You are on page 1of 158

THANG TIEN TECHNICAL MATERIAL CO., LTD .

PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

PROJECT: UNIBEN FACTORY IN HUNG YEN, VIET NAM

LOCATION : PHO NOI A IP, HUNG YEN PROVINCE, VIET NAM

METHOD STATEMENT FOR MECHANICAL SYSTEM


BIN PHP THI CNG PHN C

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 1
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

CONTENTS

NI DUNG

PART I HVAC SYSTEM / H THNG IU HA THNG GI

PART II PLUMBING SYSTEM / H THNG NG CP V THOT NC

PART III FIRE FIGHTING SYSTEM / H THNG PCCC

PART IV AIR COMPRESSOR SYSTEM / H THNG MY NN KH.

PART V BOILER SYSTEM / H THNG NI HI.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 2
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

PART I. HEATING, VENTILATION & AIR CONDITIONING (HVAC) SYSTEM


PHN I. H THNG IU HA KHNG KH V THNG GI

I. AIR CONDITIONAL INSTALLATION / LP T IU HA


II. VENTILATION FAN INSTALLATION/ LP T THNG GI
III. AIR DUCTING & DIFFUSER INSTALLATION/ LP T NG GI V CA
GI
IV. COPPER PIPE INSTALLATION/ LP T NG NG

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 3
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
I. AIR CONDITIONAL INSTALLATION / LP T IU HA

A. Manpower and Equipment Preparation/ Chun b nhn lc v vt t thit b

I. Man power / Nhn lc

- Have 02 teams/ Chia lm 2 nhm:

- Team 1 : operating crane & fork lift : 5 people (by supplier)

- Nhm 1: Vn hnh cu t hnh v xe nng hng: 5 ngi (bi bn cp hng)

- Team 2 : Installation outdoor unit & indoor unit of Air conditional

- Nhm 2: Lp t dn nng v dn lnh iu ha: 10 ngi

II. Equipment / My thi cng

- Hand tool:Drill, cutter, steel cable, silk cable.

- Dng c cm tay: Khoan , my ct, C l, m nt, cp thp, dy d

- Heavy machine : Crane 25 tons, chain hoist 15 ton steel cable 22

- My mc thit b nng; cu t hnh 25 tn, palng xch 15 tn, kch thu lc, cp
thp la 22

- Scaffold, aluminum ladder will be used to deploy work at high level

- Gin gio v thang nhm s c s dng trin khai cc cng vic trn cao.

- Measuring instruments that will be used to adjust and check while installing and
testing such as noise level check, anemometer, laser point

- Cc thit b o dng cn chnh v kim tra trong qu trnh lp t v chy th


nh thit b o n, thit b o vn tc, my laser ly du.

III. Sub Material / Vt t ph

- Expansion bolt , tape, terminal

- Vt n, bng dnh, u ct...

B. Method statement/ Bin php thi cng

I. Preparation / Chun b

1. To submit catalogues and accessories

trnh catalogue v cc thit b km theo

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 4
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
2. To submit detail drawing of installation work, foundation drawings.

trnh bn v chi tit lp t, b my.

3. To submit method of transport, man power, tools, machines, schedule for installation work.

trnh phng n vn chuyn my, d tr nhn lc, trang thit b cn thit v lch trnh lp t

4. Preparing and cleaning the installation position

Chun b lp rp ti cng trng. Kim tra, chun b v v sinh khu vc thi cng

II. Installation process / Qu trnh lp t

1. Progression of installation following the guiding of Manufacturer

Ton b quy trnh lp t tun theo hng dn lp t i theo my

2. Marking installation position and working area

nh du v tr t my v khu vc lm vic:

3 Marking copper pipe route, hanger support

nh du ng i ca ng ng iu ha, gi treo ng

4. To check technical data of Air conditional in comparision with design requirement

Kim tra li my thng s my iu ha so vi bn v thit k yu cu

5. To transport equipment to installation position by truck, crane, folk lifter (Follow attached
drawing No: M-MSD-01)

Vn chuyn v a thit b n v tr lp t bng xe ti, cn cu,xe nng... (Xem bn v nh


km s: M-MSD-01)

6. Check postion of Air condtitional in foundation, fix the Air conditional . (Follow attached
drawing No: M-MSD-02)

Kim tra v tr ca my iu ha trn mng my. Lp t c nh v gi cht my vo .


(Xem bn v nh km s: M-MSD-02)

7. Installation anti vibreation mount (Follow attached drawing No: M-MSD-02)


Lp t h thng chng rung cho iu ha (Xem bn v nh km s: M-MSD-02)

8. Installation support & trunking for Air conditional (Follow attached dwg No: M-MSD-03)

Lp t gi v trunking cho iu ha (Xem bn v nh km s: M-MSD-03)

9. Installation condensed drains of indoor unit for Air conditional


---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 5
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
Lp t gi ng ng nc ngng cho gin lnh iu ha

10. Check and adjust indoor unit & outdoor units

Kim tra v cn chnh dn nng v gin lnh

11. Clean the working area and put warning signs

Thu dn v sinh khu vc lp my, treo bin cnh bo..

C. Checking & Running test / Kim tra v chy th thit b

1. The following item need to confirm when indoor unit , Outdoor unit are first time operation

Cc vn sau y cn c xc nhn khi dn trao i nhit vn hnh ln u tin.

2. There isnt abnormal sound of the indoor unit, outdoor unit during operation.

Khng c m thanh bt thng ca dn trao i nhit khi vn hnh.

3. There isnt abnormal vibration during operation

Khng c rung ng bt thng khi vn hnh.

4. The rotation of the indoor units fan is constant

Vng quay ca dn lnh n nh

5. The temperature of indoor units fan is a normal range.

Nhit ca qut dn lnh nm trong di cho php.

6. The temperature setting of indoor unit is a normal range.

Nhit ming cp ca dn lnh nm trong phm vi ci t.

7. The current of the indoor units fan is a normal range.

Dng in ca qut dn lnh nm trong di cho php.

8. The air discharge of indoor units fan is a normal range.

Lu lng gi ca qut dn lnh nm trong di thit k.

9. There isnt any water condensed on the surface of indoor unit and pipe system

Khng cho nc ngng t trn b mt dn lnh v h thng ng.

10. There isnt any damage, dirty of the cover of the indoor unit.

V dn lnh khng b h hng v khng b bn.

11. Overcome all the fail (if any).

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 6
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
Khc phc nhng im cha ph hp (nu c).

12. Record testing data, to make handover document

Ghi li thng s kim tra lm ti liu hon cng .

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 7
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION AIR CONDITIONAL


CRANE AIR CONDITIONAL

CNG TY TNHH V? T TU K? THU? T THANG TI? N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
NGUY HI? M
C NGU ? I LM PHA TRN

WORKERS ABOVE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 8
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION AIR CONDITIONAL


OUT DOOR FIX CONCRETE

DETAIL 1

GROUND LEVEL

GROUND LEVEL

DETAIL 1

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 9
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION AIR CONDITIONAL


SUPPORT & TRUNKING

DETAIL 2
DETAIL 1

GL

DETAIL 2

DETAIL 1
FL

GL

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 10
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION FOR AC CEILING CASSETTE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 11
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION FOR AC WALL MOUNTED

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 12
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION FOR AC OUDOOR UNIT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 13
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
II. VENTILATION FAN INSTALLATION / LP T QUT THNG GI

A. Manpower and Equipment Preparation/ Chun b nhn lc v vt t thit b

I. Man power / Nhn lc

- Have 02 teams/ Chia lm 2 nhm:

- Team 1 : operating crane & fork lift : 5 people

- Nhm 1: Vn hnh cu t hnh v xe nng: 5 ngi

- Team 2 : Installation ventilation Fan, frame & support for Fan

- Nhm 2: Lp t gi , khung qut v qut thng gi: 10 ngi

II. Equipment / My thi cng

- Hand tool:Drill, cutter, steel cable, silk cable.

- Dng c cm tay: Khoan , my ct, C l, m nt, cp thp, dy d

- Heavy machine : Crane 25 tons, fork lift, chain hoist 15 ton steel cable 22

- My mc thit b nng; cu t hnh 25 tn, xe nng, palng xch 15 tn, kch thu
lc, cp thp la 22

- Scaffold, aluminum ladder will be used to deploy work at high level

- Gin gio v thang nhm s c s dng trin khai cc cng vic trn cao.

- Measuring instruments that will be used to adjust and check while installing and
testing such as noise level check, anemometer, laser point

- Cc thit b o dng cn chnh v kim tra trong qu trnh lp t v chy th


nh thit b o n, thit b o vn tc, my laser ly du.

III. Sub Material / Vt t ph

- Expansion bolt , tape, terminal

- Vt n, bng dnh, u ct...

B. Method statement/ Bin php thi cng

I. Preparation / Chun b

1. To submit catalogues and accessories

trnh catalogue v cc thit b km theo

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 14
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
2. To submit detail drawing of installation work, foundation drawings.

trnh bn v chi tit lp t, b my.

