Dolken Kayu
- 8-10 / 400 cm Btg 1.25 28,000.00
Semen
- Portland Kg 2.5 1,406.00
Kayu balok
- terentang M3 0.072 2,640,000.00
Dolken Kayu
- 8-10 / 400 cm Btg 1.25 28,000.00
Semen
- Portland Kg 2.5 1,406.00
Seng
Gelombang
- BJLS-30 Lbr 1.2 62,900.00
Kayu balok
- terentang M3 0.072 2,640,000.00
1 M' Pagar
SementaraKawat Duri
A-03 Tinggi 1,80 m
Dolken Kayu
- 8-10 / 400 cm Btg 1 28,000.00
Semen
- Portland Kg 2 1,406.00
1 M2 Pengukuran Dan
A-04 Pasang Bouwplank
Kayu papan
- albasia M3 0.007 2,071,700.00
- Pekerja Oh 0.1 42,000.00
1 M2 Pembuatan Kantor
Sementara dgn Lantai
A-05 Diplester
Dolken Kayu
- 8-10 / 400 cm Btg 1.25 28,000.00
Kayu Balok
- terentang M3 0.18 2,640,000.00
Semen
- Portland Kg 35 1,406.00
Kawat
- harmonika M2 2 35,900.00
Kaca Polos
- 3mm M2 0.08 87,400.00
Plywood 120 x
- 240 x 0,4 cm Lbr 0.06 140,000.00
- Pekerja Oh 2 42,000.00
Dolken Kayu
- 8-10 / 400 cm Btg 1.7 28,000.00
Kayu balok
- terentang M3 0.21 2,640,000.00
Semen
- Portland Kg 10.5 1,406.00
Seng
Gelombang
- BJLS 30 Lbr 1.5 62,900.00
- Pekerja Oh 1 42,000.00
Dolken Kayu
- 8-10 / 400 cm Btg 1.25 28,000.00
Kayu balok
- terentang M3 0.186 2,640,000.00
- Paku Biasa Kg 0.3 23,400.00
Semen
- Portland Kg 18 1,406.00
Seng
Gelombang
- BJLS 30 Lbr 1.5 62,900.00
- Pekerja Oh 1 42,000.00
Batu Belah
- 15/20 M3 0.15 205,500.00
Panel Beton
- Pracetak Lbr 0.986 199,200.00
Kolom Beton
- Pracetak Btg 0.525 264,000.00
Semen abu -
- abu Kg 45 1,406.00
- Pekerja Oh 0.375 42,000.00
Kawat ram
- ayam Lbr 0.434 14,900.00
Besi siku L
- 50.50.5 Kg 6.786 18,300.00
Semen
- Portland Kg 2.5 1,406.00
BRC lengkap
- dengan tiang Lbr 0.434 171,300.00
Semen
- Portland Kg 2 1,406.00
Bambu 6 - 10
- (600) cm btng 1 25,000.00
- Tali ijuk kg 0.25 23,400.00
- Pekerja org 0.25 42,000.00
Bambu 7 -10
- (400) cm btng 1.25 25,000.00
- Pekerja org 0.5 42,000.00
- Mandor org 0.025 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)
35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,315.90
269,316.00
35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,235.90
355,236.00
28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,842.90
222,843.00
22,446.00
468
14,501.90
4,200.00
6,500.00
750
400
49,265.90
49,266.00
35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,135,065.75
1,135,066.00
47,600.00
554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
927,350.00
927,350.00
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
861,935.00
861,935.00
4,200.00
4,000.00
8,200.00
8,200.00
30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00
280,014.00
26,640.00
306,654.00
306,654.00
280,014.00
2,640.00
282,654.00
282,654.00
196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00
900
1,520.00
474,296.40
474,296.00
6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00
8,125.00
900
1,520.00
166,813.22
166,813.00
74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00
900
1,520.00
265,378.10
265,378.00
25,000.00
5,850.00
10,500.00
1,105.00
150
1,040.00
43,645.00
