DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 1

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 129.46 130.82
WBP 399.04 402.45

1 SDP POMPA A R 0.75 1.1


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.66 0.67

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 307.21 309.3
WBP 616.09 620.24

3 SDP PENERANGAN B A R 0.7 0.69


M
P
E S 0.76 0.76
R
E
T 0.77 0.76
LWBP 212.38 213.72
WBP 1040.02 1047.47

4 SDP KIOS B A R 1.03 1.09


M
P
E S 0.99 0.97
R
E
T 1.01 1.07
LWBP 178.58 180.03

5 SDP ESC B
WBP 456.07 457.95

5 SDP ESC B A R 0.68 0.67


M
P
E S 0.78 0.69
R
E
T 0.77 0.87
LWBP 905.61 912.63
WBP 2719.02 2739.37

6 SDP PAC B A R 2.92 2.97


M
P
E S 2.9 2.96
R
E
T 2.86 2.87
LWBP 281.8 283.89
WBP 916.14 924.32

7 SDP KIOS A A R 0.99 1.02


M
P
E S 1.07 1.04
R
E
T 1.19 1.21
LWBP 408.04 411.22
WBP 722.84 727.85

8 SDP PENERANGAN A A R 0.86 1


M
P
E S 0.73 0.86
R
E
T 0.78 1.01
LWBP 207.89 209.95
WBP 526.4 530.12

9 SDP ESC A A R 0.92 0.64


M
P
E S 0.98 0.72
R
E
T 1.03 0.78
LWBP 227.92 229.34
WBP 570.85 575.58

10 SDP ESC D A R 0.8 0.83


M
P
E S 0.94 1.08
R
E
T 0.91 1.09
LWBP 615.63 620.13
WBP 1705.26 1718.79

11 SDP AC D A R 1.83 1.78


M
P
E
R
E
11 SDP AC D A
M
P
E S 1.98 1.95
R
E
T 1.98 1.96
LWBP 973.71 982.08
WBP 2603.65 2623.1

12 SDP PAC A A R 2.67 2.72


M
P
E S 2.69 2.73
R
E
T 2.77 2.75
LWBP 276.78 278.42
WBP 874.89 881.47

13 SDP KIOS C A R 1.03 0.91


M
P
E S 0.92 0.89
R
E
T 0.83 0.83
LWBP 295.43 297.07
WBP 816.58 822.74

14 SDP PENERANGAN C A R 0.73 0.73


M
P
E S 0.75 0.75
R
E
T 0.52 0.58
LWBP 128.98 130.03
WBP 332.69 335.43

15 SDP ESC C A R 0.74 0.38


M
P
E S 0.8 0.3
R
E
T 0.92 0.41
LWBP 626.75 631.43
WBP 2034.55 2051.36

16 SDP PAC C A R 2.23 1.91


M
P
E S 2.22 1.9
R
E
T 2.17 1.92
LWBP 522.36 524.64
WBP 1726.56 1739.02

17 SDP KIOS D A R 1.64 1.68


M
P
E S 1.55 1.6
R
E
T 1.66 1.7
LWBP 500.8 503.79
WBP 1130.1 1138.34

18 SDP PENERANGAN D A R 0.98 1.03


M
P
E S 0.8 1.09
R
E
T 0.92 0.87
LWBP 120.72 121.62
WBP 469.55 472.86

19 SDP LIFT A R 0.29 0.35


M
P
E S 0.41 0.24
R
E
T 0.66 0.39
LWBP 734.98 740.08
WBP 1412.15 1422.45

20 SDP PARKIR A R 1.89 1.9


M
P
E S 2.02 2.03
R
E
T 1.85 1.86
LWBP 44.49 44.71
WBP 193.46 194.67

21 SDP EMERGENCY A R 0.02 0.54


M
P
E S 0.14 0.44
R
E
T 0.13 0.51
LWBP 344.1 345.58
WBP 1605.99 1617.07

22 SDP R.M & E A R 1.15 1.14


M
P
E S 1.15 1.13
R
E
T 1.03 1.02

Dibuat Oleh, Diperiksa Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 01/01/2017 Date :
TER HARIAN

TANGGAL : 01/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.36 kwh

3.41 kwh

0.35 amp 4.77 kwh

0 amp

0 amp

0 kwh

0.01 kwh

0 amp 0.01 kwh

0 amp

0 amp

2.09 kwh

4.15 kwh

-0.01 amp 6.24 kwh

0 amp

-0.01 amp

1.34 kwh

7.45 kwh

0.06 amp 8.79 kwh

-0.02 amp

0.06 amp

1.45 kwh

3.33 kwh
1.88 kwh

-0.01 amp 3.33 kwh

-0.09 amp

0.1 amp

7.02 kwh

20.35 kwh

0.05 amp 27.37 kwh

0.06 amp

0.01 amp

2.09 kwh

8.18 kwh

0.03 amp 10.27 kwh

-0.03 amp

0.02 amp

3.18 kwh

5.01 kwh

0.14 amp 8.19 kwh

0.13 amp

0.23 amp

2.06 kwh

3.72 kwh

-0.28 amp 5.78 kwh

-0.26 amp

-0.25 amp

1.42 kwh

4.73 kwh

0.03 amp 6.15 kwh

0.14 amp

0.18 amp

4.5 kwh

13.53 kwh

-0.05 amp 18.03 kwh


18.03 kwh

-0.03 amp

-0.02 amp

8.37 kwh

19.45 kwh

0.05 amp 27.82 kwh

0.04 amp

-0.02 amp

1.64 kwh

6.58 kwh

-0.12 amp 8.22 kwh

-0.03 amp

0 amp

1.64 kwh

6.16 kwh

0 amp 7.8 kwh

0 amp

0.06 amp

1.05 kwh

2.74 kwh

-0.36 amp 3.79 kwh

-0.5 amp

-0.51 amp

4.68 kwh

16.81 kwh

-0.32 amp 21.49 kwh

-0.32 amp

-0.25 amp

2.28 kwh

12.46 kwh

0.04 amp 14.74 kwh

0.05 amp

0.04 amp
2.99 kwh

8.24 kwh

0.05 amp 11.23 kwh

0.29 amp

-0.05 amp

0.9 kwh

3.31 kwh

0.06 amp 4.21 kwh

-0.17 amp

-0.27 amp

5.1 kwh

10.3 kwh

0.01 amp 15.4 kwh

0.01 amp

0.01 amp

0.22 kwh

1.21 kwh

0.52 amp 1.43 kwh

0.3 amp

0.38 amp

1.48 kwh

11.08 kwh

-0.01 amp 12.56 kwh

-0.02 amp

-0.01 amp

Oleh, Diketahui Oleh,


INEERING SPV CHIEF ENGINEERING
Date :
DATA METER HARIAN

DIVISI : ENGINEERING DOKUMEN NO : 02

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 130.82 131.69
WBP 402.45 405.34

1 SDP POMPA A R 1.1 0.8


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.67 0.69

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 309.3 311.64
WBP 620.24 624.19

3 SDP PENERANGAN B A R 0.69 0.7


M
P
E S 0.76 0.77
R
E
T 0.76 0.77
LWBP 213.72 215.23
WBP 1047.47 1054.3

4 SDP KIOS B A R 1.09 1.08


M
P
E S 0.97 1.07
R
E
T 1.07 1.14
LWBP 180.03 181.16
WBP 457.95 461.51

5 SDP ESC B A R 0.67 0.91


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.69 0.94
R
E
T 0.87 1.07
LWBP 912.63 917.68
WBP 2739.37 2758.95

6 SDP PAC B A R 2.97 2.93


M
P
E S 2.96 2.92
R
E
T 2.87 2.86
LWBP 283.89 285.62
WBP 924.32 931.37

7 SDP KIOS A A R 1.02 1.06


M
P
E S 1.04 1.12
R
E
T 1.21 1.17
LWBP 411.22 413.24
WBP 727.85 732.4

8 SDP PENERANGAN A A R 1 1
M
P
E S 0.86 0.85
R
E
T 1.01 1
LWBP 209.95 210.99
WBP 530.12 533.44

9 SDP ESC A A R 0.64 0.76


M
P
E S 0.72 0.72
R
E
T 0.78 0.75
LWBP 229.34 231.13
WBP 575.58 580.29

10 SDP ESC D A R 0.83 0.73


M
P
E S 1.08 0.91
R
E
T 1.09 1.02
LWBP 620.13 624.53
WBP 1718.79 1730.56

11 SDP AC D A R 1.78 1.81


M
P
E S 1.95 1.96
R
E
T 1.96 1.98
LWBP 982.08 987.39
WBP 2623.1 2640.92

12 SDP PAC A
12 SDP PAC A A R 2.72 2.67
M
P
E S 2.73 2.68
R
E
T 2.75 2.69
LWBP 278.42 280.25
WBP 881.47 887.64

13 SDP KIOS C A R 0.91 1


M
P
E S 0.89 0.91
R
E
T 0.83 0.82
LWBP 297.07 298.7
WBP 822.74 827.82

14 SDP PENERANGAN C A R 0.73 0.89


M
P
E S 0.75 0.84
R
E
T 0.58 0.53
LWBP 130.03 130.83
WBP 335.43 337.7

15 SDP ESC C A R 0.38 0.67


M
P
E S 0.3 0.47
R
E
T 0.41 0.57
LWBP 631.43 636.14
WBP 2051.36 2066.9

16 SDP PAC C A R 1.91 2.25


M
P
E S 1.9 2.15
R
E
T 1.92 2.27
LWBP 524.64 527.56
WBP 1739.02 1751.08

17 SDP KIOS D A R 1.68 1.85


M
P
E S 1.6 1.82
R
E
T 1.7 1.74
LWBP 503.79 506.76
WBP 1138.34 1145.33

18 SDP PENERANGAN D A R 1.03 1.04


M
P
E S 1.09 1.15
R
E
T 0.87 0.99
LWBP 121.62 122.42

19 SDP LIFT
WBP 472.86 476.27

19 SDP LIFT A R 0.35 0.19


M
P
E S 0.24 0.08
R
E
T 0.39 0.3
LWBP 740.08 745.14
WBP 1422.45 1433.07

20 SDP PARKIR A R 1.9 1.89


M
P
E S 2.03 2.04
R
E
T 1.86 1.84
LWBP 44.71 45.03
WBP 194.67 195.88

21 SDP EMERGENCY A R 0.54 0.07


M
P
E S 0.44 0.19
R
E
T 0.51 0.17
LWBP 345.58 347.58
WBP 1617.07 1627.53

22 SDP R.M & E A R 1.14 1.12


M
P
E S 1.13 1.12
R
E
T 1.02 1.18

Dibuat Oleh, Diperiksa Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 02/01/2017 Date :
ER HARIAN

TANGGAL : 02/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.87 kwh

2.89 kwh

-0.3 amp 3.76 kwh

0 amp

0 amp

0 kwh

0.02 kwh

0 amp 0.02 kwh

0 amp

0 amp

2.34 kwh

3.95 kwh

0.01 amp 6.29 kwh

0.01 amp

0.01 amp

1.51 kwh

6.83 kwh

-0.01 amp 8.34 kwh

0.1 amp

0.07 amp

1.13 kwh

3.56 kwh

0.24 amp 4.69 kwh


4.69 kwh

0.25 amp

0.2 amp

5.05 kwh

19.58 kwh

-0.04 amp 24.63 kwh

-0.04 amp

-0.01 amp

1.73 kwh

7.05 kwh

0.04 amp 8.78 kwh

0.08 amp

-0.04 amp

2.02 kwh

4.55 kwh

0 amp 6.57 kwh

-0.01 amp

-0.01 amp

1.04 kwh

3.32 kwh

0.12 amp 4.36 kwh

0 amp

-0.03 amp

1.79 kwh

4.71 kwh

-0.1 amp 6.5 kwh

-0.17 amp

-0.07 amp

4.4 kwh

11.77 kwh

0.03 amp 16.17 kwh

0.01 amp

0.02 amp

5.31 kwh

17.82 kwh

23.13 kwh
-0.05 amp 23.13 kwh

-0.05 amp

-0.06 amp

1.83 kwh

6.17 kwh

0.09 amp 8 kwh

0.02 amp

-0.01 amp

1.63 kwh

5.08 kwh

0.16 amp 6.71 kwh

0.09 amp

-0.05 amp

0.8 kwh

2.27 kwh

0.29 amp 3.07 kwh

0.17 amp

0.16 amp

4.71 kwh

15.54 kwh

0.34 amp 20.25 kwh

0.25 amp

0.35 amp

2.92 kwh

12.06 kwh

0.17 amp 14.98 kwh

0.22 amp

0.04 amp

2.97 kwh

6.99 kwh

0.01 amp 9.96 kwh

0.06 amp

0.12 amp

0.8 kwh

4.21 kwh
3.41 kwh

-0.16 amp 4.21 kwh

-0.16 amp

-0.09 amp

5.06 kwh

10.62 kwh

-0.01 amp 15.68 kwh

0.01 amp

-0.02 amp

0.32 kwh

1.21 kwh

-0.47 amp 1.53 kwh

-0.25 amp

-0.34 amp

2 kwh

10.46 kwh

-0.02 amp 12.46 kwh

-0.01 amp

0.16 amp

Oleh, Diketahui Oleh,

NEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 03

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 131.69 132.27

WBP 405.34 407.75


A
1 SDP POMPA M R 0.8 0.82
P
S 0 0
E
R T 0 0
E
LWBP 0.17 0.17

WBP 0.69 0.68


A
2 PP HIDRANT M R 0 0
P
S 0 0
E
R T 0 0
E
LWBP 311.64 312.91

WBP 624.19 627.09


A
3 SDP PENERANGAN B M R 0.7 0.6
P
S 0.77 0.56
E
R T 0.77 0.65
E
LWBP 215.23 216.75

WBP 1054.3 1059.85


A
4 SDP KIOS B M R 1.08 1.05
P
S 1.07 0.98
E
R T 1.14 1.11
E
LWBP 181.16 182.53

WBP 461.51 464.06


A
5 SDP ESC B M R 0.91 0.79
P
E
R
E
A
5 SDP ESC B M
P
S 0.94 0.91
E
R T 1.07 1.02
E
LWBP 917.68 923.28

WBP 2758.95 2774.44


A
6 SDP PAC B M R 2.93 2.91
P
S 2.92 2.9
E
R T 2.86 2.87
E
LWBP 285.62 287.64

WBP 931.37 936.99


A
7 SDP KIOS A M R 1.06 1.02
P
S 1.12 1.13
E
R T 1.17 1.14
E
LWBP 413.24 415.72

WBP 732.4 735.88


A
8 SDP PENERANGAN A M R 1 0.68
P
S 0.85 0.62
E
R T 1 0.65
E
LWBP 210.99 212.25

WBP 533.44 535.96


A
9 SDP ESC A M R 0.76 0.79
P
S 0.72 0.82
E
R T 0.75 0.86
E
LWBP 231.13 232.83

WBP 580.29 583.91


A
10 SDP ESC D M R 0.73 0.65
P
S 0.91 0.96
E
R T 1.02 0.97
E
LWBP 624.53 628.52

WBP 1730.56 1739.8


A
11 SDP AC D M R 1.81 1.79
P
S 1.96 1.94
E
R T 1.98 1.95
E
LWBP 987.39 994.04

WBP 2640.92 2654.68

12 SDP PAC A
A
12 SDP PAC A M R 2.67 2.66
P
S 2.68 2.74
E
R T 2.69 2.74
E
LWBP 280.25 282.15

WBP 887.64 893.02


A
13 SDP KIOS C M R 1 0.96
P
S 0.91 0.9
E
R T 0.82 0.85
E
LWBP 298.7 300.32

WBP 827.82 832.24


A
14 SDP PENERANGAN C M R 0.89 0.72
P
S 0.84 0.71
E
R T 0.53 0.51
E
LWBP 130.83 131.66

WBP 337.7 339.58


A
15 SDP ESC C M R 0.67 0.36
P
S 0.47 0.29
E
R T 0.57 0.41
E
LWBP 636.14 640.65

WBP 2066.9 2078.88


A
16 SDP PAC C M R 2.25 2.2
P
S 2.15 2.11
E
R T 2.27 2.23
E
LWBP 527.56 531.31

WBP 1751.08 1761.74


A
17 SDP KIOS D M R 1.85 1.85
P
S 1.82 1.73
E
R T 1.74 1.75
E
LWBP 506.76 509.74

WBP 1145.33 1150.88


A
18 SDP PENERANGAN D M R 1.04 0.99
P
S 1.15 1
E
R T 0.99 0.87
E
LWBP 122.42 123.26

19 SDP LIFT
WBP 476.27 479.37
A
19 SDP LIFT M R 0.19 0.49
P
S 0.08 0.1
E
R T 0.3 0.35
E
LWBP 745.14 749.85

WBP 1433.07 1441.04


A
20 SDP PARKIR M R 1.89 1.35
P
S 2.04 1.36
E
R T 1.84 1.17
E
LWBP 45.03 45.28

WBP 195.88 196.91


A
21 SDP EMERGENCY M R 0.07 0.3
P
S 0.19 0.19
E
R T 0.17 0.13
E
LWBP 347.58 349.47

WBP 1627.53 1638.42


A
22 SDP R.M & E M R 1.12 1.18
P
S 1.12 1.2
E
R T 1.18 1.21
E

Dibuat Oleh, Diperiksa Oleh,

Dodi, Sabki, Anto


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 03/01/2017 Date :
TER HARIAN

TANGGAL : 03/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.58 kwh

2.41 kwh

0.02 amp 2.99 kwh

0 amp

0 amp

0 kwh

-0.01 kwh

0 amp -0.01 kwh

0 amp

0 amp

1.27 kwh

2.9 kwh

-0.1 amp 4.17 kwh

-0.21 amp

-0.12 amp

1.52 kwh

5.55 kwh

-0.03 amp 7.07 kwh

-0.09 amp

-0.03 amp

1.37 kwh

2.55 kwh

-0.12 amp 3.92 kwh


3.92 kwh

-0.03 amp

-0.05 amp

5.6 kwh

15.49 kwh

-0.02 amp 21.09 kwh

-0.02 amp

0.01 amp

2.02 kwh

5.62 kwh

-0.04 amp 7.64 kwh

0.01 amp

-0.03 amp

2.48 kwh

3.48 kwh

-0.32 amp 5.96 kwh

-0.23 amp

-0.35 amp

1.26 kwh

2.52 kwh

0.03 amp 3.78 kwh

0.1 amp

0.11 amp

1.7 kwh

3.62 kwh

-0.08 amp 5.32 kwh

0.05 amp

-0.05 amp

3.99 kwh

9.24 kwh

-0.02 amp 13.23 kwh

-0.02 amp

-0.03 amp

6.65 kwh

13.76 kwh

20.41 kwh
-0.01 amp 20.41 kwh

0.06 amp

0.05 amp

1.9 kwh

5.38 kwh

-0.04 amp 7.28 kwh

-0.01 amp

0.03 amp

1.62 kwh

4.42 kwh

-0.17 amp 6.04 kwh

-0.13 amp

-0.02 amp

0.83 kwh

1.88 kwh

-0.31 amp 2.71 kwh

-0.18 amp

-0.16 amp

4.51 kwh

11.98 kwh

-0.05 amp 16.49 kwh

-0.04 amp

-0.04 amp

3.75 kwh

10.66 kwh

0 amp 14.41 kwh

-0.09 amp

0.01 amp

2.98 kwh

5.55 kwh

-0.05 amp 8.53 kwh

-0.15 amp

-0.12 amp

0.84 kwh

3.94 kwh
3.1 kwh

0.3 amp 3.94 kwh

0.02 amp

0.05 amp

4.71 kwh

7.97 kwh

-0.54 amp 12.68 kwh

-0.68 amp

-0.67 amp

0.25 kwh

1.03 kwh

0.23 amp 1.28 kwh

0 amp

-0.04 amp

1.89 kwh

10.89 kwh

0.06 amp 12.78 kwh

0.08 amp

0.03 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 04

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 132.27 133.15
WBP 407.75 410.59

1 SDP POMPA A R 0.82 0.58


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.68 0.68

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 312.91 314.88
WBP 627.09 631.33

3 SDP PENERANGAN B A R 0.6 0.59


M
P
E S 0.56 0.55
R
E
T 0.65 0.64
LWBP 216.75 218.23
WBP 1059.85 1067.58

4 SDP KIOS B A R 1.05 1.02


M
P
E S 0.98 1.05
R
E
T 1.11 1.07
LWBP 182.53 183.91
WBP 464.06 467.81

5 SDP ESC B A R 0.79 0.87


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.91 0.89
R
E
T 1.02 0.91
LWBP 923.28 928.91
WBP 2774.44 2795.87

6 SDP PAC B A R 2.91 2.93


M
P
E S 2.9 2.92
R
E
T 2.87 2.9
LWBP 287.64 289.61
WBP 936.99 945.04

7 SDP KIOS A A R 1.02 1.04


M
P
E S 1.13 1.04
R
E
T 1.14 1.14
LWBP 415.72 418.28
WBP 735.88 740.63

8 SDP PENERANGAN A A R 0.68 0.03


M
P
E S 0.62 0.04
R
E
T 0.65 0.05
LWBP 212.25 213.57
WBP 535.96 539.55

9 SDP ESC A A R 0.79 0.76


M
P
E S 0.82 0.85
R
E
T 0.86 0.89
LWBP 232.83 234.48
WBP 583.91 587.67

10 SDP ESC D A R 0.65 0.71


M
P
E S 0.96 1.07
R
E
T 0.97 0.99
LWBP 628.52 632.54
WBP 1739.8 1750.59

11 SDP AC D A R 1.79 1.81


M
P
E S 1.94 1.98
R
E
T 1.95 1.97
LWBP 994.04 1000.86
WBP 2654.68 2674.8

12 SDP PAC A
12 SDP PAC A A R 2.66 2.66
M
P
E S 2.74 2.7
R
E
T 2.74 2.75
LWBP 282.15 284.01
WBP 893.02 898.46

13 SDP KIOS C A R 0.96 0.94


M
P
E S 0.9 0.89
R
E
T 0.85 0.85
LWBP 300.32 301.95
WBP 832.24 836.87

14 SDP PENERANGAN C A R 0.72 0.72


M
P
E S 0.71 0.73
R
E
T 0.51 0.51
LWBP 131.66 132.51
WBP 339.58 341.52

15 SDP ESC C A R 0.36 0.47


M
P
E S 0.29 0.62
R
E
T 0.41 0.64
LWBP 640.65 645.2
WBP 2078.88 2093.22

16 SDP PAC C A R 2.2 2.26


M
P
E S 2.11 2.16
R
E
T 2.23 2.38
LWBP 531.31 535.1
WBP 1761.74 1772.89

17 SDP KIOS D A R 1.85 1.81


M
P
E S 1.73 1.76
R
E
T 1.75 1.78
LWBP 509.74 512.72
WBP 1150.88 1157.25

18 SDP PENERANGAN D A R 0.99 0.99


M
P
E S 1 1.07
R
E
T 0.87 0.87
LWBP 123.26 124.11

19 SDP LIFT
WBP 479.37 482.45

19 SDP LIFT A R 0.49 0.43


M
P
E S 0.1 0.7
R
E
T 0.35 0.41
LWBP 749.85 756.94
WBP 1441.04 1453.27

20 SDP PARKIR A R 1.35 1.76


M
P
E S 1.36 2.05
R
E
T 1.17 1.89
LWBP 45.28 45.61
WBP 196.91 198.27

21 SDP EMERGENCY A R 0.3 0.41


M
P
E S 0.19 0.21
R
E
T 0.13 0.1
LWBP 349.47 352.4
WBP 1638.42 1649.69

22 SDP R.M & E A R 1.18 1.21


M
P
E S 1.2 1.12
R
E
T 1.21 1.15

Dibuat Oleh, Diperiksa Oleh,

Dodi, Sabki, Anto


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 04/01/2017 Date :
TER HARIAN

TANGGAL : 04/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.88 kwh

2.84 kwh

-0.24 amp 3.72 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

1.97 kwh

4.24 kwh

-0.01 amp 6.21 kwh

-0.01 amp

-0.01 amp

1.48 kwh

7.73 kwh

-0.03 amp 9.21 kwh

0.07 amp

-0.04 amp

1.38 kwh

3.75 kwh

0.08 amp 5.13 kwh


5.13 kwh

-0.02 amp

-0.11 amp

5.63 kwh

21.43 kwh

0.02 amp 27.06 kwh

0.02 amp

0.03 amp

1.97 kwh

8.05 kwh

0.02 amp 10.02 kwh

-0.09 amp

0 amp

2.56 kwh

4.75 kwh

-0.65 amp 7.31 kwh

-0.58 amp

-0.6 amp

1.32 kwh

3.59 kwh

-0.03 amp 4.91 kwh

0.03 amp

0.03 amp

1.65 kwh

3.76 kwh

0.06 amp 5.41 kwh

0.11 amp

0.02 amp

4.02 kwh

10.79 kwh

0.02 amp 14.81 kwh

0.04 amp

0.02 amp

6.82 kwh

20.12 kwh

26.94 kwh
0 amp 26.94 kwh

-0.04 amp

0.01 amp

1.86 kwh

5.44 kwh

-0.02 amp 7.3 kwh

-0.01 amp

0 amp

1.63 kwh

4.63 kwh

0 amp 6.26 kwh

0.02 amp

0 amp

0.85 kwh

1.94 kwh

0.11 amp 2.79 kwh

0.33 amp

0.23 amp

4.55 kwh

14.34 kwh

0.06 amp 18.89 kwh

0.05 amp

0.15 amp

3.79 kwh

11.15 kwh

-0.04 amp 14.94 kwh

0.03 amp

0.03 amp

2.98 kwh

6.37 kwh

0 amp 9.35 kwh

0.07 amp

0 amp

0.85 kwh

3.93 kwh
3.08 kwh

-0.06 amp 3.93 kwh

0.6 amp

0.06 amp

7.09 kwh

12.23 kwh

0.41 amp 19.32 kwh

0.69 amp

0.72 amp

0.33 kwh

1.36 kwh

0.11 amp 1.69 kwh

0.02 amp

-0.03 amp

2.93 kwh

11.27 kwh

0.03 amp 14.2 kwh

-0.08 amp

-0.06 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 05

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 133.15 134.27
WBP 410.59 413.47