3. To submit method of transport, main power, tools, machines, schedule for installation
work.

trnh phng n vn chuyn my, d tr nhn lc, trang thit b cn thit v lch trnh lp t

4. Preparing and cleaning the installation position

Chun b lp rp ti cng trng. Kim tra, chun b v v sinh khu vc thi cng
5. To identify position and fan type for installation.

Xc nh v tr v thng s qut s lp t
6. Marking for fan positions, checking position and dimention of fan

nh du, kim tra v tr v kch thc qut


7. Transport fans from warehouse to installation position

Vn chuyn qut ti v tr lp t

II. Installation process / Qu trnh lp t

1. Progression of installation following the guiding of Manufacturer

Ton b quy trnh lp t tun theo hng dn lp t i theo my


2. Install ceiling fan (Follow attached drawing No: M-MSD-01)

Lp t qut m trn (Xem bn v nh km s: M-MSD-01)


3. Install wall mounted fan (Follow attached drawing No: M-MSD-02)

Lp t qut gn tng (Xem bn v nh km s: M-MSD-02)


4. Install industrial wall mounted fan (Follow attached drawing No: M-MSD-03)

Lp t qut gn tng cng nghip (Xem bn v nh km s: M-MSD-03)


5. Install inline fan (Follow attached drawing No: M-MSD-04)

Lp t qut hng trc (Xem bn v nh km s: M-MSD-04)


6. Install centrifugal fan on high (Follow attached drawing No: M-MSD-05)

Lp t qut ly tm trn cao (Xem bn v nh km s: M-MSD-05)


7. Install centrifugal fan on floor (Follow attached drawing No: M-MSD-06)

Lp t qut ly tm trn sn (Xem bn v nh km s: M-MSD-06)


8. Check and adjust fan position.
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 15
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
Kim tra v hiu chnh v tr qut
9. Clean and cover fans

V sinh v che y cho qut


10. Connect ducting and electric

u ni ng gi v ngun in
11. Check and adjust

Kim tra v iu chnh

C. Checking & Running test / Kim tra v chy th thit b


The following item need to confirm when indoor unit , Outdoor unit are first time operation
Cc vn sau y cn c xc nhn khi dn trao i nhit vn hnh ln u tin.
1. There isnt abnormal sound of the fan during operation.

Khng c m thanh bt thng trong qu trnh vn hnh


2. There isnt abnormal vibration during operation

Khng c rung ng bt thng trong khi hot ng.


3. The rotation of fan is constant

Vng quay ca qut n nh


4. The temperature of fan is a normal range

Nhit ca qut trong di cho php


5. The current of the fan is a normal range

Dng in ca qut nm trong di cho php


6. The air discharge of fan is a range

Lu lng ca qut theo thit k


7. There isnt any damage, dirty of the cover of the fan
Khng h hng v bn trn v qut

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 16
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION CEILING FAN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 17
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION WALL MOUNTED FAN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 18
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION INDUSTRIAL WALL MOUNTED FAN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 19
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION INLINE FAN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 20
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION CENTRIFUGAL FAN


ON HIGH

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 21
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION CENTRIFUGAL FAN


ON FLOOR

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 22
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
III. DUCTING & DIFUSER INSTALLATION
III. LP T NG GI V CA GI
A. Manpower and Equipment Preparation/ Chun b nhn lc v vt t thit b

I. Man power / Nhn lc

1. Have 02 teams/ Chia lm 2 nhm:

2. Team 1 : Tranposter ducting: 5 people

3. Nhm 1: Vn chuyn ng gi: 5 ngi

4. Team 2 : Installation duct & equipment of Ventilation system

5. Nhm 2: Lp t ng gi v thit b thng gi: 10 ngi

II. Equipment / My thi cng

6. Tool box that uses to assemble and install duct: Drill, cutter, steel cable, silk
cable.

7. Cc hp cng c dung lp rp v lp t ng gi: Khoan , my ct, C l,


m nt, cp thp, dy d

8. Crimping machine, grooving and toothing machine, corrugators, plate-shearing


machine, welding machine, drilling machine, grinder.

9. My gp tn, my to m, my to gn, my ct tn, my hn, my khoan, my


mi.

10. Measuring instruments that will be used to adjust and check while installing
and testing suck as noise level check, anemometer, vernier caliper, flash light, laser
point

11. Cc thit b o dng cn chnh v kim tra trong qu trnh lp t v chy


th nh thit b o n, thit b o vn tc, thc kp o b dy, n pin, my
laser ly du

12. Scaffold, aluminum ladder will be used to deploy work at high level

13. Dn gio v thang nhm c dung trin khai cc cng vic trn cao.

Sub Material / Vt t ph

14. Expansion bolt , tape, terminal

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 23
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
15. Vt n, bng dnh, u ct...

B. Method statement/ Bin php thi cng

I. Preparation / Chun b

1. To submit catalogues and accessories

trnh catalogue v cc thit b km theo

2. To submit method of transport, main power, tools, machines, schedule for installation
work.

trnh phng n vn chuyn, d tr nhn lc, trang thit b cn thit v lch trnh lp t

3. Preparing and cleaning the installation position

Chun b lp rp ti cng trng. Kim tra, chun b v v sinh khu vc thi cng
4. Determine position that duct passing through floor (wall).

Xc nh v tr ng gi xuyn sn (tng)
5. Mark and drill holes on the floor (wall).

nh du v khoan l trn sn (tng)


6. Erect sleeve pipe into floor (wall)

t ng ch xuyn sn (tng)
7. Clean before installation

V sinh ng gi trc khi lp t

II. Installation process / Qu trnh lp t

1.Transport ducting to location to be installed (Follow attached drawing No: M-MSD-01)


Chuyn ng gi n v tr cn lp t (Xem bn v nh km s: M-MSD-01)

2. Installation ducting on support (Follow attached drawing No: M-MSD-02,03,04,05,06)

Lp ng gi ln gi (Xem bn v nh km s: M-MSD-02,03,04,05,06)

3. Connect ducting with other ducting (Follow attached drawing No: M-MSD-07)

u ni ng gi vi nhau (Xem bn v nh km s: M-MSD-07)

4. Insulation for ducting (Follow attached drawing No: M-MSD-08)

Bo n cho ng gi (Xem bn v nh km s: M-MSD-08)

5. Installation procesing ducting (Follow attached drawing No: M-MSD-09,10)


---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 24
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
Qu trnh lp t ng gi (Xem bn v nh km s: M-MSD-09,10)

6. Installation diffuser, door grill & louver (Follow attached drawing No: M-MSD-12,13)

Lp t ca gi v ming thi (Xem bn v nh km s: M-MSD-12,13)

7. Check, test hole and adjust ducting position (Follow attached drawing No: M-MSD-14)

Kim tra v hiu chnh v tr ng gi (Xem bn v nh km s: M-MSD-14)


8. Cleaning and flashing inside of dust

Lau chi v thi bi bn trong ng gi

III. Testing procedure / Bin php th kn

Tight test will be done after connect work. There are many ways to test for tight duct. It may
be light, smokeIn this project we will use light to check as follows:

Th kn s c thc hin sau khi ni ng. C nhiu cch th kn ca ng bng nh


sang , khiTheo d n ny chng ta s dung nh sang kim tra nh sau:

- Tight test will be carried out in the dark

Th kn s c tin hnh trong bng ti

- Using flash-light to beam into the duct as perpendicular to the duct side

Dng n pin ri vo trong ng gi theo hng vung gc vi cnh ng

- All joint shall be visually checked checker for tight, The system or section shall be
considered passed if no light leakage was found on the joints. Otherwise, if light has been
found from out side of duct, that portion shall be repaired and the above procedure shall be
repeated for the entire section.

Ton b mi ni c kim tra kn bng mt thng. c h thng hoc on ng coi l t


yu cu nu khng thy nh sang lt ra mi ni. Mt khc nu nh sng lt ra ngoi th
phn ng s c sa li v lp li cc bc th.

IV. Ducting insulation / Bo n ng gi

- External insulation for ducting (supply air) is fiber glass with density 32kg/m3 and 25mm
thickness. Insulation sheet is covered by aluminum. (Follow attached drawing No: M-MSD-
08)

Bo n bn ngoi ng gi (gi cp) bng bng thy tinh vi t trng 32kg/m3 v chiu dy
25mm. Lp bo n c ph mt lp giy nhm. (Xem bn v nh km s: M-MSD-08)
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 25
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
- External insulation for ducting (return air and fresh air) is fiber glass with density 32kg/m3
and 25mm thickness. Insulation sheet is covered by aluminum.

Bo n bn ngoi ng gi (gi hi v gi ti) bng bong thy tinh vi t trng 32kg/m3 v


chiu dy 25mm. Lp bo n c ph mt lp giy nhm.

- Must clean duct surface before installation insulation.

Lm sch b mt ng trc khi tin hnh cng vic bo n.

- The junction between two insulation sheets should be covered with aluminum tape to avoid
coming of air that is cause of water condensation.

im tip gip gia 2 tm bo n s c ph mt lp bng dnh nhm trnh lt khng kh


vo gy ra hin tng ng sng.

C. Checking & Running test / Kim tra v chy th thit b

1. The following item need to confirm when ventilation fan system unit are first time
operation.

Cc vn sau y cn c xc nhn h thng qut thng gi vn hnh ln u tin.