43,645.00
31,250.00
21,000.00
2,000.00
54,250.00
54,250.00
B. ANALISA HARGA SATUAN PEKERJAAN TANAH
HARGA
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 M3 Pasanag
Pondasi batu
Kali adk 1pc :
C-01 3 ps
- Batu Belah M3 1.1 205,500.00 226,050.00
Semen
- Portland Kg 202 1,406.00 284,012.00
1 M3 Pasang
Pondasi Batu
kali adk 1pc :
C-02 4ps
- Batu Belah M3 1.1 205,500.00 226,050.00
Semen
- Portland Kg 163 1,406.00 229,178.00
1 M3 Pasang
Pondasi Batu
kali adk 1pc :
C-03 5ps
- Batu Belah M3 1.1 205,500.00 226,050.00
Semen
- Portland Kg 136 1,406.00 191,216.00
1 M3 Pasang
Pondasi Batu
Kosong
(aanstamping
C-04 )
- Batu Belah M3 1.2 205,500.00 246,600.00
- Pasir Urug M3 0.3 175,300.00 52,590.00
- Pekerja Oh 0.78 42,000.00 32,760.00
769,500
46,800
2,970,000
83,100
387,600
117,000
156,000
266,750
24,500
109,200
98,000
26,480
14,450
5,069,380
5,069,380
1,140,000
93,600
-
2,970,000
49,860
387,600
117,000
156,000
396,000
300,000
401,500
24,500
231,000
147,000
45,600
21,250
6.480.910
6.481.000
912,000
74,880
2,970,000
62,325
387,600
117,000
156,000
369,600
240,000
327,800
24,500
196,000
98,000
36,400
17,680
6.412.865
6,413,000
712,500
70,200
48,600
1,485,000
83,100
387,600
117,000
156,000
277,200
210,000
308,000
24,500
161,000
98,000
32,400
17,170
4,188,720
4,189,000
1,140,000
93,600
81,000
1,485,000
83,100
15,866
528,850
900,000
387,600
117,000
156,000
286,000
24,500
231,000
29,200
90,100
5,648,816
5,649,000
E. ANALISA HARGA SATUAN PEKERJAAN DINDING
1 M2 Plesteran adk.
F-01 1pc : 2ps Tebal 15 mm
- Semen Portland Kg 8.52 1,406.00 11,979.12
- Pasir Pasang M3 0.017 233,400.00 3,967.80
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang Batu Oh 0.15 65,000.00 9,750.00
- Kepala Tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 36,021.92
Dibulatkan 36,022.00
1 M2 Plesteran adk.
F-02 1pc : 3ps Tebal 15 mm
- Semen Portland Kg 6.48 1,406.00 9,110.88
- Pasir Pasang M3 0.019 233,400.00 4,434.60
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang Batu Oh 0.15 65,000.00 9,750.00
- Kepala Tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 33,620.48
Dibulatkan 33,620.00
1 M2 Plesteran adk.
F-03 1pc : 4ps Tebal 15 mm
- Semen Portland Kg 5.2 1,406.00 7,311.20
- Pasir Pasang M3 0.02 233,400.00 4,668.00
- Pekerja Oh 0.2 42,000.00 8,400.00
- Tukang Batu Oh 0.15 65,000.00 9,750.00
- Kepala Tukang Oh 0.015 75,000.00 1,125.00
- Mandor Oh 0.01 80,000.00 800
Jumlah 32,054.20
Dibulatkan 32,054.00
1 M2 Plesteran adk.
F-04 1pc : 3ps Tebal 20 mm
- Semen Portland Kg 10.8 1,406.00 15,184.80
- Pasir Pasang M3 0.026 233,400.00 6,068.40
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang Batu Oh 0.2 65,000.00 13,000.00
- Kepala Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 47,253.20
Dibulatkan 47,253.00
1 M2 Plesteran adk.
F-05 1pc : 4ps Tebal 20 mm
- Semen Portland Kg 8.68 1,406.00 12,204.08
- Pasir Pasang M3 0.028 233,400.00 6,535.20
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang Batu Oh 0.2 65,000.00 13,000.00
