You are on page 1of 9
Scheme “Climbing inside the building” ‘This brochure shail help with its illustrations _The illustrations show a crane with « 132 HO to prepare climbing inside the building, to give tower on a site of SOLE Construction in insight into climbing procedure and to survey Bangkok/Thailand. However, this climbing the equipment required for internal climbing example applies to all Liebherr cranes. tower cranes. amicining vane Climbing inside the building 132 HC tower Anchoring Height 132 HC tower he < 9,01m 1.4, 1.6 ‘Take note of the minimum anchoring heights h, mallh, — * Place tne B-section on the climbing section and bolt. slargeh, + Place a tower section on the climbing section and bolt. + Place the B-section on the tower section and bolt. Place required ore permissible number of tower’ sections above ..B"-section and bolt. Take note of: + max. freestanding height climbing section ,,D” + ,.B"-section + nx tower sections < permissible free-standing height under hook. ‘© not more than permissible number of tower section above the uppermost anchoring point! . Install the slewing part of the tower eran. Building erected to sufficient height (number of Hioors) to require climbing of the crane and also allow installation of the second climbing frame on support beams. Associated climbing ladders are installed with any required climbing equipment and complete support grillage structure. Ensure that the structural concrete is on sufficient strength to withstand the reaction forces of the tower crane, ‘Tho crane may now be climbed, Calculation of main-anchoring forces. Required for design of support construction, statics and stability of building structure. nx standard tower section is ~al— Ho —<—t—tHu Formulas: H, =(1+q-h)+ Te ‘Legend of formula values = Moment at lower edge of slewing ring support (Nm) Fg ‘= Slewing moment (ickim) H’ = Horizontal force at lower edge of slewing ring support (kN) = Linear load to erane tower from wind or storm = Number of tower sections above uppermost anchoring point, hi =Distance between uppermost anchoring point and lower edge of slewing ring support hy = Anchoring height ‘V" =Total vertical force of upper part of crane plus climbing section, B-section and tower sections For detailed information see chapter 4 of the manual Support construction has to be designed and calculated by the oustomer 2. Climbing inside the building 2.1, Anchor the elimbing frames to the building according to the loads they have to pick up. (The loads have to he calenlated by the customers themselves.) * Take note of the loading values * Take note of the minimum anchoring height hE 2.2, Attach and secure the climbing ladder at the upper climbing frame. 2 , Section A-A Adjusting pressure blocks: Pressure block Locking screw / N 3 Ea Every corner of the frame has two rollers made of a special plastic. These rolls will assure a smooth and easy elimbing process as well as a gentle treatment of the towers corner posts. ‘System lines of a climbing frame to check installation possibilities. 10 Ht ye ‘The picture on this page shows tho empty third frame from which the crane climbed upwards. This frame will now be dismantled and moved. The frame can be separated into four parts which are not heavy and easy to transport, | climbing frame ‘Those piotures also show the climbing ladders on both ‘sides of the tower. Tho pawls of the elimbing cross mem- ber (lower pawls) are set up on 2 ladder rung. ‘Those filnstrations show how the D-section is fixed on the Jower climbing frame, The tower is set off on 4 girders that are located diagonally to the corners of the guide frame, The frame is fixed on two cross beams that have to transmit all loads into the buildiag structure, ‘This lower part of the D-section alse shows the climbing eros: member and the piston rod of the climbing hydraulic. 2nd climbing frame: ‘always located on the 'B* tower secon \ ‘Theso pictures show the upper frame which does not take up any vertical forces during operation. The olimbing ladders are attached to this upper frame and extend approx. 1 meter above the frame. ‘The lower picture also shows the upper climbing; frame ut this time for a crane that is located in a lift shaft. The construetion of this building has already proceeded past the upper frame, SS 13a

You might also like