2. There isnt abnormal sound of the ducting system during operation.

Khng c m thanh bt thng ca qut v ng gi khi vn hnh.

3. There isnt abnormal vibration during operation

Khng c rung ng bt thng khi vn hnh.

4. Overcome all the fail (if any).

Khc phc nhng im cha ph hp (nu c).

5. Record testing data, to make handover document

Ghi li thng s kim tra lm ti liu hon cng .

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 26
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
TRANSPOTR DUCTING

DWG No. M-MSD-01

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 27
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
SUPPORT DUCT ON THE WALL

DWG No. M-MSD-02

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 28
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
SUPPORT DUCT ON THE PURLIN

H+100

H+150

DWG No. M-MSD-03


---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 29
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
SUPPORT DUCT FROM RC FLOOR

H+100

H+150

DWG No. M-MSD-04

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 30
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
SUPPORT DUCT FROM RC FLOOR

- EVERY 10m LENGHT OF DUCT, FIXED SUPPORT MUST MADE

TO ENSURE DUCT NOT VIBRATION

DWG No. M-MSD-05

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 31
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

HVAC SYSTEM

INSTALLATION DUCTING
SUPPORT DUCT FROM RC

TYPE 1 TYPE 2

TOP VIEW

SIDE VIEW

CAUTION

- FABRICATE ANGLE SUPPORT WITH ALL ROUND GRINDED CORNERS

- THE ANGLE SUPPORT SHALL BE PAINTED BY:


+ ANTICORROSIVE PAINT FOR CONCEALED CEILING AREA
+ ANTICORROSIVE PAINT AND FINISHING PAINT FOR EXPOSED CEILING AREA AND MACHINE ROOM

- BOTH ENDS OF THREADED HANGER ROD SHALL BE TOUCHED UP BY ANTICORRSIVE PAINT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 32
DWG No. M-MSD-06
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
CONNECTION DUTING

DWG No. M-MSD-07

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 33
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
(INSULATION MATERIAL: PE SPONGY)

PE SPONGY
ADHESIVE (25mm)

DUCT SHEET

DUCT

INSULATION

THICNESS 25mm

DWG No. M-MSD-08

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 34
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
USE SCISSOR LIFTER

1. USE SCISSOR LIFTER:


Model: Compact 12, Weight increase:300 kg, Maximun Height level: 12m
2. DUCT INSTALL:

Transfer duct from worker to scissor lifter after insulation


Installation ducting on support

PURLIN

PURLIN

DUCT

SCISSOR LIFTER

Q=300KG / H=12M

PROTECTION FLOOR

DWG No. M-MSD-09

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 35
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
USE SCAFODING

1. USE SCAFODING:
2. DUCT INSTALL:
Transfer duct from worker to scafodding.
Second duct connected to each other, transfer duct to scaffoding with two workers

DUCT

1. The duct connecting the two workers up scaffolding 2. Duct set up scaffolding

Safety belt

Small scaffoding

SCAFFODING

3. Use two scaffolding to duct install up bracket

DWG No. M-MSD-10

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 36
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
DUCT CONNECTION AHU

FL

DWG No. M-MSD-11

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 37
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
DIFFUSER & DOOR GRILL

DETAIL "A"

DWG No. M-MSD-12

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 38
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
CONNECT TO LOUVRE ON THE WALL

ROTATED LOCK

DWG No. M-MSD-13

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 39
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION DUCTING
TEST HOLE FOR AIR VOLUME MEASUREMENT

DWG No. M-MSD-14

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 40
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
IV. COPPER PIPE INSTALLATION
IV. LP T NG NG

A. Manpower and Equipment Preparation/ Chun b nhn lc v vt t thit b

I. Man power / Nhn lc

16. Have 02 teams/ Chia lm 2 nhm:

17. Team 1 : Transportation piping : 5 people

18. Nhm 1: Vn chuyn ng: 5 ngi

19. Team 2 : Installation copper pipe & cooling , chiller pipe

20. Nhm 2: Lp t ng ng, ng nc lnh : 15 ngi

II. Equipment / My thi cng

21. All copper pipes, copper fitting, support materials, insulation material,
miscellaneous materials which has been approved by Supervision Unit.

Ton b cc thit b nh ng ng, ph kin ng ng, vt t gi , vt t ph


c n v gim st ph duyt v chp thun.

22. Tool boxes that uses to assemble and install duct.

Cc hp dng c s dng lp rp v lp t.

23. Welding machine, cutting tool, pipe reamer, grinder

My hn, dao ct ng, may mi

24. Measuring instruments that will be used to adjust and check while installing
and testing such as vernier caliper, temperature recorder, laser point

Cc thit b o dung cn chnh v kim tra trong qu trnh lp t v chy th


nh thc kp, thit b o nhit , my laser ly du

25. Scaffold, aluminum ladder will be used to deploy work at high level

Dn gio v thang nhm c dung trin khai cc cng vic trn cao

Sub Material / Vt t ph

26. Expansion bolt , tape, terminal

27. Vt n, bng dnh, u ct...

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 41
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
B. Method statement/ Bin php thi cng

I. Preparation / Chun b

1. To submit catalogues and accessories

trnh catalogue v cc thit b km theo

2. To submit detail drawing of installation work.

trnh bn v chi tit lp t.

3. To submit method of transport,main power, tools, machines, schedule for installation work.

trnh phng n vn chuyn, d tr nhn lc, trang thit b cn thit v lch trnh lp t

4. Preparing and cleaning the installation position

Chun b lp rp ti cng trng. Kim tra, chun b v v sinh khu vc thi cng

II. Installation process / Qu trnh lp t

1. To protect refrigerant pipe in delivery, store and installation is the most important step in
preventing moisture, dirt and dust from getting inside of the pipes.

Bo qun ng lnh trong qu trnh vn chuyn, ct gi v lp t l bc quan trng nht


nhm ngn chn ngun m, bn v bi thm nhp vo bn trong ng

2. When pipe are delivery, care should be taken to prevent it from becoming bent or
deformed, and the ends should be capped to prevent dirt, mud, rain, etcfrom getting inside.
Build a wooden frame to hole the pipes securely and store the pipes in the specified location.
Delivery of copper pipes without caps to work site is not acceptable.

Trong qu trnh vn chuyn cn ht sc cn trng trnh ng b cong hay bin dng, u


ng nn c bt li trnh bi bn, nc ma thm nhp vo trong. B tr mt khung g
gi ng an ton v bo qun ng ni quy nh. ng bn giao ti cng trng m khng
c u bt s khng c chp thun.

3. To perform refrigerant pipe base on detail drawing of installation work. Connecting


refrigerant pipe to other pipe. (Follow attached drawing: Shop drawing)

Thi cng ng ng lnh trn c s bn v chi tit lp t. Kt ni cc ng ng lnh vi


nhau. (Xem bn v nh km : Bn v thi cng)

4. Insulation for pipe system (Follow attached drawing No: M-MSD-01~09)

Qui trnh bo n cho ng (Xem bn v nh km s: M-MSD-01~09)


---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 42
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
5. Connect to equipment.

Kt ni vi thit b.

C. Checking & Running test / Kim tra v chy th


1. Vacuum dry / Ht chn khng
28. Use a vacuum pump to vacuum dry both of refrigerant pipe liquid and gas pipe

Dng bm ht chn khng lm kh c ng ng lnh v ng ng gas


29. Use gauge to check pressure in the refrigerant pipe.

S dng ng h kim tra p sut trong ng ng lnh.


30. Connect vacuum pump to gauge and both of liquid and gas pipe in the service port of
outdoor unit and addition service port on the pipe.

Kt ni bm ht chn khng ti ng h v c ng ng lnh v gas


31. Running vacuum pump more 2 hours and bring the system to -107kpa. After keeping
the system under that condition for more than 1 hour, check if the gauge rise or not. If
it rises, The system may either contain moisture inside or have leak.

Chy bm ht chn khng trong khong hn 2h v t ti -107kpa. Sau khi gi h


thng di iu kin khong hn 1h, kim tra ng h nu c s tng ln ngha l
h thng c cha m bn trong hoc b r r
32. If it doesnt rise, well air leakage test.

Nu s ch ng h khng tng, chng ta tin hnh th kn kh.


2. Air leakge test
33. Use nitrogen for leakage test refrigerant pipe.

S dng kh ni t th kn ng ng lnh
34. Pressure test: 4 MPa and not more than 4 MPa.

Th p: 4 MPa v di 4 MPa
35. Time for testing: 24 hours.

Thi gian th p l 24h


36. Pressure test procedure:
Step 1: Apply pressure 0.3 MPa for 3 minutes or more,

Bc 1: t p 0.3 MPa trong 3 pht hoc hn


Step 2: Apply pressure 1.5 MPa for 5 minutes or more,
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 43
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
Bc 2: t p 1.5 MPa trong 5 pht hoc hn
Step 3: Apply pressure 4 MPa for 25 minutes.