- Kepala Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 44,739.28
Dibulatkan 44,739.00
1 M2 Plesteran adk.
F-06 1pc:5ps tebal 20 mm
- Semen Portland Kg 7.29 1,406.00 10,249.74
- Pasir Pasang M3 0.026 233,400.00 6,068.40
- Pekerja Oh 0.25 42,000.00 10,500.00
- Tukang Batu Oh 0.2 65,000.00 13,000.00
- Kepala Tukang Oh 0.02 75,000.00 1,500.00
- Mandor Oh 0.0125 80,000.00 1,000.00
Jumlah 42,318.14
Dibulatkan 42,318.00
F-11 1 M2 Acian Plesteran
- Semen Portland Kg 4 1,406.00 5,624.00
- Pekerja Oh 0.143 42,000.00 6,006.00
- Tukang batu Oh 0.107 65,000.00 6,955.00
- Kepala Tukang Oh 0.0105 75,000.00 787.5
- Mandor Oh 0.0105 80,000.00 840
Jumlah 20,212.50
Dibulatkan 20,213.00
G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP
47,500.00
6,300.00
4,875.00
600
640
59,915.00
59,915.00
30,000.00
11,248.00
7,468.80
16,800.00
13,000.00
1,500.00
160
80,176.80
80,177.00
60,000.00
1,190.00
5,880.00
4,355.00
525
560
72,510.00
72,510.00
28,000.00
2,856.00
5,880.00
4,550.00
525
560
42,371.00
42,371.00
30,786.00
2,856.00
5,880.00
4,550.00
525
560
45,157.00
45,157.00
28,996.00
2,856.00
5,880.00
4,355.00
525
560
43,172.00
43,172.00
29,835.00
2,856.00
5,880.00
4,355.00
525
560
44,011.00
44,011.00
33,840.00
2,856.00
5,880.00
4,355.00
525
560
48,016.00
48,016.00
80,010.00
4,800.00
3,528.00
8,125.00
975
320
97,758.00
97,758.00
93,500.00
702
8,400.00
6,500.00
750
800
110,652.00
110,652.00
48,600.00
6,300.00
4,875.00
600
640
61,015.00
61,015.00
72,000.00
6,300.00
4,875.00
600
640
84,415.00
84,415.00
H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT
1 M2 Langit-langit Asbes
( 1,00 x 1,00 ) m, tebal 5
H-01 mm
1 M2 Langit-langit Asbes
( 1,00 x 1,00 ) m, tebal 3,5
H-02 mm
Profil Alluminium
- "T" M 3.6 12,200.00
Akustik 600 x
- 1200 Lbr 1.5 132,800.00
- Pekerja Oh 0.15 42,000.00
H-05 1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
Kayu Balok
- Borneo Super M3 0.023 2,640,000.00
Kayu Balok
- Borneo Super M3 0.023 2,640,000.00
Teakwood (120 x
- 240x 0,3) cm Lbr 0.39 129,100.00
- Pekerja Oh 0.27 42,000.00
Kayu Balok
- Borneo Super M3 0.023 2,640,000.00
Hollow 4/4
- Zincromate Btg 0.415 29,200.00
Hollow 2/4
- Zincromate Btg 0.15 22,600.00
Gypsum board
( 120 x 240 x 9 )
- mm Lbr 0.364 79,800.00
Hollow 4/4
- Zincromate Btg 0.415 29,200.00
Hollow 2/4
- Zincromate Btg 0.15 22,600.00
Kayu Balok
- Borneo Super M3 0.023 2,640,000.00
Gypsum board
( 120 x 240 x 9 )
- mm Lbr 0.39 79,800.00
Kayu Balok
- Borneo Super M3 0.023 2,640,000.00
24,750.00
238
1,260.00
4,550.00
525
120
31,443.00
31,443.00
21,450.00
238
1,260.00
4,550.00
525
120
28,143.00
28,143.00
199,200.00
1,190.00
2,520.00
6,500.00
750
240
210,400.00
210,400.00
43,920.00
4,230.00
7,560.00
199,200.00
6,300.00
32,500.00
3,750.00
600
298,060.00
298,060.00
60,720.00
1,404.00
51,363.00
11,340.00
26,000.00
3,000.00
1,080.00
154,907.00
154,907.00
60,720.00
1,404.00
50,349.00
11,340.00
26,000.00
3,000.00
1,080.00
153,893.00
153,893.00
60,720.00
1,428.00
25,116.00
11,340.00
26,000.00
3,000.00
1,080.00
128,684.00
128,684.00
12,118.00
3,390.00
29,047.20
1,925.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375
400
93,960.20
93,960.00
12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375
400
91,408.00
91,408.00
60,720.00
1,428.00
31,122.00
1,925.00
11,340.00
26,000.00
3,000.00
1,080.00
136,615.00
136,615.00
60,720.00
1,428.00
26,325.00
3,850.00
11,340.00
26,000.00