1 SDP POMPA A R 0.58 0


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.68 0.68

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 314.88 317.57
WBP 631.33 635.87

3 SDP PENERANGAN B A R 0.59 0.7


M
P
E S 0.55 0.76
R
E
T 0.64 0.78
LWBP 218.23 219.76
WBP 1067.58 1074.38

4 SDP KIOS B A R 1.02 1.14


M
P
E S 1.05 0.97
R
E
T 1.07 1.1
LWBP 183.91 185.29
WBP 467.81 471.11

5 SDP ESC B A R 0.87 1.03


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.89 1.09
R
E
T 0.91 1.11
LWBP 928.91 934.54
WBP 2795.87 2814.7

6 SDP PAC B A R 2.93 2.91


M
P
E S 2.92 2.91
R
E
T 2.9 2.87
LWBP 289.61 291.62
WBP 945.04 951.91

7 SDP KIOS A A R 1.04 0.94


M
P
E S 1.04 0.99
R
E
T 1.14 1.12
LWBP 418.28 420.85
WBP 740.63 744.89

8 SDP PENERANGAN A A R 0.03 0.65


M
P
E S 0.04 0.6
R
E
T 0.05 0.64
LWBP 213.57 214.91
WBP 539.55 542.68

9 SDP ESC A A R 0.76 0.78


M
P
E S 0.85 0.81
R
E
T 0.89 0.88
LWBP 234.48 236.12
WBP 587.67 592.38

10 SDP ESC D A R 0.71 0.71


M
P
E S 1.07 0.01
R
E
T 0.99 0.96
LWBP 632.54 636.6
WBP 1750.59 1761.67

11 SDP AC D A R 1.81 1.8


M
P
E S 1.98 1.97
R
E
T 1.97 1.95
LWBP 1000.86 1007.69
WBP 2674.8 2691.56

12 SDP PAC A
12 SDP PAC A A R 2.66 2.67
M
P
E S 2.7 2.68
R
E
T 2.75 2.68
LWBP 284.01 238.89
WBP 898.46 1784.86

13 SDP KIOS C A R 0.94 1.82


M
P
E S 0.89 1.72
R
E
T 0.85 1.78
LWBP 301.95 303.51
WBP 836.87 841.93

14 SDP PENERANGAN C A R 0.72 0.72


M
P
E S 0.73 0.71
R
E
T 0.51 0.56
LWBP 132.51 133.31
WBP 341.52 343.86

15 SDP ESC C A R 0.47 0.62


M
P
E S 0.62 0.62
R
E
T 0.64 0.68
LWBP 645.2 649.74
WBP 2093.22 2108.99

16 SDP PAC C A R 2.26 2.23


M
P
E S 2.16 2.25
R
E
T 2.38 2.27
LWBP 535.1 538.84
WBP 1772.89 1784.86

17 SDP KIOS D A R 1.81 1.82


M
P
E S 1.76 1.72
R
E
T 1.78 1.78
LWBP 512.72 515.69
WBP 1157.25 1164.02

18 SDP PENERANGAN D A R 0.99 0.98


M
P
E S 1.07 1.05
R
E
T 0.87 0.88
LWBP 124.11 124.87

19 SDP LIFT
WBP 482.45 485.89

19 SDP LIFT A R 0.43 0.93


M
P
E S 0.7 0.42
R
E
T 0.41 0.68
LWBP 756.94 762.16
WBP 1453.27 1463.24

20 SDP PARKIR A R 1.76 1.88


M
P
E S 2.05 2.04
R
E
T 1.89 1.71
LWBP 45.61 45.9
WBP 198.27 199.18

21 SDP EMERGENCY A R 0.41 0.03


M
P
E S 0.21 0.14
R
E
T 0.1 0.15
LWBP 352.4 355.18
WBP 1649.69 1660.84

22 SDP R.M & E A R 1.21 1.16


M
P
E S 1.12 1.18
R
E
T 1.15 1.21

Dibuat Oleh, Diperiksa Oleh,

IMAM S & DENI S


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 05/01/2017 Date :
TER HARIAN

TANGGAL : 05/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.12 kwh

2.88 kwh

-0.58 amp 4 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.69 kwh

4.54 kwh

0.11 amp 7.23 kwh

0.21 amp

0.14 amp

1.53 kwh

6.8 kwh

0.12 amp 8.33 kwh

-0.08 amp

0.03 amp

1.38 kwh

3.3 kwh

0.16 amp 4.68 kwh


4.68 kwh

0.2 amp

0.2 amp

5.63 kwh

18.83 kwh

-0.02 amp 24.46 kwh

-0.01 amp

-0.03 amp

2.01 kwh

6.87 kwh

-0.1 amp 8.88 kwh

-0.05 amp

-0.02 amp

2.57 kwh

4.26 kwh

0.62 amp 6.83 kwh

0.56 amp

0.59 amp

1.34 kwh

3.13 kwh

0.02 amp 4.47 kwh

-0.04 amp

-0.01 amp

1.64 kwh

4.71 kwh

0 amp 6.35 kwh

-1.06 amp

-0.03 amp

4.06 kwh

11.08 kwh

-0.01 amp 15.14 kwh

-0.01 amp

-0.02 amp

6.83 kwh

16.76 kwh

23.59 kwh
0.01 amp 23.59 kwh

-0.02 amp

-0.07 amp

-45.12 kwh

886.4 kwh

0.88 amp 841.28 kwh

0.83 amp

0.93 amp

1.56 kwh

5.06 kwh

0 amp 6.62 kwh

-0.02 amp

0.05 amp

0.8 kwh

2.34 kwh

0.15 amp 3.14 kwh

0 amp

0.04 amp

4.54 kwh

15.77 kwh

-0.03 amp 20.31 kwh

0.09 amp

-0.11 amp

3.74 kwh

11.97 kwh

0.01 amp 15.71 kwh

-0.04 amp

0 amp

2.97 kwh

6.77 kwh

-0.01 amp 9.74 kwh

-0.02 amp

0.01 amp

0.76 kwh

4.2 kwh
3.44 kwh

0.5 amp 4.2 kwh

-0.28 amp

0.27 amp

5.22 kwh

9.97 kwh

0.12 amp 15.19 kwh

-0.01 amp

-0.18 amp

0.29 kwh

0.91 kwh

-0.38 amp 1.2 kwh

-0.07 amp

0.05 amp

2.78 kwh

11.15 kwh

-0.05 amp 13.93 kwh

0.06 amp

0.06 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 06

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 134.27 134.77
WBP 413.47 415.97

1 SDP POMPA A R 0 1.1


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.68 0.69

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 317.57 318.78
WBP 635.87 639.49

3 SDP PENERANGAN B A R 0.7 0.72


M
P
E S 0.76 0.76
R
E
T 0.78 0.78
LWBP 219.76 221.22
WBP 1074.38 1082.33

4 SDP KIOS B A R 1.14 1.1


M
P
E S 0.97 1.02
R
E
T 1.1 1.1
LWBP 185.29 186.66
WBP 471.11 475

5 SDP ESC B A R 1.03 1.05


M
P
E
R
E
5 SDP ESC B A
M
P
E S 1.09 0.91
R
E
T 1.11 0.9
LWBP 934.54 940.14
WBP 2814.7 2836.89

6 SDP PAC B A R 2.91 2.91


M
P
E S 2.91 2.92
R
E
T 2.87 2.86
LWBP 291.62 293.6
WBP 951.91 959.84

7 SDP KIOS A A R 0.94 1.06


M
P
E S 0.99 1.06
R
E
T 1.12 1.21
LWBP 420.85 423.42
WBP 744.89 749.66

8 SDP PENERANGAN A A R 0.65 0.65


M
P
E S 0.6 0.62
R
E
T 0.64 0.67
LWBP 214.91 216.22
WBP 542.68 546.29

9 SDP ESC A A R 0.78 0.71


M
P
E S 0.81 0.75
R
E
T 0.88 0.8
LWBP 236.12 238.11
WBP 592.38 596.59

10 SDP ESC D A R 0.71 0.63


M
P
E S 0.01 0.95
R
E
T 0.96 0.96
LWBP 636.6 640.63
WBP 1761.67 1773.89

11 SDP AC D A R 1.8 1.81


M
P
E S 1.97 1.97
R
E
T 1.95 1.97
LWBP 1007.69 1014.45
WBP 2691.56 2709.64

12 SDP PAC A
12 SDP PAC A A R 2.67 0
M
P
E S 2.68 0
R
E
T 2.68 0
LWBP 238.89 287.66
WBP 1784.86 910.97

13 SDP KIOS C A R 1.82 0.94


M
P
E S 1.72 0.9
R
E
T 1.78 0.82
LWBP 303.51 305.14
WBP 841.93 847.37

14 SDP PENERANGAN C A R 0.72 0.71


M
P
E S 0.71 0.74
R
E
T 0.56 0.51
LWBP 133.31 134.17
WBP 343.86 346.3

15 SDP ESC C A R 0.62 0.44


M
P
E S 0.62 0.35
R
E
T 0.68 0.42
LWBP 649.74 654.39
WBP 2108.99 2126.06

16 SDP PAC C A R 2.23 2.23


M
P
E S 2.25 2.24
R
E
T 2.27 2.23
LWBP 538.84 542.55
WBP 1784.86 1797.67

17 SDP KIOS D A R 1.82 1.73


M
P
E S 1.72 1.77
R
E
T 1.78 1.76
LWBP 515.69 518.66
WBP 1164.02 1171.23

18 SDP PENERANGAN D A R 0.98 1


M
P
E S 1.05 1.1
R
E
T 0.88 0.85
LWBP 124.87 125.89

19 SDP LIFT
WBP 485.89 489.29

19 SDP LIFT A R 0.93 0.33


M
P
E S 0.42 0.27
R
E
T 0.68 0.41
LWBP 762.16 764.94
WBP 1463.24 1472.41

20 SDP PARKIR A R 1.88 1.89


M
P
E S 2.04 2.05
R
E
T 1.71 1.88
LWBP 45.9 46.07
WBP 199.18 200.32

21 SDP EMERGENCY A R 0.03 0.04


M
P
E S 0.14 0.15
R
E
T 0.15 0.16
LWBP 355.18 356.56
WBP 1660.84 1672.18

22 SDP R.M & E A R 1.16 1.19


M
P
E S 1.18 1.25
R
E
T 1.21 1.2

Dibuat Oleh, Diperiksa Oleh,

IMAM S & JAE


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 06/01/2017 Date :
TER HARIAN

TANGGAL : 06/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.5 kwh

2.5 kwh

1.1 amp 3 kwh

0 amp

0 amp

0 kwh

0.01 kwh

0 amp 0.01 kwh

0 amp

0 amp

1.21 kwh

3.62 kwh

0.02 amp 4.83 kwh

0 amp

0 amp

1.46 kwh

7.95 kwh

-0.04 amp 9.41 kwh

0.05 amp

0 amp

1.37 kwh

3.89 kwh

0.02 amp 5.26 kwh


5.26 kwh

-0.18 amp

-0.21 amp

5.6 kwh

22.19 kwh

0 amp 27.79 kwh

0.01 amp

-0.01 amp

1.98 kwh

7.93 kwh

0.12 amp 9.91 kwh

0.07 amp

0.09 amp

2.57 kwh

4.77 kwh

0 amp 7.34 kwh

0.02 amp

0.03 amp

1.31 kwh

3.61 kwh

-0.07 amp 4.92 kwh

-0.06 amp

-0.08 amp

1.99 kwh

4.21 kwh

-0.08 amp 6.2 kwh

0.94 amp

0 amp

4.03 kwh

12.22 kwh

0.01 amp 16.25 kwh

0 amp

0.02 amp

6.76 kwh

18.08 kwh

24.84 kwh
-2.67 amp 24.84 kwh

-2.68 amp

-2.68 amp

48.77 kwh

-873.89 kwh

-0.88 amp -825.12 kwh

-0.82 amp

-0.96 amp

1.63 kwh

5.44 kwh

-0.01 amp 7.07 kwh

0.03 amp

-0.05 amp

0.86 kwh

2.44 kwh

-0.18 amp 3.3 kwh

-0.27 amp

-0.26 amp

4.65 kwh

17.07 kwh

0 amp 21.72 kwh

-0.01 amp

-0.04 amp

3.71 kwh

12.81 kwh

-0.09 amp 16.52 kwh

0.05 amp

-0.02 amp

2.97 kwh

7.21 kwh

0.02 amp 10.18 kwh

0.05 amp

-0.03 amp

1.02 kwh

4.42 kwh
3.4 kwh

-0.6 amp 4.42 kwh

-0.15 amp

-0.27 amp

2.78 kwh

9.17 kwh

0.01 amp 11.95 kwh

0.01 amp

0.17 amp

0.17 kwh

1.14 kwh

0.01 amp 1.31 kwh

0.01 amp

0.01 amp

1.38 kwh

11.34 kwh

0.03 amp 12.72 kwh

0.07 amp

-0.01 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 07

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 134.27 134.83
WBP 413.47 417.85

1 SDP POMPA A R 0 1.1


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.68 0.7

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 317.57 319.91
WBP 635.87 643.57

3 SDP PENERANGAN B A R 0.7 0.95


M
P
E S 0.76 0.76
R
E
T 0.78 0.99
LWBP 219.76 223.82
WBP 1074.38 1084.35

4 SDP KIOS B A R 1.14 1.18


M
P
E S 0.97 1.09
R
E
T 1.1 1.18
LWBP 185.29 187.86
WBP 471.11 479.75

5 SDP ESC B A R 1.03 1.51


M
P
E
R
E
5 SDP ESC B A
M
P
E S 1.09 0.99
R
E
T 1.11 0.98
LWBP 934.54 943.36
WBP 2814.7 2830.55

6 SDP PAC B A R 2.91 2.85


M
P
E S 2.91 2.87
R
E
T 2.87 2.87
LWBP 291.62 292.85
WBP 951.91 960.87

7 SDP KIOS A A R 0.94 0.06


M
P
E S 0.99 1.08
R
E
T 1.12 1.35
LWBP 420.85 424.62
WBP 744.89 750.85

8 SDP PENERANGAN A A R 0.65 0.85


M
P
E S 0.6 0.82
R
E
T 0.64 0.87
LWBP 214.91 218.84
WBP 542.68 551.51

9 SDP ESC A A R 0.78 0.91


M
P
E S 0.81 0.95
R
E
T 0.88 0.99
LWBP 236.12 240.93
WBP 592.38 599.95

10 SDP ESC D A R 0.71 0.63


M
P
E S 0.01 0.95
R
E
T 0.96 0.96
LWBP 636.6 641.53
WBP 1761.67 1774.36

11 SDP AC D A R 1.8 1.75


M
P
E S 1.97 1.77
R
E
T 1.95 1.75
LWBP 1007.69 1016.65
WBP 2691.56 2711.51

12 SDP PAC A
12 SDP PAC A A R 2.67 0.95
M
P
E S 2.68 0.94
R
E
T 2.68 0.95
LWBP 287.66 289.56
WBP 910.97 916.35

13 SDP KIOS C A R 0.94 0.94


M
P
E S 0.9 0.89
R
E
T 0.82 0.85
LWBP 305.14 306.76
WBP 847.37 851.79

14 SDP PENERANGAN C A R 0.71 0.54


M
P
E S 0.74 0.61
R
E
T 0.51 0.49
LWBP 134.17 135
WBP 346.3 348.18

15 SDP ESC C A R 0.44 0.75


M
P
E S 0.35 0.17
R
E
T 0.42 0.26
LWBP 654.39 658.9
WBP 2126.06 2138.04

16 SDP PAC C A R 2.23 2.18


M
P
E S 2.24 2.2
R
E
T 2.23 2.19
LWBP 542.55 546.3
WBP 1797.67 1808.33

17 SDP KIOS D A R 1.73 1.73


M
P
E S 1.77 1.68
R
E
T 1.76 1.77
LWBP 518.66 521.64
WBP 1171.23 1176.78

18 SDP PENERANGAN D A R 1 0.96


M
P
E S 1.1 0.95
R
E
T 0.85 0.73
LWBP 125.89 126.73

19 SDP LIFT
WBP 489.29 492.39

19 SDP LIFT A R 0.33 0.63


M
P
E S 0.27 0.29
R
E
T 0.41 0.46
LWBP 764.94 769.96
WBP 1472.41 1480.38

20 SDP PARKIR A R 1.89 1.35


M
P
E S 2.05 1.37
R
E
T 1.88 1.21
LWBP 46.07 46.32
WBP 200.32 201.35

21 SDP EMERGENCY A R 0.04 0.27


M
P
E S 0.15 0.15
R
E
T 0.16 0.12
LWBP 356.56 358.45
WBP 1672.18 1683.07

22 SDP R.M & E A R 1.19 1.25


M
P
E S 1.25 1.33
R
E
T 1.2 1.24

Dibuat Oleh, Diperiksa Oleh,

Boy,Patri
OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 07/01/2017 Date :
TER HARIAN

TANGGAL : 07/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.56 kwh

4.38 kwh

1.1 amp 4.94 kwh

0 amp

0 amp

0 kwh

0.02 kwh

0 amp 0.02 kwh

0 amp

0 amp

2.34 kwh

7.7 kwh

0.25 amp 10.04 kwh

0 amp

0.21 amp

4.06 kwh

9.97 kwh

0.04 amp 14.03 kwh

0.12 amp

0.08 amp

2.57 kwh

8.64 kwh

0.48 amp 11.21 kwh


11.21 kwh

-0.1 amp

-0.13 amp

8.82 kwh

15.85 kwh

-0.06 amp 24.67 kwh

-0.04 amp

0 amp

1.23 kwh

8.96 kwh

-0.88 amp 10.19 kwh

0.09 amp

0.23 amp

3.77 kwh

5.96 kwh

0.2 amp 9.73 kwh

0.22 amp

0.23 amp

3.93 kwh

8.83 kwh

0.13 amp 12.76 kwh

0.14 amp

0.11 amp

4.81 kwh

7.57 kwh

-0.08 amp 12.38 kwh

0.94 amp

0 amp

4.93 kwh

12.69 kwh

-0.05 amp 17.62 kwh

-0.2 amp

-0.2 amp

8.96 kwh

19.95 kwh

28.91 kwh
-1.72 amp 28.91 kwh

-1.74 amp

-1.73 amp

1.9 kwh

5.38 kwh

0 amp 7.28 kwh

-0.01 amp

0.03 amp

1.62 kwh

4.42 kwh

-0.17 amp 6.04 kwh

-0.13 amp

-0.02 amp

0.83 kwh

1.88 kwh

0.31 amp 2.71 kwh

-0.18 amp

-0.16 amp

4.51 kwh

11.98 kwh

-0.05 amp 16.49 kwh

-0.04 amp

-0.04 amp

3.75 kwh

10.66 kwh

0 amp 14.41 kwh

-0.09 amp

0.01 amp

2.98 kwh

5.55 kwh

-0.04 amp 8.53 kwh

-0.15 amp

-0.12 amp

0.84 kwh

3.94 kwh
3.1 kwh

0.3 amp 3.94 kwh

0.02 amp

0.05 amp

5.02 kwh

7.97 kwh

-0.54 amp 12.99 kwh

-0.68 amp

-0.67 amp

0.25 kwh

1.03 kwh

0.23 amp 1.28 kwh

0 amp

-0.04 amp

1.89 kwh

10.89 kwh

0.06 amp 12.78 kwh

0.08 amp

0.04 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO : 08

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 134.83 136.52
WBP 417.85 421.31

1 SDP POMPA A R 1.1 0.89


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.7 0.69

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 319.91 323.29
WBP 643.57 648.06

3 SDP PENERANGAN B A R 0.95 0.71


M
P
E S 0.76 0.76
R
E
T 0.99 0.76
LWBP 223.82 224.3
WBP 1084.35 1098.61

4 SDP KIOS B A R 1.18 1.13


M
P
E S 1.09 1.1
R
E
T 1.18 1.07
LWBP 187.86 189.84
WBP 479.75 482.59

5 SDP ESC B A R 1.51 0.96


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.99 0.9
R
E
T 0.98 1.08
LWBP 943.36 953.13
WBP 2830.55 2880.13

6 SDP PAC B A R 2.85 2.96


M
P
E S 2.87 2.98
R
E
T 2.87 2.91
LWBP 292.85 298.09
WBP 960.87 975.99

7 SDP KIOS A A R 0.06 0.91


M
P
E S 1.08 1.1
R
E
T 1.35 1.11
LWBP 424.62 429.3
WBP 750.85 759.18

8 SDP PENERANGAN A A R 0.85 1.03


M
P
E S 0.82 0.89
R
E
T 0.87 1.03
LWBP 218.84 219.23
WBP 551.51 553.15

9 SDP ESC A A R 0.91 0.72


M
P
E S 0.95 0.8
R
E
T 0.99 0.79
LWBP 240.93 241.17
WBP 599.95 604.15

10 SDP ESC D A R 0.63 0.74


M
P
E S 0.95 1
R
E
T 0.96 1.04
LWBP 641.53 648.86
WBP 1774.36 1793.37

11 SDP AC D A R 1.75 1.73


M
P
E S 1.77 1.89
R
E
T 1.75 1.91
LWBP 1016.65 1029.6
WBP 2711.51 2747.64

12 SDP PAC A
12 SDP PAC A A R 0.95 2.68
M
P
E S 0.94 2.7
R
E
T 0.95 2.78
LWBP 289.56 291.39
WBP 916.35 921.44

13 SDP KIOS C A R 0.94 0.97


M
P
E S 0.89 0.92
R
E
T 0.85 0.77
LWBP 306.76 308.43
WBP 851.79 857.33

14 SDP PENERANGAN C A R 0.54 0.78


M
P
E S 0.61 0.73
R
E
T 0.49 0.52
LWBP 135 135.85
WBP 348.18 350.4

15 SDP ESC C A R 0.75 0.53


M
P
E S 0.17 0.4
R
E
T 0.26 0.48
LWBP 658.9 663.77
WBP 2138.04 2151.6

16 SDP PAC C A R 2.18 2.32


M
P
E S 2.2 2.34
R
E
T 2.19 2.32
LWBP 546.3 549.38
WBP 1808.33 1818.21

17 SDP KIOS D A R 1.73 1.8


M
P
E S 1.68 1.78
R
E
T 1.77 1.73
LWBP 521.64 524.66
WBP 1176.78 1184.03

18 SDP PENERANGAN D A R 0.96 1.02


M
P
E S 0.95 1.08
R
E
T 0.73 0.86
LWBP 126.73 127.42

19 SDP LIFT
WBP 492.39 495.47

19 SDP LIFT A R 0.63 0.5


M
P
E S 0.29 0.46
R
E
T 0.46 0.45
LWBP 769.96 776.52
WBP 1480.38 1493.79

20 SDP PARKIR A R 1.35 1.89


M
P
E S 1.37 2.05
R
E
T 1.21 1.82
LWBP 46.32 46.74
WBP 201.35 202.87

21 SDP EMERGENCY A R 0.27 0.05


M
P
E S 0.15 0.13
R
E
T 0.12 0.18
LWBP 358.45 366.41
WBP 1683.07 1693.47

22 SDP R.M & E A R 1.25 1.14


M
P
E S 1.33 1.21
R
E
T 1.24 1

Dibuat Oleh, Diperiksa Oleh,

Boy Jae & Patri


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 08/01/2017 Date :
TER HARIAN

