Site Code
Site Type
RET
RET Cables
Sub-contractor
visit date
Site Engineer
Log file signed
Rigger With Safety Equ. Engineer Static Rap
BTS
Basket tray
OVP 1
Inside After covering Panoram
OVP 2
Rectifier
3G DDF
DDF Inside Duct Inside Panoram
Mobinil LINK
Tray
Upper Panorama
Panorama
Panorama
Part 3 Panorama
Part 3 Panorama
Tray
OVP 1
Inside After covering Panoram
OVP 2
RF Module 1
RF Module 2
Front View Upper Side View Lower Side V
Upper Panorama
Panorama
Panorama
Panorama
Panorama
Panorama
Panorama
Panorama
Indoor Cleanliness Indoor Cleanliness
Outdoor Cleanliness
Outdoor Cleanliness
installation check list
ITEM DESCRIPTION
1 Delivery is complete and undamaged
2 Equipment layout checked, differences to the drawings recorded
3 Cabling routes checked, cable trays installed
4 Plinth is installed and fixed.
5 Plinth is grounded
6 Cabinets fixed to wall or floor, secured and feet adjusted
7 BTS cabinet connected to main grounding bus bar
8 Power cable is connected to the C.B well and labeled
9 C.B Rate
10 Modules are grounded to the plinth
11 Modules back/front covers are installed
12 Transmission sub-module is installed according to the instruction well and
labeled
13
Antenna Cables are connected according to the configuration and labeled
14 Internal Power Cables are connected well and labeled.
15 Transmission Cables are connected well and labeled.
16 Optical fiber cables are cleaned and connected well and labeled.
17 Cable connector seals are firmly in place
18 NSN DDF installed , earthed
19 MHAs are installed and labeled
20 MHAs are connected to the earth bar
21 MHAs cables are installed and labeled
22 Packing materials removed from the site
23 Labeling of external cables.
24 Rubbish removed and room cleaned and tidy
25 Power-on Check of the Main Unit
24 Power-on Check of the RF Modules
25 The DC Cable between the System module and the rectifier is 25 mm
on check list
OK NOK NA Remarks