3,000.00
1,080.00
133,743.00
133,743.00
30,870.00
238
2,100.00
3,250.00
375
240
37,073.00
37,073.00
8,925.00
1,875.00
2,100.00
3,250.00
375
240
16,765.00
16,765.00
No. URAIAN SATUAN VOLUME HARGA SATUAN HARGA
(Rp) (Rp)
Plint granito 10 x 40
- cm Bh 2.65 27,600.00 73,140.00
Plint granito 10 x 30
- cm Bh 3.33 25,900.00 86,247.00
Keramik corak 20 x
- 20 cm m2 1 62,500.00 62,500.00
Keramik polos 30 x
- 30 cm m2 1 53,000.00 53,000.00
- Semen portland Kg 8 1,406.00 11,248.00
Keramik corak 30 x
- 30 cm m2 1 58,000.00 58,000.00
Keramik polos 40 x
- 40 cm m2 1 56,800.00 56,800.00
Keramik corak 40 x
- 40 cm m2 1 65,500.00 65,500.00
Keramik corak 10 x
- 20 cm m2 1 72,200.00 72,200.00
Keramik corak 20 x
- 20 cm m2 1 75,200.00 75,200.00
Keramik polos 30 x
- 30 cm m2 1 68,900.00 68,900.00
Keramik corak 30 x
- 30 cm M2 1 76,600.00 76,600.00
Keramik polos 40 x
- 40 cm m2 1 72,500.00 72,500.00
Keramik corak 40 x
- 40 cm m2 1 77,000.00 77,000.00
Kayu Balok
- Kamper Samarinda m3 1.2 8,633,700.00 10,360,440.00
- Pekerja Oh 6 42,000.00 252,000.00
Kayu Balok
- Kamper Medan M3 1.2 5,692,600.00 6,831,120.00
- Pekerja Oh 6 42,000.00 252,000.00
Kayu Papan
- Kamper Samarinda M3 0.04 8,633,700.00 345,348.00
Kayu Papan
- Kamper Medan M3 0.04 5,692,600.00 227,704.00
Kayu Papan
- Kamper Medan M3 0.035 5,692,600.00 199,241.00
- Pekerja Oh 0.8 42,000.00 33,600.00
M2 Pintu &
Jendela Kaca Kayu
J-07 1 Borneo
Kayu Papan
- Borneo Super M3 0.035 5,595,800.00 195,853.00
- Pekerja Oh 0.8 42,000.00 33,600.00
M2 Pintu &
Jendela Jalusi
Kayu Kamper
J-08 1 Medan
Kayu Papan
- Kamper Medan M3 0.064 5,692,600.00 364,326.40
- Pekerja Oh 1 42,000.00 42,000.00
- Tukang Kayu Oh 3 65,000.00 195,000.00
M2 Pintu Triplek
Rangkap, Rangka
Tertutup Kayu
J-09 1 Kamper Medan
Kayu Papan
- Kamper Medan M3 0.0196 5,692,600.00 111,574.96
Kayu Papan
- Kamper Medan M3 0.06 5,692,600.00 341,556.00
Kayu Papan
- Borneo Super M3 0.0196 5,595,800.00 109,677.68
M2 Pintu
Teakwood
Rangkap, rangka
Kayu Kamper
J-12 1 Medan
Kayu Papan
- Kamper Medan M3 0.0196 5,692,600.00 111,574.96
Kayu Papan
- Kamper Medan M3 0.0196 5,692,600.00 111,574.96
Kayu Papan
- Kamper Medan M3 0.0196 5,692,600.00 111,574.96
Teakwood 120 x
- 240 x 0,4 cm Lbr 1 131,700.00 131,700.00
Kayu Balok
- Kamper Medan M3 1.1 5,692,600.00 6,261,860.00
M3 Kuda-kuda
J-16 1 Kayu Borneo Super
M2 Kaso + Reng
Genteng Plentong
J-17 1 Kayu Borneo Super
M2 Kaso + Reng
Genteng Beton
J-18 1 Kayu Borneo Super
M' Lisplang uk
(3x20)cm, Kayu
J-19 1 Kamper Medan
Kayu Papan
- Kamper Medan M3 0.0072 5,823,400.00 41,928.48
Kayu Papan
- Kamper Medan M3 0.011 5,692,600.00 62,618.60
1 m2 Pintu Alluminium
K-05 Natural
Pintu alluminium
- natural m2 1 211,800.00 211,800.00
- Pekerja Oh 1.05 42,000.00 44,100.00
Alumunium profil
- natural 4" m' 1.1 151,100.00 166,210.00
Alumunium profil
- natural 3" m' 1.1 81,000.00 89,100.00
Alumunium strip
- 6mm m2 1.05 171,800.00 180,390.00
- Pekerja Oh 0.085 42,000.00 3,570.00
1 m2 Pintu/jendela kaca
K-16 rangka alluminium natural 4"
Alumunium profil
- natural 4" m' 4.4 151,100.00 664,840.00
- Profil alluminium T m' 4.5 12,200.00 54,900.00
- Sealant tube 0.27 7,500.00 2,025.00
- Pekerja Oh 0.085 42,000.00 3,570.00
1 m2 Pintu/jendela kaca
K-17 rangka alluminium warna 4"
Alumunium profil
- warna 4" m' 4.4 163,000.00 717,200.00
Jendela nako
(rangka + kaca 5
- mm) m2 1.1 300,000.00 330,000.00
Paku skrup 1cm -