TANGGAL : 08/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.69 kwh

3.46 kwh

-0.21 amp 5.15 kwh

0 amp

0 amp

0 kwh

-0.01 kwh

0 amp -0.01 kwh

0 amp

0 amp

3.38 kwh

4.49 kwh

-0.24 amp 7.87 kwh

0 amp

-0.23 amp

0.48 kwh

14.26 kwh

-0.05 amp 14.74 kwh

0.01 amp

-0.11 amp

1.98 kwh

2.84 kwh

-0.55 amp 4.82 kwh


4.82 kwh

-0.09 amp

0.1 amp

9.77 kwh

49.58 kwh

0.11 amp 59.35 kwh

0.11 amp

0.04 amp

5.24 kwh

15.12 kwh

0.85 amp 20.36 kwh

0.02 amp

-0.24 amp

4.68 kwh

8.33 kwh

0.18 amp 13.01 kwh

0.07 amp

0.16 amp

0.39 kwh

1.64 kwh

-0.19 amp 2.03 kwh

-0.15 amp

-0.2 amp

0.24 kwh

4.2 kwh

0.11 amp 4.44 kwh

0.05 amp

0.08 amp

7.33 kwh

19.01 kwh

-0.02 amp 26.34 kwh

0.12 amp

0.16 amp

12.95 kwh

36.13 kwh

49.08 kwh
1.73 amp 49.08 kwh

1.76 amp

1.83 amp

1.83 kwh

5.09 kwh

0.03 amp 6.92 kwh

0.03 amp

-0.08 amp

1.67 kwh

5.54 kwh

0.24 amp 7.21 kwh

0.12 amp

0.03 amp

0.85 kwh

2.22 kwh

-0.22 amp 3.07 kwh

0.23 amp

0.22 amp

4.87 kwh

13.56 kwh

0.14 amp 18.43 kwh

0.14 amp

0.13 amp

3.08 kwh

9.88 kwh

0.07 amp 12.96 kwh

0.1 amp

-0.04 amp

3.02 kwh

7.25 kwh

0.06 amp 10.27 kwh

0.13 amp

0.13 amp

0.69 kwh

3.77 kwh
3.08 kwh

-0.13 amp 3.77 kwh

0.17 amp

-0.01 amp

6.56 kwh

13.41 kwh

0.54 amp 19.97 kwh

0.68 amp

0.61 amp

0.42 kwh

1.52 kwh

-0.22 amp 1.94 kwh

-0.02 amp

0.06 amp

7.96 kwh

10.4 kwh

-0.11 amp 18.36 kwh

-0.12 amp

-0.24 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 09

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 136.52 137.85
WBP 421.31 424.31

1 SDP POMPA A R 0.89 1.07


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.69 0.7

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 323.29 325.12
WBP 648.06 652.04

3 SDP PENERANGAN B A R 0.71 0.71


M
P
E S 0.76 0.76
R
E
T 0.76 0.76
LWBP 224.3 225.83
WBP 1098.61 1105.56

4 SDP KIOS B A R 1.13 1.05


M
P
E S 1.1 1.05
R
E
T 1.07 1.08
LWBP 189.84 190.97
WBP 482.59 485.9

5 SDP ESC B A R 0.96 0.79


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.9 0.92
R
E
T 1.08 1.01
LWBP 953.13 958.5
WBP 2880.13 2899.3

6 SDP PAC B A R 2.96 2.82


M
P
E S 2.98 2.8
R
E
T 2.91 2.74
LWBP 298.09 299.94
WBP 975.99 983.04

7 SDP KIOS A A R 0.91 0.96


M
P
E S 1.1 1.03
R
E
T 1.11 1.05
LWBP 429.3 431.81
WBP 759.18 763.64

8 SDP PENERANGAN A A R 1.03 1


M
P
E S 0.89 0.83
R
E
T 1.03 1
LWBP 219.23 220.47
WBP 553.15 556.34

9 SDP ESC A A R 0.72 0.8


M
P
E S 0.8 0.84
R
E
T 0.79 0.91
LWBP 241.17 242.96
WBP 604.15 609.29

10 SDP ESC D A R 0.74 0.73


M
P
E S 1 1.05
R
E
T 1.04 1
LWBP 648.86 653.2
WBP 1793.37 1806.66

11 SDP AC D A R 1.73 1.9


M
P
E S 1.89 1.87
R
E
T 1.91 1.87
LWBP 1029.6 1036
WBP 2747.64 2764.53

12 SDP PAC A
12 SDP PAC A A R 2.68 2.5
M
P
E S 2.7 2.55
R
E
T 2.78 2.53
LWBP 291.39 293.33
WBP 921.44 928.44

13 SDP KIOS C A R 0.97 0.94


M
P
E S 0.92 0.88
R
E
T 0.77 0.78
LWBP 308.43 310.07
WBP 857.33 863.54

14 SDP PENERANGAN C A R 0.78 0.95


M
P
E S 0.73 0.81
R
E
T 0.52 0.58
LWBP 135.85 136.7
WBP 350.4 353.07

15 SDP ESC C A R 0.53 0.68


M
P
E S 0.4 0.57
R
E
T 0.48 0.63
LWBP 663.77 668.74
WBP 2151.6 2170

16 SDP PAC C A R 2.32 2.29


M
P
E S 2.34 2.18
R
E
T 2.32 2.31
LWBP 549.38 552.31
WBP 1818.21 1831.52

17 SDP KIOS D A R 1.8 1.79


M
P
E S 1.78 1.68
R
E
T 1.73 1.79
LWBP 524.66 527.72
WBP 1184.03 1192.35

18 SDP PENERANGAN D A R 1.02 1.07


M
P
E S 1.08 1.17
R
E
T 0.86 1.07
LWBP 127.42 128.3

19 SDP LIFT
WBP 495.47 499.26

19 SDP LIFT A R 0.5 0.18


M
P
E S 0.46 0.27
R
E
T 0.45 0.3
LWBP 776.52 780.84
WBP 1493.79 1504.15

20 SDP PARKIR A R 1.89 1.89


M
P
E S 2.05 2.03
R
E
T 1.82 1.84
LWBP 46.74 47.15
WBP 202.87 204.18

21 SDP EMERGENCY A R 0.05 0.23


M
P
E S 0.13 0.39
R
E
T 0.18 0.36
LWBP 366.41 364.64
WBP 1693.47 1705.83

22 SDP R.M & E A R 1.14 1.16


M
P
E S 1.21 1.15
R
E
T 1 1.21

Dibuat Oleh, Diperiksa Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 09/01/2017 Date :
TER HARIAN

TANGGAL : 09/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.33 kwh

3 kwh

0.18 amp 4.33 kwh

0 amp

0 amp

0 kwh

0.01 kwh

0 amp 0.01 kwh

0 amp

0 amp

1.83 kwh

3.98 kwh

0 amp 5.81 kwh

0 amp

0 amp

1.53 kwh

6.95 kwh

-0.08 amp 8.48 kwh

-0.05 amp

0.01 amp

1.13 kwh

3.31 kwh

-0.17 amp 4.44 kwh


4.44 kwh

0.02 amp

-0.07 amp

5.37 kwh

19.17 kwh

-0.14 amp 24.54 kwh

-0.18 amp

-0.17 amp

1.85 kwh

7.05 kwh

0.05 amp 8.9 kwh

-0.07 amp

-0.06 amp

2.51 kwh

4.46 kwh

-0.03 amp 6.97 kwh

-0.06 amp

-0.03 amp

1.24 kwh

3.19 kwh

0.08 amp 4.43 kwh

0.04 amp

0.12 amp

1.79 kwh

5.14 kwh

-0.01 amp 6.93 kwh

0.05 amp

-0.04 amp

4.34 kwh

13.29 kwh

0.17 amp 17.63 kwh

-0.02 amp

-0.04 amp

6.4 kwh

16.89 kwh

23.29 kwh
-0.18 amp 23.29 kwh

-0.15 amp

-0.25 amp

1.94 kwh

7 kwh

-0.03 amp 8.94 kwh

-0.04 amp

0.01 amp

1.64 kwh

6.21 kwh

0.17 amp 7.85 kwh

0.08 amp

0.06 amp

0.85 kwh

2.67 kwh

0.15 amp 3.52 kwh

0.17 amp

0.15 amp

4.97 kwh

18.4 kwh

-0.03 amp 23.37 kwh

-0.16 amp

-0.01 amp

2.93 kwh

13.31 kwh

-0.01 amp 16.24 kwh

-0.1 amp

0.06 amp

3.06 kwh

8.32 kwh

0.05 amp 11.38 kwh

0.09 amp

0.21 amp

0.88 kwh

4.67 kwh
3.79 kwh

-0.32 amp 4.67 kwh

-0.19 amp

-0.15 amp

4.32 kwh

10.36 kwh

0 amp 14.68 kwh

-0.02 amp

0.02 amp

0.41 kwh

1.31 kwh

0.18 amp 1.72 kwh

0.26 amp

0.18 amp

-1.77 kwh Kesalahan pencatatan kemarin


12.36 kwh

0.02 amp 10.59 kwh

-0.06 amp

0.21 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
lahan pencatatan kemarin
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 10

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 137.85 138.45
WBP 424.31 426.83

1 SDP POMPA A R 1.07 1.5


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.7 0.7

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 325.12 326.72
WBP 652.04 655.98

3 SDP PENERANGAN B A R 0.71 0.72


M
P
E S 0.76 0.77
R
E
T 0.76 0.75
LWBP 225.83 227.23
WBP 1105.56 1112.28

4 SDP KIOS B A R 1.05 1.11


M
P
E S 1.05 1.07
R
E
T 1.08 1.1
LWBP 190.97 192.06
WBP 485.9 489.33

5 SDP ESC B A R 0.79 0.78


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.92 0.76
R
E
T 1.01 0.92
LWBP 958.5 963.35
WBP 2899.3 2918.27

6 SDP PAC B A R 2.82 2.85


M
P
E S 2.8 2.92
R
E
T 2.74 2.83
LWBP 299.94 301.55
WBP 983.04 989.82

7 SDP KIOS A A R 0.96 0.9


M
P
E S 1.03 0.94
R
E
T 1.05 1.01
LWBP 431.81 433.8
WBP 763.64 768.09

8 SDP PENERANGAN A A R 1 1.05


M
P
E S 0.83 0.82
R
E
T 1 1
LWBP 220.47 221.5
WBP 556.34 559.64

9 SDP ESC A A R 0.8 0.74


M
P
E S 0.84 0.88
R
E
T 0.91 0.83
LWBP 242.96 244.48
WBP 609.29 613.21

10 SDP ESC D A R 0.73 0.73


M
P
E S 1.05 1.02
R
E
T 1 1.03
LWBP 653.2 656.93
WBP 1806.66 1816.41

11 SDP AC D A R 1.9 1.71


M
P
E S 1.87 1.87
R
E
T 1.87 1.87
LWBP 1036 1040.86
WBP 2764.53 2781.37

12 SDP PAC A
12 SDP PAC A A R 2.5 2.49
M
P
E S 2.55 2.51
R
E
T 2.53 2.5
LWBP 293.33 295.06
WBP 928.44 934.1

13 SDP KIOS C A R 0.94 0.98


M
P
E S 0.88 0.91
R
E
T 0.78 0.83
LWBP 310.07 311.7
WBP 863.54 868.37

14 SDP PENERANGAN C A R 0.95 0.96


M
P
E S 0.81 0.81
R
E
T 0.58 0.53
LWBP 136.7 137.46
WBP 353.07 355.18

15 SDP ESC C A R 0.68 0.61


M
P
E S 0.57 0.51
R
E
T 0.63 0.53
LWBP 668.74 673.16
WBP 2170 2184.74

16 SDP PAC C A R 2.29 2.26


M
P
E S 2.18 2.26
R
E
T 2.31 2.27
LWBP 552.31 555.8
WBP 1831.52 1842.69

17 SDP KIOS D A R 1.79 1.88


M
P
E S 1.68 1.78
R
E
T 1.79 1.81
LWBP 527.72 530
WBP 1192.35 1198.85

18 SDP PENERANGAN D A R 1.07 1.05


M
P
E S 1.17 1.17
R
E
T 1.07 1
LWBP 128.3 129.1

19 SDP LIFT
WBP 499.26 502.58

19 SDP LIFT A R 0.18 0.26


M
P
E S 0.27 0.16
R
E
T 0.3 0.38
LWBP 780.84 785.19
WBP 1504.15 1514.15

20 SDP PARKIR A R 1.89 1.89


M
P
E S 2.03 2.04
R
E
T 1.84 1.83
LWBP 47.15 47.41
WBP 204.18 205.32

21 SDP EMERGENCY A R 0.23 0.45


M
P
E S 0.39 0.4
R
E
T 0.36 0.66
LWBP 364.64 366.59
WBP 1705.83 1717.11

22 SDP R.M & E A R 1.16 1.19


M
P
E S 1.15 1.25
R
E
T 1.21 1.27

Dibuat Oleh, Diperiksa Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 10/01/2017 Date :
TER HARIAN

TANGGAL : 10/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.6 kwh

2.52 kwh

0.43 amp 3.12 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

1.6 kwh

3.94 kwh

0.01 amp 5.54 kwh

0.01 amp

-0.01 amp

1.4 kwh

6.72 kwh

0.06 amp 8.12 kwh

0.02 amp

0.02 amp

1.09 kwh

3.43 kwh

-0.01 amp 4.52 kwh


4.52 kwh

-0.16 amp

-0.09 amp

4.85 kwh

18.97 kwh

0.03 amp 23.82 kwh

0.12 amp

0.09 amp

1.61 kwh

6.78 kwh

-0.06 amp 8.39 kwh

-0.09 amp

-0.04 amp

1.99 kwh

4.45 kwh

0.05 amp 6.44 kwh

-0.01 amp

0 amp

1.03 kwh

3.3 kwh

-0.06 amp 4.33 kwh

0.04 amp

-0.08 amp

1.52 kwh

3.92 kwh

0 amp 5.44 kwh

-0.03 amp

0.03 amp

3.73 kwh

9.75 kwh

-0.19 amp 13.48 kwh

0 amp

0 amp

4.86 kwh

16.84 kwh

21.7 kwh
-0.01 amp 21.7 kwh

-0.04 amp

-0.03 amp

1.73 kwh

5.66 kwh

0.04 amp 7.39 kwh

0.03 amp

0.05 amp

1.63 kwh

4.83 kwh

0.01 amp 6.46 kwh

0 amp

-0.05 amp

0.76 kwh

2.11 kwh

-0.07 amp 2.87 kwh

-0.06 amp

-0.1 amp

4.42 kwh

14.74 kwh

-0.03 amp 19.16 kwh

0.08 amp

-0.04 amp

3.49 kwh

11.17 kwh

0.09 amp 14.66 kwh

0.1 amp

0.02 amp

2.28 kwh

6.5 kwh

-0.02 amp 8.78 kwh

0 amp

-0.07 amp

0.8 kwh

4.12 kwh
3.32 kwh

0.08 amp 4.12 kwh

-0.11 amp

0.08 amp

4.35 kwh

10 kwh

0 amp 14.35 kwh

0.01 amp

-0.01 amp

0.26 kwh

1.14 kwh

0.22 amp 1.4 kwh

0.01 amp

0.3 amp

1.95 kwh

11.28 kwh

0.03 amp 13.23 kwh

0.1 amp

0.06 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 11

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 138.45 139.08
WBP 426.83 429.5

1 SDP POMPA A R 1.5 0.96


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.7 0.71

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 326.72 328.66
WBP 655.98 659.59

3 SDP PENERANGAN B A R 0.72 0.71


M
P
E S 0.77 0.77
R
E
T 0.75 0.77
LWBP 227.23 228.71
WBP 1112.28 1118.8

4 SDP KIOS B A R 1.11 1.01


M
P
E S 1.07 1.01
R
E
T 1.1 1.02
LWBP 192.06 193.45
WBP 489.33 492.26

5 SDP ESC B A R 0.78 0.71


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.76 0.65
R
E
T 0.92 0.85
LWBP 963.35 968.85
WBP 2918.27 2936.45

6 SDP PAC B A R 2.85 2.89


M
P
E S 2.92 2.91
R
E
T 2.83 2.85
LWBP 301.55 303.44
WBP 989.82 996.8

7 SDP KIOS A A R 0.9 0.86


M
P
E S 0.94 1.03
R
E
T 1.01 1.04
LWBP 433.8 436.31
WBP 768.09 772.53

8 SDP PENERANGAN A A R 1.05 1


M
P
E S 0.82 0.78
R
E
T 1 0.97
LWBP 221.5 222.83
WBP 559.64 562.98

9 SDP ESC A A R 0.74 0.73


M
P
E S 0.88 0.83
R
E
T 0.83 0.87
LWBP 244.48 246.17
WBP 613.21 616.51

10 SDP ESC D A R 0.73 0.71


M
P
E S 1.02 1
R
E
T 1.03 0.96
LWBP 656.93 660.76
WBP 1816.41 1825.22

11 SDP AC D A R 1.71 1.71


M
P
E S 1.87 1.87
R
E
T 1.87 1.87
LWBP 1040.86 1047.17
WBP 2781.37 2798.29

12 SDP PAC A
12 SDP PAC A A R 2.49 2.63
M
P
E S 2.51 2.66
R
E
T 2.5 2.64
LWBP 295.06 296.92
WBP 934.1 939.23

13 SDP KIOS C A R 0.98 0.98


M
P
E S 0.91 0.87
R
E
T 0.83 0.83
LWBP 311.7 313.35
WBP 868.37 872.76

14 SDP PENERANGAN C A R 0.96 0.77


M
P
E S 0.81 0.7
R
E
T 0.53 0.51
LWBP 137.46 138.36
WBP 355.18 357.21

15 SDP ESC C A R 0.61 0.65


M
P
E S 0.51 0.51
R
E
T 0.53 0.6
LWBP 673.16 677.78
WBP 2184.74 2198.03

16 SDP PAC C A R 2.26 2.23


M
P
E S 2.26 2.15
R
E
T 2.27 2.27
LWBP 555.8 559.5
WBP 1842.69 1852.82

17 SDP KIOS D A R 1.88 1.75


M
P
E S 1.78 1.7
R
E
T 1.81 1.74
LWBP 530 533.65
WBP 1198.85 1204.82

18 SDP PENERANGAN D A R 1.05 1.01


M
P
E S 1.17 1.07
R
E
T 1 0.88
LWBP 129.1 129.95

19 SDP LIFT
WBP 502.58 505.56

19 SDP LIFT A R 0.26 0.51


M
P
E S 0.16 0.54
R
E
T 0.38 0.54
LWBP 785.19 790
WBP 1514.15 1522.62

20 SDP PARKIR A R 1.89 1.35


M
P
E S 2.04 1.35
R
E
T 1.83 1.14
LWBP 47.41 47.74
WBP 205.32 207.11

21 SDP EMERGENCY A R 0.45 0.3


M
P
E S 0.4 0.42
R
E
T 0.66 0.38
LWBP 366.59 368.59
WBP 1717.11 1727.86

22 SDP R.M & E A R 1.19 1.22


M
P
E S 1.25 1.11
R
E
T 1.27 1.18

Dibuat Oleh, Diperiksa Oleh,

Dodi & Anto


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 11/01/2017 Date :
TER HARIAN

TANGGAL : 11/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.63 kwh

2.67 kwh

-0.54 amp 3.3 kwh

0 amp

0 amp

0 kwh

0.01 kwh

0 amp 0.01 kwh

0 amp

0 amp

1.94 kwh

3.61 kwh

-0.01 amp 5.55 kwh

0 amp

0.02 amp

1.48 kwh

6.52 kwh

-0.1 amp 8 kwh

-0.06 amp

-0.08 amp

1.39 kwh

2.93 kwh

-0.07 amp 4.32 kwh


4.32 kwh

-0.11 amp

-0.07 amp

5.5 kwh

18.18 kwh

0.04 amp 23.68 kwh

-0.01 amp

0.02 amp

1.89 kwh

6.98 kwh

-0.04 amp 8.87 kwh

0.09 amp

0.03 amp

2.51 kwh

4.44 kwh

-0.05 amp 6.95 kwh

-0.04 amp

-0.03 amp

1.33 kwh

3.34 kwh

-0.01 amp 4.67 kwh

-0.05 amp

0.04 amp

1.69 kwh

3.3 kwh

-0.02 amp 4.99 kwh

-0.02 amp

-0.07 amp

3.83 kwh

8.81 kwh

0 amp 12.64 kwh

0 amp

0 amp

6.31 kwh

16.92 kwh

23.23 kwh
0.14 amp 23.23 kwh

0.15 amp

0.14 amp

1.86 kwh

5.13 kwh

0 amp 6.99 kwh

-0.04 amp

0 amp

1.65 kwh

4.39 kwh

-0.19 amp 6.04 kwh

-0.11 amp

-0.02 amp

0.9 kwh

2.03 kwh

0.04 amp 2.93 kwh

0 amp

0.07 amp

4.62 kwh

13.29 kwh

-0.03 amp 17.91 kwh

-0.11 amp

0 amp

3.7 kwh

10.13 kwh

-0.13 amp 13.83 kwh

-0.08 amp

-0.07 amp

3.65 kwh

5.97 kwh

-0.04 amp 9.62 kwh

-0.1 amp

-0.12 amp

0.85 kwh

3.83 kwh
2.98 kwh

0.25 amp 3.83 kwh

0.38 amp

0.16 amp

4.81 kwh

8.47 kwh

-0.54 amp 13.28 kwh

-0.69 amp

-0.69 amp

0.33 kwh

1.79 kwh

-0.15 amp 2.12 kwh

0.02 amp

-0.28 amp

2 kwh

10.75 kwh

0.03 amp 12.75 kwh

-0.14 amp

-0.09 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 12

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 139.08 139.87
WBP 429.5 432.06

1 SDP POMPA A R 0.96 0.93


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.71 0.71

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 328.66 330.66
WBP 659.59 663.56

3 SDP PENERANGAN B A R 0.71 0.71


M
P
E S 0.77 0.78
R
E
T 0.77 0.79
LWBP 228.71 230.17
WBP 1118.8 1125.96

4 SDP KIOS B A R 1.01 0.98


M
P
E S 1.01 0.98
R
E
T 1.02 1.06
LWBP 193.45 194.73
WBP 492.26 495.6

5 SDP ESC B A R 0.71 0.85


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.65 0.83
R
E
T 0.85 1.1
LWBP 968.85 974.5
WBP 2936.45 2956.7

6 SDP PAC B A R 2.89 2.91


M
P
E S 2.91 2.91
R
E
T 2.85 2.83
LWBP 303.44 305.35
WBP 996.8 1003.66

7 SDP KIOS A A R 0.86 1


M
P
E S 1.03 1.01
R
E
T 1.04 1.12
LWBP 436.31 438.81
WBP 772.53 776.72

8 SDP PENERANGAN A A R 1 0.84


M
P
E S 0.78 0.71
R
E
T 0.97 0.82
LWBP 222.83 224.19
WBP 562.98 566.12

9 SDP ESC A A R 0.73 0.71


M
P
E S 0.83 0.85
R
E
T 0.87 0.92
LWBP 246.17 247.8
WBP 616.51 620.46

10 SDP ESC D A R 0.71 0.67


M
P
E S 1 0.92
R
E
T 0.96 0.94
LWBP 660.76 664.59
WBP 1825.22 1835.27

11 SDP AC D A R 1.71 1.57


M
P
E S 1.87 1.71
R
E
T 1.87 1.72
LWBP 1047.17 1053.93
WBP 2798.29 2815.27

12 SDP PAC A
12 SDP PAC A A R 2.63 2.63
M
P
E S 2.66 2.67
R
E
T 2.64 2.62
LWBP 296.92 298.78
WBP 939.23 945.11

13 SDP KIOS C A R 0.98 0.98


M
P
E S 0.87 0.91
R
E
T 0.83 0.81
LWBP 313.35 314.98
WBP 872.76 877.74

14 SDP PENERANGAN C A R 0.77 0.77


M
P
E S 0.7 0.71
R
E
T 0.51 0.51
LWBP 138.36 139.27
WBP 357.21 359.46

15 SDP ESC C A R 0.65 0.6


M
P
E S 0.51 0.46
R
E
T 0.6 0.46
LWBP 677.78 682.37
WBP 2198.03 2213.11

16 SDP PAC C A R 2.23 2.25


M
P
E S 2.15 2.17
R
E
T 2.27 2.27
LWBP 559.5 563.18
WBP 1852.82 1864.08

17 SDP KIOS D A R 1.75 1.55


M
P
E S 1.7 1.58
R
E
T 1.74 1.58
LWBP 533.65 536.69
WBP 1204.82 1211.61

18 SDP PENERANGAN D A R 1.01 1


M
P
E S 1.07 1.1
R
E
T 0.88 0.88
LWBP 129.95 130.8

19 SDP LIFT
WBP 505.56 508.86

19 SDP LIFT A R 0.51 0.21


M
P
E S 0.54 0.07
R
E
T 0.54 0.36
LWBP 790 795.03
WBP 1522.62 1533.54

20 SDP PARKIR A R 1.35 1.51


M
P
E S 1.35 1.58
R
E
T 1.14 1.25
LWBP 47.74 48.14
WBP 207.11 208.87

21 SDP EMERGENCY A R 0.3 0.42


M
P
E S 0.42 0.19
R
E
T 0.38 0.21
LWBP 368.59 371.06
WBP 1727.86 1738.98

22 SDP R.M & E A R 1.22 1.15


M
P
E S 1.11 1.05
R
E
T 1.18 1.18

Dibuat Oleh, Diperiksa Oleh,

Dodi & Anto


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 12/01/2017 Date :
TER HARIAN

