No STA KETERANGAN DIMENSI STATUS

DIKERJAKAN Shop drawing Fisik Analisa

1 Intersection 0+000 RCP MEDIAN RCP 0.60 Ada 100%


2 Intersection 0+000 WATER BALANCE BC 1 X BC (3.0 X 3.0) Ada 50%

3 00+050.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%


4 00+318.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%

5 00+550.00 RCP MEDIAN RCP 0.60 Ada 100%

6 00+639.33 BOX TUNNEL 2 X BT (18.00 X 6.25) Ada 90% Ada

7 00+675.00 SALURAN BOX CULVERT 2 X BC (10.0 X 4.0) Ada 100% Ada

8 01+167.02 JEMBATAN PERTAGAS PCI Girder L : 30m Ada 100% Ada

9 01+225.00 RCP MEDIAN RCP 0.60 Ada 100%

10 01+389.06 JEMBTAN Minyak 1 PCI Girder L : 20m Ada 100% Ada


11 01+483.32 JEMBATAN Minyak 2 PCI Girder L : 20m Ada 100% Ada
12 01+700.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%

13 01+852.55 RCP MEDIAN RCP 0.60 Ada 100%

14 02+075.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%

15 02+350.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%

16 02+625.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%

17 03+066.78 BOX CULVERT DAN BOX TUNNEL (14.4 X 6.10) + (16.0 X 7.13) Ada 100% Ada

18 04+605.00 SALURAN BOX CULVERT 2 X BC (10.0 X 4.0) Ada 100% Ada

19 04+916.62 WATER BALANCE BC 2 X BC (3.0 X 3.0) Ada 100%

20 05+225.00 KABEL DUCT RCP 0.60 Ada 100%

21 05+613.00 JEMBATAN (2 span) PCI Girder L : 35m Ada 100% Ada


22 06+000.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%

23 06+600.00 WATER BALANCE BC 1 X BC (3.0 X 2.0) Ada 100%


24 07+126.00 JEMBATAN SS. PEMULUTAN (40 + 20) M Ada 80% Ada

25 07+800.00 BOX CULVERT 2 X BC (10.0 X 4.0) Ada 0% Ada

26 00+294.78 SALURAN BOX CULVERT 2 X BC (10.0 X 4.0) Ada 40% Ada


27 00+252.70 BOX TUNNEL TP 1 X BT (3.0 X 3.0) Ada 80%
28 01+495.10 JEMBATAN PCI Girder L = 20 m Ada 100% Ada
29 01+510.26 KABEL DUCT RCP 0.60 Ada 100%

30 SALURAN BOX CULVERT (R5) 1 x BC (1.0 x 1.0) Belum Ada 0%


31 SALURAN BOX CULVERT (R4) 1 x BC (1.0 x 1.0) Belum Ada 0%
32 SALURAN BOX CULVERT (R3) 1 x BC (3.0 x 2.0) Belum Ada 0%
33 SALURAN BOX CULVERT (R2) 1 x BC (3.0 x 2.0) Belum Ada 0%

34 08+250.88 SALURAN BOX CULVERT 1 X BC (20.0 X 6.1) Belum Ada 0% Belum Ada
35

08+475.00 BOX CULVERT 1 x BC (3.0 x 3.0)

08+725.00 BOX CULVERT 1 x BC (3.0 x 3.0)


36 08+970.45 SALURAN BOX CULVERT 1 x BC (15.0 x 6.10)= (5+10.0) Belum Ada 0% Belum Ada

37 09+594.86 JALAN KEBUN/ BOX TUNNEL BC (16.16 X 6.61)=(3+10+3) Belum Ada 0% Belum Ada
09+950.00 BOX CULVERT BC (1X3X3) Belum Ada 0%
0%
10+100.00 BOX CULVERT BC (1X3X3) Belum Ada 0%
10+275.00 BOX CULVERT BC (1X3X3) Belum Ada 0%

10+375.00 SALURAN BOX CULVERT BC (16.16 X 6.61)=(2+14) Belum Ada 0% Belum Ada

38 10+578.78 JALAN KEBUN/ BOX TUNNEL BC 1x(10X6.61)=(5+5) Belum Ada 0% Belum Ada

39 11+225.00 JALAN KEBUN/ BOX TUNNEL BC 1x(15X6.61)=(10+5) Belum Ada 0% Belum Ada

