (Alarm) = NA [x slgnat when ol reaches very low evel Trip) = NA Tiina Sisarationss 7 VQ) Tatiowrun Tesy tas Geen Dares D-Pe Test TTR Teer ww) we, c postu varry OLTe jeport Produced by Trident Enerey Syste ame BALOT) RASALSVAL Name 23 [oa to bate nd Approved by ~ ADOC / East Region Enclosures : Test reports 11 Meagering and noting down the IR values. DC winding resistance test Ratia tests ‘Tan Delta and capactance of Bushings and windings IGA for both transformer and OLTC In Aditi to Voltage Break Down Test. heck List Page 8 of 8

You might also like