TANGGAL : 12/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.79 kwh

2.56 kwh

-0.03 amp 3.35 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2 kwh

3.97 kwh

0 amp 5.97 kwh

0.01 amp

0.02 amp

1.46 kwh

7.16 kwh

-0.03 amp 8.62 kwh

-0.03 amp

0.04 amp

1.28 kwh

3.34 kwh

0.14 amp 4.62 kwh


4.62 kwh

0.18 amp

0.25 amp

5.65 kwh

20.25 kwh

0.02 amp 25.9 kwh

0 amp

-0.02 amp

1.91 kwh

6.86 kwh

0.14 amp 8.77 kwh

-0.02 amp

0.08 amp

2.5 kwh

4.19 kwh

-0.16 amp 6.69 kwh

-0.07 amp

-0.15 amp

1.36 kwh

3.14 kwh

-0.02 amp 4.5 kwh

0.02 amp

0.05 amp

1.63 kwh

3.95 kwh

-0.04 amp 5.58 kwh

-0.08 amp

-0.02 amp

3.83 kwh

10.05 kwh

-0.14 amp 13.88 kwh

-0.16 amp

-0.15 amp

6.76 kwh

16.98 kwh

23.74 kwh
0 amp 23.74 kwh

0.01 amp

-0.02 amp

1.86 kwh

5.88 kwh

0 amp 7.74 kwh

0.04 amp

-0.02 amp

1.63 kwh

4.98 kwh

0 amp 6.61 kwh

0.01 amp

0 amp

0.91 kwh

2.25 kwh

-0.05 amp 3.16 kwh

-0.05 amp

-0.14 amp

4.59 kwh

15.08 kwh

0.02 amp 19.67 kwh

0.02 amp

0 amp

3.68 kwh

11.26 kwh

-0.2 amp 14.94 kwh

-0.12 amp

-0.16 amp

3.04 kwh

6.79 kwh

-0.01 amp 9.83 kwh

0.03 amp

0 amp

0.85 kwh

4.15 kwh
3.3 kwh

-0.3 amp 4.15 kwh

-0.47 amp

-0.18 amp

5.03 kwh

10.92 kwh

0.16 amp 15.95 kwh

0.23 amp

0.11 amp

0.4 kwh

1.76 kwh

0.12 amp 2.16 kwh

-0.23 amp

-0.17 amp

2.47 kwh

11.12 kwh

-0.07 amp 13.59 kwh

-0.06 amp

0 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 13

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 139.87 140.99
WBP 432.06 434.78

1 SDP POMPA A R 0.93 0.72


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.71 0.71

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 330.66 333.22
WBP 663.56 667.87

3 SDP PENERANGAN B A R 0.71 0.71


M
P
E S 0.78 0.79
R
E
T 0.79 0.8
LWBP 230.17 231.61
WBP 1125.96 1134.41

4 SDP KIOS B A R 0.98 1.14


M
P
E S 0.98 1.09
R
E
T 1.06 1.1
LWBP 194.73 195.97
WBP 495.6 499.29

5 SDP ESC B A R 0.85 0.92


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.83 0.89
R
E
T 1.1 0.96
LWBP 974.5 981.02
WBP 2956.7 2979.3

6 SDP PAC B A R 2.91 2.98


M
P
E S 2.91 2.96
R
E
T 2.83 2.87
LWBP 305.35 307.65
WBP 1003.66 1011.78

7 SDP KIOS A A R 1 0.93


M
P
E S 1.01 0.99
R
E
T 1.12 1.09
LWBP 438.81 442.11
WBP 776.72 781.72

8 SDP PENERANGAN A A R 0.84 0.98


M
P
E S 0.71 0.79
R
E
T 0.82 0.99
LWBP 224.19 225.9
WBP 566.12 569.67

9 SDP ESC A A R 0.71 0.79


M
P
E S 0.85 0.71
R
E
T 0.92 0.78
LWBP 247.8 249.58
WBP 620.46 625.26

10 SDP ESC D A R 0.67 0.67


M
P
E S 0.92 1.04
R
E
T 0.94 1.01
LWBP 664.59 668.89
WBP 1835.27 1847.45

11 SDP AC D A R 1.57 1.64


M
P
E S 1.71 1.85
R
E
T 1.72 1.87
LWBP 1053.93 1062.72
WBP 2815.27 2833.73

12 SDP PAC A
12 SDP PAC A A R 2.63 2.66
M
P
E S 2.67 2.73
R
E
T 2.62 2.71
LWBP 298.78 301.75
WBP 945.11 951.92

13 SDP KIOS C A R 0.98 0.95


M
P
E S 0.91 0.83
R
E
T 0.81 0.73
LWBP 314.98 316.75
WBP 877.74 884.22

14 SDP PENERANGAN C A R 0.77 0.95


M
P
E S 0.71 0.81
R
E
T 0.51 0.57
LWBP 139.27 140.67
WBP 359.46 362.13

15 SDP ESC C A R 0.6 0.68


M
P
E S 0.46 0.58
R
E
T 0.46 0.67
LWBP 682.37 689.76
WBP 2213.11 2230.83

16 SDP PAC C A R 2.25 2.1


M
P
E S 2.17 2.06
R
E
T 2.27 2.09
LWBP 563.18 569.04
WBP 1864.08 1877.31

17 SDP KIOS D A R 1.55 1.67


M
P
E S 1.58 1.58
R
E
T 1.58 1.6
LWBP 536.69 540.06
WBP 1211.61 1219.59

18 SDP PENERANGAN D A R 1 1.12


M
P
E S 1.1 1.18
R
E
T 0.88 1.09
LWBP 130.8 131.77

19 SDP LIFT
WBP 508.86 512.6

19 SDP LIFT A R 0.21 0.61


M
P
E S 0.07 0.35
R
E
T 0.36 0.67
LWBP 795.03 801.2
WBP 1533.54 1544.58

20 SDP PARKIR A R 1.51 1.84


M
P
E S 1.58 1.98
R
E
T 1.25 1.74
LWBP 48.14 48.64
WBP 208.87 210.86

21 SDP EMERGENCY A R 0.42 0.07


M
P
E S 0.19 0.18
R
E
T 0.21 0.21
LWBP 371.06 373.64
WBP 1738.98 1750.75

22 SDP R.M & E A R 1.15 1.21


M
P
E S 1.05 1.08
R
E
T 1.18 1.2

Dibuat Oleh, Diperiksa Oleh,

Anton&imam.Deni
OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 13/01/2017 Date :
TER HARIAN

TANGGAL : 13/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.12 kwh

2.72 kwh

-0.21 amp 3.84 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.56 kwh

4.31 kwh

0 amp 6.87 kwh

0.01 amp

0.01 amp

1.44 kwh

8.45 kwh

0.16 amp 9.89 kwh

0.11 amp

0.04 amp

1.24 kwh

3.69 kwh

0.07 amp 4.93 kwh


4.93 kwh

0.06 amp

-0.14 amp

6.52 kwh

22.6 kwh

0.07 amp 29.12 kwh

0.05 amp

0.04 amp

2.3 kwh

8.12 kwh

-0.07 amp 10.42 kwh

-0.02 amp

-0.03 amp

3.3 kwh

5 kwh

0.14 amp 8.3 kwh

0.08 amp

0.17 amp

1.71 kwh

3.55 kwh

0.08 amp 5.26 kwh

-0.14 amp

-0.14 amp

1.78 kwh

4.8 kwh

0 amp 6.58 kwh

0.12 amp

0.07 amp

4.3 kwh

12.18 kwh

0.07 amp 16.48 kwh

0.14 amp

0.15 amp

8.79 kwh

18.46 kwh

27.25 kwh
0.03 amp 27.25 kwh

0.06 amp

0.09 amp

2.97 kwh

6.81 kwh

-0.03 amp 9.78 kwh

-0.08 amp

-0.08 amp

1.77 kwh

6.48 kwh

0.18 amp 8.25 kwh

0.1 amp

0.06 amp

1.4 kwh

2.67 kwh

0.08 amp 4.07 kwh

0.12 amp

0.21 amp

7.39 kwh

17.72 kwh

-0.15 amp 25.11 kwh

-0.11 amp

-0.18 amp

5.86 kwh

13.23 kwh

0.12 amp 19.09 kwh

0 amp

0.02 amp

3.37 kwh

7.98 kwh

0.12 amp 11.35 kwh

0.08 amp

0.21 amp

0.97 kwh

4.71 kwh
3.74 kwh

0.4 amp 4.71 kwh

0.28 amp

0.31 amp

6.17 kwh

11.04 kwh

0.33 amp 17.21 kwh

0.4 amp

0.49 amp

0.5 kwh

1.99 kwh

-0.35 amp 2.49 kwh

-0.01 amp

0 amp

2.58 kwh

11.77 kwh

0.06 amp 14.35 kwh

0.03 amp

0.02 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 14

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 140.99 140.99
WBP 434.78 434.78

1 SDP POMPA A R 0.72 0.72


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.71 0.71

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 333.22 333.22
WBP 667.87 667.87

3 SDP PENERANGAN B A R 0.71 0.71


M
P
E S 0.79 0.79
R
E
T 0.8 0.8
LWBP 231.61 231.61
WBP 1134.41 1134.41

4 SDP KIOS B A R 1.14 1.14


M
P
E S 1.09 1.09
R
E
T 1.1 1.1
LWBP 195.97 195.97
WBP 499.29 499.29

5 SDP ESC B A R 0.92 0.92


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.89 0.89
R
E
T 0.96 0.96
LWBP 981.02 981.02
WBP 2979.3 2979.3

6 SDP PAC B A R 2.98 2.98


M
P
E S 2.96 2.96
R
E
T 2.87 2.87
LWBP 307.65 307.65
WBP 1011.78 1011.78

7 SDP KIOS A A R 0.93 0.93


M
P
E S 0.99 0.99
R
E
T 1.09 1.09
LWBP 442.11 442.11
WBP 781.72 781.72

8 SDP PENERANGAN A A R 0.98 0.98


M
P
E S 0.79 0.79
R
E
T 0.99 0.99
LWBP 225.9 225.9
WBP 569.67 569.67

9 SDP ESC A A R 0.79 0.79


M
P
E S 0.71 0.71
R
E
T 0.78 0.78
LWBP 249.58 251.05
WBP 625.26 628.42

10 SDP ESC D A R 0.67 0.68


M
P
E S 1.04 1.07
R
E
T 1.01 1.05
LWBP 668.89 672.18
WBP 1847.45 1854.98

11 SDP AC D A R 1.64 1.69


M
P
E S 1.85 1.85
R
E
T 1.87 1.87
LWBP 1062.72 1062.72
WBP 2833.73 2833.73

12 SDP PAC A
12 SDP PAC A A R 2.66 2.66
M
P
E S 2.73 2.73
R
E
T 2.71 2.71
LWBP 301.75 302.54
WBP 951.92 956.23

13 SDP KIOS C A R 0.95 1.01


M
P
E S 0.83 0.87
R
E
T 0.73 0.77
LWBP 316.75 318.27
WBP 884.22 887.73

14 SDP PENERANGAN C A R 0.95 0.78


M
P
E S 0.81 0.73
R
E
T 0.57 0.54
LWBP 140.67 141.1
WBP 362.13 364.03

15 SDP ESC C A R 0.68 0.57


M
P
E S 0.58 0.55
R
E
T 0.67 0.71
LWBP 689.76 691.4
WBP 2230.83 2241.67

16 SDP PAC C A R 2.1 2.21


M
P
E S 2.06 2.22
R
E
T 2.09 2.33
LWBP 569.04 570.59
WBP 1877.31 1885.77

17 SDP KIOS D A R 1.67 1.62


M
P
E S 1.58 1.57
R
E
T 1.6 1.6
LWBP 540.06 542.77
WBP 1219.59 1225.07

18 SDP PENERANGAN D A R 1.12 10.1


M
P
E S 1.18 1.1
R
E
T 1.09 0.87
LWBP 131.77 132.51

19 SDP LIFT
WBP 512.6 515.45

19 SDP LIFT A R 0.61 0.36


M
P
E S 0.35 0.35
R
E
T 0.67 0.32
LWBP 801.2 801.2
WBP 1544.58 1544.58

20 SDP PARKIR A R 1.84 1.84


M
P
E S 1.98 1.98
R
E
T 1.74 1.74
LWBP 48.64 49.12
WBP 210.86 212.66

21 SDP EMERGENCY A R 0.07 0.03


M
P
E S 0.18 0.19
R
E
T 0.21 0.17
LWBP 373.64 376.43
WBP 1750.75 1761.92

22 SDP R.M & E A R 1.21 1.18


M
P
E S 1.08 1.16
R
E
T 1.2 1.24

Dibuat Oleh, Diperiksa Oleh,

Anton.Deni
OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 14/01/2017 Date :
TER HARIAN

TANGGAL : 14/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh
0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

1.47 kwh

3.16 kwh

0.01 amp 4.63 kwh

0.03 amp

0.04 amp

3.29 kwh

7.53 kwh

0.05 amp 10.82 kwh

0 amp

0 amp

0 kwh

0 kwh

0 kwh
0 amp 0 kwh

0 amp

0 amp

0.79 kwh

4.31 kwh

0.06 amp 5.1 kwh

0.04 amp

0.04 amp

1.52 kwh

3.51 kwh

-0.17 amp 5.03 kwh

-0.08 amp

-0.03 amp

0.43 kwh

1.9 kwh

-0.11 amp 2.33 kwh

-0.03 amp

0.04 amp

1.64 kwh

10.84 kwh

0.11 amp 12.48 kwh

0.16 amp

0.24 amp

1.55 kwh

8.46 kwh

-0.05 amp 10.01 kwh

-0.01 amp

0 amp

2.71 kwh

5.48 kwh

8.98 amp 8.19 kwh

-0.08 amp

-0.22 amp

0.74 kwh

3.59 kwh
2.85 kwh

-0.25 amp 3.59 kwh

0 amp

-0.35 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0.48 kwh

1.8 kwh

-0.04 amp 2.28 kwh

0.01 amp

-0.04 amp

2.79 kwh

11.17 kwh

-0.03 amp 13.96 kwh

0.08 amp

0.04 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO : 15

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 140.99 142.43
WBP 434.78 440.18

1 SDP POMPA A R 0.72 0.94


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.71 0.72

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 333.22 336.73
WBP 667.87 675.61

3 SDP PENERANGAN B A R 0.71 0.62


M
P
E S 0.79 0.55
R
E
T 0.8 0.64
LWBP 231.61 234.75
WBP 1134.41 1149.41

4 SDP KIOS B A R 1.14 1.06


M
P
E S 1.09 1.1
R
E
T 1.1 1.05
LWBP 195.97 199.42
WBP 499.29 506.35

5 SDP ESC B A R 0.92 0.78


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.89 0.77
R
E
T 0.96 0.88
LWBP 981.02 994.05
WBP 2979.3 3019.97

6 SDP PAC B A R 2.98 3.01


M
P
E S 2.96 3.03
R
E
T 2.87 2.92
LWBP 307.65 311.27
WBP 1011.78 1025.3

7 SDP KIOS A A R 0.93 0.98


M
P
E S 0.99 1.05
R
E
T 1.09 1.17
LWBP 442.11 446.44
WBP 781.72 790

8 SDP PENERANGAN A A R 0.98 0.68


M
P
E S 0.79 0.64
R
E
T 0.99 0.66
LWBP 225.9 228.16
WBP 569.67 575.82

9 SDP ESC A A R 0.79 0.66


M
P
E S 0.71 0.73
R
E
T 0.78 0.81
LWBP 251.05 252.82
WBP 628.42 633.24

10 SDP ESC D A R 0.68 0.74


M
P
E S 1.07 1.1
R
E
T 1.05 1.12
LWBP 672.18 676.35
WBP 1854.98 1866.2

11 SDP AC D A R 1.69 1.69


M
P
E S 1.85 1.86
R
E
T 1.87 1.88
LWBP 1062.72 1074.3
WBP 2833.73 2866.94

12 SDP PAC A
12 SDP PAC A A R 2.66 2.69
M
P
E S 2.73 2.76
R
E
T 2.71 2.81
LWBP 302.54 304.39
WBP 956.23 962.16

13 SDP KIOS C A R 1.01 0.92


M
P
E S 0.87 0.84
R
E
T 0.77 0.75
LWBP 318.27 319.92
WBP 887.73 893.4

14 SDP PENERANGAN C A R 0.78 0.77


M
P
E S 0.73 0.73
R
E
T 0.54 0.51
LWBP 141.1 142.04
WBP 364.03 366.58

15 SDP ESC C A R 0.57 0.66


M
P
E S 0.55 0.58
R
E
T 0.71 0.68
LWBP 691.4 696
WBP 2241.67 2256.67

16 SDP PAC C A R 2.21 2.17


M
P
E S 2.22 2.15
R
E
T 2.33 2.18
LWBP 570.59 573.73
WBP 1885.77 1897.28

17 SDP KIOS D A R 1.62 1.68


M
P
E S 1.57 1.6
R
E
T 1.6 1.59
LWBP 542.77 545.82
WBP 1225.07 1232.48

18 SDP PENERANGAN D A R 10.1 1.07


M
P
E S 1.1 1.12
R
E
T 0.87 0.87
LWBP 132.51 133.41

19 SDP LIFT
WBP 515.45 519.29

19 SDP LIFT A R 0.36 0.27


M
P
E S 0.35 0.25
R
E
T 0.32 0.41
LWBP 801.2 812.45
WBP 1544.58 1568.62

20 SDP PARKIR A R 1.84 1.9


M
P
E S 1.98 2.05
R
E
T 1.74 1.67
LWBP 49.12 49.58
WBP 212.66 214.47

21 SDP EMERGENCY A R 0.03 0.21


M
P
E S 0.19 0.19
R
E
T 0.17 0.38
LWBP 376.43 379.13
WBP 1761.92 1773.53

22 SDP R.M & E A R 1.18 1.16


M
P
E S 1.16 1.13
R
E
T 1.24 1.03

Dibuat Oleh, Diperiksa Oleh,

Jae Patri & Deni


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 15/01/2017 Date :
TER HARIAN

TANGGAL : 15/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.44 kwh

5.4 kwh

0.22 amp 6.84 kwh

0 amp

0 amp

0 kwh

0.01 kwh

0 amp 0.01 kwh

0 amp

0 amp

3.51 kwh

7.74 kwh

-0.09 amp 11.25 kwh

-0.24 amp

-0.16 amp

3.14 kwh

15 kwh

-0.08 amp 18.14 kwh

0.01 amp

-0.05 amp

3.45 kwh

7.06 kwh

-0.14 amp 10.51 kwh


10.51 kwh

-0.12 amp

-0.08 amp

13.03 kwh

40.67 kwh

0.03 amp 53.7 kwh

0.07 amp

0.05 amp

3.62 kwh

13.52 kwh

0.05 amp 17.14 kwh

0.06 amp

0.08 amp

4.33 kwh

8.28 kwh

-0.3 amp 12.61 kwh

-0.15 amp

-0.33 amp

2.26 kwh

6.15 kwh

-0.13 amp 8.41 kwh

0.02 amp

0.03 amp

1.77 kwh

4.82 kwh

0.06 amp 6.59 kwh

0.03 amp

0.07 amp

4.17 kwh

11.22 kwh

0 amp 15.39 kwh

0.01 amp

0.01 amp

11.58 kwh

33.21 kwh

44.79 kwh
0.03 amp 44.79 kwh

0.03 amp

0.1 amp

1.85 kwh

5.93 kwh

-0.09 amp 7.78 kwh

-0.03 amp

-0.02 amp

1.65 kwh

5.67 kwh

-0.01 amp 7.32 kwh

0 amp

-0.03 amp

0.94 kwh

2.55 kwh

0.09 amp 3.49 kwh

0.03 amp

-0.03 amp

4.6 kwh

15 kwh

-0.04 amp 19.6 kwh

-0.07 amp

-0.15 amp

3.14 kwh

11.51 kwh

0.06 amp 14.65 kwh

0.03 amp

-0.01 amp

3.05 kwh

7.41 kwh

-9.03 amp 10.46 kwh

0.02 amp

0 amp

0.9 kwh

4.74 kwh
3.84 kwh

-0.09 amp 4.74 kwh

-0.1 amp

0.09 amp

11.25 kwh

24.04 kwh

0.06 amp 35.29 kwh

0.07 amp

-0.07 amp

0.46 kwh

1.81 kwh

0.18 amp 2.27 kwh

0 amp

0.21 amp

2.7 kwh

11.61 kwh

-0.02 amp 14.31 kwh

-0.03 amp

-0.21 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 16

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 142.43 143.3
WBP 440.18 442.64

1 SDP POMPA A R 0.94 1.38


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.72 0.72

2 PP HIDRANT A R 0 0.04
M
P
E S 0 0.06
R
E
T 0 0.02
LWBP 336.73 338.74
WBP 675.61 679.68

3 SDP PENERANGAN B A R 0.62 0.65


M
P
E S 0.55 0.63
R
E
T 0.64 0.69
LWBP 234.75 236.1
WBP 1149.41 1154.67

4 SDP KIOS B A R 1.06 1.01


M
P
E S 1.1 1.01
R
E
T 1.05 1.08
LWBP 199.42 200.18
WBP 506.35 508.8

5 SDP ESC B A R 0.78 0.67


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.77 0.65
R
E
T 0.88 0.85
LWBP 994.05 998.01
WBP 3019.97 3037.43

6 SDP PAC B A R 3.01 2.94


M
P
E S 3.03 2.96
R
E
T 2.92 2.87
LWBP 311.27 314.39
WBP 1025.3 1033.84

7 SDP KIOS A A R 0.98 0.88


M
P
E S 1.05 0.85
R
E
T 1.17 0.94
LWBP 446.44 450.66
WBP 790 795.29

8 SDP PENERANGAN A A R 0.68 0.99


M
P
E S 0.64 0.82
R
E
T 0.66 1.02
LWBP 228.16 230.41
WBP 575.82 579.94

9 SDP ESC A A R 0.66 0.74


M
P
E S 0.73 0.88
R
E
T 0.81 0.99
LWBP 252.82 254.48
WBP 633.24 637.89

10 SDP ESC D A R 0.74 0.66


M
P
E S 1.1 0.82
R
E
T 1.12 0.78
LWBP 676.35 680.52
WBP 1866.2 1878.33

11 SDP AC D A R 1.69 1.66


M
P
E S 1.86 1.82
R
E
T 1.88 1.84
LWBP 1074.3 1085.47
WBP 2866.94 2887.03

12 SDP PAC A
12 SDP PAC A A R 2.69 2.67
M
P
E S 2.76 2.73
R
E
T 2.81 2.7
LWBP 304.39 306.18
WBP 962.16 968.62

13 SDP KIOS C A R 0.92 1


M
P
E S 0.84 0.91
R
E
T 0.75 0.82
LWBP 319.92 321.56
WBP 893.4 899.02

14 SDP PENERANGAN C A R 0.77 0.94


M
P
E S 0.73 0.82
R
E
T 0.51 0.52
LWBP 142.04 142.9
WBP 366.58 369.3

15 SDP ESC C A R 0.66 0.76


M
P
E S 0.58 0.68
R
E
T 0.68 0.71
LWBP 696 700.54
WBP 2256.67 2273.26

16 SDP PAC C A R 2.17 2.27


M
P
E S 2.15 2.18
R
E
T 2.18 2.31
LWBP 573.73 576.5
WBP 1897.28 1909.64

17 SDP KIOS D A R 1.68 1.76


M
P
E S 1.6 1.69
R
E
T 1.59 1.67
LWBP 545.82 548.85
WBP 1232.48 1240.52

18 SDP PENERANGAN D A R 1.07 1.08


M
P
E S 1.12 1.18
R
E
T 0.87 0.99
LWBP 133.41 134.3

19 SDP LIFT
WBP 519.29 523.2

19 SDP LIFT A R 0.27 0.33


M
P
E S 0.25 0.22
R
E
T 0.41 0.22
LWBP 812.45 816.28
WBP 1568.62 1580.92

20 SDP PARKIR A R 1.9 1.74


M
P
E S 2.05 2.04
R
E
T 1.67 1.75
LWBP 49.58 49.95
WBP 214.47 216.21

21 SDP EMERGENCY A R 0.21 0.21


M
P
E S 0.19 0.19
R
E
T 0.38 0.19
LWBP 379.13 381.28
WBP 1773.53 1785.05

22 SDP R.M & E A R 1.16 1.21


M
P
E S 1.13 1.18
R
E
T 1.03 1.21

Dibuat Oleh, Diperiksa Oleh,

Jae , Patri & Deni


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 16/01/2017 Date :
TER HARIAN