- 2,5cm bh 10 250 2,500.00
1 Cm Pengelasan dengan
K-03 las listrik
1 m2 Pintu Alluminium
K-05 Natural
Pintu alluminium
- natural m2 1 211,800.00 211,800.00
- Pekerja Oh 1.05 42,000.00 44,100.00
Papan kayu
- kamper M2 0.0018 5,692,600.00 10,246.68
- Pekerja Oh 0.1 42,000.00 4,200.00
Kayu papan
- borneo super M3 0.0096 5,595,800.00 53,719.68
Kayu papan
- borneo super M3 0.019 5,595,800.00 106,320.20
Kayu papan
- borneo super kg 0.019 5,595,800.00 106,320.20
Alumunium profil
- natural 4" m' 1.1 151,100.00 166,210.00
Alumunium profil
- natural 3" m' 1.1 81,000.00 89,100.00
Alumunium strip
- 6mm m2 1.05 171,800.00 180,390.00
- Pekerja Oh 0.085 42,000.00 3,570.00
1 m2 Pintu/jendela kaca
K-16 rangka alluminium natural 4"
Alumunium profil
- natural 4" m' 4.4 151,100.00 664,840.00
- Profil alluminium T m' 4.5 12,200.00 54,900.00
- Sealant tube 0.27 7,500.00 2,025.00
- Pekerja Oh 0.085 42,000.00 3,570.00
1 m2 Pintu/jendela kaca
K-17 rangka alluminium warna 4"
Alumunium profil
- warna 4" m' 4.4 163,000.00 717,200.00
Jendela nako
(rangka + kaca 5
- mm) m2 1.1 300,000.00 330,000.00
Paku skrup 1cm -
- 2,5cm bh 10 250 2,500.00
Dibulatkan
Perlengkapan 30 %
harga urinoir lot 0.3 1,773,400.00
Jumlah
Dibulatkan
Perlengkapan 12 %
harga wastafel lot 0.12 1,773,400.00
Jumlah
Dibulatkan
Bak fibreglass
0.60m x 0.60m bh 1 255,300.00
Pekerja org 1.8 42,000.00
Perlengkapan 18 %
harga bak lot 0.18 255,300.00
Jumlah
Dibulatkan
M-05 1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Dibulatkan
Dibulatkan
Dibulatkan
Dibulatkan
Perlengkapan 35 %
harga pipa lot 0.35 18,960.00
Jumlah
Dibulatkan
Dibulatkan
Perlengkapan 35 %
harga pipa lot 0.35 31,770.00
Jumlah
Dibulatkan
Dibulatkan
Perlengkapan 35 %
harga pipa lot 0.35 15,660.00
Jumlah
Dibulatkan
M-14 1 Buah Bak Cuci piring Stainless steel
Dibulatkan
Dibulatkan
Dibulatkan
Dibulatkan
Perlengkapan 35 %
harga talang lot 0.35 63,000.00
Pekerja org 0.15 42,000.00
Dibulatkan
1 M' Saluran Air Limbah Buis Beton
M-19 60 cm
Dibulatkan
Dibulatkan
1 Buah Closet
M-21 Duduk
Dibulatkan
M-22 1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass
kapasitas 1 m3 bh 1 1,316,400.00
Pekerja org 3.3 42,000.00
Perlengkapan 6 %
harga bak lot 0.06 1,316,400.00
Jumlah
Dibulatkan
Urugan dan
perataan tanah m3 1.125 34,584.00
Jumlah
Dibulatkan
Urugan dan
perataan tanah m3 0.563 34,584.00
Jumlah
Dibulatkan
HARGA
(Rp)
188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00
1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80
532,020.00
2,430,770.00
2,430,770.00
1,012,700.00
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
212,808.00
1,400,178.00
1,400,178.00
255,300.00
75,600.00
175,500.00
40,500.00
8,800.00
45,954.00
601,654.00
601,654.00
0 cm
67,870.00
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
159,314.90
159,315.00
cm
144,150.00
160,284.00
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
620,778.90
620,779.00
cm
41,075.00
61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
134,400.00
65,975.00
112.5
1,280.00
377,545.50
377,546.00
12,030.00
1,512.00
3,900.00
450
144
4,210.50
22,246.50
22,247.00
18,960.00
1,512.00
3,900.00
450
144
6,636.00
31,602.00
31,602.00
31,770.00
1,512.00
3,900.00
450
144
11,119.50
48,895.50
48,896.00
33,210.00
1,512.00
3,900.00
450
144
11,119.50
50,335.50
50,336.00
104,370.00
3,402.00
8,775.00
1,012.50
328
36,529.50
154,417.00
154,417.00
15,660.00
3,402.00
