Professional Documents
Culture Documents
Task
Figure 1 Topology
DHCP Server
default-router 54.113.89.1
exit
Task 3: Make SW1 as a VTP Server and rest of all configure as a client. Make sure that vtp
domain is netwaxlab.com.
SW1
vlan 10
exit
vlan 20
exit
SW2
SW3
SW4
ASW1
ASW2
ASW3
ASW4
Make sure all switches are accepted vlan information from server. Verify at your end.
LAB 10: VLan and Trunking
Task 5: PC9 and PC10 having different IP's but in single Vlan. You need to communicate PC9
and PC10. (No need to communicate with server and Routers).
SW1
vlan 100
exit
SW4
(NOTE: Make sure ASW switches assign interface on respected vlan's as per given in topology.)
interface f0/2
switchport mode access
switchport access vlan 10
exit
interface f0/3
switchport mode access
switchport access vlan 20
exit