TANGGAL : 16/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.87 kwh

2.46 kwh

0.44 amp 3.33 kwh

0 amp

0 amp

0 kwh

0 kwh

0.04 amp 0 kwh

0.06 amp

0.02 amp

2.01 kwh

4.07 kwh

0.03 amp 6.08 kwh

0.08 amp

0.05 amp

1.35 kwh

5.26 kwh

-0.05 amp 6.61 kwh

-0.09 amp

0.03 amp

0.76 kwh

2.45 kwh

-0.11 amp 3.21 kwh


3.21 kwh

-0.12 amp

-0.03 amp

3.96 kwh

17.46 kwh

-0.07 amp 21.42 kwh

-0.07 amp

-0.05 amp

3.12 kwh

8.54 kwh

-0.1 amp 11.66 kwh

-0.2 amp

-0.23 amp

4.22 kwh

5.29 kwh

0.31 amp 9.51 kwh

0.18 amp

0.36 amp

2.25 kwh

4.12 kwh

0.08 amp 6.37 kwh

0.15 amp

0.18 amp

1.66 kwh

4.65 kwh

-0.08 amp 6.31 kwh

-0.28 amp

-0.34 amp

4.17 kwh

12.13 kwh

-0.03 amp 16.3 kwh

-0.04 amp

-0.04 amp

11.17 kwh

20.09 kwh

31.26 kwh
-0.02 amp 31.26 kwh

-0.03 amp

-0.11 amp

1.79 kwh

6.46 kwh

0.08 amp 8.25 kwh

0.07 amp

0.07 amp

1.64 kwh

5.62 kwh

0.17 amp 7.26 kwh

0.09 amp

0.01 amp

0.86 kwh

2.72 kwh

0.1 amp 3.58 kwh

0.1 amp

0.03 amp

4.54 kwh

16.59 kwh

0.1 amp 21.13 kwh

0.03 amp

0.13 amp

2.77 kwh

12.36 kwh

0.08 amp 15.13 kwh

0.09 amp

0.08 amp

3.03 kwh

8.04 kwh

0.01 amp 11.07 kwh

0.06 amp

0.12 amp

0.89 kwh

4.8 kwh
3.91 kwh

0.06 amp 4.8 kwh

-0.03 amp

-0.19 amp

3.83 kwh

12.3 kwh

-0.16 amp 16.13 kwh

-0.01 amp

0.08 amp

0.37 kwh

1.74 kwh

0 amp 2.11 kwh

0 amp

-0.19 amp

2.15 kwh

11.52 kwh

0.05 amp 13.67 kwh

0.05 amp

0.18 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 17

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 143.3 144.39
WBP 442.64 445.88

1 SDP POMPA A R 1.38 1.26


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.72 0.73

2 PP HIDRANT A R 0.04 0
M
P
E S 0.06 0
R
E
T 0.02 0
LWBP 338.74 341.26
WBP 679.68 684.12

3 SDP PENERANGAN B A R 0.65 0.72


M
P
E S 0.63 0.77
R
E
T 0.69 0.8
LWBP 236.1 237.5
WBP 1154.67 1162.91

4 SDP KIOS B A R 1.01 1.04


M
P
E S 1.01 1.01
R
E
T 1.08 1.04
LWBP 200.18 201.53
WBP 508.8 511.87

5 SDP ESC B A R 0.67 0.95


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.65 0.9
R
E
T 0.85 0.96
LWBP 998.01 1004.47
WBP 3037.43 3060.04

6 SDP PAC B A R 2.94 2.98


M
P
E S 2.96 2.98
R
E
T 2.87 2.9
LWBP 314.39 315.43
WBP 1033.84 1041.2

7 SDP KIOS A A R 0.88 1


M
P
E S 0.85 1.08
R
E
T 0.94 1.14
LWBP 450.66 452.28
WBP 795.29 799.76

8 SDP PENERANGAN A A R 0.99 1


M
P
E S 0.82 0.85
R
E
T 1.02 1.01
LWBP 230.41 231.34
WBP 579.94 583.58

9 SDP ESC A A R 0.74 0.88


M
P
E S 0.88 0.87
R
E
T 0.99 0.89
LWBP 254.48 256.06
WBP 637.89 641.16

10 SDP ESC D A R 0.66 0.65


M
P
E S 0.82 0.88
R
E
T 0.78 0.9
LWBP 680.52 684.46
WBP 1878.33 1889.09

11 SDP AC D A R 1.66 1.72


M
P
E S 1.82 1.87
R
E
T 1.84 1.89
LWBP 1085.47 1089.67
WBP 2887.03 2905.1

12 SDP PAC A
12 SDP PAC A A R 2.67 2.66
M
P
E S 2.73 2.75
R
E
T 2.7 2.73
LWBP 306.18 308.1
WBP 968.62 974.74

13 SDP KIOS C A R 1 0.99


M
P
E S 0.91 0.85
R
E
T 0.82 0.81
LWBP 321.56 323.17
WBP 899.02 904.34

14 SDP PENERANGAN C A R 0.94 0.95


M
P
E S 0.82 0.81
R
E
T 0.52 0.53
LWBP 142.9 143.79
WBP 369.3 371.77

15 SDP ESC C A R 0.76 0.61


M
P
E S 0.68 0.53
R
E
T 0.71 0.62
LWBP 700.54 705.21
WBP 2273.26 2289.03

16 SDP PAC C A R 2.27 2.21


M
P
E S 2.18 2.19
R
E
T 2.31 2.31
LWBP 576.5 580.22
WBP 1909.64 1921.23

17 SDP KIOS D A R 1.76 1.85


M
P
E S 1.69 1.72
R
E
T 1.67 1.75
LWBP 548.85 551.98
WBP 1240.52 1247.71

18 SDP PENERANGAN D A R 1.08 1.08


M
P
E S 1.18 1.2
R
E
T 0.99 1.08
LWBP 134.3 135.32

19 SDP LIFT
WBP 523.2 527.13

19 SDP LIFT A R 0.33 0.25


M
P
E S 0.22 0.17
R
E
T 0.22 0.28
LWBP 816.28 820.4
WBP 1580.92 1594.09

20 SDP PARKIR A R 1.74 1.89


M
P
E S 2.04 2.05
R
E
T 1.75 1.78
LWBP 49.95 50.28
WBP 216.21 217.76

21 SDP EMERGENCY A R 0.21 0.03


M
P
E S 0.19 0.18
R
E
T 0.19 0.62
LWBP 381.28 383.19
WBP 1785.05 1796.1

22 SDP R.M & E A R 1.21 1.13


M
P
E S 1.18 1.16
R
E
T 1.21 1.05

Dibuat Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 17/01/2017 Date :
TER HARIAN

TANGGAL : 17/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.09 kwh

3.24 kwh

-0.12 amp 4.33 kwh

0 amp

0 amp

0 kwh

0.01 kwh

-0.04 amp 0.01 kwh

-0.06 amp

-0.02 amp

2.52 kwh

4.44 kwh

0.07 amp 6.96 kwh

0.14 amp

0.11 amp

1.4 kwh

8.24 kwh

0.03 amp 9.64 kwh

0 amp

-0.04 amp

1.35 kwh

3.07 kwh

0.28 amp 4.42 kwh


4.42 kwh

0.25 amp

0.11 amp

6.46 kwh

22.61 kwh

0.04 amp 29.07 kwh

0.02 amp

0.03 amp

1.04 kwh

7.36 kwh

0.12 amp 8.4 kwh

0.23 amp

0.2 amp

1.62 kwh

4.47 kwh

0.01 amp 6.09 kwh

0.03 amp

-0.01 amp

0.93 kwh

3.64 kwh

0.14 amp 4.57 kwh

-0.01 amp

-0.1 amp

1.58 kwh

3.27 kwh

-0.01 amp 4.85 kwh

0.06 amp

0.12 amp

3.94 kwh

10.76 kwh

0.06 amp 14.7 kwh

0.05 amp

0.05 amp

4.2 kwh

18.07 kwh

22.27 kwh
-0.01 amp 22.27 kwh

0.02 amp

0.03 amp

1.92 kwh

6.12 kwh

-0.01 amp 8.04 kwh

-0.06 amp

-0.01 amp

1.61 kwh

5.32 kwh

0.01 amp 6.93 kwh

-0.01 amp

0.01 amp

0.89 kwh

2.47 kwh

-0.15 amp 3.36 kwh

-0.15 amp

-0.09 amp

4.67 kwh

15.77 kwh

-0.06 amp 20.44 kwh

0.01 amp

0 amp

3.72 kwh

11.59 kwh

0.09 amp 15.31 kwh

0.03 amp

0.08 amp

3.13 kwh

7.19 kwh

0 amp 10.32 kwh

0.02 amp

0.09 amp

1.02 kwh

4.95 kwh
3.93 kwh

-0.08 amp 4.95 kwh

-0.05 amp

0.06 amp

4.12 kwh

13.17 kwh

0.15 amp 17.29 kwh

0.01 amp

0.03 amp

0.33 kwh

1.55 kwh

-0.18 amp 1.88 kwh

-0.01 amp

0.43 amp

1.91 kwh

11.05 kwh

-0.08 amp 12.96 kwh

-0.02 amp

-0.16 amp

Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 18

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 144.39 145.19
WBP 445.88 448.41

1 SDP POMPA A R 1.26 0.91


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.73 0.73

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 341.26 343.29
WBP 684.12 688.07

3 SDP PENERANGAN B A R 0.72 0.73


M
P
E S 0.77 0.78
R
E
T 0.8 0.8
LWBP 237.5 238.86
WBP 1162.91 1170.02

4 SDP KIOS B A R 1.04 1.05


M
P
E S 1.01 1.06
R
E
T 1.04 1.07
LWBP 201.53 202.61
WBP 511.87 514.58

5 SDP ESC B A R 0.95 0.66


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.9 0.63
R
E
T 0.96 0.78
LWBP 1004.47 1010.22
WBP 3060.04 3080.38

6 SDP PAC B A R 2.98 2.91


M
P
E S 2.98 2.98
R
E
T 2.9 2.88
LWBP 315.43 317.31
WBP 1041.2 1048.48

7 SDP KIOS A A R 1 0.99


M
P
E S 1.08 1.06
R
E
T 1.14 1.16
LWBP 452.28 454.9
WBP 799.76 804.29

8 SDP PENERANGAN A A R 1 0.98


M
P
E S 0.85 0.83
R
E
T 1.01 1
LWBP 231.34 232.88
WBP 583.58 587.3

9 SDP ESC A A R 0.88 0.83


M
P
E S 0.87 0.97
R
E
T 0.89 1.01
LWBP 256.06 257.39
WBP 641.16 644.63

10 SDP ESC D A R 0.65 0.62


M
P
E S 0.88 0.93
R
E
T 0.9 0.98
LWBP 684.46 688.16
WBP 1889.09 1899.3

11 SDP AC D A R 1.72 1.73


M
P
E S 1.87 1.87
R
E
T 1.89 1.89
LWBP 1089.67 1096.59
WBP 2905.1 2923.18

12 SDP PAC A
12 SDP PAC A A R 2.66 2.67
M
P
E S 2.75 2.72
R
E
T 2.73 2.7
LWBP 308.1 309.85
WBP 974.74 980.83

13 SDP KIOS C A R 0.99 0.95


M
P
E S 0.85 0.91
R
E
T 0.81 0.8
LWBP 323.17 324.79
WBP 904.34 909.22

14 SDP PENERANGAN C A R 0.95 0.94


M
P
E S 0.81 0.82
R
E
T 0.53 0.53
LWBP 143.79 144.56
WBP 371.77 374.07

15 SDP ESC C A R 0.61 0.55


M
P
E S 0.53 0.41
R
E
T 0.62 0.5
LWBP 705.21 709.47
WBP 2289.03 2303.62

16 SDP PAC C A R 2.21 2.22


M
P
E S 2.19 2.13
R
E
T 2.31 2.26
LWBP 580.22 583.66
WBP 1921.23 1932.16

17 SDP KIOS D A R 1.85 1.82


M
P
E S 1.72 1.77
R
E
T 1.75 1.74
LWBP 551.98 554.94
WBP 1247.71 1254.58

18 SDP PENERANGAN D A R 1.08 1.08


M
P
E S 1.2 1.19
R
E
T 1.08 1
LWBP 135.32 136.2

19 SDP LIFT
WBP 527.13 530.92

19 SDP LIFT A R 0.25 0.19


M
P
E S 0.17 0.2
R
E
T 0.28 0.29
LWBP 820.4 825.53
WBP 1594.09 1604.53

20 SDP PARKIR A R 1.89 1.89


M
P
E S 2.05 2.04
R
E
T 1.78 1.77
LWBP 50.28 50.67
WBP 217.76 219.36

21 SDP EMERGENCY A R 0.03 0.03


M
P
E S 0.18 0.18
R
E
T 0.62 0.21
LWBP 383.19 385.44
WBP 1796.1 1806.99

22 SDP R.M & E A R 1.13 1.2


M
P
E S 1.16 1.16
R
E
T 1.05 1.06

Dibuat Oleh, Diperiksa Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 18/01/2017 Date :
TER HARIAN

TANGGAL : 18/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.8 kwh

2.53 kwh

-0.35 amp 3.33 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.03 kwh

3.95 kwh

0.01 amp 5.98 kwh

0.01 amp

0 amp

1.36 kwh

7.11 kwh

0.01 amp 8.47 kwh

0.05 amp

0.03 amp

1.08 kwh

2.71 kwh

-0.29 amp 3.79 kwh


3.79 kwh

-0.27 amp

-0.18 amp

5.75 kwh

20.34 kwh

-0.07 amp 26.09 kwh

0 amp

-0.02 amp

1.88 kwh

7.28 kwh

-0.01 amp 9.16 kwh

-0.02 amp

0.02 amp

2.62 kwh

4.53 kwh

-0.02 amp 7.15 kwh

-0.02 amp

-0.01 amp

1.54 kwh

3.72 kwh

-0.05 amp 5.26 kwh

0.1 amp

0.12 amp

1.33 kwh

3.47 kwh

-0.03 amp 4.8 kwh

0.05 amp

0.08 amp

3.7 kwh

10.21 kwh

0.01 amp 13.91 kwh

0 amp

0 amp

6.92 kwh

18.08 kwh

25 kwh
0.01 amp 25 kwh

-0.03 amp

-0.03 amp

1.75 kwh

6.09 kwh

-0.04 amp 7.84 kwh

0.06 amp

-0.01 amp

1.62 kwh

4.88 kwh

-0.01 amp 6.5 kwh

0.01 amp

0 amp

0.77 kwh

2.3 kwh

-0.06 amp 3.07 kwh

-0.12 amp

-0.12 amp

4.26 kwh

14.59 kwh

0.01 amp 18.85 kwh

-0.06 amp

-0.05 amp

3.44 kwh

10.93 kwh

-0.03 amp 14.37 kwh

0.05 amp

-0.01 amp

2.96 kwh

6.87 kwh

0 amp 9.83 kwh

-0.01 amp

-0.08 amp

0.88 kwh

4.67 kwh
3.79 kwh

-0.06 amp 4.67 kwh

0.03 amp

0.01 amp

5.13 kwh

10.44 kwh

0 amp 15.57 kwh

-0.01 amp

-0.01 amp

0.39 kwh

1.6 kwh

0 amp 1.99 kwh

0 amp

-0.41 amp

2.25 kwh

10.89 kwh

0.07 amp 13.14 kwh

0 amp

0.01 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 19

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 145.19 145.68
WBP 448.41 450.64

1 SDP POMPA A R 0.91 0.77


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.73 0.73

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 343.29 344.84
WBP 688.07 692.05

3 SDP PENERANGAN B A R 0.73 0.7


M
P
E S 0.78 0.75
R
E
T 0.8 0.78
LWBP 238.86 240.29
WBP 1170.02 1176.5

4 SDP KIOS B A R 1.05 1.01


M
P
E S 1.06 1.05
R
E
T 1.07 1.08
LWBP 202.61 203.48
WBP 514.58 517.4

5 SDP ESC B A R 0.66 0.65


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.63 0.62
R
E
T 0.78 0.8
LWBP 1010.22 1015.03
WBP 3080.38 3099.19

6 SDP PAC B A R 2.91 3


M
P
E S 2.98 2.99
R
E
T 2.88 2.89
LWBP 317.31 318.92
WBP 1048.48 1056.02

7 SDP KIOS A A R 0.99 1.01


M
P
E S 1.06 1.09
R
E
T 1.16 1.12
LWBP 454.9 456.9
WBP 804.29 808.87

8 SDP PENERANGAN A A R 0.98 0.97


M
P
E S 0.83 0.81
R
E
T 1 0.96
LWBP 232.88 234.08
WBP 587.3 591.02

9 SDP ESC A A R 0.83 0.8


M
P
E S 0.97 0.94
R
E
T 1.01 0.98
LWBP 257.39 258.84
WBP 644.63 647.98

10 SDP ESC D A R 0.62 0.52


M
P
E S 0.93 0.85
R
E
T 0.98 0.82
LWBP 688.16 691.97
WBP 1899.3 1908.92

11 SDP AC D A R 1.73 1.7


M
P
E S 1.87 1.85
R
E
T 1.89 1.85
LWBP 1096.59 1101.79
WBP 2923.18 2941.23

12 SDP PAC A
12 SDP PAC A A R 2.67 2.65
M
P
E S 2.72 2.7
R
E
T 2.7 2.69
LWBP 309.85 311.71
WBP 980.83 986.13

13 SDP KIOS C A R 0.95 0.98


M
P
E S 0.91 0.92
R
E
T 0.8 0.82
LWBP 324.79 326.41
WBP 909.22 913.94

14 SDP PENERANGAN C A R 0.94 0.76


M
P
E S 0.82 0.69
R
E
T 0.53 0.52
LWBP 144.56 145.49
WBP 374.07 376.36

15 SDP ESC C A R 0.55 0.58


M
P
E S 0.41 55
R
E
T 0.5 0.66
LWBP 709.47 713.91
WBP 2303.62 2317.89

16 SDP PAC C A R 2.22 2.22


M
P
E S 2.13 2.23
R
E
T 2.26 2.25
LWBP 583.66 587.45
WBP 1932.16 1942.87

17 SDP KIOS D A R 1.82 1.69


M
P
E S 1.77 1.68
R
E
T 1.74 1.67
LWBP 554.94 558.02
WBP 1254.58 1261.69

18 SDP PENERANGAN D A R 1.08 1.16


M
P
E S 1.19 1.03
R
E
T 1 1.13
LWBP 136.2 137.16

19 SDP LIFT
WBP 530.92 534.58

19 SDP LIFT A R 0.19 0.37


M
P
E S 0.2 0.32
R
E
T 0.29 0.51
LWBP 825.53 829.71
WBP 1604.53 1614.73

20 SDP PARKIR A R 1.89 1.89


M
P
E S 2.04 2.04
R
E
T 1.77 1.77
LWBP 50.67 50.99
WBP 219.36 220.9

21 SDP EMERGENCY A R 0.03 0.03


M
P
E S 0.18 0.18
R
E
T 0.21 0.19
LWBP 385.44 387.21
WBP 1806.99 1817.83

22 SDP R.M & E A R 1.2 1.21


M
P
E S 1.16 1.07
R
E
T 1.06 1.21

Dibuat Oleh, Diperiksa Oleh,

DODI, SABKI, ANTO


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 19/01/2017 Date :
TER HARIAN

TANGGAL : 19/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.49 kwh

2.23 kwh

-0.14 amp 2.72 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

1.55 kwh

3.98 kwh

-0.03 amp 5.53 kwh

-0.03 amp

-0.02 amp

1.43 kwh

6.48 kwh

-0.04 amp 7.91 kwh

-0.01 amp

0.01 amp

0.87 kwh

2.82 kwh

-0.01 amp 3.69 kwh


3.69 kwh

-0.01 amp

0.02 amp

4.81 kwh

18.81 kwh

0.09 amp 23.62 kwh

0.01 amp

0.01 amp

1.61 kwh

7.54 kwh

0.02 amp 9.15 kwh

0.03 amp

-0.04 amp

2 kwh

4.58 kwh

-0.01 amp 6.58 kwh

-0.02 amp

-0.04 amp

1.2 kwh

3.72 kwh

-0.03 amp 4.92 kwh

-0.03 amp

-0.03 amp

1.45 kwh

3.35 kwh

-0.1 amp 4.8 kwh

-0.08 amp

-0.16 amp

3.81 kwh

9.62 kwh

-0.03 amp 13.43 kwh

-0.02 amp

-0.04 amp

5.2 kwh

18.05 kwh

23.25 kwh
-0.02 amp 23.25 kwh

-0.02 amp

-0.01 amp

1.86 kwh

5.3 kwh

0.03 amp 7.16 kwh

0.01 amp

0.02 amp

1.62 kwh

4.72 kwh

-0.18 amp 6.34 kwh

-0.13 amp

-0.01 amp

0.93 kwh

2.29 kwh

0.03 amp 3.22 kwh

54.59 amp

0.16 amp

4.44 kwh

14.27 kwh

0 amp 18.71 kwh

0.1 amp

-0.01 amp

3.79 kwh

10.71 kwh

-0.13 amp 14.5 kwh

-0.09 amp

-0.07 amp

3.08 kwh

7.11 kwh

0.08 amp 10.19 kwh

-0.16 amp

0.13 amp

0.96 kwh

4.62 kwh
3.66 kwh

0.18 amp 4.62 kwh

0.12 amp

0.22 amp

4.18 kwh

10.2 kwh

0 amp 14.38 kwh

0 amp

0 amp

0.32 kwh

1.54 kwh

0 amp 1.86 kwh

0 amp

-0.02 amp

1.77 kwh

10.84 kwh

0.01 amp 12.61 kwh

-0.09 amp

121 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI :Engineering DOKUMEN NO : 20

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 145.68 146.5
WBP 450.64 453.41

1 SDP POMPA A R 0.77 0.95


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.73 0.74

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 344.84 346.79
WBP 692.05 695.87

3 SDP PENERANGAN B A R 0.7 0.7


M
P
E S 0.75 0.74
R
E
T 0.78 0.77
LWBP 240.29 241.76
WBP 1176.5 1183.38

4 SDP KIOS B A R 1.01 1.08


M
P
E S 1.05 1.08
R
E
T 1.08 1.19
LWBP 203.48 204.59
WBP 517.4 520.14

5 SDP ESC B A R 0.65 0.59


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.62 0.58
R
E
T 0.8 0.84
LWBP 1015.03 1020.14
WBP 3099.19 3118.25

6 SDP PAC B A R 3 2.99


M
P
E S 2.99 2.98
R
E
T 2.89 2.89
LWBP 318.92 320.92
WBP 1056.02 1063.19

7 SDP KIOS A A R 1.01 0.98


M
P
E S 1.09 1
R
E
T 1.12 1.16
LWBP 456.9 459.33
WBP 808.87 813.19

8 SDP PENERANGAN A A R 0.97 0.96


M
P
E S 0.81 0.82
R
E
T 0.96 0.94
LWBP 234.08 235.51
WBP 591.02 594.53

9 SDP ESC A A R 0.8 0.84


M
P
E S 0.94 0.93
R
E
T 0.98 0.93
LWBP 258.84 260.33
WBP 647.98 651.75

10 SDP ESC D A R 0.52 0.66


M
P
E S 0.85 0.85
R
E
T 0.82 0.88
LWBP 691.97 695.81
WBP 1908.92 1919.71

11 SDP AC D A R 1.7 1.67


M
P
E S 1.85 1.85
R
E
T 1.85 1.83
LWBP 1101.79 1108.33
WBP 2941.23 2958.57

12 SDP PAC A
12 SDP PAC A A R 2.65 0.64
M
P
E S 2.7 2.68
R
E
T 2.69 2.72
LWBP 311.71 313.56
WBP 986.13 992.32

13 SDP KIOS C A R 0.98 0.96


M
P
E S 0.92 0.89
R
E
T 0.82 0.85
LWBP 326.41 328.14
WBP 913.94 919.2

14 SDP PENERANGAN C A R 0.76 0.94


M
P
E S 0.69 0.82
R
E
T 0.52 0.52
LWBP 145.49 146.45
WBP 376.36 378.87

15 SDP ESC C A R 0.58 0.7


M
P
E S 55 0.59
R
E
T 0.66 0.59
LWBP 713.91 718.48
WBP 2317.89 2333.52

16 SDP PAC C A R 2.22 2.25


M
P
E S 2.23 2.25
R
E
T 2.25 2.26
LWBP 587.45 591.07
WBP 1942.87 1954.73

17 SDP KIOS D A R 1.69 1.75


M
P
E S 1.68 1.71
R
E
T 1.67 1.69
LWBP 558.02 561.09
WBP 1261.69 1269.08

18 SDP PENERANGAN D A R 1.16 1.01


M
P
E S 1.03 1.14
R
E
T 1.13 0.96
LWBP 137.16 138.1

19 SDP LIFT
WBP 534.58 538.28

19 SDP LIFT A R 0.37 0.19


M
P
E S 0.32 0.21
R
E
T 0.51 0.32
LWBP 829.71 834.72
WBP 1614.73 1623.46

20 SDP PARKIR A R 1.89 1.35


M
P
E S 2.04 1.35
R
E
T 1.77 1.11
LWBP 50.99 51.39
WBP 220.9 222.4

21 SDP EMERGENCY A R 0.03 0.26


M
P
E S 0.18 0.58
R
E
T 0.19 0.18
LWBP 387.21 389.44
WBP 1817.83 1828.74

22 SDP R.M & E A R 1.21 1.18


M
P
E S 1.07 1.09
R
E
T 1.21 1.17

Dibuat Oleh, Diperiksa Oleh,

DODY, SABKI, ANTO


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 20/01/2017 Date :
TER HARIAN