Bc 3: t p 4 MPa trong 25 pht


3. Check pressure drop / Th p
37. If the pressure doesnt drop within 24 hours, the system passed the test.

Nu p lc khng b gim trong 24h th h thng t yu cu


38. If the pressure drop within 24 hours, check for leak to repair and air test again.

Nu p lc gim th kim tra r r sa cha v tip tc th p.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 44
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


SELECTION INSULATION & JACKET TABLE

DWG No. M-MSD-01

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 45
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


INSULATION FOR REFRIGERANT PIPE

DWG No. M-MSD-02

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 46
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


INSULATION AROUND WOODEN SLEEPER
BY GLASS WOOL

SECTION A-A

DWG No. M-MSD-03

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 47
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


INSULATION AROUND WOODEN SLEEPER

SECTION A-A
INSULATION PROCEDURE AROUND WOODEN SLEEPER

1 INSULATE THERMAFLEX WITH GLUE (SEE 1, 2)


1 INSULATE THERMAFLEX WITH GLUE (SEE 3, 4)
1 INSULATE THERMAFLEX WITH GLUE (SEE 5)

DWG No. M-MSD-04

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 48
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


TYPICAL INSULATION FOR PIPE & DUCT

DWG No. M-MSD-05

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 49
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


INSULATION REFIGERANT PIPE

DWG No. M-MSD-06

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 50
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


CUTTING COPPER PIPE

DWG No. M-MSD-07

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 51
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM

INSTALLATION PIPING FOR HVAC


WELDING PIPING

DWG No. M-MSD-08

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 52
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
HVAC SYSTEM
INSTALLATION PIPING FOR HVAC
FLUSHING PROCEDURE
FOR REFRIGERANT PIPING OF PAC

A) Leakage test for field piping PG

Approx. 28Kg/cm2

A/C Indoor Unit

B) Flashing for Ref. Gas Piping and vacuum test

N2 GAS
Cylinder

A/C Indoor Unit

C) Leakage test after piping connection


(Never open attached Ref. Gas valve in indoor unit or outdoor unit)

A/C Indoor Unit

PG
Approx. 7~10Kg/cm2

DWG No. M-MSD-09

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 53
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

PART II. PLUMBING SYSTEM

PART II. H THNG CP THOT NC

I . INSTALLATION PLUMBING / LP T H THNG CP THOT NC


II. INTALLATION PUMPS / LP T H BM
III. EQUIPMENT INTALATION / LP T THIT B

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 54
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
I. INSTALLATION PLUMBING SYSTEM
I. LP T H THNG CP THOT NC
A. Manpower and Equipment/ Chun b nhn lc v vt t thit b.
I. Manpower/ Nhn lc.
- Have 02 teams/ Chia lm 2 nhm
- Team 1: Operating crane: 5 people (by supplier)
- Nhm 1: Vn hnh cu t hnh: 5 ngi (bi bn cp hng)
- Team 2: Installation piping: 10 people
- Nhm 2: lp t h thng ng ng: 10 ngi
II. Equipment/ My thi cng

- Hand tool: Drill, cutter, thermal welding, pipe reamer, grinder, steel cable, silk cable.

Dng c cm tay: Khoan, my ct, my hn nhit, my khot ng, my mi, c l, m nt, cp


thp, dy d

- Heavy machine : Crane 25 tons, fork lift 3 ton, chain hoist 15 ton steel cable 22, roller,
rotary

My mc thit b nng; cu t hnh 25 tn, xe nng 3 tn, palng xch 15 tn, kch thu lc,
cp thp la 22, con ln.

- Scaffold, aluminum ladder will be used to deploy work at high level.

Dn gio v thang nhm dng thi cng cc v tr cao.

- Mesuaring instruments that will be used to adjust and check while installing and testing such
as vernier caliper, laser point

Cc thit b o dng cn chnh v kim tra trong qu trnh lt t v chy th nh : thc


kp, my laser ly du
III. Sub Material / Vt t ph
- Sub material (Expansionn bolt, bolt, nut and washer, Teflon).
Vt t ph ( vt n, bulong, bng tan).
B. Method statement / Bin php thi cng .
I. Preparation work/ Cng vic chun b
1. To submit catalogues and accessories
trnh catalogue v cc thit b km theo.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 55
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
2. To submit detail drawing of installation work, foundation drawings.
trnh bn v chi tit lp t, b my.
3. To submit method of transport, man power, tools, machines, schedule for installation work.
trnh phng n vn chuyn my, d tr nhn lc, trang thit b cn thit v lch trnh lp
t
4. Preparing and cleaning the installation position.
Chun b lp rp ti cng trng. Kim tra v v sinh khu vc thi cng.
5. Large roofed warehouse to store pipe.
Chun b nh kho c mi rng lu tr v bo qun ng.
6. Check pipe quality during the transportation to construction site.
Kim tra cht lng ng trong qu trnh vn chuyn ng n cng trng.
7. Well keeping pipe in dry and cool place.
Bo qun ng ni kh ro v nhit ph hp.
II. Installation process/ Qu trnh lp t.

1. Progression of installation following the guiding of Manufacturer.

Ton b quy trnh lp t tun theo hng dn lp t i theo my.

2. Marking installation position and working area.

nh du v tr t my v khu vc lm vic:

3 Marking pipe route, hanger support.

nh du ng i ca ng, gi treo ng.

4. To check technical data of Pumps in comparision with design requirement.

Kim tra li my thng s my bm so vi bn v thit k yu cu.

5. To transport equipment to installation position by truck, crane, folk lifter (Follow attached
drawing No: M-MSD-01)

Vn chuyn v a thit b n v tr lp t bng xe ti, cn cu,xe nng... (Xem bn v nh


km s: M-MSD-01)

6. Check postion of Pump in foundation, fix the Pump. (Follow attached drawing No: M-
MSD-02)

Kim tra v tr ca my bm trn mng my. Lp t c nh v gi cht my vo . (Xem


bn v nh km s: M-MSD-02)
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 56
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
7. Installation anti vibreation mount of pumps.
Lp t h thng chng rung cho bm

8. Installation support for piping (Follow attached dwg No: M-MSD-03)

Lp t gi h thng ng ng (Xem bn v nh km s: M-MSD-03)

9. Check and adjust for piping and support

Kim tra v cn chnh h thng ng ng v gi


11. Lean concrete and pipe installation.
B tng lt v lp t ng.
12. Excavation level shall be deeper than level of pipe bottom 100mm. There will be
compacted sand and 50mm lean concrete.
su rnh o su hn ct y ng 100 mm. Nn ct c m v ph ln l 50mm b
tng lt.
13. Installation support for piping (Follow attached dwg No: M-MSD-03)

Lp t gi h thng ng ng (Xem bn v nh km s: M-MSD-03)

14. Check and adjust for piping and support

Kim tra v cn chnh h thng ng ng v gi


15. Pipe and support shall be installed as owner specification requirement.
ng v gi c lp t theo yu cu k thut ca ch u t.
16. Back field.
Cng tc lp.
17. Concrete pipe will be connected to solod brick manhole with 200mm wall thickness.
ng b tng s c ni vi h ga xy bng gch c, tng dy 200mm.

18. Clean the working area and put warning signs

Thu dn v sinh khu vc lm vic v treo bin cnh bo..

III. Checking / Kim tra


1. All openings in the piping shall be tightly closed except the hightest opening, and the
system filled with water to point of overflow.
Tt c cc l trn ng ng c bt kn tr v tr cao nht, cho nc vo h thng cho n
khi thy nc trn r v tr cao nht.
2. The water shall be kept in the portion under test for a minimum of 30 minutes. All joint

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 57
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
shall be visually checked for water leakage and after the 30 minutes duration, the system or
sections shall be considered passed if no water leakage was found on the joints. Otherwise, if
leak has been found, that portion shall be repaired and the above procedure shall be repeated
for the entire section.
3. Nc s c gi trong vng 30p, kim tra cc im u ni pht hin r r, nu khng
c hin tng r r tc l ht thng t yu cu th kn.Nu pht hin ra c r r th phi
tho nc lm kh ng ng v tin hnh sa cha, sau lp li cc bc trong cng
on th kn cho n khi t yu cu.
4. Check pipe pressure test documents (certified by consultants).
Kim tra h s Test p lc ng ( c xc nhn ca t vn).
5. All openings shall be tightly closed and an air release valve shall be installed at the highest
portion of the pipe section to be test.
ng tt c cc trn tuyn ng cn th, lp mt van x kh im cao nht trn ng ng.
6. Water piping subkected to a certain work pressure shall be test by means of Hydrostatic
Pressure test.
ng nc s ph thuc vo p sut lm vic a ra bin php test bng p thy tnh.
7. The Hydrostatic Pressure Test shall be documentd using the attached form.
Vic th kn phi c cng nhn bng vn bn c chun ha.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 58
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PIPING
CRANE PIPING

CRANE: 5 TON

CNG TY TNHH V? T TU K? THU? T THANG TI? N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
NGUY HI? M
C NGU? I LM PHA TRN

WORKERS ABOVE

WORKING AREA PREPARATION

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 59
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INNERTIAL BLOCK

INSTALLATION DETAIL FOR PUMP

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 60
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

UNDER GROUND PIPING PROCEDURE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 61
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

PAINTING WORK FOR PIPING


(GALVANIZED STEEL PIPE)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 62
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

