Department of Public Works
Effective Date: April 2017
Version: 3
EVALUATION CRITERIA ‘SUB | WEIGHTING
POINTS | FACTOR
42. Detailed Project-specific Programme, including how time will be managed: 05
* Submit a detailed Programme of work which should outline:
) List ofall activities from inception to completion with key milestones and || 3x1
urations / time frames (considering curing of trenching, removing of
exist. Sewer pipes, installing new pipes, replacing paving,
{oiletsttemporary to be utlized during construction, lead times, etc.)
b) Indication of all trades and the critical path (start to finish relationships
between activities)
‘Sub total 20
2x1
TOTAL, 100
(Weighting wil be multiplied by the scores allocated during the evaluation process to arrive at the total functionality points
Minimum functionality score to qualify for further evaluation 50%
Total minimum qualllying score Tor Tunclonaliy 1s 60%, unless motivated otherwise to the Bid Committee)