Reducing Risk Through On-Demand Manufacturing
EXECUTIVE SUMMARY
n Prototyping
Proto Labs 19992016 Proto Labs, Inc., 5540 Pioneer Creek Dr., Maple Plain, MN 55359 USA | 877.479.3680 2
Reducing Risk Through On-Demand Manufacturing
n disruptive technologies and innovations
Proto Labs 19992016 Proto Labs, Inc., 5540 Pioneer Creek Dr., Maple Plain, MN 55359 USA | 877.479.3680 3
Reducing Risk Through On-Demand Manufacturing
THE BOTTOM LINE IDENTIFYING OPPORTUNITIES Collectively, this activity can add up to weeks
or months of delays across multiple parts in an
The manufacturing supply chain safeguards The need for manufacturing supply chain assembly. Additional delays may unexpectedly
preserve and accelerate the timeline while safeguards vary by company, product type arise if project issues are not identified during
allowing for opportunities to improve and product maturity. They also vary at the quotation process.
product and process quality. The strategic the component level. The key is to ensure
use of safeguards ensures a steady supply of that critical-path processes for critical- For example, if design for manufacturability
product in line with target delivery dates. path components are identified and the (DFM) issues are discovered only when an
appropriate safeguards are established. order is initiated, the response is to regroup,
Partnering with suppliers that leverage redesign and re-quote the project, which creates
technology and process excellence to For new or revised products, safeguards significant delays.
expedite responses and deliveries is are needed from the design phase through
crucial in the successful implementation commercialization. For established ALTERNATIVE
of supply chain safeguards. products, safeguards extend from market
Through the use of complex software
introduction into the end-of-life phase.
code and automated manufacturing
As a product progresses through the life cycle, equipment, interactive online quotes with
The bottom line: Supply chain lead times lengthen and risks become more manufacturability analysis are now made
safeguards preserve and accelerate impactful. Therefore, manufacturing safeguards possible within hours by best in class contract
become increasingly important as a product manufacturers. These sophisticated online
the timeline while allowing for quoting programs will report and illustrate
moves from design into market launch.
opportunities that will improve design issues that can impact quality, cost and
FOLLOWING ARE EXAMPLES OF
product and mitigate risk. time to market.
MANUFACTURING SAFEGUARDS AND
THEIR IMPACTS ADVANTAGE
Days, even weeks, saved during the design
Request for Quote
phase can accumulate to a month or more
Time-to-market Advantage (Injection Molding Example) At every stage in the product life cycle, there over the entire project. When design for
is the non-value-added task of requesting and manufacturability feedback is incorporated
receiving quotations from suppliers. during the early phase of design, the path to a
validation and testing is shortened by weeks,
sometimes months. Furthermore, early DFM
feedback reduces the risk of rework and its
associated costs.
Proto Labs 19992016 Proto Labs, Inc., 5540 Pioneer Creek Dr., Maple Plain, MN 55359 USA | 877.479.3680 4
Reducing Risk Through On-Demand Manufacturing
Product Development suppliers that specialize in rapid manufacturing performance and manufacturing costs, which
using conventional methods, such as CNC protects against late-term issue identification that
Throughout the product development process, machining and injection molding. Although the can lead to costly delays and rework.
models and prototypes are required for form, manufacturing process is unchanged, process
fit and functional testing. These physical optimization through automation leads to much Pilot Production
representations are invaluable in the discovery shorter lead times. For example, an order of 500
of flaws that impact product performance, injection-molded prototypes, which can take Pilot production is essentially a soft launch used
manufacturability and production costs. months to deliver, can be made available in 7 to to evaluate and fine tune products and processes.
10 days using Proto Labs rapid injection molding Usually consisting of 1,000 to 5,000 units, pilot
While vital in the process, a model or prototype,
services. production offers products that manufacturing,
when produced by conventional means, may
product management, marketing and sales can
require weeks to deliver. Since there may be
ADVANTAGE use for trials, evaluations and test marketing.
several design and prototyping cycles, the
cumulative impact on the timeline may be months. In attempts to keep projects on schedule,
ALTERNATIVE
companies are often tempted to avoid
ALTERNATIVE prototyping or reduce the number of prototype The demands for pilot product lie between those
revisions. While this may have an immediate of prototypes and production. While ideal to
Additive manufacturing (also called 3D printing)
benefit, design issues that are undetected match all characteristics of production products,
expedites delivery of models and prototypes.
may significantly delay manufacturing when close approximations are often acceptable. This
Used in lieu of, or in conjunction with, conventional
discovered during the production process. By latitude allows the substitution of processes
manufacturing practices, additive manufacturing
leveraging expedited processes, companies can to accelerate delivery while keeping costs at
may reduce lead times by 50 to 80 percent.
execute prototype evaluations without inducing a minimum. For example, CNC machining or
Additionally, additive manufacturing proves to
delays during the product development process, additive manufacturing may be used for parts
be an efficient process with little demands in
which protects from even larger delays during the that will ultimately be injection molded.
terms of time or effort on the front end of the
production phase.
process. However, its processes yield parts with Another alternative is to simplify the production
somewhat different physical characteristics and Relative to traditional prototyping lead times, process. If, for example, parts will be injection
design constraints than those parts made using the accelerated delivery provides a time cushion molded, aluminum molds may possibly be used
traditional manufacturing processes. that may be used to absorb upstream delays. to manufacture the entire pilot production order.
