NCC
NCC/MANDOLA VIHAR/I586/15-16
17.10.2015 PR: Mail dt 09.10.2015,
Mis ATLANTA ENTERPRISES Attn: Mr.Hlassan Cell: 9889987866
D-1/133, Jankipuram Vistar MrSusheel (Penetron) , Cell: 9320201301
Lucknow
Dewt Sirs,
Sub: Order for Waterproofing Treatment work at our Mandola Vihar Project, Ghazisbad-reg.
Ref: Your Mail dt. 14.10-2015 & subsequent discussions had with you on 17.10.2018
With reference to the above we are pleased to confirm our order on you for carrying-out subject
‘work fbr our works at Mandola Vihar, Ghaziahad UP as follows:-
QLSCOPE_OF WORK: DESCRIPTION OF TAE WORK TO BE CARRIED-OUT, AREA AND RATES
SHOULD BE AS PER ANNEXURE ENCLOSED HEREWITH, Entire work shall be carred-outsteclly as per
approved specifications and as per the instructions of client / consultants / site officials. You shall use
PENETRON material only.
Note: ‘The prices indicated in the Annexure are inclusive of required jointing treatment & injecting
grouting ete., wherever required.
{2.BASIC VALUE OF THE ORDER:
Hundred Eighty Four only)
Rs, 7093284,00(Rs.Seventy Lakh Ninety Three Thousand Two
O3,PRICE BASIS: F.O.R, Site Basis.
A.TAXES: We agree to pay WCT @5% and Service Tax @5.6% EXTRA on prices indicated in the Annexure,
‘No additional taxes / levies will be paid other than this work order.
05. DEDUCTIONS: ITs @2%, WCTTDS @4% shall be deducted from your bls and necessary TOS
Certificate willbe issued at the end of financial year.
06. PRICE VALIDITY: The rates mentioned. inthe. Annexure shal-be-valid till vitual-completion of entire scope.
‘of this order and no price escalation is allowed under any circumstances. Any inerease / decrease in the
‘quantities shall be executed as per the client's requirement and the price is firm for any quantity variation,
QL.GUARANTEE ; The entire scope of work should be guaranteed for a minimum period of 10 years against
performance, defects fom the date of virtual completion of work on Bond Paper as per the format to be given
by our site officials. Incase of any defects found during the Guarantee period, the same shall be rectified
Immediately to the satisfaction of our clients at no extra cost
98. WORK COMPLETION: Total work shall be completed as per the schedule & construction programme
‘of our site office.
99, LIQUIDATED DAMAGES: In case of any delay from your end for reasons whatsoever, we will have the
right either to cancel the order without prejudice to any oiher rights and make an alternate arrangement at. the
risk and cost of you and/or to accept the execution of work with delay at a reduced price by 0.5% per every week
‘of delay or part thereof subject to.2 maximum of 3% ofthe value of such delay.
10. Your work progress will be reviewed every week by our client / consultants / site officials during which
‘your authorised representative shall be available
11, You shall arrange to carryout the entite work under the supervision of your quali
2.TEST CERTIFICATES You shall furnish all the requisite Test Certfieates at site along withthe material and
‘one eopy shall be mailed to Project Manager.
sd Engineers only
QUALITY: Quality Assurance Plan (QAP) shall be submitted for our / client review.
‘You shall sirietly adhere to the approved Quality Assurance Plan,
Vw :
NCC Limited
(Gerry agua Conracion arn inte
‘CN: €722004P2990PLC011146
NCC House, Madhapur, Hyderabad 500081 T +91 40 2326 8888. F +91 40 2812 5555 ncclimited.comNCC
‘U4.Mode of Measurement: Payment would be made forthe Jaid area ~as per the certification of site officals only.
2:
15. STATUTORY REQUIREMENTS: You will be governed by all the statutory requirements as per central &
local Authorities, You will_be responsible for ESL, BP
‘of records shall be submitted to our site officials No labourers below the age of 18 years will be allowed atthe
‘work premises, You are responsible t follow all the safety regulations ofthe site. You shall cover the people
working on your behalf at our site with Workmen Compensation and Insurance at your cost and necessary
records shall be submitted to our site office. You shal submit your PF Registration Number immediately,
AGFACILITIES AT SITE:
We agree to provide you with requisite storage place for material and accommodation for labour
However you shall be responsible for security of your materials
We agree to provide required cement, send, water & electricity free of cost. Any excessive consumption of the
same beyond pentnissible limits shall be debited to yo.
‘We also agree to provide you Material Hoist for movement of material at all levels at site free of cast. However
necessary labour deployment shall be in your scape only.
17.You shall ensure in usage of safe and reliable equipment at site. You are also responsible for the safe custody
and storage ofall equipment, msterials, construction tools, tackles and machinery af the site which are covered by
this work order. You shall take necessary zction to protect all finished or partially finished construction and
protect adjacent or adjoining property, which might be damaged by the process of construction or erection, All
{expenses incurred for the above shall be to your account only. You should always keep the stores and other
areas of usage clean. All the serap / unused / off euts and Garbage should be disposed ata locaton specified by the
client / our site incharge.
‘1&.TERMS OF PAYMENT:
‘50% value ofthe onder would be released against delivery of required meterel at ste
Balance Payment would be seleasod through Running Account Bills,
RETENTION MONEY: 5% value against each bill would be retained by us as Retention Money and the same
‘would be released after 12 months from the dete of handing-over OR against submission of Performance Bank
Guarantee for equivalent amount from any Nationalised Bank / of reputed Scheduled Bank valid for one year
from the date of completion,
ALL PAYMENTS WOULD BE RELEASED FROM OUR SITE OFFICE ONLY.