TANGGAL : 20/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.82 kwh

2.77 kwh

0.18 amp 3.59 kwh

0 amp

0 amp

0 kwh

0.01 kwh

0 amp 0.01 kwh

0 amp

0 amp

1.95 kwh

3.82 kwh

0 amp 5.77 kwh

-0.01 amp

-0.01 amp

1.47 kwh

6.88 kwh

0.07 amp 8.35 kwh

0.03 amp

0.11 amp

1.11 kwh

2.74 kwh

-0.06 amp 3.85 kwh


3.85 kwh

-0.04 amp

0.04 amp

5.11 kwh

19.06 kwh

-0.01 amp 24.17 kwh

-0.01 amp

0 amp

2 kwh

7.17 kwh

-0.03 amp 9.17 kwh

-0.09 amp

0.04 amp

2.43 kwh

4.32 kwh

-0.01 amp 6.75 kwh

0.01 amp

-0.02 amp

1.43 kwh

3.51 kwh

0.04 amp 4.94 kwh

-0.01 amp

-0.05 amp

1.49 kwh

3.77 kwh

0.14 amp 5.26 kwh

0 amp

0.06 amp

3.84 kwh

10.79 kwh

-0.03 amp 14.63 kwh

0 amp

-0.02 amp

6.54 kwh

17.34 kwh

23.88 kwh
-2.01 amp 23.88 kwh

-0.02 amp

0.03 amp

1.85 kwh

6.19 kwh

-0.02 amp 8.04 kwh

-0.03 amp

0.03 amp

1.73 kwh

5.26 kwh

0.18 amp 6.99 kwh

0.13 amp

0 amp

0.96 kwh

2.51 kwh

0.12 amp 3.47 kwh

-54.41 amp

-0.07 amp

4.57 kwh

15.63 kwh

0.03 amp 20.2 kwh

0.02 amp

0.01 amp

3.62 kwh

11.86 kwh

0.06 amp 15.48 kwh

0.03 amp

0.02 amp

3.07 kwh

7.39 kwh

-0.15 amp 10.46 kwh

0.11 amp

-0.17 amp

0.94 kwh

4.64 kwh
3.7 kwh

-0.18 amp 4.64 kwh

-0.11 amp

-0.19 amp

5.01 kwh

8.73 kwh

-0.54 amp 13.74 kwh

-0.69 amp

-0.66 amp

0.4 kwh

1.5 kwh

0.23 amp 1.9 kwh

0.4 amp

-0.01 amp

2.23 kwh

10.91 kwh

-0.03 amp 13.14 kwh

0.02 amp

-0.04 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI :Engineering DOKUMEN NO : 21

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 146.5 147.3
WBP 453.41 456.02

1 SDP POMPA A R 0.95 1.33


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.74 0.74

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 346.79 348.79
WBP 695.87 699.94

3 SDP PENERANGAN B A R 0.7 0.63


M
P
E S 0.74 0.62
R
E
T 0.77 0.69
LWBP 241.76 243.2
WBP 1183.38 1190.95

4 SDP KIOS B A R 1.08 1.11


M
P
E S 1.08 1.12
R
E
T 1.19 1.08
LWBP 204.59 205.71
WBP 520.14 523.17

5 SDP ESC B A R 0.59 0.86


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.58 0.8
R
E
T 0.84 0.98
LWBP 1020.14 1026.45
WBP 3118.25 3138.66

6 SDP PAC B A R 2.99 2.96


M
P
E S 2.98 2.95
R
E
T 2.89 2.83
LWBP 320.92 322.95
WBP 1063.19 1070.72

7 SDP KIOS A A R 0.98 0.98


M
P
E S 1 1.05
R
E
T 1.16 1.1
LWBP 459.33 461.84
WBP 813.19 817.58

8 SDP PENERANGAN A A R 0.96 0.83


M
P
E S 0.82 0.74
R
E
T 0.94 0.79
LWBP 235.51 237.04
WBP 594.53 598.37

9 SDP ESC A A R 0.84 0.9


M
P
E S 0.93 1.01
R
E
T 0.93 1.1
LWBP 260.33 261.8
WBP 651.75 655.3

10 SDP ESC D A R 0.66 0.58


M
P
E S 0.85 0.77
R
E
T 0.88 0.72
LWBP 695.81 699.64
WBP 1919.71 1929.85

11 SDP AC D A R 1.67 1.66


M
P
E S 1.85 1.84
R
E
T 1.83 1.85
LWBP 1108.33 1115.16
WBP 2958.57 2975.63

12 SDP PAC A
12 SDP PAC A A R 0.64 2.65
M
P
E S 2.68 2.71
R
E
T 2.72 2.67
LWBP 313.56 315.45
WBP 992.32 997.94

13 SDP KIOS C A R 0.96 1.04


M
P
E S 0.89 0.9
R
E
T 0.85 0.84
LWBP 328.14 329.78
WBP 919.2 924.22

14 SDP PENERANGAN C A R 0.94 0.77


M
P
E S 0.82 0.71
R
E
T 0.52 0.51
LWBP 146.45 147.37
WBP 378.87 381.27

15 SDP ESC C A R 0.7 0.81


M
P
E S 0.59 0.64
R
E
T 0.59 0.69
LWBP 718.48 723.12
WBP 2333.52 2347.09

16 SDP PAC C A R 2.25 1.97


M
P
E S 2.25 1.89
R
E
T 2.26 1.98
LWBP 591.07 594.77
WBP 1954.73 1966.17

17 SDP KIOS D A R 1.75 1.17


M
P
E S 1.71 1.63
R
E
T 1.69 1.64
LWBP 561.09 564.13
WBP 1269.08 1276.4

18 SDP PENERANGAN D A R 1.01 1.01


M
P
E S 1.14 1.12
R
E
T 0.96 0.86
LWBP 138.1 139.05

19 SDP LIFT
WBP 538.28 542.09

19 SDP LIFT A R 0.19 0.21


M
P
E S 0.21 0.36
R
E
T 0.32 0.36
LWBP 834.72 839.72
WBP 1623.46 1635.9

20 SDP PARKIR A R 1.35 1.51


M
P
E S 1.35 1.6
R
E
T 1.11 1.23
LWBP 51.39 51.72
WBP 222.4 223.84

21 SDP EMERGENCY A R 0.26 0.03


M
P
E S 0.58 0.1
R
E
T 0.18 0.16
LWBP 389.44 391.78
WBP 1828.74 1839.15

22 SDP R.M & E A R 1.18 1.2


M
P
E S 1.09 1.07
R
E
T 1.17 1.17

Dibuat Oleh, Diperiksa Oleh,

IMAM . ANTON . DENI


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 21/01/2017 Date :
TER HARIAN

TANGGAL : 21/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.8 kwh

2.61 kwh

0.38 amp 3.41 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2 kwh

4.07 kwh

-0.07 amp 6.07 kwh

-0.12 amp

-0.08 amp

1.44 kwh

7.57 kwh

0.03 amp 9.01 kwh

0.04 amp

-0.11 amp

1.12 kwh

3.03 kwh

0.27 amp 4.15 kwh


4.15 kwh

0.22 amp

0.14 amp

6.31 kwh

20.41 kwh

-0.03 amp 26.72 kwh

-0.03 amp

-0.06 amp

2.03 kwh

7.53 kwh

0 amp 9.56 kwh

0.05 amp

-0.06 amp

2.51 kwh

4.39 kwh

-0.13 amp 6.9 kwh

-0.08 amp

-0.15 amp

1.53 kwh

3.84 kwh

0.06 amp 5.37 kwh

0.08 amp

0.17 amp

1.47 kwh

3.55 kwh

-0.08 amp 5.02 kwh

-0.08 amp

-0.16 amp

3.83 kwh

10.14 kwh

-0.01 amp 13.97 kwh

-0.01 amp

0.02 amp

6.83 kwh

17.06 kwh

23.89 kwh
2.01 amp 23.89 kwh

0.03 amp

-0.05 amp

1.89 kwh

5.62 kwh

0.08 amp 7.51 kwh

0.01 amp

-0.01 amp

1.64 kwh

5.02 kwh

-0.17 amp 6.66 kwh

-0.11 amp

-0.01 amp

0.92 kwh

2.4 kwh

0.11 amp 3.32 kwh

0.05 amp

0.1 amp

4.64 kwh

13.57 kwh

-0.28 amp 18.21 kwh

-0.36 amp

-0.28 amp

3.7 kwh

11.44 kwh

-0.58 amp 15.14 kwh

-0.08 amp

-0.05 amp

3.04 kwh

7.32 kwh

0 amp 10.36 kwh

-0.02 amp

-0.1 amp

0.95 kwh

4.76 kwh
3.81 kwh

0.02 amp 4.76 kwh

0.15 amp

0.04 amp

5 kwh

12.44 kwh

0.16 amp 17.44 kwh

0.25 amp

0.12 amp

0.33 kwh

1.44 kwh

-0.23 amp 1.77 kwh

-0.48 amp

-0.02 amp

2.34 kwh

10.41 kwh

0.02 amp 12.75 kwh

-0.02 amp

0 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI :Engineering DOKUMEN NO : 21

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 147.3 148.18
WBP 456.02 458.27

1 SDP POMPA A R 1.33 1.18


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.17
WBP 0.74 0.74

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 348.79 350.81
WBP 699.94 704.84

3 SDP PENERANGAN B A R 0.63 0.72


M
P
E S 0.62 0.77
R
E
T 0.69 0.8
LWBP 243.2 243.2
WBP 1190.95 1190.95

4 SDP KIOS B A R 1.11 1.11


M
P
E S 1.12 1.12
R
E
T 1.08 1.08
LWBP 205.71 205.71
WBP 523.17 523.17

5 SDP ESC B A R 0.86 0.86


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.8 0.8
R
E
T 0.98 0.98
LWBP 1026.45 1026.45
WBP 3138.66 3138.66

6 SDP PAC B A R 2.96 2.96


M
P
E S 2.95 2.95
R
E
T 2.83 2.83
LWBP 322.95 325.09
WBP 1070.72 1078.59

7 SDP KIOS A A R 0.98 1.04


M
P
E S 1.05 0.98
R
E
T 1.1 1.12
LWBP 461.84 464.45
WBP 817.58 822.34

8 SDP PENERANGAN A A R 0.83 0.88


M
P
E S 0.74 0.81
R
E
T 0.79 0.8
LWBP 237.04 238.63
WBP 598.37 602.65

9 SDP ESC A A R 0.9 1


M
P
E S 1.01 1.1
R
E
T 1.1 1.08
LWBP 261.8 263.27
WBP 655.3 658.96

10 SDP ESC D A R 0.58 0.54


M
P
E S 0.77 0.91
R
E
T 0.72 0.85
LWBP 699.64 703.82
WBP 1929.85 1939.77

11 SDP AC D A R 1.66 1.73


M
P
E S 1.84 1.89
R
E
T 1.85 1.9
LWBP 1115.16 1121.95
WBP 2975.63 2993.88

12 SDP PAC A
12 SDP PAC A A R 2.65 2.66
M
P
E S 2.71 2.75
R
E
T 2.67 2.74
LWBP 315.45 317.41
WBP 997.94 1003.35

13 SDP KIOS C A R 1.04 0.96


M
P
E S 0.9 0.92
R
E
T 0.84 0.8
LWBP 329.78 331.46
WBP 924.22 929.38

14 SDP PENERANGAN C A R 0.77 0.78


M
P
E S 0.71 0.75
R
E
T 0.51 0.52
LWBP 147.37 148.43
WBP 381.27 383.72

15 SDP ESC C A R 0.81 0.82


M
P
E S 0.64 0.79
R
E
T 0.69 0.85
LWBP 723.12 727.89
WBP 2347.09 2360.18

16 SDP PAC C A R 1.97 2.03


M
P
E S 1.89 1.85
R
E
T 1.98 1.97
LWBP 594.77 597.92
WBP 1966.17 1976.08

17 SDP KIOS D A R 1.17 1.69


M
P
E S 1.63 1.67
R
E
T 1.64 1.68
LWBP 564.13 567.19
WBP 1276.4 1283.04

18 SDP PENERANGAN D A R 1.01 1.01


M
P
E S 1.12 1.1
R
E
T 0.86 0.86
LWBP 139.05 139.98

19 SDP LIFT
WBP 542.09 545.76

19 SDP LIFT A R 0.21 0.19


M
P
E S 0.36 0.17
R
E
T 0.36 0.35
LWBP 839.72 844.76
WBP 1635.9 1645.95

20 SDP PARKIR A R 1.51 1.36


M
P
E S 1.6 1.36
R
E
T 1.23 1.15
LWBP 51.72 52.14
WBP 223.84 225.56

21 SDP EMERGENCY A R 0.03 0.3


M
P
E S 0.1 0.48
R
E
T 0.16 0.49
LWBP 391.78 394.06
WBP 1839.15 1850.29

22 SDP R.M & E A R 1.2 1.11


M
P
E S 1.07 1.02
R
E
T 1.17 1.1

Dibuat Oleh, Diperiksa Oleh,

IMAM . ANTON . DENI


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 22/01/2017 Date :
TER HARIAN

TANGGAL : 21/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.88 kwh

2.25 kwh

-0.15 amp 3.13 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.02 kwh

4.9 kwh

0.09 amp 6.92 kwh

0.15 amp

0.11 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh
0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.14 kwh

7.87 kwh

0.06 amp 10.01 kwh

-0.07 amp

0.02 amp

2.61 kwh

4.76 kwh

0.05 amp 7.37 kwh

0.07 amp

0.01 amp

1.59 kwh

4.28 kwh

0.1 amp 5.87 kwh

0.09 amp

-0.02 amp

1.47 kwh

3.66 kwh

-0.04 amp 5.13 kwh

0.14 amp

0.13 amp

4.18 kwh

9.92 kwh

0.07 amp 14.1 kwh

0.05 amp

0.05 amp

6.79 kwh

18.25 kwh

25.04 kwh
0.01 amp 25.04 kwh

0.04 amp

0.07 amp

1.96 kwh

5.41 kwh

-0.08 amp 7.37 kwh

0.02 amp

-0.04 amp

1.68 kwh

5.16 kwh

0.01 amp 6.84 kwh

0.04 amp

0.01 amp

1.06 kwh

2.45 kwh

0.01 amp 3.51 kwh

0.15 amp

0.16 amp

4.77 kwh

13.09 kwh

0.06 amp 17.86 kwh

-0.04 amp

-0.01 amp

3.15 kwh

9.91 kwh

0.52 amp 13.06 kwh

0.04 amp

0.04 amp

3.06 kwh

6.64 kwh

0 amp 9.7 kwh

-0.02 amp

0 amp

0.93 kwh

4.6 kwh
3.67 kwh

-0.02 amp 4.6 kwh

-0.19 amp

-0.01 amp

5.04 kwh

10.05 kwh

-0.15 amp 15.09 kwh

-0.24 amp

-0.08 amp

0.42 kwh

1.72 kwh

0.27 amp 2.14 kwh

0.38 amp

0.33 amp

2.28 kwh

11.14 kwh

-0.09 amp 13.42 kwh

-0.05 amp

-0.07 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO :

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 148.18 149.68
WBP 458.27 461.27

1 SDP POMPA A R 1.18 0.94


M
P
E S 0 0
R
E
T 0 0
LWBP 0.17 0.18
WBP 0.74 0.74

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 350.81 354.27
WBP 704.84 709.09

3 SDP PENERANGAN B A R 0.72 0.66


M
P
E S 0.77 0.74
R
E
T 0.8 0.77
LWBP 243.2 247.07
WBP 1190.95 1207.25

4 SDP KIOS B A R 1.11 0.97


M
P
E S 1.12 0.93
R
E
T 1.08 0.95
LWBP 205.71 208.84
WBP 523.17 529.41

5 SDP ESC B A R 0.86 0.58


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.8 0.67
R
E
T 0.98 0.78
LWBP 1026.45 1042.79
WBP 3138.66 3181.93

6 SDP PAC B A R 2.96 2.98


M
P
E S 2.95 2.88
R
E
T 2.83 2.68
LWBP 325.09 328.64
WBP 1078.59 1086.84

7 SDP KIOS A A R 1.04 0.8


M
P
E S 0.98 0.76
R
E
T 1.12 0.89
LWBP 464.45 468.94
WBP 822.34 827.12

8 SDP PENERANGAN A A R 0.88 0.98


M
P
E S 0.81 0.85
R
E
T 0.8 0.99
LWBP 238.63 241.35
WBP 602.65 606.61

9 SDP ESC A A R 1 0.73


M
P
E S 1.1 0.84
R
E
T 1.08 0.89
LWBP 263.27 265.45
WBP 658.96 663.09

10 SDP ESC D A R 0.54 0.58


M
P
E S 0.91 0.83
R
E
T 0.85 0.8
LWBP 703.82 710.29
WBP 1939.77 1952.24

11 SDP AC D A R 1.73 1.68


M
P
E S 1.89 1.85
R
E
T 1.9 1.86
LWBP 1121.95 1133.94
WBP 2993.88 3013

12 SDP PAC A
12 SDP PAC A A R 2.66 2.69
M
P
E S 2.75 2.68
R
E
T 2.74 2.69
LWBP 317.41 320.38
WBP 1003.35 1010.24

13 SDP KIOS C A R 0.96 0.92


M
P
E S 0.92 0.85
R
E
T 0.8 0.76
LWBP 331.46 333.43
WBP 929.38 936

14 SDP PENERANGAN C A R 0.78 0.95


M
P
E S 0.75 0.83
R
E
T 0.52 0.53
LWBP 148.43 149.88
WBP 383.72 386.4

15 SDP ESC C A R 0.82 0.6


M
P
E S 0.79 0.51
R
E
T 0.85 0.62
LWBP 727.89 735.54
WBP 2360.18 2377.77

16 SDP PAC C A R 2.03 2.13


M
P
E S 1.85 2.14
R
E
T 1.97 2.22
LWBP 597.92 603.06
WBP 1976.08 1989.09

17 SDP KIOS D A R 1.69 1.69


M
P
E S 1.67 1.68
R
E
T 1.68 1.62
LWBP 567.19 571.72
WBP 1283.04 1290.8

18 SDP PENERANGAN D A R 1.01 1.06


M
P
E S 1.1 1.19
R
E
T 0.86 1.07
LWBP 139.98 141.4

19 SDP LIFT
WBP 545.76 549.74

19 SDP LIFT A R 0.19 0.68


M
P
E S 0.17 0.58
R
E
T 0.35 0.69
LWBP 844.76 849.66
WBP 1645.95 1655.25

20 SDP PARKIR A R 1.36 1.25


M
P
E S 1.36 1.26
R
E
T 1.15 1.2
LWBP 52.14 52.79
WBP 225.56 227.41

21 SDP EMERGENCY A R 0.3 0.3


M
P
E S 0.48 0.19
R
E
T 0.49 0.21
LWBP 394.06 397.59
WBP 1850.29 1861.23

22 SDP R.M & E A R 1.11 1.17


M
P
E S 1.02 1.17
R
E
T 1.1 1.05

Dibuat Oleh, Diperiksa Oleh,

Jae & Patri


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 23/01/2017 Date :
TER HARIAN

TANGGAL : 23/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.5 kwh

3 kwh

-0.24 amp 4.5 kwh

0 amp

0 amp

0.01 kwh

0 kwh

0 amp 0.01 kwh

0 amp

0 amp

3.46 kwh

4.25 kwh

-0.06 amp 7.71 kwh

-0.03 amp

-0.03 amp

3.87 kwh

16.3 kwh

-0.14 amp 20.17 kwh

-0.19 amp

-0.13 amp

3.13 kwh

6.24 kwh

-0.28 amp 9.37 kwh


9.37 kwh

-0.13 amp

-0.2 amp

16.34 kwh

43.27 kwh

0.02 amp 59.61 kwh

-0.07 amp

-0.15 amp

3.55 kwh

8.25 kwh

-0.24 amp 11.8 kwh

-0.22 amp

-0.23 amp

4.49 kwh

4.78 kwh

0.1 amp 9.27 kwh

0.04 amp

0.19 amp

2.72 kwh

3.96 kwh

-0.27 amp 6.68 kwh

-0.26 amp

-0.19 amp

2.18 kwh

4.13 kwh

0.04 amp 6.31 kwh

-0.08 amp

-0.05 amp

6.47 kwh

12.47 kwh

-0.05 amp 18.94 kwh

-0.04 amp

-0.04 amp

11.99 kwh

19.12 kwh

31.11 kwh
0.03 amp 31.11 kwh

-0.07 amp

-0.05 amp

2.97 kwh

6.89 kwh

-0.04 amp 9.86 kwh

-0.07 amp

-0.04 amp

1.97 kwh

6.62 kwh

0.17 amp 8.59 kwh

0.08 amp

0.01 amp

1.45 kwh

2.68 kwh

-0.22 amp 4.13 kwh

-0.28 amp

-0.23 amp

7.65 kwh

17.59 kwh

0.1 amp 25.24 kwh

0.29 amp

0.25 amp

5.14 kwh

13.01 kwh

0 amp 18.15 kwh

0.01 amp

-0.06 amp

4.53 kwh

7.76 kwh

0.05 amp 12.29 kwh

0.09 amp

0.21 amp

1.42 kwh

5.4 kwh
3.98 kwh

0.49 amp 5.4 kwh

0.41 amp

0.34 amp

4.9 kwh

9.3 kwh

-0.11 amp 14.2 kwh

-0.1 amp

0.05 amp

0.65 kwh

1.85 kwh

0 amp 2.5 kwh

-0.29 amp

-0.28 amp

3.53 kwh

10.94 kwh

0.06 amp 14.47 kwh

0.15 amp

-0.05 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO : 24

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 149.68 150.23
WBP 461.27 463.8

1 SDP POMPA A R 0.94 1.03


M
P
E S 0 0
R
E
T 0 0
LWBP 0.18 0.18
WBP 0.74 0.74

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 354.27 354.81
WBP 709.09 712.95

3 SDP PENERANGAN B A R 0.66 0.69


M
P
E S 0.74 0.75
R
E
T 0.77 0.7
LWBP 247.07 247.76
WBP 1207.25 1212.3

4 SDP KIOS B A R 0.97 1.03


M
P
E S 0.93 1.04
R
E
T 0.95 1.05
LWBP 208.84 209.21
WBP 529.41 531.7

5 SDP ESC B A R 0.58 0.69


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.67 0.77
R
E
T 0.78 0.96
LWBP 1042.79 1044.43
WBP 3181.93 3197.32

6 SDP PAC B A R 2.98 2.96


M
P
E S 2.88 2.95
R
E
T 2.68 2.9
LWBP 328.64 329.18
WBP 1086.84 1092.83

7 SDP KIOS A A R 0.8 1.12


M
P
E S 0.76 1.12
R
E
T 0.89 1.07
LWBP 468.94 469.59
WBP 827.12 830.56

8 SDP PENERANGAN A A R 0.98 0.66


M
P
E S 0.62 0.62
R
E
T 0.63 0.63
LWBP 241.35 241.72
WBP 606.61 609.43

9 SDP ESC A A R 0.73 0.82


M
P
E S 0.84 0.99
R
E
T 0.89 0.93
LWBP 265.45 266.08
WBP 663.09 666.83

10 SDP ESC D A R 0.58 0.59


M
P
E S 0.83 0.84
R
E
T 0.8 0.82
LWBP 710.29 711.85
WBP 1952.24 1962.52

11 SDP AC D A R 1.68 1.67


M
P
E S 1.85 1.83
R
E
T 1.86 1.85
LWBP 1133.94 1135.52
WBP 3013 3027.09

12 SDP PAC A
12 SDP PAC A A R 2.69 2.65
M
P
E S 2.68 2.72
R
E
T 2.69 2.7
LWBP 320.38 321.13
WBP 1010.24 1016.18

13 SDP KIOS C A R 0.92 0.98


M
P
E S 0.85 0.92
R
E
T 0.76 0.85
LWBP 333.43 334.7
WBP 936 940.2

14 SDP PENERANGAN C A R 0.95 0.95


M
P
E S 0.83 0.8
R
E
T 0.53 0.54
LWBP 149.88 150.28
WBP 386.4 388.83

15 SDP ESC C A R 0.6 0.61


M
P
E S 0.51 0.5
R
E
T 0.62 0.6
LWBP 735.54 737.07
WBP 2377.77 2392.8

16 SDP PAC C A R 2.13 2.24


M
P
E S 2.14 2.15
R
E
T 2.22 2.26
LWBP 603.06 604.66
WBP 1989.09 2000.83

17 SDP KIOS D A R 1.69 1.89


M
P
E S 1.68 1.85
R
E
T 1.62 1.86
LWBP 571.72 573.26
WBP 1290.8 1297.57

18 SDP PENERANGAN D A R 1.06 1.09


M
P
E S 1.19 1.21
R
E
T 1.07 1.01
LWBP 141.4 141.83

19 SDP LIFT
WBP 549.74 553.41

19 SDP LIFT A R 0.68 0.21


M
P
E S 0.58 0.16
R
E
T 0.69 0.28
LWBP 849.66 855.15
WBP 1655.25 1667.87

20 SDP PARKIR A R 1.25 1.89


M
P
E S 1.26 2.04
R
E
T 1.2 1.8
LWBP 52.79 53.11
WBP 227.41 228.89

21 SDP EMERGENCY A R 0.3 0.03


M
P
E S 0.19 0.21
R
E
T 0.21 0.43
LWBP 397.59 399.49
WBP 1861.23 1871.63

22 SDP R.M & E A R 1.17 1.14


M
P
E S 1.17 1.14
R
E
T 1.05 1.19

Dibuat Oleh, Diperiksa Oleh,

Jae & Patri


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 24/01/2017 Date :
TER HARIAN