When seeking to evaluate product design Accelerated delivery also offers a responsiveness Soft tooling made from aluminum is produced for
with prototypes produced using the same that allows execution of multiple design a fraction of the cost and at a fraction of the time
methods as those for production, there are revisions to fine tune product designs for quality, of steel molds.
Proto Labs 19992016 Proto Labs, Inc., 5540 Pioneer Creek Dr., Maple Plain, MN 55359 USA | 877.479.3680 5
Reducing Risk Through On-Demand Manufacturing
The evaluation that pilot production provides also production-grade parts while production tooling For example, if projections are for 10,000 units
protects lead times by preemptively countering and processes are in development, thereby per week upon initial launch and the delay
product design and design for manufacturability getting you to market sooner. is four weeks, the bridge process would be
issues. Early discovery and modification prevents expected to delivery 40,000 units. After that,
ALTERNATIVE production processes would engage to deliver
delay-causing issues being detected later in the
manufacturing process. Bridge-to-production solutions are enacted the bulk of the projected demand.
when the delivery of production orders will Another advantage is that bridge solutions
extend beyond planned timeframes for product offer an alternative when faced with the hard
Managing Production Throughout Product Life Cycle delivery. As a safeguard, they are placed in service decision to proceed with known issues or
when upstream processes impart a delay on repair the issues while suffering a delay. This
ANNUAL QUANTITY
production order launch; production lead times is an all-too-common situation that arises if
are unexpectedly long; or production problems inadequate evaluation is completed during
are encountered, causing delays. product development. For example, if a design
Ideally, the same process as that for production flaw or design-for-manufacturability issue is
will be used, which yields identical quality discovered late in the process, tooling rework
parameters as the production method, but may be suggested. Rather than bear the profit
with modified assets. For example, one option consequences of an inferior product or accept a
PHASE
is short-run, soft tooling that minimizes costly delay, enact the bridge solution to allow
modifications to the production tooling without
Bridge to Production complexity and expedites construction to
reduce lead times. In this case, the tooling may experiencing delays.
Bridge to production is a manufacturing
exclude high-end automation and cycle-time
approach that bridges the time gap between
acceleration features that are less beneficial for
initiation of production manufacturing and
lower production quantities in order to reduce
receipt of finished goods.
delivery time and total investment.
Proto Labs 19992016 Proto Labs, Inc., 5540 Pioneer Creek Dr., Maple Plain, MN 55359 USA | 877.479.3680 6
Reducing Risk Through On-Demand Manufacturing
MANUFACTURING THROUGHOUT
THE PRODUCT LIFE CYCLE
CONCLUSION
Design for manufacturability analysis in hours
Prototypes in days
As shown by the four scenarios, within a growth-oriented organization, Enables iterative design
manufacturing safeguards provide the mechanisms to prevent disruptions
or recover from challenges while capitalizing on opportunities. With fast, SP
EE
D Functional testing
responsive processes that reduce or eliminate non-value added time, the
Pilot runs
DE
DESIGN
VEL
manufacturing safeguards absorb delays and transfer time gains forward to
TE
Engineering builds
RA
OP
ST
ON
ITE
ME
AN RAT I
cushion the impact of downstream interruptions.
RI
AT
NT
AL EG
ID
SK
YS IC L
IS VA
MIT
The utilization of manufacturing safeguards also promotes thorough
IGATION
CONC CH
EPT LAUN
product evaluations to prevent unforeseen problems that will cause delays Cost-effective tooling
BRIDGE
in delivering products to market. Early problem detection also preserves IDEA TOOLING Low-volume bridge to
eliminate production gaps
resources that would otherwise be consumed when responding to a supply CL
INE
GR
OW
TH
Design confidence for
DE transition to steel tooling
chain disruption on the critical path. When new product opportunities arise, EN
D
PL -OF ND
MA
these nimble and responsive processes are also the key tools for delivering AN -L -DE S
MATURITY
NIN IFE ON PART
G
more new products to market.
MAIN
TENANCE
Manufacturing safeguards are a key element of a strategic supply- Inventory cost reduction Supply chain emergencies
After-market parts Manage unpredictability
chain initiative that mitigates the risks of disruptions, threats and of demand
Proto Labs 19992016 Proto Labs, Inc., 5540 Pioneer Creek Dr., Maple Plain, MN 55359 USA | 877.479.3680 7
PROTO LABS
Proto Labs is the worlds fastest on-demand manufacturer
of custom prototypes and low-volume production parts.
The technology-enabled company uses advanced 3D
printing, CNC machining and rapid injection molding
technologies to produce parts within days. The result is
an unprecedented speed-to-market value for product
designers and engineers. The Proto Labs process is
relatively simple. Designers upload their 3D CAD model to
its web-based quoting system and receive manufacturability
analysis and pricing information within hours. When the
design is ready, its manufacturing services can produce
from one to 10,000+ real parts in a matter of days.