PAINTING WORK FOR PIPING


(BLACK STEEL PIPE)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 63
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 64
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 65
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 66
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


SUPPORT FOR PIPE UNDER GROUND

FLAT BAR 300X30X3

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 67
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND
1300

CLOSED BY
PIPE CAP

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 68
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 69
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

SECTION A-A SECTION B-B


B

MANHOLE COVER

A
B

TYPE A

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 70
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

SECTION A-A

A A

TYPE B TYPE C

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 71
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION PLUMBING SYSTEM


GI.PIPE UNDER GROUND

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 72
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
II. INSTALLATION PUPMS
II. LP T BM NC CP V THOT NC
A. Manpower and Equipment/ Chun b nhn lc v vt t thit b.
I. Manpower/ Nhn lc.
- Have 02 teams/ Chia lm 2 nhm
- Team 1: Operating crane & fork lift: 3 people
- Nhm 1: Vn hnh cu t hnh v xe nng: 3 ngi
- Team 2: Installation equipment: 10 people
- Nhm 2: lp t h thng thit b : 10 ngi
II. Equipment / My thi cng.
- Hand tool : wrench, monkey wrench. Silk cable, mark pen, hand cutting machine, Meter.
Dng c cm tay : c l, m lt, dy d, bt du,my ct tay, thc.
- Machines: table cutting machine, welding machine, threading machine, drilling machines.
My mc thit b, my ct, my hn kim loi, my ren, my khoan.
III. Sub Material / Vt t ph
- Expansion bolt, nut and washer
Vt n, bulong
B. Method statement / Bin php thi cng .
I. Preparation work/ Cng vic chun b.
1. Sample equipment submission (valve, sub equipment)
trnh thit b mu (van v thit b ph).
2. Submit shop drawing of installation work.
trnh bn v chi tit lp t.
3. Submit method of material, manpower, tool, machines, schedule for installation work.
trnh phng n d tr vt t, d tr nhn lc, trang thit b cn thit v lch trnh lp
t.
3. Cover the fittings with nylon.
Dng nylon che chn, bo v thit b.
4. Prepare execution instruments.
Chun b dng c thi cng.
5. Check installation position (shop drawings).
Kim tra v tr lp t ( bn v thi cng).

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 73
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
6. Check quipment holders.
Kim tra gi thit b.
7. Check fittings, place fitting into positions need to install (refer shop drawings).
Kim tra thit b - t thit b vo v tr cn lp ( xem bn v thi cng).

8. Installation of water supply pump (Follow attached drawing No: M-MSD-01)

Lp t bm cp nc (Xem bn v nh km s: M-MSD-01)

9. Installation of submersible pump (Follow attached drawing No: M-MSD-02)

Lp t bm nc thi (Xem bn v nh km s: M-MSD-02)

10. Installation of valve (Follow attached drawing No: M-MSD-03,4)

Lp t h thng van (Xem bn v nh km s: M-MSD-03,4)


11. Fix and adjust fittings (Refer particular installation figure)
Tin hnh ni ng vi thit b ( xem hnh lp t in hnh).
12. Check and adjust (invite consultants to inspect).
Tin hnh kim tra, cn chnh ( mi t vn kim tra).
13. Test pressure in accordance with technical requirements (invite consultants to inspect).
Test p lc theo yu cu k thut (mi t vn kim tra).
14. Final check and cleaning the installation position
Kim tra ln cui v v sinh khu vc thi cng.

C. Checking & Running test / Kim tra v chy th thit b


1. The QC deoartments will attend at site to check all pipe line and installation process in
order to suit manufacturer requirement to make sure that al quipments and fitting has
connected well.
Ban kim tra cht lng s c mt ti cng trng kim tra trang thit b lp t ph
hp vi yu cu v hng dn ca nh sn xut cha ?m bo ton b thit b v ph kin
c lp t ng.
2. Overcome all the fail (if any) to confirm system ready to operate.
Khc phc nhng im cha ph hp trn (nu c) nhm m bo sn sang hot ng.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 74
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION WATER SUPPLY PUMP

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 75
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION SUBMERSIBLE PUMP

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 76
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION VALVE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 77
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

INSTALLATION OF VALVE
(GATE VALVE OR Y-STRAINER, CHECK VALVE, BALL VALVE, ...)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 78
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
III. EQUIPMENT INSTALLATION
III. LP T THIT B
A. Manpower and Equipment/ Chun b nhn lc v vt t thit b.
I. Manpower/ Nhn lc.
- Have 02 teams/ Chia lm 2 nhm
- Team 1: Transpotation equipment: 3 people
- Nhm 1: Vn chuyn thit b: 3 ngi
- Team 2: Installation equipment: 7 people
- Nhm 2: lp t h thng thit b:: 7 ngi
II. Equipment / My thi cng.
- Hand tool : wrench, monkey wrench. Silk cable, mark pen, hand cutting machine, Meter.
Dng c cm tay : c l, m lt, dy d, bt du,my ct tay, thc.
- Machines: table cutting machine, welding machine, threading machine, drilling machines.
My mc thit b, my ct, my hn kim loi, my ren, my khoan.
III. Sub Material / Vt t ph
- Expansion bolt, nut and washer
Vt n, bulong
B. Method statement / Bin php thi cng .
I. Preparation work/ Cng vic chun b.
1. Sample equipment submission (sanitary equipment, sub equipment)
trnh thit b mu (thit b v sinh, thit b ph).
2. Submit shop drawing of installation work.
trnh bn v chi tit lp t.
3. Submit method of material, manpower, tool, machines, schedule for installation work.
trnh phng n d tr vt t, d tr nhn lc, trang thit b cn thit v lch trnh lp
t.
3. Cover the fittings with nylon.
Dng nylon che chn, bo v thit b.
4. Prepare execution instruments.
Chun b dng c thi cng.
5. Check installation position (shop drawings).
Kim tra v tr lp t ( bn v thi cng).

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 79
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
6. Check quipment holders.
Kim tra gi thit b.
7. Check fittings, place fitting into positions need to install (refer shop drawings).
Kim tra thit b - t thit b vo v tr cn lp ( xem bn v thi cng).
8. Fix and adjust fittings (Refer particular installation figure)
Tin hnh ni ng vi thit b ( xem hnh lp t in hnh).
9. Check and adjust (invite consultants to inspect).
Tin hnh kim tra, cn chnh ( mi t vn kim tra).
10. Test pressure in accordance with technical requirements (invite consultants to inspect).
Test p lc theo yu cu k thut (mi t vn kim tra).
11. Final check and cleaning the installation position
Kim tra ln cui v v sinh khu vc thi cng.

C. Checking & Running test / Kim tra v chy th thit b


1. The QC deoartments will attend at site to check all pipe line and installation process in
order to suit manufacturer requirement to make sure that al quipments and fitting has
connected well.
Ban kim tra cht lng s c mt ti cng trng kim tra trang thit b lp t ph
hp vi yu cu v hng dn ca nh sn xut cha ?m bo ton b thit b v ph kin
c lp t ng.
2. Overcome all the fail (if any) to confirm system ready to operate.
Khc phc nhng im cha ph hp trn (nu c) nhm m bo sn sang hot ng.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 80
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION LAVATORY

Mirror Mirror

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 81
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION SERVICE SINK

1FL0

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 82
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION WATER CLOSET(WESTERN TYPE)

1FL0

1FL0

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 83
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION URINAL

1FL0

1FL0

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 84
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION OF FLOOR DRAIN


(T-5A, T-5B)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 85
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION OF FLOOR DRAIN


(T-5A, T-5B)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 86
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION OF FLOOR CLEAN OUT


(COA, COV, COB)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 87
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
SANITARY WARE EQUIPMENT

INSTALLATION OF FLOOR CLEAN OUT


(COA, COV, COB)

t1

t2

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 88
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