40 11+612.78 SALURAN BOX CULVERT BC 1x(15X6.61)=(5+10) Belum Ada 0% Belum Ada

41 12+016.28 SS. KTM RAMBUTAN PCI girder L : 20+40 Belum Ada 0% Ada
42 00+025.00 BOX CULVERT BC 2 x (10.0 x 4.0) Belum Ada 0% Belum Ada
43 00+150.00 SALURAN BOX CULVERT (A) BC 1 x (3.0 x 3.0) Belum Ada 0%
44 00+350.00 SALURAN BOX CULVERT (A) BC 1 x (3.0 x 3.0) Belum Ada 0%
45 00+480.00 SALURAN BOX CULVERT (A) BC 1 x (3.0 x 3.0) Belum Ada 0%
46 00+620.00 SALURAN BOX CULVERT (A) BC 1 x (3.0 x 3.0) Belum Ada 0%
47 00+750.00 SALURAN BOX CULVERT (A) BC 1 x (3.0 x 3.0) Belum Ada 0%

48 00+445.81 SALURAN BOX CULVERT (R5) 1 x BC (1.0 x 1.0) Belum Ada 0%


49 00+244.96 SALURAN BOX CULVERT (R4) 1 x BC (1.0 x 1.0) Belum Ada 0%
50 00+303.03 SALURAN BOX CULVERT (R3) 1 x BC (3.0 x 2.0) Belum Ada 0%
51 00+125.09 SALURAN BOX CULVERT (R2) 1 x BC (3.0 x 2.0) Belum Ada 0%
52 00+251.00 SALURAN BOX CULVERT (R1) BC 1x(10X6.61)=(5+5) Belum Ada 0% Belum Ada

53 00+104.00 SALURAN BOX CULVERT (R1) 1 X BC (3.0 X 3.0) Belum Ada 0%

54 12+700.00 SALURAN BOX CULVERT 1 X BC (2.0 X 3.0) Belum Ada 0%

55 13+277.75 SALURAN BOX CULVERT 1 X BT (20 X 6.1)= (6+8+6) Belum Ada 0% Belum Ada

56 14+444.40 BOX CULVERT 1 X BC (2.0 X 3.0) Belum Ada 0%


57 14+460.00 BOX TUNNEL 1 X BT (3.0 X 3.0) Belum Ada 0%

58 15+035.00 BOX CULVERT 2 X BC (3.0 X 3.0) Belum Ada 0%

59 15+430.18 BOX TUNNEL 1 X BT (3.0 X 3.0) Ada 20%

60 15+448.50 BOX CULVERT 2 X BC (3.0 X 3.0) Ada 20%

61 15+972.00 BOX CULVERT 1 X BC (3.0 X 2.0) Ada 30%


62 15+985.00 BOX TUNNEL 1 X BT (3.0 X 3.0) Ada 20%

63 16+310.00 BOX TUNNEL 1 X BT (3.0 X 3.0) Ada 20%

64 16+324.00 BOX CULVERT 2 X BC (3.0 X 3.0) Ada 10%

65 16+641.00 BOX CULVERT 2 X BC (3.0 X 3.0) Ada 0%

66 16+832.00 BOX CULVERT 1 X BC (3.0 X 3.0) Belum Ada 0%

67 17+045.00 BOX CULVERT 2 X BC (3.0 X 3.0) Belum Ada 0%


68 17+677.00 JEMBATAN (L=30 M) 30 Ada 30% Ada

69 18+146.00 BOX CULVERT 3 X BC (3.0 X 3.0) Belum Ada 0%

70 18+170.00 BOX CULVERT 2 X BC (3.0 X 3.0) Belum Ada 0%

71 18+744.56 BOX CULVERT 3 X BC (3.0 X 3.0) Ada 10% Ada

72 18+802.27 BOX TUNNEL 2 X BT (31 X 6.25)-- skew Belum Ada 0% belum ada
73 18+850.00 BOX CULVERT 2 X BC (3.0 X 3.0) Belum Ada 0%

74 19+300.00 RCP MEDIAN RCP 0.60 Ada 100%

75 19+872.00 BOX CULVERT 1 X BC (2.0 X 3.0) Ada 40%

76 20+386.78 BOX TUNNEL 1 X BT (3.5 X 3.5) Ada 100%


77 20+394.41 KABEL DUCT RCP 0.60 Ada 100%

78 20+797.00 BOX CULVERT 1 X BC (3.0 X 2.0) Ada 100%


79 20+840.00 KABEL DUCT RCP 0.60 Ada 100%

80 20+870.15 JEMBATAN (L= 30 M) Ada 60% Ada


81 21+270.58 RCP MEDIAN RCP 0.60 Ada 100%

82 21+899.00 RCP MEDIAN RCP 0.60 Ada 100%


83 21+915.00 KABEL DUCT RCP 0.60 Ada 100%
84 21+920.00 RCP MEDIAN RCP 0.60 Ada 100%