8,775.00
1,012.50
328
5,481.00
34,658.50
34,659.00
397,800.00
1,260.00
19,500.00
2,250.00
120
420,930.00
420,930.00
40,900.00
105
420
6,500.00
750
400
49,075.00
49,075.00
66,600.00
420
6,500.00
750
400
74,670.00
74,670.00
48,730.00
9,300.00
144.82
7,118.70
6,047.85
420
6,500.00
750
400
79,411.37
79,411.00
63,000.00
22,050.00
6,300.00
26,000.00
1,875.00
100
119,325.00
119,325.00
143,990.00
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
221,242.74
221,243.00
10,400.50
351
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100
79,986.50
79,987.00
1,724,700.00
138,600.00
71,500.00
75
12,800.00
103,482.00
2,051,157.00
2,051,157.00
1,316,400.00
138,600.00
71,500.00
75
12,800.00
78,984.00
1,618,359.00
1,618,359.00
118,134.00
37,514.20
1,612,795.50
3,304,006.50
1,931,659.20
619,527.30
1,386,720.00
233,750.00
67,500.00
126,360.00
215,250.00
330,300.00
38,907.00
10,022,423.70
10,022,424.00
45,000.00
18,757.10
806,397.75
1,652,003.25
965,829.60
309,763.65
2,311,200.00
116,875.00
33,760.00
63,180.00
107,625.00
330,300.00
19,470.79
6,780,162.14
6,780,162.00
VOLUM
No. URAIAN SAT E HARGA SAT
Cat penutup
- setara sieve 2x Kg 0.17 41,700.00
- Pekerja Oh 0.07 42,000.00
Cat penutup 3x
- setara sieve Kg 0.35 41,700.00
- Pekerja Oh 0.07 42,000.00
Cat penutup 2x
- setara ICI Kg 0.26 75,000.00
- Pekerja Oh 0.02 42,000.00
Cat penutup 2
- x Kg 0.18 75,000.00
- Pekerja Oh 0.028 42,000.00
Cat tembok
- setara ICI Kg 0.2 75,000.00
Cat tembok
- setara Vinilex Kg 0.2 25,000.00
Cat tembok
- setara Vinilex Kg 0.13 25,000.00
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
Cat penutup 2x
- setara vinilex Kg 0.26 25,000.00
- Pekerja Oh 0.02 42,000.00
Cat penutup 2
- x Kg 0.18 25,000.00
- Pekerja Oh 0.028 42,000.00
1,780.00
6,300.00
200
8,280.00
8,280.00
2,864.00
768
296
1,680.00
2,600.00
300
200
8,708.00
8,708.00
3,750.00
5,100.00
7,089.00
2,940.00
4,875.00
562.5
200
24,516.50
24,517.00
6,080.00
3,750.00
5,100.00
14,595.00
2,940.00
6,825.00
300
200
39,790.00
39,790.00
7,200.00
41,924.40
10,000.00
3,900.00
1,200.00
200
64,424.40
64,424.00
2,835.00
4,200.00
480
7,515.00
7,515.00
2,500.00
3,000.00
19,500.00
840
4,095.00
472.5
200
30,607.50
30,608.00
3,600.00
13,500.00
1,176.00
2,730.00
315
200
21,521.00
21,521.00
15,000.00
4,000.00
325
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800
53,775.00
53,775.00
5,000.00
4,000.00
325
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800
43,775.00
43,775.00
3,250.00
2,750.00
3,250.00
670
1,650.00
5,460.00
13,000.00
1,500.00
800
32,330.00
32,330.00
66,840.00
8,925.00
14,700.00
11,375.00
1,275.00
136
103,251.00
103,251.00
3,040.00
160
840
13,000.00
1,500.00
800
19,340.00
19,340.00
erancah
3,040.00
160
4,139.60
10,500.00
14,625.00
1,687.50
600
34,752.10
34,752.00
20,310.00
252
3,900.00
900
480
25,842.00
25,842.00
2,500.00
3,000.00
6,500.00
840
4,095.00
472.5
200
17,607.50
17,608.00
2,500.00
3,000.00
9,750.00
1,260.00
6,142.50
712.5
304
23,669.00
23,669.00
3,600.00
4,500.00
1,176.00
2,730.00
315
200
12,521.00
12,521.00
NO. URAIAN KOEF SAT. HARGA SAT. (Rp)
O-01 1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
Pupuk kandang 0.08 krg 25,000.00
2,000.00
24
25,000.00
1,050.00
200
28,274.00
28,274.00
2,000.00
24
50,000.00
1,050.00
200
53,274.00
53,274.00
1,000.00
24
10,000.00
840
160
12,024.00
12,024.00
1,000.00
7,500.00
1,680.00
320
10,500.00
10,500.00
NO URAIAN SATUAN UPAH (Rp.)