TANGGAL : 24/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.55 kwh

2.53 kwh

0.09 amp 3.08 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0.54 kwh

3.86 kwh

0.03 amp 4.4 kwh

0.01 amp

-0.07 amp

0.69 kwh

5.05 kwh

0.06 amp 5.74 kwh

0.11 amp

0.1 amp

0.37 kwh

2.29 kwh

0.11 amp 2.66 kwh


2.66 kwh

0.1 amp

0.18 amp

1.64 kwh

15.39 kwh

-0.02 amp 17.03 kwh

0.07 amp

0.22 amp

0.54 kwh

5.99 kwh

0.32 amp 6.53 kwh

0.36 amp

0.18 amp

0.65 kwh

3.44 kwh

-0.32 amp 4.09 kwh

0 amp

0 amp

0.37 kwh

2.82 kwh

0.09 amp 3.19 kwh

0.15 amp

0.04 amp

0.63 kwh

3.74 kwh

0.01 amp 4.37 kwh

0.01 amp

0.02 amp

1.56 kwh

10.28 kwh

-0.01 amp 11.84 kwh

-0.02 amp

-0.01 amp

1.58 kwh

14.09 kwh

15.67 kwh
-0.04 amp 15.67 kwh

0.04 amp

0.01 amp

0.75 kwh

5.94 kwh

0.06 amp 6.69 kwh

0.07 amp

0.09 amp

1.27 kwh

4.2 kwh

0 amp 5.47 kwh

-0.03 amp

0.01 amp

0.4 kwh

2.43 kwh

0.01 amp 2.83 kwh

-0.01 amp

-0.02 amp

1.53 kwh

15.03 kwh

0.11 amp 16.56 kwh

0.01 amp

0.04 amp

1.6 kwh

11.74 kwh

0.2 amp 13.34 kwh

0.17 amp

0.24 amp

1.54 kwh

6.77 kwh

0.03 amp 8.31 kwh

0.02 amp

-0.06 amp

0.43 kwh

4.1 kwh
3.67 kwh

-0.47 amp 4.1 kwh

-0.42 amp

-0.41 amp

5.49 kwh

12.62 kwh

0.64 amp 18.11 kwh

0.78 amp

0.6 amp

0.32 kwh

1.48 kwh

-0.27 amp 1.8 kwh

0.02 amp

0.22 amp

1.9 kwh

10.4 kwh

-0.03 amp 12.3 kwh

-0.03 amp

0.14 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 25

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 150.23 150.92
WBP 463.8 466.52

1 SDP POMPA A R 1.03 1.04


M
P
E S 0 0
R
E
T 0 0
LWBP 0.18 0.19
WBP 0.74 0.74

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 354.81 357.33
WBP 712.95 717.12

3 SDP PENERANGAN B A R 0.69 0.7


M
P
E S 0.75 0.75
R
E
T 0.7 0.78
LWBP 247.76 249.22
WBP 1212.3 1221.74

4 SDP KIOS B A R 1.03 1.11


M
P
E S 1.04 1.08
R
E
T 1.05 1.1
LWBP 209.21 210.64
WBP 531.7 535.28

5 SDP ESC B A R 0.69 0.88


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.77 0.77
R
E
T 0.96 0.94
LWBP 1044.43 1050.95
WBP 3197.32 3222.83

6 SDP PAC B A R 2.96 3.02


M
P
E S 2.95 3
R
E
T 2.9 2.92
LWBP 329.18 331.45
WBP 1092.83 1102.39

7 SDP KIOS A A R 1.12 1.03


M
P
E S 1.12 1.12
R
E
T 1.07 1.18
LWBP 469.59 472.88
WBP 830.56 836.31

8 SDP PENERANGAN A A R 0.66 0.99


M
P
E S 0.62 0.87
R
E
T 0.63 1
LWBP 241.72 243.64
WBP 609.43 614.07

9 SDP ESC A A R 0.82 0.84


M
P
E S 0.99 0.92
R
E
T 0.93 1.03
LWBP 266.08 267.85
WBP 666.83 670.49

10 SDP ESC D A R 0.59 0.55


M
P
E S 0.84 0.8
R
E
T 0.82 0.76
LWBP 711.85 716.51
WBP 1962.52 1973.18

11 SDP AC D A R 1.67 1.67


M
P
E S 1.83 1.84
R
E
T 1.85 1.86
LWBP 1135.52 1144.07
WBP 3027.09 3049.25

12 SDP PAC A
12 SDP PAC A A R 2.65 2.69
M
P
E S 2.72 2.76
R
E
T 2.7 2.71
LWBP 321.13 323.44
WBP 1016.18 1022.27

13 SDP KIOS C A R 0.98 1


M
P
E S 0.92 0.92
R
E
T 0.85 0.8
LWBP 334.7 336.33
WBP 940.2 945.64

14 SDP PENERANGAN C A R 0.95 0.96


M
P
E S 0.8 0.82
R
E
T 0.54 0.6
LWBP 150.28 151.34
WBP 388.83 391.2

15 SDP ESC C A R 0.61 0.73


M
P
E S 0.5 0.53
R
E
T 0.6 0.67
LWBP 737.07 742.64
WBP 2392.8 2407.68

16 SDP PAC C A R 2.24 2.25


M
P
E S 2.15 2.15
R
E
T 2.26 2.28
LWBP 604.66 609.34
WBP 2000.83 2012.63

17 SDP KIOS D A R 1.89 1.85


M
P
E S 1.85 1.9
R
E
T 1.86 1.84
LWBP 573.26 576.87
WBP 1297.57 1304.35

18 SDP PENERANGAN D A R 1.09 1.07


M
P
E S 1.21 1.2
R
E
T 1.01 1.07
LWBP 141.83 142.94

19 SDP LIFT
WBP 553.41 557.01

19 SDP LIFT A R 0.21 0.19


M
P
E S 0.16 0.17
R
E
T 0.28 0.28
LWBP 855.15 859.78
WBP 1667.87 1677.97

20 SDP PARKIR A R 1.89 1.87


M
P
E S 2.04 2.03
R
E
T 1.8 1.78
LWBP 53.11 53.31
WBP 228.89 230.69

21 SDP EMERGENCY A R 0.03 0.28


M
P
E S 0.21 0.45
R
E
T 0.43 0.41
LWBP 399.49 400.75
WBP 1871.63 1882.81

22 SDP R.M & E A R 1.14 1.14


M
P
E S 1.14 1.07
R
E
T 1.19 1.17

Dibuat Oleh, Diperiksa Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date: 25/01/2017 Date :
TER HARIAN

TANGGAL : 25/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.69 kwh

2.72 kwh

0.01 amp 3.41 kwh

0 amp

0 amp

0.01 kwh

0 kwh

0 amp 0.01 kwh

0 amp

0 amp

2.52 kwh

4.17 kwh

0.01 amp 6.69 kwh

0 amp

0.08 amp

1.46 kwh

9.44 kwh

0.08 amp 10.9 kwh

0.04 amp

0.05 amp

1.43 kwh

3.58 kwh

0.19 amp 5.01 kwh


5.01 kwh

0 amp

-0.02 amp

6.52 kwh

25.51 kwh

0.06 amp 32.03 kwh

0.05 amp

0.02 amp

2.27 kwh

9.56 kwh

-0.09 amp 11.83 kwh

0 amp

0.11 amp

3.29 kwh

5.75 kwh

0.33 amp 9.04 kwh

0.25 amp

0.37 amp

1.92 kwh

4.64 kwh

0.02 amp 6.56 kwh

-0.07 amp

0.1 amp

1.77 kwh

3.66 kwh

-0.04 amp 5.43 kwh

-0.04 amp

-0.06 amp

4.66 kwh

10.66 kwh

0 amp 15.32 kwh

0.01 amp

0.01 amp

8.55 kwh

22.16 kwh

30.71 kwh
0.04 amp 30.71 kwh

0.04 amp

0.01 amp

2.31 kwh

6.09 kwh

0.02 amp 8.4 kwh

0 amp

-0.05 amp

1.63 kwh

5.44 kwh

0.01 amp 7.07 kwh

0.02 amp

0.06 amp

1.06 kwh

2.37 kwh

0.12 amp 3.43 kwh

0.03 amp

0.07 amp

5.57 kwh

14.88 kwh

0.01 amp 20.45 kwh

0 amp

0.02 amp

4.68 kwh

11.8 kwh

-0.04 amp 16.48 kwh

0.05 amp

-0.02 amp

3.61 kwh

6.78 kwh

-0.02 amp 10.39 kwh

-0.01 amp

0.06 amp

1.11 kwh

4.71 kwh
3.6 kwh

-0.02 amp 4.71 kwh

0.01 amp

0 amp

4.63 kwh

10.1 kwh

-0.02 amp 14.73 kwh

-0.01 amp

-0.02 amp

0.2 kwh

1.8 kwh

0.25 amp 2 kwh

0.24 amp

-0.02 amp

1.26 kwh

11.18 kwh

0 amp 12.44 kwh

-0.07 amp

-0.02 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : Engineering DOKUMEN NO : 26

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 150.92 151.8
WBP 466.52 469.1

1 SDP POMPA A R 1.04 1.19


M
P
E S 0 0
R
E
T 0 0
LWBP 0.19 0.19
WBP 0.74 0.74

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 357.33 359.49
WBP 717.12 721.22

3 SDP PENERANGAN B A R 0.7 0.7


M
P
E S 0.75 0.75
R
E
T 0.78 0.78
LWBP 249.22 250.75
WBP 1221.74 1229.3

4 SDP KIOS B A R 1.11 1.1


M
P
E S 1.08 1.04
R
E
T 1.1 1.1
LWBP 210.64 211.9
WBP 535.28 538.35

5 SDP ESC B A R 0.88 0.87


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.77 0.8
R
E
T 0.94 0.78
LWBP 1050.95 1057.13
WBP 3222.83 3243.17

6 SDP PAC B A R 3.02 2.97


M
P
E S 3 2.98
R
E
T 2.92 2.9
LWBP 331.45 333.73
WBP 1102.39 1109.9

7 SDP KIOS A A R 1.03 0.95


M
P
E S 1.12 1.05
R
E
T 1.18 1.11
LWBP 472.88 475.69
WBP 836.31 840.93

8 SDP PENERANGAN A A R 0.99 0.99


M
P
E S 0.87 0.87
R
E
T 1 1
LWBP 243.64 245.34
WBP 614.07 617.88

9 SDP ESC A A R 0.84 0.91


M
P
E S 0.92 0.95
R
E
T 1.03 1.01
LWBP 267.85 269.02
WBP 670.49 674.21

10 SDP ESC D A R 0.55 0.63


M
P
E S 0.8 0.94
R
E
T 0.76 0.9
LWBP 716.51 719.56
WBP 1973.18 1984.82

11 SDP AC D A R 1.67 1.66


M
P
E S 1.84 1.83
R
E
T 1.86 1.84
LWBP 1144.07 1151.33
WBP 3049.25 3066.51

12 SDP PAC A
12 SDP PAC A A R 2.69 2.51
M
P
E S 2.76 2.55
R
E
T 2.71 2.54
LWBP 323.44 324.88
WBP 1022.27 1028.14

13 SDP KIOS C A R 1 1
M
P
E S 0.92 0.87
R
E
T 0.8 0.83
LWBP 336.33 337.99
WBP 945.64 950.3

14 SDP PENERANGAN C A R 0.96 0.95


M
P
E S 0.82 0.8
R
E
T 0.6 0.55
LWBP 151.34 151.93
WBP 391.2 393.61

15 SDP ESC C A R 0.73 0.53


M
P
E S 0.53 0.46
R
E
T 0.67 0.57
LWBP 742.64 746
WBP 2407.68 2422.24

16 SDP PAC C A R 2.25 2.19


M
P
E S 2.15 2.2
R
E
T 2.28 2.23
LWBP 609.34 612.33
WBP 2012.63 2023.84

17 SDP KIOS D A R 1.85 1.9


M
P
E S 1.9 1.82
R
E
T 1.84 1.83
LWBP 576.87 579.36
WBP 1304.35 1311.18

18 SDP PENERANGAN D A R 1.07 1.07


M
P
E S 1.2 1.19
R
E
T 1.07 1.01
LWBP 142.94 143.72

19 SDP LIFT
WBP 557.01 560.43

19 SDP LIFT A R 0.19 0.18


M
P
E S 0.17 0.14
R
E
T 0.28 0.34
LWBP 859.78 865.35
WBP 1677.97 1688.05

20 SDP PARKIR A R 1.87 1.89


M
P
E S 2.03 2.03
R
E
T 1.78 1.8
LWBP 53.31 53.78
WBP 230.69 232.39

21 SDP EMERGENCY A R 0.28 0.46


M
P
E S 0.45 0.66
R
E
T 0.41 0.61
LWBP 400.75 403.45
WBP 1882.81 1893.73

22 SDP R.M & E A R 1.14 1.17


M
P
E S 1.07 1.14
R
E
T 1.17 1.2

Dibuat Oleh, Diperiksa Oleh,

Fandy, Dwi, Bowo


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 26 Januari 2017 Date :
TER HARIAN

TANGGAL : 26 Januari 2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.88 kwh

2.58 kwh

0.15 amp 3.46 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.16 kwh

4.1 kwh

0 amp 6.26 kwh

0 amp

0 amp

1.53 kwh

7.56 kwh

-0.01 amp 9.09 kwh

-0.04 amp

0 amp

1.26 kwh

3.07 kwh

-0.01 amp 4.33 kwh


4.33 kwh

0.03 amp

-0.16 amp

6.18 kwh

20.34 kwh

-0.05 amp 26.52 kwh

-0.02 amp

-0.02 amp

2.28 kwh

7.51 kwh

-0.08 amp 9.79 kwh

-0.07 amp

-0.07 amp

2.81 kwh

4.62 kwh

0 amp 7.43 kwh

0 amp

0 amp

1.7 kwh

3.81 kwh

0.07 amp 5.51 kwh

0.03 amp

-0.02 amp

1.17 kwh

3.72 kwh

0.08 amp 4.89 kwh

0.14 amp

0.14 amp

3.05 kwh

11.64 kwh

-0.01 amp 14.69 kwh

-0.01 amp

-0.02 amp

7.26 kwh

17.26 kwh

24.52 kwh
-0.18 amp 24.52 kwh

-0.21 amp

-0.17 amp

1.44 kwh

5.87 kwh

0 amp 7.31 kwh

-0.05 amp

0.03 amp

1.66 kwh

4.66 kwh

-0.01 amp 6.32 kwh

-0.02 amp

-0.05 amp

0.59 kwh

2.41 kwh

-0.2 amp 3 kwh

-0.07 amp

-0.1 amp

3.36 kwh

14.56 kwh

-0.06 amp 17.92 kwh

0.05 amp

-0.05 amp

2.99 kwh

11.21 kwh

0.05 amp 14.2 kwh

-0.08 amp

-0.01 amp

2.49 kwh

6.83 kwh

0 amp 9.32 kwh

-0.01 amp

-0.06 amp

0.78 kwh

4.2 kwh
3.42 kwh

-0.01 amp 4.2 kwh

-0.03 amp

0.06 amp

5.57 kwh

10.08 kwh

0.02 amp 15.65 kwh

0 amp

0.02 amp

0.47 kwh

1.7 kwh

0.18 amp 2.17 kwh

0.21 amp

0.2 amp

2.7 kwh

10.92 kwh

0.03 amp 13.62 kwh

0.07 amp

0.03 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : ENGINEERING OPS DOKUMEN NO : 27

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 151.8 152.29
WBP 469.1 471.65

1 SDP POMPA A R 1.19 1.05


M
P
E S 0 0
R
E
T 0 0
LWBP 0.19 0.19
WBP 0.74 0.75

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 359.49 360
WBP 721.22 724.88

3 SDP PENERANGAN B A R 0.7 0.69


M
P
E S 0.75 0.74
R
E
T 0.78 0.78
LWBP 250.75 252.27
WBP 1229.3 1235.27

4 SDP KIOS B A R 1.1 1.01


M
P
E S 1.04 1.07
R
E
T 1.1 1.12
LWBP 211.9 212.73
WBP 538.35 541.25

5 SDP ESC B A R 0.87 0.78


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.8 0.83
R
E
T 0.78 0.91
LWBP 1057.13 1061.49
WBP 3243.17 3261

6 SDP PAC B A R 2.97 2.94


M
P
E S 2.98 2.97
R
E
T 2.9 2.89
LWBP 333.73 335.23
WBP 1109.9 1116.62

7 SDP KIOS A A R 0.95 0.92


M
P
E S 1.05 1.02
R
E
T 1.11 1.13
LWBP 475.69 477.38
WBP 840.93 845.17

8 SDP PENERANGAN A A R 0.99 0.82


M
P
E S 0.87 0.74
R
E
T 1 0.78
LWBP 245.34 246.35
WBP 617.88 621.43

9 SDP ESC A A R 0.91 0.75


M
P
E S 0.95 0.97
R
E
T 1.01 0.96
LWBP 269.02 270.53
WBP 674.21 677.91

10 SDP ESC D A R 0.63 0.65


M
P
E S 0.94 0.84
R
E
T 0.9 0.86
LWBP 719.56 723.42
WBP 1984.82 1995.61

11 SDP AC D A R 1.66 1.64


M
P
E S 1.83 1.84
R
E
T 1.84 1.83
LWBP 1151.33 1155.47
WBP 3066.51 3083.27

12 SDP PAC A
12 SDP PAC A A R 2.51 2.64
M
P
E S 2.55 2.7
R
E
T 2.54 2.7
LWBP 324.88 326.75
WBP 1028.14 1033.78

13 SDP KIOS C A R 1 0.97


M
P
E S 0.87 0.88
R
E
T 0.83 0.82
LWBP 337.99 339.64
WBP 950.3 955.26

14 SDP PENERANGAN C A R 0.95 0.95


M
P
E S 0.8 0.87
R
E
T 0.55 0.55
LWBP 151.93 152.9
WBP 393.61 396.06

15 SDP ESC C A R 0.53 0.72


M
P
E S 0.46 0.56
R
E
T 0.57 0.61
LWBP 746 750.3
WBP 2422.24 2436.75

16 SDP PAC C A R 2.19 2.23


M
P
E S 2.2 2.24
R
E
T 2.23 2.19
LWBP 612.33 616.2
WBP 2023.84 2034.92

17 SDP KIOS D A R 1.9 1.77


M
P
E S 1.82 1.69
R
E
T 1.83 1.75
LWBP 579.36 582.41
WBP 1311.18 1318.27

18 SDP PENERANGAN D A R 1.07 1.07


M
P
E S 1.19 1.19
R
E
T 1.01 1.01
LWBP 143.72 144.58

19 SDP LIFT
WBP 560.43 563.4

19 SDP LIFT A R 0.18 0.19


M
P
E S 0.14 0.1
R
E
T 0.34 0.3
LWBP 865.35 869.76
WBP 1688.05 1697.02

20 SDP PARKIR A R 1.89 1.52


M
P
E S 2.03 2.35
R
E
T 1.8 2.33
LWBP 53.78 54.09
WBP 232.39 233.97

21 SDP EMERGENCY A R 0.46 0.07


M
P
E S 0.66 0.24
R
E
T 0.61 0.21
LWBP 403.45 405.22
WBP 1893.73 1903.81

22 SDP R.M & E A R 1.17 1.17


M
P
E S 1.14 1.06
R
E
T 1.2 1.16

Dibuat Oleh, Diperiksa Oleh,

Sabki & team


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 27/01/2017 Date :
TER HARIAN

TANGGAL : 27/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.49 kwh

2.55 kwh

-0.14 amp 3.04 kwh

0 amp

0 amp

0 kwh

0.01 kwh

0 amp 0.01 kwh

0 amp

0 amp

0.51 kwh

3.66 kwh

-0.01 amp 4.17 kwh

-0.01 amp

0 amp

1.52 kwh

5.97 kwh

-0.09 amp 7.49 kwh

0.03 amp

0.02 amp

0.83 kwh

2.9 kwh

-0.09 amp 3.73 kwh


3.73 kwh

0.03 amp

0.13 amp

4.36 kwh

17.83 kwh

-0.03 amp 22.19 kwh

-0.01 amp

-0.01 amp

1.5 kwh

6.72 kwh

-0.03 amp 8.22 kwh

-0.03 amp

0.02 amp

1.69 kwh

4.24 kwh

-0.17 amp 5.93 kwh

-0.13 amp

-0.22 amp

1.01 kwh

3.55 kwh

-0.16 amp 4.56 kwh

0.02 amp

-0.05 amp

1.51 kwh

3.7 kwh

0.02 amp 5.21 kwh

-0.1 amp

-0.04 amp

3.86 kwh

10.79 kwh

-0.02 amp 14.65 kwh

0.01 amp

-0.01 amp

4.14 kwh

16.76 kwh

20.9 kwh
0.13 amp 20.9 kwh

0.15 amp

0.16 amp

1.87 kwh

5.64 kwh

-0.03 amp 7.51 kwh

0.01 amp

-0.01 amp

1.65 kwh

4.96 kwh

0 amp 6.61 kwh

0.07 amp

0 amp

0.97 kwh

2.45 kwh

0.19 amp 3.42 kwh

0.1 amp

0.04 amp

4.3 kwh

14.51 kwh

0.04 amp 18.81 kwh

0.04 amp

-0.04 amp

3.87 kwh

11.08 kwh

-0.13 amp 14.95 kwh

-0.13 amp

-0.08 amp

3.05 kwh

7.09 kwh

0 amp 10.14 kwh

0 amp

0 amp

0.86 kwh

3.83 kwh
2.97 kwh

0.01 amp 3.83 kwh

-0.04 amp

-0.04 amp

4.41 kwh

8.97 kwh

-0.37 amp 13.38 kwh

0.32 amp

0.53 amp

0.31 kwh

1.58 kwh

-0.39 amp 1.89 kwh

-0.42 amp

-0.4 amp

1.77 kwh

10.08 kwh

0 amp 11.85 kwh

-0.08 amp

-0.04 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO : 28

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 152.29 153.17
WBP 471.65 474.53

1 SDP POMPA A R 1.05 1.79


M
P
E S 0 0
R
E
T 0 0
LWBP 0.19 0.19
WBP 0.75 0.75

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 360 362.92
WBP 724.88 728.47

3 SDP PENERANGAN B A R 0.69 0.56


M
P
E S 0.74 0.64
R
E
T 0.78 0.66
LWBP 252.27 253.76
WBP 1235.27 1242.52

4 SDP KIOS B A R 1.01 0.97


M
P
E S 1.07 1.07
R
E
T 1.12 1.03
LWBP 212.73 214.05
WBP 541.25 544.64

5 SDP ESC B A R 0.78 0.55


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.83 0.7
R
E
T 0.91 0.75
LWBP 1061.49 1067.17
WBP 3261 3282.21

6 SDP PAC B A R 2.94 3


M
P
E S 2.97 3.02
R
E
T 2.89 2.94
LWBP 335.23 337.23
WBP 1116.62 1124.25

7 SDP KIOS A A R 0.92 1.04


M
P
E S 1.02 0.99
R
E
T 1.13 1.1
LWBP 477.38 479.92
WBP 845.17 849.24

8 SDP PENERANGAN A A R 0.82 0.96


M
P
E S 0.74 0.77
R
E
T 0.78 0.86
LWBP 246.35 247.91
WBP 621.43 625.71

9 SDP ESC A A R 0.75 0.81


M
P
E S 0.97 0.88
R
E
T 0.96 0.83
LWBP 270.53 272.06
WBP 677.91 681.46

10 SDP ESC D A R 0.65 0.65


M
P
E S 0.84 0.76
R
E
T 0.86 0.75
LWBP 723.42 727.29
WBP 1995.61 2006.25

11 SDP AC D A R 1.64 1.75


M
P
E S 1.84 1.88
R
E
T 1.83 1.87
LWBP 1155.47 1162.27
WBP 3083.27 3102.19

12 SDP PAC A
12 SDP PAC A A R 2.64 2.69
M
P
E S 2.7 2.276
R
E
T 2.7 2.79
LWBP 326.75 328.59
WBP 1033.78 1039.33

13 SDP KIOS C A R 0.97 0.95


M
P
E S 0.88 0.85
R
E
T 0.82 0.79
LWBP 339.64 341.29
WBP 955.26 960.77

14 SDP PENERANGAN C A R 0.95 0.96


M
P
E S 0.87 0.85
R
E
T 0.55 0.59
LWBP 152.9 153.9
WBP 396.06 398.69

15 SDP ESC C A R 0.72 0.73


M
P
E S 0.56 0.63
R
E
T 0.61 0.73
LWBP 750.3 754.71
WBP 2436.75 2450.55

16 SDP PAC C A R 2.23 1.87


M
P
E S 2.24 1.98
R
E
T 2.19 1.94
LWBP 616.2 619.82
WBP 2034.92 2046.05

17 SDP KIOS D A R 1.77 1.65


M
P
E S 1.69 1.6
R
E
T 1.75 1.68
LWBP 582.41 585.47
WBP 1318.27 1325.54

18 SDP PENERANGAN D A R 1.07 1.08


M
P
E S 1.19 1.2
R
E
T 1.01 0.99
LWBP 144.58 145.43

19 SDP LIFT
WBP 563.4 566.5

19 SDP LIFT A R 0.19 0.2


M
P
E S 0.1 0.44
R
E
T 0.3 0.09
LWBP 869.76 874.78
WBP 1697.02 1708.61

20 SDP PARKIR A R 1.52 1.91


M
P
E S 2.35 2.03
R
E
T 2.33 1.83
LWBP 54.09 54.45
WBP 233.97 235.54

21 SDP EMERGENCY A R 0.07 0.03


M
P
E S 0.24 0.2
R
E
T 0.21 0.21
LWBP 405.22 407.42
WBP 1903.81 1914.65

22 SDP R.M & E A R 1.17 1.15


M
P
E S 1.06 1.03
R
E
T 1.16 1.14

Dibuat Oleh, Diperiksa Oleh,

Sabki & Team


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 27/1/2017 Date :
TER HARIAN

