2. Test equipment
2.1. Slide regulator, 5 A, 230 V. Use step up transformer to raise up output voltage.
2.2. Voltmeter
2.3. Amperemeter
2.4. Cable connection 2.5 mm2
3. Test circuit
A 1S1
~ Adjustable
V
Voltage source
1S2
Figure 1: Connection diagram of knee point test
4. Test procedure
4.1. Connect the circuit as shown as figure 1.
4.2. Primary winding and other(s) secondary winding is left opened.
4.3. Raise the voltage source step by step and record the voltage and current as table 1.
CT Specification:
Ratio :
Serial no :
Test core no :
No. Voltage (V) Current (A) Remarks
1.
2.
3.
4.
5.
6.
Table 1: Voltage and current of test
4.4. If current already reached to the nominal secondary current, the test is stopped.
4.5. For evaluation of test, send the record to: trafo@trafoindonesia.com/FAX: +6221-3850702
PT. TRAFOINDO PRIMA PERKASA
1. Purpose
This test is intended to verify that current transformation ratio as shown on the name
plate is correct. Primary current injection test is not accuracy test, therefore the result
of this test to calculate ratio error is not acceptable.
2. Test Circuit
A P1
1S1
~ Adjustable
A
Current source
1S2
P2
3. Test procedure
3.1. Check the name plate ratio and primary current
3.2. Check the current source is able to raise up to nominal current of CT.
3.3. Check the size of primary cable
3.4. Check the terminal on secondary CT either core I, core II and or core III are short-
circuited.
3.5. Start to raise up the current and record with below simple table.
CT Specification:
Ratio :
Serial no :
Test core no :
No. Actual primary current Actual secondary Actual ratio Calculated
(A) current (A) ratio
1.
2.
3.
4.
5.