PART III: FIRE FIGHTING SYSTEM


PHN III: H THNG CU HA

A. MANPOWER AND EQUITMENT PREPARATION / CHUN B NHN LC V


THIT B
B. METHOD STATEMENT/ BIN PHP THI CNG
C. TESTING AND RUNING SYSTEM / KIM TRA V CHY TH H THNG

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 89
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
A . Manpower and equitment preparation / Chun b nhn lc v thit b
I. Manpower / Nhn lc
- Have 03 teams/ Chia lm 03 nhm:
- Team 1: operating crane & fork lift 03 ngi .
Vn hnh cu t hnh v xe nng 03 ngi.
- Team 2: fabrication piping & support 05 ngi
Gia cng ng v gi - 05 ngi.
- Team 3: Installation equitment and piping 10 ngi
Lp t thit b v ng 10 ngi.
II. Equitment / My thi cng
- All equitment, piping, material. miscellaneous materials which has been approved by
supervision unit.
Ton b cc thit b, ng, vt t, vt t ph c n v gim st ph duyt v chp
thun.
- Sub material: U, V steel, expansion bolt, paints silver, ...
Vt t ph: st U,V, vt n, sn chng r
- Heavy machine: table cutting machine, welding machine.
My mc thit b nng: my ct bn, my hn.
- Tool boxes that uses to assemble and install air compressor, dryers.
Cc hp dng c dng lp rp v lp t my nn kh, my sy kh.
- Measuring instruments that will be used to adjust and check while installing and
testing such as noise level check, angular verlocity meter, clamp meter, voltmeter,
laser point
Cc thit b o dng cn chnh v kim tra trong qu trnh lp t v chy th nh
thit b o n, vn tc gc, km kp dng, vn k, my laser ly du
- Scaffold, aluminum ladder will be used to deploy work at high level.
Dn gio v thang nhm dng thi cng cc v tr cao.
B . Method statement / Bin php thi cng
I. Preparation / Chun b.
1. To submit catalogues and accessories.
trnh catalogues v ph kin km theo.
2. To submit detail drawing of installation work, foundation drawings.
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 90
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
trnh bn v chi tit lp t, b my.
3. To submit method of transport, man power, tools, machines, schedule for installa
work.
trnh phng n vn chuyn my, d tr nhn lc, thit b cn thit v lch trnh lp t
4. To submit method install pipe, manpower, tool, machine, schedule for install work
trnh phng php lp ng, d tr nhn lc, thit b v tin lp t
5. Preparing and cleaning the installation position
Chun b lp rp ti cng trng. Kim tra, chun b v v sinh khu vc thi cng
6. All welder must have certificate
Tt c cng nhn hn u phi c chng ch hnh ngh
II. Installation process / Qu trnh lp t.
II.1. Support for piping / Gi ng.
1. Transport material to executin location and put material into holder or plat surface
Chuyn vt t ra v tr cn thi cng v t trn gi hoc b mt ph hp
2. Cutting support by machines in the work shop
Ct gi bng my ct ti xng
3. Remove burr and marking drill joints
Lm sch mt st v nh du cc v tr cn khoan l
4. Clear all support and painting in the work shop (anti-rust pain and sliver paint)
Lm sch ton b gi v sn ti xng (sn chng r v sn nh)
5. Support interval pitch for horizontal piping (follow attached drawing No: M-MSD-01)
Khong cch gi cho ng nm ngang (theo bn v nh km s: M-MSD-01)
6. Support interval pitch for vertical piping (follow attached drawing No: M-MSD-02)
Khong cch gi cho ng ng (theo bn v nh km s: M-MSD-02)
7. Position for piping support (follow attached drawing No: M-MSD-03)
V tr gi ng (theo bn v nh km s: M-MSD-03)
8. Support for piping from purlin (follow attached drawing No: M-MSD-04)
ng vo x g thp (theo bn v nh km s: M-MSD-04)
9. Support for horizontal pipes (follow attached drawing No: M-MSD-05)
Gi cho hng ng (theo bn v nh km s: M-MSD-05)
10. Support from contruction steel (follow attached drawing No: M-MSD-06)
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 91
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
ng vo kt cu thp (theo bn v nh km s: M-MSD-06)
11. Fix support for piping (follow attached drawing No: M-MSD-07)
Gi tng cng cho ng (theo bn v nh km s: M-MSD-07)
12. Marking position of support follow shop drawing and installation
nh du v tr gi theo bn v thi cng ri lp t
13. Check and repaint support
Kim tra v sn li gi
II.2. Piping work / Lp ng.
1. Processing of installation following the guiding of manufacture
Ton b quy trnh lp t tun theo hng dn lp t ca nh sn xut
2. Clear pipes and anti-rust paint, red paint pipes
lm sch ng v sn chng r sau sn 1 lp
3. Transport pipes to execution location and put pipes into holder or plat surface
Vn chuyn ng ra v tr cn thi cng v t ng trn gi hoc b mt ph hp
4. Method of joint and fitting for piping (follow attached drawing No: M-MSD-08)
Phng php ni ng v ph kin (follow attached drawing No: M-MSD-08)
5. Valve application (follow attached drawing No: M-MSD-09)
Lp t van (follow attached drawing No: M-MSD-09)
6. Piping test method (follow attached drawing No: M-MSD-10)
Phng php kim tra ng ng (follow attached drawing No: M-MSD-10)
7. Procedure welding GIP (follow attached drawing No: M-MSD-11)
Trnh t hn ng km (follow attached drawing No: M-MSD-11)
8. Procedure screw GIP (follow attached drawing No: M-MSD-12)
Trnh t ren ng km (follow attached drawing No: M-MSD-12)
9. Installation pipes as shop drawing and specification
Lp ng theo bn v thi cng v yu cu k thut
10. Piping indication color (follow attached drawing No: M-MSD-13)
Mu sn ch th ng (follow attached drawing No: M-MSD-13)
11. Piping indication mark (follow attached drawing No: M-MSD-14)
Dn ch dn ng ng (follow attached drawing No: M-MSD-14)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 92
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
II.3. Installation equitment / Lp t thit b.
1. Transport equitment to installation position by truck, crane (follow attached drawing
No: M-MSD-15)
Vn chuyn thit b n v tr lp t bng xe ti, xe cu (theo bn v nh km s: M-
MSD-15)
2. Install achor bolt and vibration absorber set (follow attached drawing No: M-MSD-16)
Lp t n thp v b phn gim rung (theo bn v nh km s: M-MSD-16)
3. Install air fire fighting pumps (follow attached drawing No: M-MSD-16)
Lp t bm cu ha (theo bn v nh km s: M-MSD-16)
4. Clear and protection for equitments
V sinh v che y cho thit b
5. Connect piping with equitment (follow attached drawing No: M-MSD-16)
u ni ng vi thit b (theo bn v nh km s: M-MSD-16)
6. Install fire hydrant on 1 st floor (follow attached drawing No: M-MSD-17)
Lp t t cu ha trn tng 1 (theo bn v nh km s: M-MSD-17)
7. Install fire hydrant on 2 nd floor (follow attached drawing No: M-MSD-18)
Lp t t cu ha trn tng 2 (theo bn v nh km s: M-MSD-18)
8. Install fire hydrant on and pillar (follow attached drawing No: M-MSD-19)
Lp t t cu ha ngoi nh v tr cu ha (theo bn v nh km s: M-MSD-19)
9. Install fire department connecter (follow attached drawing No: M-MSD-20)
Lp t tr tip nc (theo bn v nh km s: M-MSD-20)
10. Install fire extinguisher (follow attached drawing No: M-MSD-21)
Lp t bnh cha chy (theo bn v nh km s: M-MSD-21)
11. Install fire alarm valve (follow attached drawing No: M-MSD-22)
Lp t cm van bo chaystuwj ng (theo bn v nh km s: M-MSD-22)
12. Install sprinkler head (follow attached drawing No: M-MSD-23)
Lp t u cha chy t ng (theo bn v nh km s: M-MSD-23)
13. Check and adjust connecting mission
Kim tra v iu chnh
B . Testing and runing / Kim tra v chy th
I. Pressure test / Th p.
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 93
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
1. All system should be test for leak by water
Ton b h thng ng sau khi lp t s c th kn bng p lc nc
2. Testing pressure for system is 18 kg/cm2, holding times within 1 hours.
p sut th l 18 kg/cm2 trong khong 1 gi.
3. After testing, report will be make and invite consultant to check and inspection.
Sau khi th p phi lp bin bn v mi cc n v lin quan kim tra nghim thu.
II. Runing test / Chy th
The following item need to confirm when pumps are operated first time.
Cc vn sau y cn phi c xc nhn khi bm vn hnh ln u tin.
1. Thre isnt abnormal sound of the fire fighting pump dring operation.
Khng c m thanh bt thng pht ra t bm cu ha khi hot ng.
2. There isnt abnormal vibration during operation.
Khng c rung ng bt thng trong khi hot ng.
3. The temperature of fire fighting pump is a normal range.
Nhit ca bm cu ha nm trong gii cho php.
4. The current of the fire fighting pump is a normal range.
Dng in ca bm in cu ha nm trong gii cho php.
5. The pressure of water flow is a range.
p lc nc trong h thng cu ha nm trong gii thit k.
6. There is any damage, dirty of the cover of the fire fighting pump.
V bm cu ha khng b h hng, khng b bn.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 94
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

SUPPORT INTERVAL PITCH FOR HORIZONTAL PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 95
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

SUPPORT INTERVAL PITCH FOR VERTICAL PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 96
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

POSITION FOR PIPING SUPPORT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 97
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

SUPPORT FOR PIPING FROM PURLIN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 98
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

SUPPORT FOR HORIZONTAL PIPE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 99
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

SUPPORT FROM CONTRUCTION STEEL

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 100
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

FIX SUPPORT FOR PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 101
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

METHOD OF JOINT & FITTING FOR PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 102
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

VALVE APPLICATION

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 103
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

PIPING TEST METHOD

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 104
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

PROCEDURE CUTTING & WELDING PIPE

CAUTION: Keep distance between floor & Pipe w/ wooden


square material.

CAUTION: - Electric arc welder (flange to pipe) with pipe befor filter
- Weld tig with pipe after filter

CAUTION: USE WIRE OR RODS WITH CLOTH THROUGH PIPE

Cover Cover

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 105
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

PROCEDURE CUTTING & THREAD GI.PIPE

CAUTION: Keep distance between floor & Pipe w/ wooden


square material.

