The document is a site visit report from March 20, 2013 for the SBY_01N701 site in East Java. It records observations about the condition of the tower/pole, landscape and fence, shelter, AC and CME equipment, and any other notes. The report does not list any specific defects and was signed by the site picture Fajar Aryanto and the regional manager.
The document is a site visit report from March 20, 2013 for the SBY_01N701 site in East Java. It records observations about the condition of the tower/pole, landscape and fence, shelter, AC and CME equipment, and any other notes. The report does not list any specific defects and was signed by the site picture Fajar Aryanto and the regional manager.
The document is a site visit report from March 20, 2013 for the SBY_01N701 site in East Java. It records observations about the condition of the tower/pole, landscape and fence, shelter, AC and CME equipment, and any other notes. The report does not list any specific defects and was signed by the site picture Fajar Aryanto and the regional manager.