You are on page 1of 6

1 2 3 4 5 6 7 8

A A

B B

C C

C 2 18/08/2017 UPDATE MLU CD LB

B 1 8/08/2017 UPDATE MLU CD LB

A 0 04/08/2017 FIRST ISSUE MLU CD LB

REV. DATE MODIFICATION BY CHKD APPD

STATUS REVISIONS
B004E.00072
PRELIMINARY A
D FOR LAYOUT ORDER N D
FOR CONSTRUCTION B C
FOR CONSTRUCTION EXCEPT HOLD
Engineer L. BASTIN

AS BUILT
Destination
Checker DONIS donis

Draftman LUCASSE lucassem


TOPOLOBAMPO II (42 CC NOROESTE)
Name Signature
Designation
HRSG MODULE (BUNDLE) LIFTING INSPECTION
REPORT

NDraw
This Drawing and the design it covers are the property of C.M.I. They are merely loaned and on the borrower's
express agreement that they will not be reproduced, copied, loaned, exhibited or used, except in the limited way and 69020_88E10
E private use permitted by any written consent given by C.M.I. to the borrower E
Scale: Sheet: 0/ 5
Contratista : Clasificasin

Tipo :
- 42 CC NOROESTE

Autor : Fichero :
HRSG BUNDLE FINAL LEVELS ADJUSTMENT
FOR
-

N : INSPECTION REPORT
INFORMATION Cliente :
-

F Emisin Inicial : 04/08/2017 Rev : F


Dibuj. Prep. Rev. Aprob.
1BUK-19-H__-__-CMI-6348
Miguel Guerras
2017.08.29 12:28:53 +01'00' 2

MLU MLU CD LB Reemplaza Hoja : 1 Sigue :5 DN : A3


Todos los derechos reservados. La reproduccin total o parcial de este dibujo sin autorizacin del proprietario est prohibida
1 2 3 4 5 6 7 8
Doc.No. Rev.

Inspection Report
69020_88E10 B Bundles final level adjustment

TABLE OF CONTENTS 1. PURPOSE


1. PURPOSE ...................................................................................................................... 1
This document represents the official headers levels checking.
2. DIMENSIONAL INSPECTION REPORT ......................................................................... 1
2.1 Preliminary remarks ..................................................................................................... 1
2. DIMENSIONAL INSPECTION REPORT
2.2 References .................................................................................................................. 1
2.1 Preliminary remarks
3. REPORT DATA .............................................................................................................. 1
3.1 Reference drawings ..................................................................................................... 1 - This document must be filled in after dimensional check, after all bundles lifting and before any
drum erection.
3.2 Inspection report drawings ........................................................................................... 2
- All dimensions indicated in the report shall be checked with valid method and equipment.

- If necessary, complementary dimensional inspection could be asked by CMI supervisor.

2.2 References

Drawings of groups 50 and 44.

3. REPORT DATA

3.1 Reference drawings

Drawing n Title

69020_505** HRSG MAIN STEEL STRUCTURE ERECTION DRAWINGS


69020_44*** HRSG HANGERS DRAWINGS

CMI-ENERGY CONFIDENTIAL Page 1 / 2


Doc.No. Rev.

Inspection Report
69020_88E10 B Bundles final level adjustment

3.2 Inspection report drawings This page shall be submitted with each update of the drawings from this inspection report.
The following drawings are included in this inspection report and shall be filled by the Erector in TOPOLOBAMPO BUNDLES FINAL LEVEL ADJUSTMENT INSPECTION REPORT
coordination with CMI Technical Advisor. The latest revision of these drawings shall be used. 88E10 Unit

Measuring instrument(s) identification


On each drawing, the Erector shall fill as well :

- The HRSG unit number Type Identification Number Calibration Validity

- The date corresponding to each update

- The revision number related to each update

- The Inspectors name and signature

For each update, it is acceptable to correct directly on the already submitted drawings but the date and
For measurement conformity according to the rules of art:
revision number of each update shall be clearly indicated.
Erector Client CMI Site
Drawing n Title
Name
69020_88E10 HRSG BUNDLES FINAL LEVEL ADJUSTMENT INSPECTION REPORT
SHEET 1 of 3 DRAWING Measurement of the TOS upper moment beams Date
69020_88E10 HRSG BUNDLES FINAL LEVEL ADJUSTMENT INSPECTION REPORT
SHEET 2 of 3 DRAWING Measurement of the TOS bundle beams at hangers positions Signature
69020_88E10 HRSG BUNDLES FINAL LEVEL ADJUSTMENT INSPECTION REPORT
SHEET 3 of 3 DRAWING Measurement of the TOS upper headers pins level CMI site comments

Acceptance by CMI Engineering


Remark(s)

Name

Date

Signature
Disclaimer: Review by CMI does not relieve other parties from responsibilities for error or deviation from
contract requirements

CMI-ENERGY CONFIDENTIAL Page 2 / 2