CAUTION: USE WIRE OR RODS WITH CLOTH THROUGH PIPE

Cover Cover

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 106
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

PIPING INDICATION COLOR

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 107
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

PIPING INDICATION MARK

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 108
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALLATION FIRE FIGHTING ROOM


BY FORK LIFT

PUMP RM

WORKING AREA

CNG TY TNHH V? T TU K? THU? T THANG TI?N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
NGUY HI? M
C NGU ? I LM PHA TRN

WORKERS ABOVE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 109
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

INSTALLATION AIR COMPRESSOR PIPING


(200A~250A)BY CRANE 10TON

PUMP RM

WORKING AREA

FIX TO PURLIN

GIP.200A~250A

CRANE 10TON

COMPACT 12

CNG TY TNHH V? T TU K? THU? T THANG TI?N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
NGUY HI? M
C NGU ? I LM PHA TRN

WORKERS ABOVE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 110
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

FIRE FIGHTING SYSTEM

WELDING PIPE ON SUPPORT

WELDING PIPING ON SUPPORT

CNG TY TNHH V? T TU K? THU? T THANG TI?N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
CAUTION:
NGUY HI?M
C NGU ? I LM PHA TRN

WORKERS ABOVE - Before entering the factory workers must wear full labor
protection clothes as: halmets, glasses, shoes, safety belt

- Welding pipe follow procedure:


+ Connect pipe to pipe by spot welding
+ Check straightness and adjust
+ Proceed with full welding around pipe perimeter

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 111
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALL PUMPS AND


CONNECT PIPING WITH EQUITMENT

PLAN

SECTION

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 112
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALL FIRE HYDRANT ON 1ST FLOOR

FF 50A

THREAD ROD M10x15

GV 50A

FHC

FF 50A FHC

FL0

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 113
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALL FIRE HYDRANT AND PILLAR

GIP 100A

MAIN PIPE
GIP 100A

STEEL ANGLE SUPPORT

U-80

QUICK CONNECT 65Ax2SETS

GIP 100A

INDOOR OUTDOOR

CONCRETE BASE

FL0,0 GL0,0

ALPHANT ROAD

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 114
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALL FIRE DEPARTMANT CONNERTOR

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 115
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALL FIRE EXTINGUISHER

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 116
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALL ALARM CHECK VALVE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 117
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
FIRE FIGHTING SYSTEM

INSTALL SPRINKLER HEAD

D25
5
D2

D25
5
D2

D25

D25
2
D3
D25

5
D2

D25
GROOVED
0 5
MECHANICAL TEE D4 D2

D25
D25

0 2
D5 D3
E
PIP

D25
IN

GROOVED
MA

MECHANICAL TEE
0
D4
D25

0
D5
D25
E
PIP
IN

5
D2
MA

D25

5
GROOVED D2
D25

MECHANICAL TEE
D25

2
D3
E
PIP

5
D2
D25
IN
MA

GROOVED
MECHANICAL TEE
5
D2
D25
E

2
D3
PIP
IN
MA

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 118
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

PART IV: COMPRESSED AIR SYSTEM


PHN IV: H THNG KH NN

A. MANPOWER AND EQUITMENT PREPARATION / CHUN B NHN LC V


THIT B
B. METHOD STATEMENT/ BIN PHP THI CNG

C. TESTING AND RUNING SYSTEM / KIM TRA V CHY TH H THNG

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 119
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
A . Manpower and equitment preparation / Chun b nhn lc v thit b
I. Manpower / Nhn lc
- Have 03 teams/ Chia lm 03 nhm:
- Team 1: operating crane & fork lift 03 ngi .
Vn hnh cu t hnh v xe nng 03 ngi.
- Team 2: fabrication piping & support 03 ngi
Gia cng ng v gi - 03 ngi.
- Team 3: Installation equitment and piping 10 ngi
Lp t thit b v ng 10 ngi.
II. Equitment / My thi cng
- All air compressors, dryers, support materials, miscellaneous materials which has been
approved by supervision unit.
Ton b cc thit b my nn kh, my sy kh, vt t gi , vt t ph c n v
gim st ph duyt v chp thun.
- Heavy machine: crane 25 tons, chain hoist.
My mc thit b nng: cu t hnh 25 tn, palng xch.
- Tool boxes that uses to assemble and install air compressor, dryers.
Cc hp dng c dng lp rp v lp t my nn kh, my sy kh.
- Measuring instruments that will be used to adjust and check while installing and
testing such as noise level check, angular verlocity meter, clamp meter, voltmeter,
laser point
Cc thit b o dng cn chnh v kim tra trong qu trnh lp t v chy th nh
thit b o n, vn tc gc, km kp dng, vn k, my laser ly du
- Scaffold, aluminum ladder will be used to deploy work at high level.
Dn gio v thang nhm dng thi cng cc v tr cao.
B . Method statement / Bin php thi cng
I. Preparation / Chun b.
1. To submit catalogues and accessories.
trnh catalogues v thit b km theo.
2. To submit detail drawing of installation work, foundation drawings.
trnh bn v chi tit lp t, b my.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 120
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
3. To submit method of transport, man power, tools, machines, schedule for installa
work.
trnh phng n vn chuyn my, d tr nhn lc, thit b cn thit v lch trnh lp t
4. Preparing and cleaning the installation position
Chun b lp rp ti cng trng. Kim tra, chun b v v sinh khu vc thi cng
II. Installation process / Qu trnh lp t
II.1. Support for piping / Gi ng.
1. Support interval pitch for horizontal piping (follow attached drawing No: M-MSD-01)
Khong cch gi cho ng nm ngang (theo bn v nh km s: M-MSD-01)
2. Support interval pitch for vertical piping (follow attached drawing No: M-MSD-02)
Khong cch gi cho ng ng (theo bn v nh km s: M-MSD-02)
3. Position for piping support (follow attached drawing No: M-MSD-03)
V tr gi ng (theo bn v nh km s: M-MSD-03)
4. Support for piping from purlin (follow attached drawing No: M-MSD-04)
ng vo x g thp (theo bn v nh km s: M-MSD-04)
5. Support for horizontal pipes (follow attached drawing No: M-MSD-05)
Gi cho hng ng (theo bn v nh km s: M-MSD-05)
6. Support from contruction steel (follow attached drawing No: M-MSD-06)
ng vo kt cu thp (theo bn v nh km s: M-MSD-06)
7. Fix support for piping (follow attached drawing No: M-MSD-07)
Gi tng cng cho ng (theo bn v nh km s: M-MSD-07)
8. Painting support
Sn gi
9. Marking position of support follow shop drawing and installation
nh du v tr gi theo bn v thi cng ri lp t
10. Check and repaint support
Kim tra v sn li gi
II.2. Piping work / Lp ng.
12. Method of joint and fitting for piping (follow attached drawing No: M-MSD-08)
Phng php ni ng v ph kin (follow attached drawing No: M-MSD-08)
13. Piping test method (follow attached drawing No: M-MSD-09)
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 121
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
Phng php kim tra ng ng (follow attached drawing No: M-MSD-09)
14. Valve application (follow attached drawing No: M-MSD-10)
Lp t van (follow attached drawing No: M-MSD-10)
15. Procedure welding GIP (follow attached drawing No: M-MSD-11)
Trnh t hn ng km (follow attached drawing No: M-MSD-11)
16. Procedure screw GIP (follow attached drawing No: M-MSD-12)
Trnh t ren ng km (follow attached drawing No: M-MSD-12)
17. Piping indication color (follow attached drawing No: M-MSD-13)
Mu sn ch th ng (follow attached drawing No: M-MSD-13)
18. Piping indication mark (follow attached drawing No: M-MSD-14)
Dn ch dn ng ng (follow attached drawing No: M-MSD-14)
II.3. Installation equitment / Lp t thit b.
1. Transport equitment to installation position by truck, crane, fork lift ,(follow attached
drawing No: M-MSD-15)
Vn chuyn thit b n v tr lp t bng xe ti, xe cu, xe nng.. (theo bn v nh
km s: M-MSD-15)
2. Install achor bolt and vibration absorber set (follow attached drawing No: M-MSD-16)
Lp t n thp v b phn gim rung (theo bn v nh km s: M-MSD-16)
3. Install air compressor (follow attached drawing No: M-MSD-16)
Lp t my nn kh (theo bn v nh km s: M-MSD-16)
4. Clear and protection for air compressor
V sinh v che y cho my nn kh
5. Connect ducting and piping (follow attached drawing No: M-MSD-17)
u ni ng gi v ng kh (theo bn v nh km s: M-MSD-17)
6. Installation air tank (follow attached drawing No: M-MSD-18)
Lp t bnh cha kh nn (theo bn v nh km s: M-MSD-18)
7. Installation air dryer (follow attached drawing No: M-MSD-19)
Lp t my sy kh (theo bn v nh km s: M-MSD-19)
8. Installation air fillter (follow attached drawing No: M-MSD-20)
Lp t b lc kh (theo bn v nh km s: M-MSD-20)
9. Check and adjust connecting mission
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 122
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
Kim tra v iu chnh
B . Testing and runing / Kim tra v chy th
I. Pressure test / Th p.
1. Testing pressure for system is 10kg/cm2, holding times within 2 hours.
p sut th l 10kg/cm2 trong khong 2 gi.
2. All system should be test for leak by water. Testing procedure will be carry out at each
individual area as follows.
Ton b h thng ng sau khi lp t s c th kn bng p lc nc.vic kim tra
s c tin hnh theo tng khu vc v c phn chia nh sau :
- Zone A1 : In Compressor room. Pressure test is 10 kg/cm2
Khu vc A1 :Trong phng my nn kh. p sut th l 10 kg/cm2
- Zone A2 : Production area , Pressure test is 10 kg/cm2
Khu vc A2 : Khu sn xut, p sut th l 10 kg/cm2.
3. After testing, report will be make and invite consultant to check and inspection.
Sau khi th p phi lp bin bn v mi cc n v lin quan kim tra nghim thu.
II. Runing test / Chy th
The following item need to confirm when air compressors are operated first time.
Cc vn sau y cn phi c xc nhn khi my nn vn hnh ln u tin.
1. Thre isnt abnormal sound of the air compressors dring operation.
Khng c m thanh bt thng pht ra t my nn, my sy kh khi hot ng.
2. There isnt abnormal vibration during operation.
Khng c rung ng bt thng trong khi hot ng.
3. The temperature of air compressors, air dryer is a normal range.
Nhit ca my nn kh, my sy kh nm trong gii cho php.
4. The current of the air compressors is a normal range.
Dng in ca my nn, my sy kh nm trong gii cho php.
5. The air discharge of air compressors is a range.
Lu lng ca my nn nm trong gii thit k.
6. There is any damage, dirty of the cover of the air compressors, dryer.
V my nn kh, my sy kh khng b h hng, khng b bn.