19.Notwithstanding enything contained in any other Agreement, Contract or other document entered into or
executed whether prior fo or subsequent to this ORDER, the Courts in the City of Hyderabad shall alone have
Jurisdiction to try to any dispute or difference between the parties to this ORDER with regard to. the
interpretation of the (erms of ORDER or any other matter relating to or arising out ofthis ORDER and this
shall be treated as a separate contract.
NCC Limited, Project: Sapna Enclave,
Mandola Vikar_ Loni, Ghaziabad, UP -201102,
Contaet: Mr. Venkat, Cell: 7840001366
(Our Sales Tex Nos. valid in UP:UPTT: LW. 247669 wef 01.03.1999; CST: LW. S1O78IO wel 15.03.1999
‘This order is sent to you in duplicate. Please return the copy duly signed asa token of acceptance of this order.
For NCC Limited
\vu/
(NB RAJU)
__ Sr.Vice President (Mttris)
INCC Limited
{Former Noein Cnarucon Company Une)
‘IN: L722008P1990"LC011186
NCC House, Madnapur, Hyderabad 500081 +91 402326 8888 F 491 40 23125555 neclimited.comANNEXURE TO ORDER NO.NCC/MANDOLA VIHAR/1586/15-16, DT. 17.10.2015
NCC
‘SNe.
‘Scape of Work
Tan
oe
Raa
Amount
THFET Treatment: Admixing the concrete with crystal forning
admixtures (powder)
‘Cysalization Waterproofing vestment to 1 000m: hick Basement Rall
‘of M30 Grade cement content 291 kg per eum
Providing and installing integrat crystaline Penetron Plus Dry shake
‘Waterproofing Treaument_ capable of reducing the water penetration by a
imum of 90% as per DIN L048, Spinklng te Peuezon Ps Powder
fat a dosage rae of 0.7 Kg/ Sqm on the PCC before laying the Raf
Concrete “and treating canstrction joints, honey combs, and grouting
‘werever required wit a minimum Buaranee period of 10 yeas With
insurance backed product guste, FOR BASEMENT raft
San
13346
2130
4055969.80
Ceystalization Weer proofing weatent o 125 mim thick Gradelab oF
"M20 Grade coment content 230 kg pe cum
Providing and installing integral cystine Ponetron Admix
waterproofing treatment capable of reducing the water penetration bY &
minimum of 90% as per DIN 1048. Admixing the concrete with erst
forming admixtures Peneron Admix at a ratio of 0.8% by weight of
‘zments per the manufacturer’ specification and treating construction
Joints, noney combs, and grouting wherever required with a minimam
guarantee period of 10 years with insurance backed product guaratce.
FOR BASEMENT 125mm Thiok raft of M2S Grade conotete, Quantity i
023KGIM2
21533,
86.80
186006440 |
CCrystalization Water prooting Weatment io 300mm tick Rewaning wal
Raftof M30 Grade, cement content 291 kg per am
Providing and installing intogral rystaline Penetton Adm
waterproofing treatment capable of reducing the water penetration bY &
‘minimum of 90% as per DIN 1088. Admixing the coerete with ert
forming admixtures Penetron Admix at a ratio of 0.8% by weight of
‘cement per the manufseturer's specification and treating constuction
jit, honey combs, and groving wherever required with @ minimam
‘guarante-period-of 10-years with insurance Backed product guarantee
FOR RETAINING WALL 300mm Thick Retaining Wall of M30 Grade
concrete. Quantity i 0.7 KOM.
Sam
1394
sons
42161530
‘Crystalization Waterproofing treatment to Ave 20021 On tick
‘Retaining wal of M25 Grade, cement content 258 kg pe eum
Providing and installing integral crystalline PenettonAdmix
waterproofing treatment capable of reducing the water penetration by &
minimum of 90% as per DIN 1048. Admixing the eoncete with etal
forming admicures Penetron Admix at a rao of 04% by weight of
‘cement a per the manufacturer's specifiation and treating constuction
Joni, Honey combs, and grouting wherever requireé with a minimum
_gutagitce petiod of 10 years with insurance backed preduct guarantee.
FOR RETAINING WALL 210mm Thick Retaining wall of M25 Grade
concrete. Quantity is 0.45 KGIND.
282
251.87
m6
TYPE 2 Treatment: over completed concreies (Liquid coating) The
application consists application of two. coat of Penetron Crystalline
coming @ 700-gr/sqm per coat and_ treating construction joints,
honey combs, and grouting wherever reqeired with « minimum
guarantee period of 10 years with insurance ‘backed product
guarantee.
Ceystlizaton Wale prcoiing Reaiment to 100mm Wek Basernen Raf
Sam
Rate only
Ta
ACTUAL
‘Ceystlization Water prooting testment to 125 mm hick Grades
San
Rate only
S23.
ACTUALS,
‘Crystallization Waterproofing treatment to 300mm thick Retaining Wal
Rat
Sqm
Rate only
413.82
ACTUALS:
‘Ceystalizaton Water prooting eatmont to Ave, 2002 Oma disk
Retaining ws
Sqm
Rateonly
43.8
ACTUALS
Toul
oo
yy Ei
IG are ere
festa Neamt etearpon ocanie a/ ocaoeison actu