MINIMUM FORMWORK STRIPPING TIMES—IN SITU CONCRETE,
Hecniliie |) Aree | Gallien
Formed surface | Clasifcation conditions aaa
ste eiantitiows | “Sine swe
Classes 4.5 9 hours 12 hours 18hours
‘A minimums of ene day applies othe ripping of veal Tees where rot
eam and slab | Forms says Gays Faas
sols
Supping das Busy 2d
NOTES:
1 The siping tins for beam and sla afits fr members cured in conditions let than $~C sal
te intened by tal iy foreach day which the dally average lemperalue wes betwee 2-C
aed $C. by a whole day for cach day on wich the daily average tempers was below 2-C
2 whore ool
53 Inthe sbsene af st eanding, lel lrpeaties are ually avalable rom the Astaion Rares
oF Meteorologs
54.3, Stage III of construction—Formwork stripping and after placement of concrete
SA3.1 Consiruction loads
cl i speci itis adisble ostrip forms ely sett the tations ven
Loads on the newly poured concrete (e.g. stacked materials and equipment) shall not exceed
those nominated in the project documentation and the formwork documentation, See
(Clause 2.3(b) and Clause 4.7-1().
54.3.2. Stripping times
Stripping of formwork from in sity conesete shall not be undertaken earlier than as speci
in the documentation. In the absence of such specified minimum times, Table 5.4.1 may be
used in the ease of stripping forms from beam oF slab sofMits provided that there is
‘compliance with the following conditions:
(a The ratio of span between supports tothe overall depth ofthe member is less than
280
(D+ 100)
‘where D isthe overall depth ofthe section in millimetres83 AS 36101998
(>) The conerete is of normal class as defined in AS 3600, and the mean compressive
strength at the designated early age, fas, shall be not less than the appropriate value
given in Table 5.4.2, Where these early concrete strengths are not achieved, the times
given shall be increased by a factor of 1.5,
(c) In the case of slabs, the superimposed loads do not exceed 2.0 kN/
If these conditions can not be accommodated, additional project documentation shall be
obtained.
When standard beam or cylinder tests are used to determine stripping times, test specimens
shall be cured under conditions which are not more favourable than the most unfavourable
conditions for the portions of the conerete which the test specimens represent
TABLE 5.4.2
EARLY-AGE MEAN STRENGTHS FOR
NORMAL-CLASS CONCRETE
Minimum mean compressive strength (fia), MP2
At3 days AtT days
Grade designation ude designation | fon
N20E3 9 N20E7 15
N2SE3 2 N2sE7 19
NS2E3 is N32E7 24
N4OE3 18 N40E7 x0
NSOE3 23 NSOE? ”