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 123
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

SUPPORT INTERVAL PITCH FOR HORIZONTAL PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 124
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

SUPPORT INTERVAL PITCH FOR VERTICAL PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 125
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

POSITION FOR PIPING SUPPORT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 126
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

SUPPORT FOR PIPING FROM PURLIN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 127
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

SUPPORT FOR PIPING FROM PURLIN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 128
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

SUPPORT FROM CONTRUCTION STEEL

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 129
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

FIX SUPPORT FOR PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 130
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

METHOD OF JOINT & FITTING FOR PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 131
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

VALVE APPLICATION

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 132
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

PIPING TEST METHOD

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 133
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

PROCEDURE CUTTING & WELDING PIPE

CAUTION: Keep distance between floor & Pipe w/ wooden


square material.

CAUTION: - Electric arc welder (flange to pipe) with pipe befor filter
- Weld tig with pipe after filter

CAUTION:
USE WIRE OR RODS WITH CLOTH THROUGH PIPE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 134
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

PROCEDURE CUTTING & WELDING PIPE

CAUTION: Keep distance between floor & Pipe w/ wooden


square material.

CAUTION: - Electric arc welder (flange to pipe) with pipe befor filter
- Weld tig with pipe after filter

CAUTION:
USE WIRE OR RODS WITH CLOTH THROUGH PIPE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 135
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

PIPING INDICATION COLOR

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 136
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

PIPING INDICATION MARK

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 137
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

INSTALLATION AIR COMPRESSOR


BY FORK LIFT

COMP. RM

WORKING AREA

CNG TY TNHH V? T TU K? THU? T THANG TI? N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
NGUY HI? M
C NGU ? I LM PHA TRN

WORKERS ABOVE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 138
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

INSTALLATION AIR COMPRESSOR PIPING


(200A~250A)BY CRANE 10TON

PUMP RM

WORKING AREA

FIX TO PURLIN

GIP.200A~250A

CRANE 10TON

COMPACT 12

CNG TY TNHH V? T TU K ? THU? T THANG TI? N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
NGUY HI?M
C NGU ? I LM PHA TRN

WORKERS ABOVE

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 139
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

WELDING PIPE ON SUPPORT

WELDING PIPING ON SUPPORT

CNG TY TNHH V? T TU K? THU? T THANG TI?N


THANG TIEN TECHNICAL MATERIAL CO., LTD

DRAGER
CAUTION:
NGUY HI?M
C NGU ? I LM PHA TRN

WORKERS ABOVE - Before entering the factory workers must wear full labor
protection clothes as: halmets, glasses, shoes, safety belt

- Welding pipe follow procedure:


+ Connect pipe to pipe by spot welding
+ Check straightness and adjust
+ Proceed with full welding around pipe perimeter

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 140
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

INSTALLATION AIR COMPRESSOR

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 141
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

CONNECT PIPING WITH EQUITMENT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 142
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

INSTALLATION AIR DRYER

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 143
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

INSTALLATION FILLTER

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 144
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------

PART IV: BOILER SYSTEM


PHN IV: H THNG CP HI

A. MANPOWER AND EQUITMENT PREPARATION / CHUN B NHN LC V


THIT B
B. METHOD STATEMENT/ BIN PHP THI CNG

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 145
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
A . Manpower and equitment preparation / Chun b nhn lc v thit b
I. Manpower / Nhn lc
- Have 03 teams/ Chia lm 03 nhm:
- Team 1: operating crane & fork lift 03 ngi .
Vn hnh cu t hnh v xe nng 03 ngi.
- Team 2: fabrication piping & support 03 ngi
Gia cng ng v gi - 03 ngi.
- Team 3: Installation equitment and piping 10 ngi
Lp t thit b v ng 10 ngi.
II. Equitment / My thi cng
- All valve, pipe,support materials, miscellaneous materials which has been approved by
supervision unit.
Ton b cc van , ng , vt t gi , vt t ph c n v gim st ph duyt v
chp thun.
- Heavy machine: crane 5 tons, chain hoist.
My mc thit b nng: cu t hnh 5 tn, palng xch.
- Measuring instruments that will be used to adjust and check while installing and
testing such as noise level check, angular verlocity meter, clamp meter, voltmeter,
laser point
Cc thit b o dng cn chnh v kim tra trong qu trnh lp t v chy th nh
thit b o n, vn tc gc, km kp dng, vn k, my laser ly du
- Scaffold, aluminum ladder will be used to deploy work at high level.
Dn gio v thang nhm dng thi cng cc v tr cao.
B . Method statement / Bin php thi cng
I. Preparation / Chun b.
5. To submit catalogues and accessories.
trnh catalogues v thit b km theo.
6. To submit detail drawing of installation work drawings.
trnh bn v chi tit lp t,
7. To submit method of transport, man power, tools, machines, schedule for installa
work.
trnh phng n vn chuyn my, d tr nhn lc, thit b cn thit v lch trnh lp t
---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 146
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
8. Preparing and cleaning the installation position
Chun b lp rp ti cng trng. Kim tra, chun b v v sinh khu vc thi cng
II. Installation process / Qu trnh lp t
II.1. Support for piping / Gi ng.
09. Support interval pitch for horizontal piping (follow attached drawing No: M-MSD-
01~03)
Khong cch gi cho ng nm ngang (theo bn v nh km s: M-MSD-01~03)
10. Support interval pitch for vertical piping (follow attached drawing No: M-MSD-
04~05)
Khong cch gi cho ng ng (theo bn v nh km s: M-MSD-04~05)
11. Painting support
Sn gi
12. Marking position of support follow shop drawing and installation
nh du v tr gi theo bn v thi cng ri lp t
13. Check and repaint support
Kim tra v sn li gi
II.2. Piping work / Lp ng.
14. Method of fix point for pipes with expansion joint (follow attached drawing No: M-
MSD-06)
Phng php ni ng v khp gin n (follow attached drawing No: M-MSD-06)
15. Valve and piping application (follow attached drawing No: M-MSD-07~09)
Lp t van v ng hi (follow attached drawing No: M-MSD-07~09)
16. Piping indication color (follow attached drawing No: M-MSD-10)
Mu sn ch th ng (follow attached drawing No: M-MSD-10)
17. Piping indication mark (follow attached drawing No: M-MSD-11)
Dn ch dn ng ng (follow attached drawing No: M-MSD-11)

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 147
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

HORIZONTAL HANGER SUPPORT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 148
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

HORIZONTAL HANGER SUPPORT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 149
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

DETAILSUPPORT PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 150
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

VERTICAL HANGER SUPPORT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 151
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

VERTICAL HANGER SUPPORT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 152
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

FIX POINT FOR PIPES WITH EXPANSION JOINT

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 153
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

DETAIL FOR EQUIPMENT PIPING

PG PG

SV
PBV

GV YT GV

GV
STEAM TRAP

GV YT GV DRAIN

GV
GV

DRAIN

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 154
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

DETAIL STEAM PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 155
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
PUMPING SYSTEM

DETAIL STEAM PIPING

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 156
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

PIPING INDICATION COLOR

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 157
THANG TIEN TECHNICAL MATERIAL CO., LTD .
PROJECT: UNIBEN FACTORY IN HUNG YEN, V IET NAM

MECHANIACAL METHOD STATEMENT


--------------------------------------------------------------------------------------------------------------------------------------
AIR COMPRESSOR SYSTEM

PIPING INDICATION MARK

---------------------------------------------------------------------------------------------------------------------------
Method statement / Bin php thi cng Page 158

You might also like