Kepala Tukang
2 Batu Org/hr Rp 75,000.00
Kepala Tukang
3 Kayu Org/hr Rp 75,000.00
Kepala Tukang
4 Besi Org/hr Rp 75,000.00
Kepala Tukang
5 Cat Org/hr Rp 75,000.00
Kepala Tukang
6 Listrik Org/hr Rp 75,000.00
Tukang
10 Besi/Baja Org/hr Rp 65,000.00
Pembantu
17 Tukang Org/hr Rp 42,000.00
Pembantu
24 Operator Org/hr Rp 50,000.00
Pembantu
25 Mekanik Org/hr Rp 42,000.00
NO MATERIAL SAT HARGA (Rp)
AGREGAT KASAR,BAHAN
PEREKAT & BAHAN
A. JADINYA
49 Formite/spacer bh 2,500.00
Hollow/Con Blok 8 x 20 x
50 40 bh 5,000.00
Hollow/Con Blok 8 x 15 x
51 40 bh 4,000.00
Hollow/Con Blok 8 x 10 x
52 40 bh 3,000.00
LABURAN,PENGISI DAN
B ALATNYA
32 Terpentin kg 19,500.00
33 Tiner A kg 23,900.00
34 Tiner B kg 21,400.00
35 Kumpon lbr 30,800.00
36 Melamik kg 52,500.00
42 Sincromat kg 40,900.00
43 Cat Kayu Sieve lt 41,700.00
44 Cat Besi lt 44,000.00
Plafond hardpleks 5 mm
2 120 x 240 lbr 62,400.00
22 Supercon m2 57,900.00
1 Tegel PC 20 x 20 bh 3,400.00
3 Tegel PC 30 x 30 bh 3,400.00
Poslin 11 x 11 Warna
12 Standar DN m2 63,300.00
Poslin 11 x 11 Warna
13 khusus DN m2 67,300.00
Keramik 10 x 20 dan 20 x
20 KW I DN Putih / Polos
14 Mulia m2 54,500.00
Keramik 10 x 20 KW I DN
Corak/Warna/Anti Slip
15 Mulia m2 56,000.00
Keramik 20 x 20 (KM) KW I
DN Corak/Warna /Anti Slip
16 Mulia m2 62,500.00
Keramik 20 x 20 (KM) KW I
17 DN Putih Polos Mulia m2 54,500.00
Keramik 20 x 25 Dinding
18 KM KW I DN Corak Mulia m2 62,500.00
Keramik 30 x 30 KWI DN
19 Putih Polos Mulia m2 53,000.00
Keramik 30 x 30 KWI DN
Warna/Corak (ANTI SLIP)
20 Mulia m2 58,000.00
Keramik 40 x 40 KWI DN
21 Putih Polos Mulia m2 56,800.00
Keramik 40 x 40 KWI DN
Warna/Corak (ANTI SLIP)
22 Mulia m2 65,500.00
Keramik 10 x 20 dan 20 x
20 KW I DN Putih / Polos
23 Roman m2 64,400.00
Keramik 10 x 20 KW I DN
Corak/Warna/Anti Slip
24 Roman m2 72,200.00
Keramik 20 x 20 (KM) KW I
DN Corak/Warna/Anti Slip
25 Roman m2 75,200.00
Keramik 20 x 20 (KM) KW I
26 DN Putih Polos Roman m2 72,900.00
Keramik 20 x 25 Dinding
27 KM KW I DN Corak Roman m2 75,200.00
Keramik 20 x 25 KW I DN
28 Putih Polos Roman m2 72,900.00
Keramik 30 x 30 KW I DN
29 Polos Roman m2 68,900.00
Keramik 30 x 30 KW I DN
Warna/Corak (ANTI SLIP)
30 Roman m2 76,600.00
Keramik 40 x 40 KW I DN