TANGGAL : 28/1/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.88 kwh

2.88 kwh

0.74 amp 3.76 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.92 kwh

3.59 kwh

-0.13 amp 6.51 kwh

-0.1 amp

-0.12 amp

1.49 kwh

7.25 kwh

-0.04 amp 8.74 kwh

0 amp

-0.09 amp

1.32 kwh

3.39 kwh

-0.23 amp 4.71 kwh


4.71 kwh

-0.13 amp

-0.16 amp

5.68 kwh

21.21 kwh

0.06 amp 26.89 kwh

0.05 amp

0.05 amp

2 kwh

7.63 kwh

0.12 amp 9.63 kwh

-0.03 amp

-0.03 amp

2.54 kwh

4.07 kwh

0.14 amp 6.61 kwh

0.03 amp

0.08 amp

1.56 kwh

4.28 kwh

0.06 amp 5.84 kwh

-0.09 amp

-0.13 amp

1.53 kwh

3.55 kwh

0 amp 5.08 kwh

-0.08 amp

-0.11 amp

3.87 kwh

10.64 kwh

0.11 amp 14.51 kwh

0.04 amp

0.04 amp

6.8 kwh

18.92 kwh

25.72 kwh
0.05 amp 25.72 kwh

-0.424 amp

0.09 amp

1.84 kwh

5.55 kwh

-0.02 amp 7.39 kwh

-0.03 amp

-0.03 amp

1.65 kwh

5.51 kwh

0.01 amp 7.16 kwh

-0.02 amp

0.04 amp

1 kwh

2.63 kwh

0.01 amp 3.63 kwh

0.07 amp

0.12 amp

4.41 kwh

13.8 kwh

-0.36 amp 18.21 kwh

-0.26 amp

-0.25 amp

3.62 kwh

11.13 kwh

-0.12 amp 14.75 kwh

-0.09 amp

-0.07 amp

3.06 kwh

7.27 kwh

0.01 amp 10.33 kwh

0.01 amp

-0.02 amp

0.85 kwh

3.95 kwh
3.1 kwh

0.01 amp 3.95 kwh

0.34 amp

-0.21 amp

5.02 kwh

11.59 kwh

0.39 amp 16.61 kwh

-0.32 amp

-0.5 amp

0.36 kwh

1.57 kwh

-0.04 amp 1.93 kwh

-0.04 amp

0 amp

2.2 kwh

10.84 kwh

-0.02 amp 13.04 kwh

-0.03 amp

-0.02 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO : 29

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 153.17 154.68
WBP 474.53 477.41

1 SDP POMPA A R 1.79 0.93


M
P
E S 0 0
R
E
T 0 0
LWBP 0.19 0.19
WBP 0.75 0.75

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 362.92 364.53
WBP 728.47 732.65

3 SDP PENERANGAN B A R 0.56 0.73


M
P
E S 0.64 0.79
R
E
T 0.66 0.82
LWBP 253.76 255.25
WBP 1242.52 1248.68

4 SDP KIOS B A R 0.97 1.09


M
P
E S 1.07 1.08
R
E
T 1.03 1.08
LWBP 214.05 215.3
WBP 544.64 547.47

5 SDP ESC B A R 0.55 0.79


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.7 0.85
R
E
T 0.75 0.96
LWBP 1067.17 1073.28
WBP 3282.21 3299.94

6 SDP PAC B A R 3 3.1


M
P
E S 3.02 3.01
R
E
T 2.94 2.98
LWBP 337.23 339.25
WBP 1124.25 1131.82

7 SDP KIOS A A R 1.04 1.03


M
P
E S 0.99 1.11
R
E
T 1.1 1.14
LWBP 479.92 482.09
WBP 849.24 853.79

8 SDP PENERANGAN A A R 0.96 1.01


M
P
E S 0.77 0.89
R
E
T 0.86 1
LWBP 247.91 249.55
WBP 625.71 629.9

9 SDP ESC A A R 0.81 1.01


M
P
E S 0.88 1.01
R
E
T 0.83 1.13
LWBP 272.06 273.45
WBP 681.46 684.68

10 SDP ESC D A R 0.65 0.56


M
P
E S 0.76 0.76
R
E
T 0.75 0.78
LWBP 727.29 731.47
WBP 2006.25 2016.07

11 SDP AC D A R 1.75 1.77


M
P
E S 1.88 1.92
R
E
T 1.87 1.94
LWBP 1162.27 1169.02
WBP 3102.19 3119.89

12 SDP PAC A
12 SDP PAC A A R 2.69 2.7
M
P
E S 2.276 2.74
R
E
T 2.79 2.82
LWBP 328.59 330.46
WBP 1039.33 1044.36

13 SDP KIOS C A R 0.95 1.03


M
P
E S 0.85 0.87
R
E
T 0.79 0.78
LWBP 341.29 342.98
WBP 960.77 965.81

14 SDP PENERANGAN C A R 0.96 0.78


M
P
E S 0.85 0.73
R
E
T 0.59 0.6
LWBP 153.9 159.97
WBP 398.69 400.88

15 SDP ESC C A R 0.73 0.65


M
P
E S 0.63 0.64
R
E
T 0.73 0.69
LWBP 754.71 759.25
WBP 2450.55 2462.73

16 SDP PAC C A R 1.87 1.88


M
P
E S 1.98 1.85
R
E
T 1.94 1.95
LWBP 619.82 622.78
WBP 2046.05 2056.27

17 SDP KIOS D A R 1.65 1.72


M
P
E S 1.6 1.72
R
E
T 1.68 0.83
LWBP 585.47 588.46
WBP 1325.54 1332.09

18 SDP PENERANGAN D A R 1.08 1.02


M
P
E S 1.2 1.16
R
E
T 0.99 0.86
LWBP 145.43 146.2

19 SDP LIFT
WBP 566.5 569.26

19 SDP LIFT A R 0.2 0.19


M
P
E S 0.44 0.23
R
E
T 0.09 0.33
LWBP 874.78 879.76
WBP 1708.61 1719.15

20 SDP PARKIR A R 1.91 1.37


M
P
E S 2.03 1.36
R
E
T 1.83 1.14
LWBP 54.45 55.01
WBP 235.54 237.17

21 SDP EMERGENCY A R 0.03 0.27


M
P
E S 0.2 0.41
R
E
T 0.21 0.38
LWBP 407.42 410.69
WBP 1914.65 1926.4

22 SDP R.M & E A R 1.15 1.1


M
P
E S 1.03 1.1
R
E
T 1.14 1.17

Dibuat Oleh, Diperiksa Oleh,

IMAM SUBEHI & TEAM


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 29/1/2017 Date :
TER HARIAN

TANGGAL : 29/1/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
1.51 kwh

2.88 kwh

-0.86 amp 4.39 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

1.61 kwh

4.18 kwh

0.17 amp 5.79 kwh

0.15 amp

0.16 amp

1.49 kwh

6.16 kwh

0.12 amp 7.65 kwh

0.01 amp

0.05 amp

1.25 kwh

2.83 kwh

0.24 amp 4.08 kwh


4.08 kwh

0.15 amp

0.21 amp

6.11 kwh

17.73 kwh

0.1 amp 23.84 kwh

-0.01 amp

0.04 amp

2.02 kwh

7.57 kwh

-0.01 amp 9.59 kwh

0.12 amp

0.04 amp

2.17 kwh

4.55 kwh

0.05 amp 6.72 kwh

0.12 amp

0.14 amp

1.64 kwh

4.19 kwh

0.2 amp 5.83 kwh

0.13 amp

0.3 amp

1.39 kwh

3.22 kwh

-0.09 amp 4.61 kwh

0 amp

0.03 amp

4.18 kwh

9.82 kwh

0.02 amp 14 kwh

0.04 amp

0.07 amp

6.75 kwh

17.7 kwh

24.45 kwh
0.01 amp 24.45 kwh

0.464 amp

0.03 amp

1.87 kwh

5.03 kwh

0.08 amp 6.9 kwh

0.02 amp

-0.01 amp

1.69 kwh

5.04 kwh

-0.18 amp 6.73 kwh

-0.12 amp

0.01 amp

6.07 kwh

2.19 kwh

-0.08 amp 8.26 kwh

0.01 amp

-0.04 amp

4.54 kwh

12.18 kwh

0.01 amp 16.72 kwh

-0.13 amp

0.01 amp

2.96 kwh

10.22 kwh

0.07 amp 13.18 kwh

0.12 amp

-0.85 amp

2.99 kwh

6.55 kwh

-0.06 amp 9.54 kwh

-0.04 amp

-0.13 amp

0.77 kwh

3.53 kwh
2.76 kwh

-0.01 amp 3.53 kwh

-0.21 amp

0.24 amp

4.98 kwh

10.54 kwh

-0.54 amp 15.52 kwh

-0.67 amp

-0.69 amp

0.56 kwh

1.63 kwh

0.24 amp 2.19 kwh

0.21 amp

0.17 amp

3.27 kwh

11.75 kwh

-0.05 amp 15.02 kwh

0.07 amp

0.03 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO : 30

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 154.68 155.12
WBP 477.41 476.21

1 SDP POMPA A R 0.93 0.93


M
P
E S 0 0
R
E
T 0 0
LWBP 0.19 0.19
WBP 0.75 0.75

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 364.53 366.69
WBP 732.65 736.8

3 SDP PENERANGAN B A R 0.73 0.71


M
P
E S 0.79 0.76
R
E
T 0.82 0.8
LWBP 255.25 256.72
WBP 1248.68 1257.19

4 SDP KIOS B A R 1.09 1.07


M
P
E S 1.08 1.02
R
E
T 1.08 1.07
LWBP 215.3 216.66
WBP 547.47 550.96

5 SDP ESC B A R 0.79 0.78


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.85 0.82
R
E
T 0.96 0.01
LWBP 1073.28 1079.42
WBP 3299.94 3329.33

6 SDP PAC B A R 3.1 2.97


M
P
E S 3.01 2.99
R
E
T 2.98 2.9
LWBP 339.25 341.22
WBP 1131.82 1139.27

7 SDP KIOS A A R 1.03 0.99


M
P
E S 1.11 1
R
E
T 1.14 1.02
LWBP 482.09 484.76
WBP 853.79 858.4

8 SDP PENERANGAN A A R 1.01 0.99


M
P
E S 0.89 0.85
R
E
T 1 1.05
LWBP 249.55 251.19
WBP 629.9 633.82

9 SDP ESC A A R 1.01 0.96


M
P
E S 1.01 1.03
R
E
T 1.13 1.1
LWBP 273.45 274.87
WBP 684.68 688.69

10 SDP ESC D A R 0.56 0.64


M
P
E S 0.76 0.94
R
E
T 0.78 0.86
LWBP 731.47 735.67
WBP 2016.07 2028.08

11 SDP AC D A R 1.77 1.7


M
P
E S 1.92 1.86
R
E
T 1.94 1.87
LWBP 1169.02 1175.93
WBP 3119.89 3138.46

12 SDP PAC A
12 SDP PAC A A R 2.7 2.64
M
P
E S 2.74 2.69
R
E
T 2.82 2.69
LWBP 330.46 332.29
WBP 1044.36 1050.79

13 SDP KIOS C A R 1.03 1.02


M
P
E S 0.87 0.9
R
E
T 0.78 0.82
LWBP 342.98 344.63
WBP 965.81 971.36

14 SDP PENERANGAN C A R 0.78 0.95


M
P
E S 0.73 0.83
R
E
T 0.6 0.6
LWBP 159.97 155.84
WBP 400.88 403.61

15 SDP ESC C A R 0.65 0.71


M
P
E S 0.64 0.62
R
E
T 0.69 0.69
LWBP 759.25 763.69
WBP 2462.73 2478.9

16 SDP PAC C A R 1.88 2.19


M
P
E S 1.85 2.2
R
E
T 1.95 2.23
LWBP 622.78 625.63
WBP 2056.27 2068.3

17 SDP KIOS D A R 1.72 1.86


M
P
E S 1.72 1.78
R
E
T 0.83 1.78
LWBP 588.46 591.5
WBP 1332.09 1339.54

18 SDP PENERANGAN D A R 1.02 1.07


M
P
E S 1.16 1.19
R
E
T 0.86 1
LWBP 146.2 146.93

19 SDP LIFT
WBP 569.26 572.59

19 SDP LIFT A R 0.19 0.39


M
P
E S 0.23 0.25
R
E
T 0.33 0.32
LWBP 879.76 884.75
WBP 1719.15 1730.63

20 SDP PARKIR A R 1.37 1.89


M
P
E S 1.36 2.03
R
E
T 1.14 1.78
LWBP 55.01 55.22
WBP 237.17 238.64

21 SDP EMERGENCY A R 0.27 0.03


M
P
E S 0.41 0.09
R
E
T 0.38 0.17
LWBP 410.69 412.01
WBP 1926.4 1936.53

22 SDP R.M & E A R 1.1 1.16


M
P
E S 1.1 1.1
R
E
T 1.17 1.2

Dibuat Oleh, Diperiksa Oleh,

IMAM SUBEHI & TEAM


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 30/1/2017 Date :
TER HARIAN

TANGGAL : 30/1/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.44 kwh

-1.2 kwh

0 amp -0.76 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

2.16 kwh

4.15 kwh

-0.02 amp 6.31 kwh

-0.03 amp

-0.02 amp

1.47 kwh

8.51 kwh

-0.02 amp 9.98 kwh

-0.06 amp

-0.01 amp

1.36 kwh

3.49 kwh

-0.01 amp 4.85 kwh


4.85 kwh

-0.03 amp

-0.95 amp

6.14 kwh

29.39 kwh

-0.13 amp 35.53 kwh

-0.02 amp

-0.08 amp

1.97 kwh

7.45 kwh

-0.04 amp 9.42 kwh

-0.11 amp

-0.12 amp

2.67 kwh

4.61 kwh

-0.02 amp 7.28 kwh

-0.04 amp

0.05 amp

1.64 kwh

3.92 kwh

-0.05 amp 5.56 kwh

0.02 amp

-0.03 amp

1.42 kwh

4.01 kwh

0.08 amp 5.43 kwh

0.18 amp

0.08 amp

4.2 kwh

12.01 kwh

-0.07 amp 16.21 kwh

-0.06 amp

-0.07 amp

6.91 kwh

18.57 kwh

25.48 kwh
-0.06 amp 25.48 kwh

-0.05 amp

-0.13 amp

1.83 kwh

6.43 kwh

-0.01 amp 8.26 kwh

0.03 amp

0.04 amp

1.65 kwh

5.55 kwh

0.17 amp 7.2 kwh

0.1 amp

0 amp

-4.13 kwh

2.73 kwh

0.06 amp -1.4 kwh

-0.02 amp

0 amp

4.44 kwh

16.17 kwh

0.31 amp 20.61 kwh

0.35 amp

0.28 amp

2.85 kwh

12.03 kwh

0.14 amp 14.88 kwh

0.06 amp

0.95 amp

3.04 kwh

7.45 kwh

0.05 amp 10.49 kwh

0.03 amp

0.14 amp

0.73 kwh

4.06 kwh
3.33 kwh

0.2 amp 4.06 kwh

0.02 amp

-0.01 amp

4.99 kwh

11.48 kwh

0.52 amp 16.47 kwh

0.67 amp

0.64 amp

0.21 kwh

1.47 kwh

-0.24 amp 1.68 kwh

-0.32 amp

-0.21 amp

1.32 kwh

10.13 kwh

0.06 amp 11.45 kwh

0 amp

0.03 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO : 31

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP 155.12 155.81
WBP 476.21 482.39

1 SDP POMPA A R 0.93 0.89


M
P
E S 0 0
R
E
T 0 0
LWBP 0.19 0.19
WBP 0.75 0.77

2 PP HIDRANT A R 0 0
M
P
E S 0 0
R
E
T 0 0
LWBP 366.69 368.54
WBP 736.8 739.76

3 SDP PENERANGAN B A R 0.71 0.63


M
P
E S 0.76 0.57
R
E
T 0.8 0.66
LWBP 256.72 258.18
WBP 1257.19 1262.51

4 SDP KIOS B A R 1.07 1.03


M
P
E S 1.02 0.99
R
E
T 1.07 1.05
LWBP 216.66 217.7
WBP 550.96 553.16

5 SDP ESC B A R 0.78 0.75


M
P
E
R
E
5 SDP ESC B A
M
P
E S 0.82 0.89
R
E
T 0.01 0.8
LWBP 1079.42 1085.1
WBP 3329.33 3339.78

6 SDP PAC B A R 2.97 3.02


M
P
E S 2.99 2.96
R
E
T 2.9 2.87
LWBP 341.22 343.18
WBP 1139.27 1149.94

7 SDP KIOS A A R 0.99 1.02


M
P
E S 1 1.01
R
E
T 1.02 0.98
LWBP 484.76 488.46
WBP 858.4 862.73

8 SDP PENERANGAN A A R 0.99 1.04


M
P
E S 0.85 1.04
R
E
T 1.05 0.85
LWBP 251.19 253.42
WBP 633.82 637.54

9 SDP ESC A A R 0.96 0.82


M
P
E S 1.03 0.86
R
E
T 1.1 0.91
LWBP 274.87 277.14
WBP 688.69 692.4

10 SDP ESC D A R 0.64 0.63


M
P
E S 0.94 0.85
R
E
T 0.86 0.84
LWBP 735.67 739.48
WBP 2028.08 2036.73

11 SDP AC D A R 1.7 1.72


M
P
E S 1.86 1.89
R
E
T 1.87 1.86
LWBP 1175.93 1185.76
WBP 3138.46 3156.34

12 SDP PAC A
12 SDP PAC A A R 2.64 2.67
M
P
E S 2.69 2.75
R
E
T 2.69 2.69
LWBP 332.29 334
WBP 1050.79 1055.65

13 SDP KIOS C A R 1.02 1


M
P
E S 0.9 0.83
R
E
T 0.82 0.89
LWBP 344.63 346.27
WBP 971.36 975.67

14 SDP PENERANGAN C A R 0.95 0.77


M
P
E S 0.83 0.75
R
E
T 0.6 0.53
LWBP 155.84 156.77
WBP 403.61 405.67

15 SDP ESC C A R 0.71 0.64


M
P
E S 0.62 0.55
R
E
T 0.69 0.56
LWBP 763.69 768.12
WBP 2478.9 2491.25

16 SDP PAC C A R 2.19 2.21


M
P
E S 2.2 2.21
R
E
T 2.23 2.25
LWBP 625.63 629.26
WBP 2068.3 2078.24

17 SDP KIOS D A R 1.86 1.67


M
P
E S 1.78 1.67
R
E
T 1.78 1.66
LWBP 591.5 594.54
WBP 1339.54 1344.87

18 SDP PENERANGAN D A R 1.07 1.01


M
P
E S 1.19 1.1
R
E
T 1 0.87
LWBP 146.93 148.21

19 SDP LIFT
WBP 572.59 575.9

19 SDP LIFT A R 0.39 0.79


M
P
E S 0.25 0.5
R
E
T 0.32 0.6
LWBP 884.75 889.76
WBP 1730.63 1739.15

20 SDP PARKIR A R 1.89 1.35


M
P
E S 2.03 1.33
R
E
T 1.78 1.14
LWBP 55.22 55.76
WBP 238.64 239.93

21 SDP EMERGENCY A R 0.03 0.03


M
P
E S 0.09 0.15
R
E
T 0.17 0.13
LWBP 412.01 415.88
WBP 1936.53 1947.06

22 SDP R.M & E A R 1.16 0.99


M
P
E S 1.1 0.98
R
E
T 1.2 1.03

Dibuat Oleh, Diperiksa Oleh,

Boy Jae & Patri


OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV
Date : 31/01/2017 Date :
TER HARIAN

TANGGAL : 31/01/2017

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0.69 kwh

6.18 kwh

-0.04 amp 6.87 kwh

0 amp

0 amp

0 kwh

0.02 kwh

0 amp 0.02 kwh

0 amp

0 amp

1.85 kwh

2.96 kwh

-0.08 amp 4.81 kwh

-0.19 amp

-0.14 amp

1.46 kwh

5.32 kwh

-0.04 amp 6.78 kwh

-0.03 amp

-0.02 amp

1.04 kwh

2.2 kwh

-0.03 amp 3.24 kwh


3.24 kwh

0.07 amp

0.79 amp

5.68 kwh

10.45 kwh

0.05 amp 16.13 kwh

-0.03 amp

-0.03 amp

1.96 kwh

10.67 kwh

0.03 amp 12.63 kwh

0.01 amp

-0.04 amp

3.7 kwh

4.33 kwh

0.05 amp 8.03 kwh

0.19 amp

-0.2 amp

2.23 kwh

3.72 kwh

-0.14 amp 5.95 kwh

-0.17 amp

-0.19 amp

2.27 kwh

3.71 kwh

-0.01 amp 5.98 kwh

-0.09 amp

-0.02 amp

3.81 kwh

8.65 kwh

0.02 amp 12.46 kwh

0.03 amp

-0.01 amp

9.83 kwh

17.88 kwh

27.71 kwh
0.03 amp 27.71 kwh

0.06 amp

0 amp

1.71 kwh

4.86 kwh

1054.63 amp 6.57 kwh

-0.07 amp

0.07 amp

1.64 kwh

4.31 kwh

-0.18 amp 5.95 kwh

-0.08 amp

-0.07 amp

0.93 kwh

2.06 kwh

-0.07 amp 2.99 kwh

-0.07 amp

-0.13 amp

4.43 kwh

12.35 kwh

0.02 amp 16.78 kwh

0.01 amp

0.02 amp

3.63 kwh

9.94 kwh

-0.19 amp 13.57 kwh

-0.11 amp

-0.12 amp

3.04 kwh

5.33 kwh

-0.06 amp 8.37 kwh

-0.09 amp

-0.13 amp

1.28 kwh

4.59 kwh
3.31 kwh

0.4 amp 4.59 kwh

0.25 amp

0.28 amp

5.01 kwh

8.52 kwh

-0.54 amp 13.53 kwh

-0.7 amp

-0.64 amp

0.54 kwh

1.29 kwh

0 amp 1.83 kwh

0.06 amp

-0.04 amp

3.87 kwh

10.53 kwh

-0.17 amp 14.4 kwh

-0.12 amp

-0.17 amp

Oleh, Diketahui Oleh,

INEERING SPV CHIEF ENGINEERING


Date :
DATA METER HARIAN

DIVISI : DOKUMEN NO :

METER READING
NO METER UTILITIES STATUS
YESTERDAY TODAY
LWBP

WBP

1 SDP POMPA A R
M
P
E S
R
E
T

LWBP

WBP

2 PP HIDRANT A R
M
P
E S
R
E
T

LWBP

WBP

3 SDP PENERANGAN B A R
M
P
E S
R
E
T

LWBP

WBP

4 SDP KIOS B A R
M
P
E S
R
E
T

LWBP

WBP

5 SDP ESC B A R
M
P
E
R
E
5 SDP ESC B A
M
P
E S
R
E
T

LWBP

WBP

6 SDP PAC B A R
M
P
E S
R
E
T

LWBP

WBP

7 SDP KIOS A A R
M
P
E S
R
E
T

LWBP

WBP

8 SDP PENERANGAN A A R
M
P
E S
R
E
T

LWBP

WBP

9 SDP ESC A A R
M
P
E S
R
E
T

LWBP

WBP

10 SDP ESC D A R
M
P
E S
R
E
T

LWBP

WBP

11 SDP AC D A R
M
P
E S
R
E
T

LWBP

WBP

12 SDP PAC A
12 SDP PAC A A R
M
P
E S
R
E
T

LWBP

WBP

13 SDP KIOS C A R
M
P
E S
R
E
T

LWBP

WBP

14 SDP PENERANGAN C A R
M
P
E S
R
E
T

LWBP

WBP

15 SDP ESC C A R
M
P
E S
R
E
T

LWBP

WBP

16 SDP PAC C A R
M
P
E S
R
E
T

LWBP

WBP

17 SDP KIOS D A R
M
P
E S
R
E
T

LWBP

WBP

18 SDP PENERANGAN D A R
M
P
E S
R
E
T

LWBP

19 SDP LIFT
WBP

19 SDP LIFT A R
M
P
E S
R
E
T

LWBP

WBP

20 SDP PARKIR A R
M
P
E S
R
E
T

LWBP

WBP

21 SDP EMERGENCY A R
M
P
E S
R
E
T

LWBP

WBP

22 SDP R.M & E A R


M
P
E S
R
E
T

Dibuat Oleh, Diperiksa Oleh,

OPERASIONAL SHIFT OPERASIONAL ENGINEERING SPV


Date : Date :
TER HARIAN

TANGGAL :

READING TOTAL PEMAKAIAN


SAT SAT
USAGE LWBP + WBP
0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh
0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 kwh
0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh
0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh

0 amp

0 amp

0 kwh

0 kwh

0 amp 0 kwh