You are on page 1of 3
| | | | | | NCC NCC/MANDOLA VIHAR/I586/15-16 17.10.2015 PR: Mail dt 09.10.2015, Mis ATLANTA ENTERPRISES Attn: Mr.Hlassan Cell: 9889987866 D-1/133, Jankipuram Vistar MrSusheel (Penetron) , Cell: 9320201301 Lucknow Dewt Sirs, Sub: Order for Waterproofing Treatment work at our Mandola Vihar Project, Ghazisbad-reg. Ref: Your Mail dt. 14.10-2015 & subsequent discussions had with you on 17.10.2018 With reference to the above we are pleased to confirm our order on you for carrying-out subject ‘work fbr our works at Mandola Vihar, Ghaziahad UP as follows:- QLSCOPE_OF WORK: DESCRIPTION OF TAE WORK TO BE CARRIED-OUT, AREA AND RATES SHOULD BE AS PER ANNEXURE ENCLOSED HEREWITH, Entire work shall be carred-outsteclly as per approved specifications and as per the instructions of client / consultants / site officials. You shall use PENETRON material only. Note: ‘The prices indicated in the Annexure are inclusive of required jointing treatment & injecting grouting ete., wherever required. {2.BASIC VALUE OF THE ORDER: Hundred Eighty Four only) Rs, 7093284,00(Rs.Seventy Lakh Ninety Three Thousand Two O3,PRICE BASIS: F.O.R, Site Basis. A.TAXES: We agree to pay WCT @5% and Service Tax @5.6% EXTRA on prices indicated in the Annexure, ‘No additional taxes / levies will be paid other than this work order. 05. DEDUCTIONS: ITs @2%, WCTTDS @4% shall be deducted from your bls and necessary TOS Certificate willbe issued at the end of financial year. 06. PRICE VALIDITY: The rates mentioned. inthe. Annexure shal-be-valid till vitual-completion of entire scope. ‘of this order and no price escalation is allowed under any circumstances. Any inerease / decrease in the ‘quantities shall be executed as per the client's requirement and the price is firm for any quantity variation, QL.GUARANTEE ; The entire scope of work should be guaranteed for a minimum period of 10 years against performance, defects fom the date of virtual completion of work on Bond Paper as per the format to be given by our site officials. Incase of any defects found during the Guarantee period, the same shall be rectified Immediately to the satisfaction of our clients at no extra cost 98. WORK COMPLETION: Total work shall be completed as per the schedule & construction programme ‘of our site office. 99, LIQUIDATED DAMAGES: In case of any delay from your end for reasons whatsoever, we will have the right either to cancel the order without prejudice to any oiher rights and make an alternate arrangement at. the risk and cost of you and/or to accept the execution of work with delay at a reduced price by 0.5% per every week ‘of delay or part thereof subject to.2 maximum of 3% ofthe value of such delay. 10. Your work progress will be reviewed every week by our client / consultants / site officials during which ‘your authorised representative shall be available 11, You shall arrange to carryout the entite work under the supervision of your quali 2.TEST CERTIFICATES You shall furnish all the requisite Test Certfieates at site along withthe material and ‘one eopy shall be mailed to Project Manager. sd Engineers only QUALITY: Quality Assurance Plan (QAP) shall be submitted for our / client review. ‘You shall sirietly adhere to the approved Quality Assurance Plan, Vw : NCC Limited (Gerry agua Conracion arn inte ‘CN: €722004P2990PLC011146 NCC House, Madhapur, Hyderabad 500081 T +91 40 2326 8888. F +91 40 2812 5555 ncclimited.com NCC ‘U4.Mode of Measurement: Payment would be made forthe Jaid area ~as per the certification of site officals only. 2: 15. STATUTORY REQUIREMENTS: You will be governed by all the statutory requirements as per central & local Authorities, You will_be responsible for ESL, BP ‘of records shall be submitted to our site officials No labourers below the age of 18 years will be allowed atthe ‘work premises, You are responsible t follow all the safety regulations ofthe site. You shall cover the people working on your behalf at our site with Workmen Compensation and Insurance at your cost and necessary records shall be submitted to our site office. You shal submit your PF Registration Number immediately, AGFACILITIES AT SITE: We agree to provide you with requisite storage place for material and accommodation for labour However you shall be responsible for security of your materials We agree to provide required cement, send, water & electricity free of cost. Any excessive consumption of the same beyond pentnissible limits shall be debited to yo. ‘We also agree to provide you Material Hoist for movement of material at all levels at site free of cast. However necessary labour deployment shall be in your scape only. 17.You shall ensure in usage of safe and reliable equipment at site. You are also responsible for the safe custody and storage ofall equipment, msterials, construction tools, tackles and machinery af the site which are covered by this work order. You shall take necessary zction to protect all finished or partially finished construction and protect adjacent or adjoining property, which might be damaged by the process of construction or erection, All {expenses incurred for the above shall be to your account only. You should always keep the stores and other areas of usage clean. All the serap / unused / off euts and