31 Polos Roman m2 72,500.00
Keramik 40 x 40 KW I DN
Warna/Corak (ANTI SLIP)
32 Roman m2 77,000.00
BuisTanah 10 cm ( 0.50
11 M' ) stk 9,600.00
BuisTanah 15 cm ( 0.50
12 M' ) stk 12,700.00
BuisTanah 20 cm ( 0.50
13 M' ) stk 16,800.00
BuisTanah 25 cm ( 0.50
14 M' ) stk 22,800.00
15 Injuk kg 17,400.00
23 Wiremesh M8 m2 51,900.00
24 Wiremesh M6 m2 38,700.00
25 Timah kg 46,300.00
Plat Srip 2 x 30 mm ( 6
28 m1 ) bt 33,000.00
Plat Srip 3 x 30 mm ( 6
29 m1 ) bt 33,100.00
30 Plat Strip bt 18,200.00
Besi Hallow ( 2 x 4 x 4) cm
65 (400cm) btg 22,600.00
Besi Hallow ( 4 x 4) cm
66 (400 cm) btg 29,200.00
I BAHAN KACA
Kaca Rayband 5 mm
5 ( ASAHI ) m2 148,700.00
Kaca Rayband 8 mm
6 ( ASAHI ) m2 323,400.00
Kaca Rayband 12 mm
7 ( ASAHI ) m2 627,000.00
Glass Block DN 20 x 20
14 ( Kedawung ) bh 22,000.00
Glass Block DN 20 x 20 Ex
15 LN bh 125,700.00
16 Sealant kg 211,800.00
K BAHAN PERPIPAAN
Macam2 Sambungan
54 Paralon 1/2" bh 4,400.00
Macam2 Sambungan
55 Paralon 3/4" bh 4,700.00
Macam2 Sambungan
56 Paralon 1" bh 4,900.00
Macam2 Sambungan
57 Paralon 1 1/4" bh 7,200.00
Macam2 Sambungan
58 Paralon 1 1/2" bh 9,500.00
Macam2 Sambungan
59 Paralon 1 3/4" bh 13,500.00
Macam2 Sambungan
60 Paralon 2" bh 15,800.00
Macam2 Sambungan
61 Paralon 2 1/2" bh 26,400.00
Macam2 Sambungan
62 Paralon 3" bh 29,700.00
Macam2 Sambungan
63 Paralon 4" bh 34,000.00
L BAHAN SANITAIR
Genteng Bubungan Ex
24 Jatiwangi Segi Tiga bh 4,800.00
Bubungan Genteng
45 Keramik bh 10,000.00
Bubungan Genteng
48 Plentong bh 6,000.00
N BAHAN MEKANIKAL
AC Split 3 PK Setara
10 TOSHIBA unit 30,791,800.00
AC Split 2 PK Setara
11 TOSHIBA unit 21,926,500.00
AC Split 1 PK Setara
12 TOSHIBA unit 5,174,100.00
O BAHAN ELEKTRIKAL
Rumah Panel 30 x 60 cm
30 ( Kosong ) unt 153,500.00
Lampu Sirkel TL 20 W
56 Lengkap bh 67,900.00
BAHAN ALAT
PENGANTUNG DAN
P KUNCI
15 Espangolet ps 51,600.00
16 Grendel 15 cm bh 49,800.00
17 Grendel 5 cm bh 5,500.00
BAHAN PENGIKAT
UNTUK KONSTRUKSI
Q JALAN
Pompa Submersible
kap. 150 liter / menit 3
8 KW unit 27,151,200.00
BAHAN PENAMPUNG
S AIR
T ALAT TUKANG
B. BIDANG PERTAMANAN
Pohon pelindung
(angsana, mahoni,
8 kamboja dll) tinggi 2m batang 25,000.00
Pohon perdu (kaca
piring, puring, mawar,
9 melati, dll) batang 10,000.00