2) Installation of 700 TPD ASU-4 in OP-II (Pkg-1)-(WI C37W)
1. Installation of 700 TPD ASU-4 at OP-II- MEC/BH/011/033
02/40/C37W/01 April-2016
General file, Vol-4
3)Air Separation Unit-4-(WI-C37W)-Pkg-2,5&6
1. 02/40/C37W/Pkg-2/01 Power Supply Facility for 700 TPD ASU-4 MEC/BH/011/033
Extension of Main Building for 700 TPD
2. 02/40/C37W/Pkg-5/01 MEC/BH/011/033
ASU-4
Illumination & Area Lighting for 700
3 02/40/C37W/Pkg-6/01 MEC/BH/011/033
ASU-4
4) BSP-OP-II-INSTALLATION OF 700 TPD ASU-4 (PKG-4)
1 02/40/C37W/04/01 ASU-4 PKG-4-(ACVS)M/s Voltas ltd MEC/BH/011/034 closed
Vol- 1& 2
2 02/40/C37W/04/02 ASU-4 PKG-4-(ACVS)M/s SK Systems MEC/BH/011/034
closed
3 02/40/C37W/04/03 ASU-4 PKG-4-(ACVS)M/s Mesina MEC/BH/011/034 closed
ASU-4 PKG-4-(ACVS)M/s Saket / Blue
4 02/40/C37W/04/04 MEC/BH/011/034 closed
Star Ltd
5) 7 MT Expansion projects (WI-9101)-Continuous Casting Plant-(Pkg-026)
MEC/BH/011/034
1. 02/40/9101/026/01 CCP-Technological
B. LIST OF FR & TS
2) IPPL (Pkg-075):
TPL(ER)/BSP-Pkg-075/09-10/026
6 M/s TATA Projects Ltd MEC/BH/102/30 28.01.2010
dated 27.04.10
CAL/EPC/T117/R0/BSP-IPPL/Rev-0 M/s Shapoorji Pallonji & Co
7 MEC/BH/102/30 28.01.2010
dated 27.04.10 Ltd
D. LIST OF Standards
Sl.
Offer Number Description Location Remarks
No.
1) INDIAN BOILER
11TH EDITION 2010 MEC/BH/071/002 Hard Print
REGULATION
RULES FOR
2)
ASME SEC-VIII DIV-2 , 2007 CONSTRUCTION OF PC Soft print.
PRESSURE VESSELS
3) CODE OF PRACTICE FOR
IPSS 1-06-034-098 MEC/BH/071/002 Hard Print
OXYGEN GAS PIPELINE
4) BOLTED BONET STEEL
API 600, 2001 PC Soft print
GATE VALVE
5) Soft &
ASME B31.1,2004 POWER PIPING MEC/BH/071/002
Hard print
6) FRAY IRON PIPE FLANGE
ASME B16.1,2009 PC Soft print
AND FLANGED FITTING
7) OXYGEN PIPELINE & Soft &
IGC Doc 13/12/E MEC/BH/071/002
PIPING SYSTEMS Hard print