Garbage should be disposed ata locaton specified by the client / our site incharge. ‘1&.TERMS OF PAYMENT: ‘50% value ofthe onder would be released against delivery of required meterel at ste Balance Payment would be seleasod through Running Account Bills, RETENTION MONEY: 5% value against each bill would be retained by us as Retention Money and the same ‘would be released after 12 months from the dete of handing-over OR against submission of Performance Bank Guarantee for equivalent amount from any Nationalised Bank / of reputed Scheduled Bank valid for one year from the date of completion, ALL PAYMENTS WOULD BE RELEASED FROM OUR SITE OFFICE ONLY. 19.Notwithstanding enything contained in any other Agreement, Contract or other document entered into or executed whether prior fo or subsequent to this ORDER, the Courts in the City of Hyderabad shall alone have Jurisdiction to try to any dispute or difference between the parties to this ORDER with regard to. the interpretation of the (erms of ORDER or any other matter relating to or arising out ofthis ORDER and this shall be treated as a separate contract. NCC Limited, Project: Sapna Enclave, Mandola Vikar_ Loni, Ghaziabad, UP -201102, Contaet: Mr. Venkat, Cell: 7840001366 (Our Sales Tex Nos. valid in UP:UPTT: LW. 247669 wef 01.03.1999; CST: LW. S1O78IO wel 15.03.1999 ‘This order is sent to you in duplicate. Please return the copy duly signed asa token of acceptance of this order. For NCC Limited \vu/ (NB RAJU) __ Sr.Vice President (Mttris) INCC Limited {Former Noein Cnarucon Company Une) ‘IN: L722008P1990"LC011186 NCC House, Madnapur, Hyderabad 500081 +91 402326 8888 F 491 40 23125555 neclimited.com ANNEXURE TO ORDER NO.NCC/MANDOLA VIHAR/1586/15-16, DT. 17.10.2015 NCC ‘SNe. ‘Scape of Work Tan oe Raa Amount THFET Treatment: Admixing the concrete with crystal forning admixtures (powder) ‘Cysalization Waterproofing vestment to 1 000m: hick Basement Rall ‘of M30 Grade cement content 291 kg per eum Providing and installing integrat crystaline Penetron Plus Dry shake ‘Waterproofing Treaument_ capable of reducing the water penetration by a imum of 90% as per DIN L048, Spinklng te Peuezon Ps Powder fat a dosage rae of 0.7 Kg/ Sqm on the PCC before laying the Raf Concrete “and treating canstrction joints, honey combs, and grouting ‘werever required wit a minimum Buaranee period of 10 yeas With insurance backed product guste, FOR BASEMENT raft San 13346 2130 4055969.80 Ceystalization Weer proofing weatent o 125 mim thick Gradelab oF "M20 Grade coment content 230 kg pe cum Providing and installing integral cystine Ponetron Admix waterproofing treatment capable of reducing the water penetration bY & minimum of 90% as per DIN 1048. Admixing the concrete with erst forming admixtures Peneron Admix at a ratio of 0.8% by weight of ‘zments per the manufacturer’ specification and treating construction Joints, noney combs, and grouting wherever required with a minimam guarantee period of 10 years with insurance backed product guaratce. FOR BASEMENT 125mm Thiok raft of M2S Grade conotete, Quantity i 023KGIM2 21533, 86.80 186006440 | CCrystalization Water prooting Weatment io 300mm tick Rewaning wal Raftof M30 Grade, cement content 291 kg per am Providing and installing intogral rystaline Penetton Adm waterproofing treatment capable of reducing the water penetration bY & ‘minimum of 90% as per DIN 1088. Admixing the coerete with ert forming admixtures Penetron Admix at a ratio of 0.8% by weight of ‘cement per the manufseturer's specification and treating constuction jit, honey combs, and groving wherever required with @ minimam ‘guarante-period-of 10-years with insurance Backed product guarantee FOR RETAINING WALL 300mm Thick Retaining Wall of M30 Grade concrete. Quantity i 0.7 KOM. Sam 1394 sons 42161530 ‘Crystalization Waterproofing treatment to Ave 20021 On tick ‘Retaining wal of M25 Grade, cement content 258 kg pe eum Providing and installing integral crystalline PenettonAdmix waterproofing treatment capable of reducing the water penetration by & minimum of 90% as per DIN 1048. Admixing the eoncete with etal forming admicures Penetron Admix at a rao of 04% by weight of ‘cement a per the manufacturer's specifiation and treating constuction Joni, Honey combs, and grouting wherever requireé with a minimum _gutagitce petiod of 10 years with insurance backed preduct guarantee. FOR RETAINING WALL 210mm Thick Retaining wall of M25 Grade concrete. Quantity is 0.45 KGIND. 282 251.87 m6 TYPE 2 Treatment: over completed concreies (Liquid coating) The application consists application of two. coat of Penetron Crystalline coming @ 700-gr/sqm per coat and_ treating construction joints, honey combs, and grouting wherever reqeired with « minimum guarantee period of 10 years with insurance ‘backed product guarantee. Ceystlizaton Wale prcoiing Reaiment to 100mm Wek Basernen Raf Sam Rate only Ta ACTUAL ‘Ceystlization Water prooting testment to 125 mm hick Grades San Rate only S23. ACTUALS, ‘Crystallization Waterproofing treatment to 300mm thick Retaining Wal Rat Sqm Rate only 413.82 ACTUALS: ‘Ceystalizaton Water prooting eatmont to Ave, 2002 Oma disk Retaining ws Sqm Rateonly 43.8 ACTUALS Toul oo yy Ei IG are ere festa Neamt etearpon ocanie a/ ocaoeison actu

You might also like