WORK REPORT

Responsibilty
S.No Time No's
Engineer Electricians
Nageswar rao / Nagesh /
1 Sireesh / Naresh 8:00 am to 5:00 pm 3
Sattibabu

2 Santosh Konda Govind / Ayyappa 8:00 am to 5:00 pm 2

3 Charan Ramesh naidu 8:00 am to 5:00 pm 1

4 Sateesh Chakri 8:00 am to 5:00 pm 1

5 Kishore Korprolu govind 2:00 pm to 10:00 pm 1


Ramesh 10:00 pm to 6:00 am 1
9
T DATE:15.09.2017

Area WORK DESCRIPTION

SS 2.0 1)SS 2.0 Power transformer maintenance.

Township 1)Electrical material issued for car shed and electrical work u/p.

1)CCR package unit,pump,DB problems identification. 2)Attend


CCR
to Admin AC complaint.
1)Silica gel replacing for distribution transformer at SS 5.0
SS 5.0 2)HFO tank earthing nut and bolts changed. 3)43-AG-2005 LPB
changed.
B-Shift
C-Shift
7

REMARKS
Electricians Atte
1 2 3 4 5 6 7
S.No Sri Lakshmi electrician FRI SAT SUN MON TUE WED THU
1 Konda Govind P P A P P P P
2 korupolu govind B P A P P A N
3 B Mahesh P A N B P P P
4 Nageswararao P P A N B P P
5 Ayyappa P A A P P P P
6 chakri P P A A P N B
7 Ramesh N B P A P P A
8 Sattibabu P P A A N B A
9 Nagesh A N B P P A A
Total Man power present 8 7 3 6 9 7 6
Inst Technicians
1 Naidu babu P P P
2 Kumar P P P
2 2 2

S.No Pratyusha manpower


1 Ramesh naidu (HVAC) P A P P P A A
2 Pratyusha manpower 1 P P A
3 Pratyusha manpower 2 P P A
Total Man power present 1 0 1 1 3 2 0
ectricians Attendance Month of September-2017
8 9 10 11 12 13 14 15 16 17 18 19 20 21
FRI SAT SUN MON TUE WED THU FRI SAT SUN MON TUE WED THU
P P A P P P P
B P A A p N B
A N B P P P A
P P A N B P P
P P A P P P P
P P A P P B P
N B P A A P N
P P A P P P P
P P N B N A P
8 9 3 7 8 8 8

P P A P A A
P A A P P A
2 1 0 2 1 0

P P A P P A P
A A A A A
A A A A A
1 1 0 1 1 0 1
22 23 24 25 26 27 28 29 30
FRI SAT SUN MON TUE WED THU FRI SAT